Engineering Process Flow
Engineering Process Flow
Preparation: User
URS Review: Engg
Addition of equipment in Approval: QA
Addition of new equipment in existing facility
new facility
Change Control process
Change control committee
PR & PO generation
User & MM, CC to WH
Material ordering
MM
FAT
Performed by: User, Engg & QA.
YES
Installation of instrument/ equipment at site Performed by: Vendor in the presence of
user, Engineering and QA
Document generated:
Validation protocol
IQ, OQ & PQ Reports
Updation on equipment ID list in case of Equipment ID generation Requestor: User
new equipment Issuer: QA
Updated preventive maintenance schedule
by Engineering
Updation of Calibration planner by Commissioning of instrument/ equipment Performed by: Vendor in the presence of
Engineering user, Engineering and QA
Re-validation (why requalification )or
qualification , for new equipment (even
like to like) , it should be qualification
first, then requalification as per the Prepared by: User
Validation protocol Reviewed by: Engg and QA
planner
Closure of the change control Authorized by: QA
Installation Qualification
Performance Qualification