0% found this document useful (0 votes)
171 views

GGC-HSEF 016 Daily Checklist

This daily construction health and safety checklist contains 24 items to inspect including the availability of personal protective equipment, scaffolding safety, signage, permits, emergency equipment, hazardous materials handling, waste management, tool safety, access and egress, equipment inspections, lighting, manual handling, chemical storage, and welfare facilities. Any issues identified require corrective measures and documentation of completion dates. The checklist is to be signed off by the safety officer, foreman, construction manager, and HSE manager to confirm inspections were done and workers received task instructions.

Uploaded by

Amjad
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
171 views

GGC-HSEF 016 Daily Checklist

This daily construction health and safety checklist contains 24 items to inspect including the availability of personal protective equipment, scaffolding safety, signage, permits, emergency equipment, hazardous materials handling, waste management, tool safety, access and egress, equipment inspections, lighting, manual handling, chemical storage, and welfare facilities. Any issues identified require corrective measures and documentation of completion dates. The checklist is to be signed off by the safety officer, foreman, construction manager, and HSE manager to confirm inspections were done and workers received task instructions.

Uploaded by

Amjad
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

Health Safety & Environment Doc. Ref.

GGC-HSEF 016

Construction Health and Safety Plan Revision 00

DAILY CHECKLIST Date 12-05-13

Building: Plot: Date:


To Standard
Description Corrective Measures Date
YES NO
1 PPE (Helmet, Safety Shoes, Jacket) available & utilized
Full Body Safety Harness used where required / Body
2
harness inspections completed.
Scaff Tag System Implemented and scaffolding safe for use
3
including working towers platforms
4 Proper Signage / Lifting Operation in progress etc.
5 ‘Hot Work Permit’ in Place/Being monitored (Daily close-outs)
6 ‘Fire Extinguishers’ in Place / Being monitored
Emergency Evacuation (known to all workforce) signage
7
showing access / egress in place
8 First Aid Box / site clinic contact details
9 Any Hazardous Materials(MSDS Submitted)
Crane Load Certificate / Operators Competency Certificate in
10
place area barricaded
Waste Disposal skips emptied / covered waste management
11
in place
Hand Power Tools electrical connection adequate.
12
Distribution panels in place
13 Excavation Edge / Fall Protection / solid
14 Safe Access & Egress to all working area including signage
15 Appropriate Use of Tools PPE etc.
Plant & equipment’s (Crane, Lifting Equipment) checklists
16
completed
17 Adequate lighting / serviceable
18 Safe Manual Handling techniques
Flammable Liquids / paints / glues (Proper Storing &
19
Stacking) spill kits
Welfare Arrangements (Drinking Water, Shaded Rest Area
20
toilets)
21 House Keeping up to date
22 Signage’s
23 Risk assessments completed and signed
Edge protection complete Solid barricading & covers
24
(openings & edges)

The above list does not exclude or waive any other checklist or legal requirement
List tasks for the day:

List specific hazards related to the tasks:

List safety precautions:

Note: If tasks change, this list and the risk assessment must be revised before proceeding with new / changed task.
A signed attendance register must be attached to this list.
I hereby certify that the above items were checked, and all workers under my supervision received a safe task instruction:

Safety Officer / Engineer Print Date

Foreman / Supervisor / Engineer Print Date

Construction Manager Print Date

HSE Manager Print Date

Health, Safety & Environment Is Everyone’s Business

You might also like