Siemens Mfg. Co., Inc. Quality System Manual: APPROVED BY: John Siemens III DATE: 21 Sept 96
Siemens Mfg. Co., Inc. Quality System Manual: APPROVED BY: John Siemens III DATE: 21 Sept 96
Siemens Mfg. Co., Inc. is a contract electronics assembler dedicated to the manufacturing of products
which will meet or exceed our customer’s requirements and expectations.
Objectives:
Siemens Mfg. Co., Inc. will accomplish this by installing a system of policies and procedures which
will minimize defects by continuously monitoring and improving processes, training of personnel, and
working with our customers to establish a partnership for success in today’s business environment.
TABLE OF CONTENTS
Section
1. Management Responsibilities 5
2. Quality Planning 6
3. Contract Review 7
4. Design Control (Not applicable) 11
5. Documentation & Data Control 12
6. Purchasing 17
7. Customer Supplied Product 20
8. Product Identification and Traceability 22
9. Process Control 23
10. Inspection and Testing 24
11. Control of Inspection, Measuring, and Test Equipment 31
12. Inspection and Test Status 33
13. Control of Nonconforming Product 34
14. Corrective and Preventive Action 37
15. Handling, Storage, Packaging, Preservation, and Delivery 39
16. Control of Quality Records 43
17. Internal Quality Audits 45
18. Training 46
19. Servicing 47
20. Statistical Techniques 48
Revision
QC 1 Quality System Manual Change and Review Record Original
QC 2 Organization Chart F
QC 3 Drawing and Specification Control Record A
QC 3t Drawing and Specification Control Record (Transformers) B
QC 6 Equivalent Item Authorization B
QC 7a Calibration Evaluation Form Original
QC 7b Calibration Record Original
Process Control Information Sheet (form number not required) n/a
QC 8a In-process Checklist A
QC 11 Rejected Material Report PC Printout
QC 13a Parts Identification sticker Original
QC 13b Calibration Certification Label Original
QC 13c Reject Tags Original
QC 14 Inspection Report D
QC 14d Technician Report C
QC 14e Repair Report Original
QC 14f Test Report Original
QC 16 Corrective Action Request A
QC 17 Pre-Production Checklist J
QC 17b First Article Inspection B
QC 18. Approval of Delivery Commitment A
QC 19a Customer Supplied Sticker Original
Revision
QC 20 Customer Satisfaction Questionnaire Original
QC 22 Shipping Information A
QC 23 Material Hold Original
QC 25 Approved Supplier list Original
QC 26 Static Strap Control Sheet Original
QC 29 Quality System Survey (Not included with the Manual) A
QC 32 Packaging Log Original
QC 33 Contract Review Problem Form E
QC 35 Certificate of Conformance Original
QC 36 Shelf Life Sticker Original
QC 37 Requisition/Shortage Card Original
QC 40 Purchase Requisition Original
QC 41 BOM verification control sheet (Customer specific) Original
QC 42 Software revision change checklist Original
Table B Rev change routing flowchart Original
Table C General process Flow Original
1.1. Organizational relationships for Siemens Mfg. Co., Inc. are defined and documented in the
organizational chart Form QC 2.
1.2. Responsibility and authority are defined and documented in each procedure.
1.3. Quality System Manager is given authority and responsibility by Siemens Mfg. Co., Inc. executive
management to plan, review, implement and maintain quality system policies and procedures as outlined
in this manual and which comply with the customers contract requirements to assure conformity to
product requirements and services.
1.4. Quality System Manager is responsible for maintaining current outlined policies and procedures in
this manual and for making them available as needed.
1.5. Quality System Manager is responsible for determining and providing resources (including
information, equipment, and the assigning of competent personnel) (see Section 18) for the performance
of verification activities (other than testing of Siemens assembled product) including internal quality
audits. The Quality System Manager is responsible for determining and providing resources needed to
enhance customer satisfaction by meeting customer requirements.
1.6. The SIEMENS Mfg. Co. President shall appoint the Quality System Manager as the ISO
management representative who shall have the authorities and responsibilities to establish, implement,
maintain, and continually improve the Quality System to ISO 9001: 2008 (excluding design) version
requirements. The Quality System Manager will, furthermore, report on the performance of the Quality
System for management review.
1.7. The Quality System Manager is responsible for determining opportunities for improvement
(preventive/corrective action) using Pareto analysis of defect data gathered (inspection & test results,
customer complaints, returned material, etc) to determine conformity to product requirements (to
determine what to work on) in conjunction with trend analysis (to determine if progress is being made)
and for presenting these opportunities to a management review meeting to determining objectives with
measurable goals. Any additional analysis will be determined at the management review meeting. The
Quality System Manager is also responsible for determining an index of customer satisfaction and for
presenting this index at the management meeting (ref. also customer satisfaction questionnaire, Form
QC 20).
1.8. The Quality System Manager is responsible for determining opportunities for improvement
(preventive/corrective action) using Trend analysis of information related to customer satisfaction (Form
QC 20).
1.9. Every 12 months, as a minimum, Siemens Mfg. Co., Inc. performs a management review to review
the suitability and effectiveness of the quality system, quality policy, as well as quality objectives and
quality management system changes set at the management review meeting. The results of the review
shall be recorded.
RECORDS: Management Review
Form QC 20 Customer Satisfaction Questionnaire
Scope:
The Quality Manual System (QMS) includes or references all procedures necessary to produce
product which conforms to customer specifications, from the receipt of a request for a quote through
delivery of the product to the customer, and the subsequent determination of customer satisfaction.
Siemens Mfg. Co., Inc will achieve customer satisfaction by continually improving the effectiveness of
the QMS through the use of the quality policy, quality objectives, audit results, analysis of data,
corrective and preventive actions, and management review. The Quality Manual System (QMS) also
includes or references all procedures necessary for compliance to ISO 9001: 2008 requirements with the
exception of Design and Development inasmuch as Siemens Mfg. Co., Inc does not perform any product
design functions.
2.1. It is the responsibility of the Quality System Manager to establish, document, and maintain a quality
system as a means of ensuring that product conforms to specified requirements. The Quality System
Manager shall prepare a documented quality manual covering the requirements of ISO 9001: 2008 to
carry out specific tasks/activities.
2.2. Specific procedures have been established for those activities where the skills and qualifications of
the tasks require further instructions (ref. Section 18.1; Personnel Training).
2.4. Procedures as part of the Quality Manual meet requirements of ISO 9001: 2008, and support the
Quality Policy. Specific procedures (Level 2: not included as a part of the Quality System Manual)
provide more details where needed to assist in specific methods.
2.5. The documented Quality System outlined in paragraph three is the method used by Siemens Mfg.
Co., Inc. to produce assemblies that conform to product requirements. Quality planning is accomplished
by completing Form QC 17.
A. For contracts and products, quality planning is conducted using the Contract Review
Procedure (see Section 3).
B. Siemens Mfg. Co., Inc. directs its activities based on customer needs and expectations. Any
project requiring quality planning comes from customer demands or requests. These projects are
determined by a member of the management review board, and a Pre-Production Checklist
(Form QC 17) will be filled out for each project.
2.6. The completed Form QC 17 records quality planning activities to ensure any updates, revisions, and
clarifications of selected projects conform to the current Quality System and Quality Policy.
1. Siemens Mfg. Co., Inc. has established and maintains specific methods to conduct contract review as
described in the Contract Review section (Section 3.1).
2. Section 3 outlines the process used for each contract to ensure that:
A. Requirements are adequately defined and documented.
B. Differences are resolved.
C. Siemens Mfg. Co., Inc. has the capability to produce and deliver product as required by the
customer.
3. Any change to the contract (whether customer or Siemens initiated) is identified as described in the
Contract Review procedure (Section 3.1). In addition, those functions within Siemens that are affected
by the change are notified of the changes as stated in the same procedure. The Contract Review Problem
form (Form QC 33) is used to communicate those changes.
SECTION 3.1
CONTRACT REVIEW PROCEDURE
3.1.1. Upon receipt of a Request for Quote (RFQ), the Sales and/or Quotations dept. personnel and/or
Production Supervisor will review the customer product and delivery requirements, contact the customer
for clarifications (if necessary), and generate a preliminary quote (computer generated form). The
preliminary quote information will then be forwarded to the Siemens Mfg. Co., Inc. President for
approval.
3.1.2. The Siemens Mfg. Co., Inc. President will review the preliminary quote, determine whether or not
Siemens Mfg. Co., Inc. has the capability to meet the contract or order requirements (including statutory
or regulatory requirements), make any necessary changes, then indicate acceptance by initialing the
preliminary quote. Approval can be verbal as long as it is noted on the preliminary quote that the
approval was verbal. The quote package will then be forwarded to the Supervisor who originated the
quote for drafting of a Formal Price Quotation.
3.1.3. The Supervisor who drafted the original preliminary quote will use the information on the
approved preliminary quote to generate a draft of the Formal Price Quotation. The Formal Price
Quotation will then be forwarded to the clerical personnel for data entry.
3.1.4. The clerical personnel will obtain a unique quote number from the Quote Estimator (if not already
assigned) and then transfer all listed information from the draft of the Formal Price Quotation quote to
the computer using the customized quote program. The clerical personnel will then print one copy of the
Formal Price Quotation, and forward it to the Supervisor who drafted the Formal Price Quotation for
review and approval.
3.1.5a. If the information on the Formal Price Quotation and the preliminary quotation is not identical,
the Supervisor will return the Formal Price Quotation to the clerical personnel for corrections to the
computer and the generation of a revised Formal Price Quotation. The revised formal quote will be
forwarded to an individual authorized to sign quotes (ref: Form QC 2) for review and, if acceptable,
approval (signing). The signed Formal Price Quotation will then be delivered to the customer.
3.1.6. When a Purchase Order (P.O.) is received by Siemens Mfg. Co., Inc., the Customer Service rep.
will:
A. Compare the information on the P.O. to the Formal Price Quote for accuracy.
B. Enter the order onto the computer using the order entry program.
C. If all information is correct, the Customer Service rep. will stamp the P.O. “ENTERED” and
“DATED”, forward a copy of the P.O. to the Materials Control Manager and the original P.O. to
clerical personnel who will set up a “Shipping” folder. If the P.O. value. is $30,000 or greater,
then the Order Entry Clerk will forward the P.O. to the Siemens Co. President, or Vice-President
for approval.
D. Fill out and mail(E-Mail)/fax a P.O. acknowledgment to the customer. NOTE: Delivery dates
are not confirmed at this time. Delivery approval is done at step 3.1.13.
3.1.6a. If the information on the P.O. is not the same as the information on the Formal Price Quotation,
or if there is no written quote (verbal order, repeat order, etc.), the Customer Service Representative
will fill out a Contract Review Problem form (Form QC 33) for resolution by a Contract Review team
member.
3.1.6b. All customer initiated changes will be routed to the Customer Service Representative. If the
change received was mailed (or E-Mailed) or faxed to Siemens and involves only changes to the
delivery dates, then the Customer Service Representative will update the Sales Order on the computer as
well as notifying the Director of Materials and Planning. If the change request does not involve delivery
dates, then the Customer Service Representative will fill out Form QC 33 (unless already done) which
will be forwarded to the Contract Review team. If the change request was received by phone, then the
individual who took the call will forward all necessary information to the Customer Service
Representative who will respond as noted above.
3.1.7. When a Contract Review member receives a Contract Review Problem form, the team member
will work with the customer and take all steps necessary to resolve the problem(s) noted. The team
member will then fill out the resolution portion of the “Problem” form (if not already completed). Ref.
3.1.7a for routing of the completed “Problem” form.
3.1.8. On receipt of the P.O., the Materials Control Manager will retrieve the quote package from the
Quotation dept. and have a master Siemens Bill of Materials (B.O.M.) generated which will be
forwarded to the documentation department for verification. The Materials Control Manager will then
forward the quote package to Purchasing. It is, furthermore, the Materials Control Managers’
responsibility upon receipt of a purchase order to initiate the PRE-PRODUCTION CHECKLIST (Form
QC 17). NOTE (Form QC 17 is to be used on new jobs and formal revision changes (ref: Table B) only,
and will not be used on repeat jobs). The Materials Control Manager will fill out all of page one (with
the exception of Test Procedures, under the Documentation Received section). If any discrepancies are
found, the Materials Control Manager shall notify the customer within one work day requesting
clarification. If the discrepancy involves the bill of materials (B.O.M.), then the order will be held until
the problem is resolved. If the discrepancy does not involve the B.O.M., then the processing of the order
will continue. Once all discrepancies are resolved, the Materials Control Manager shall forward the
original PRE-PRODUCTION CHECKLIST with a copy of the quote and a copy of the P.O. to the
Documentation Specialist (to be forwarded to the Engineering Mgr for completion). Rev change
information will be listed in the note field of MANEX as well referenced on the Revision change
summary section of the Pre-Production checklist.
3.1.9. Once all parts are ordered, the Purchasing team will enter the date that the last part is due onto the
copy of the P.O., and forward the P.O. to an Operations Committee member for approval. NOTE: Ref.
Quality System Manual, Section 6.1 (Purchasing) for additional details about purchasing.
3.1.11. If the “Problem” form involves a price change to the quote, then the issue will be resolved by
the Contract Review team.
3.1.13. On receipt of the P.O., the office personnel, Customer Service representative will enter the
delivery commitment dates on the computer using the order entry program then generate another P.O.
acknowledgment, which now will include delivery commitments, for delivery to the customer.. The
initialed form will then be filed in the “Shipping” folder for reference.
3.1.14. If at any time during manufacturing, a Supervisor becomes aware of a problem that may affect
the quote, that Supervisor will discuss the problem with the customer and the Siemens Supervisors
responsible for that product line to resolve the issue. The recommended changes will be noted on the
Contract Review Problem form (Form QC 33) resolution section which will be forwarded to the affected
Supervisor for implementation.
3.1.15. Ref: para. 8a. Exception: The Materials Control Manager need not send a copy of the Equivalent
Item Authorization Form to Documentation. This was already done by the engineering department
personnel.
3.1.16. On receipt of an Equivalent Item Authorization form (Form QC 6), the Engineering Manager (or
his designee) will contact the customer (unless Siemens has written authorization to use “or equivalent”
parts) for authorization to make the indicated change(s). On receipt of an approved Equivalent Item
Authorization form (Form QC 6), the Engineering Manager will forward the approved Form QC 6 to the
Documentation Control person who will forward one copy to the Materials Control Manager and file the
original for reference. Note: In addition to the Engineering Manager, the following personnel are
authorized to approve an equivalent item: Technical Coordinator, the Technical Support person, the
Quality System Manager, the Quality Supervisor, the Company President, and a Production Supervisor.
3.1.16 (additional). Upon receipt of the PRE-PRODUCTION CHECKLIST, the Engineering Manager
shall make all arrangements necessary for the completion of the CHECKLIST. The Engineering
Manager shall also:
A. the PRE-PRODUCTION CHECKLIST will not be filled out for repeat jobs.
B.
In conjunction with the Quality System and/or Production Manager(s), review the PRE-
PRODUCTION CHECKLIST.
C. Forward the completed PRE-PRODUCTION CHECKLIST, the copy of the quote & the copy
of the P.O., to the documentation control person, to be filed in the job folder for traceability.
3.1.17. All approved changes will be routed to the affected department Supervisors/Lead People.
RECORDS: Form QC 6, Equivalent Item Authorization Form QC 33, Contract Review Problem
Form QC 17, Pre-Production Checklist Form QC 18, Approval of Delivery Commitment
1. Siemens Mfg. Co., Inc. has established and maintains specific methods to control documents and data
that relate to the requirements of ISO 9001: 2008 and the Siemens documented Quality System
including, as applicable, customer supplied documents. These methods, as stated in Section 5.1, address
the issues of document review and approval, availability, retention, and change, as well as removal of
invalid and/or obsolete documents.
SECTION 5.1
DOCUMENT AND DATA PROCEDURE
(Electronic Assemblies)
5.1.1. Each job folder in the QC master file will contain a master list (Drawing and Specification
Record, Form QC 3) of documents that are available for the production of that assembly.
5.1.2. The Quality System Manager will maintain a master list of Quality Procedures and reference
material that pertain to conformity to product requirements (ANSI/J-STD-001, etc.).
5.1.3. The Technical Coordinator will maintain a Master list of test software. Software revision changes
will be handled using form QC 42 (Software revision change checklist).
5.1.4. Documents for the electronic assemblies(including test procedures) received for PCB production
will be routed per Table B. The document control person will:
A. Pull the job folder for that assembly from the QC master file. If there is no job folder, then
make one by taking a blank folder, stapling a Drawing and Specification Record ( Form QC 3) to
the inside cover, and writing the Siemens Part number, customer and board name onto the folder
tab.
B. Compare the documentation received to the documentation on file. If the documentation
received is identical to the file copy, then throw away the documentation received. If the
documentation received is not identical to the file copy, or if there is no file copy, mark the
documentation received with a date stamp and initial the date stamp.
C. Retrieve/dispose of all earlier versions of documents being replaced from the
locations/persons listed on Form QC 3 with the exception of the QC file copy, which will be
marked with a red “Obsolete” stamp and placed in the “Obsolete” file for reference.
D. Issue new/revised documentation (excluding test procedures) to the supervisor/lead person
responsible for the production folder. Stamp all documentation issued with a red “Controlled
Copy” stamp. Record the reason for the new issue (obsolete, original lost or not useable, etc.)
E. Issue new/revised test procedures to the lead technician.
E. Record the distribution of documents onto Form QC 3. Note: If there is no Revision number
on the documentation received, then the date received will be used as the Revision number.
G. Contact the Materials Control Manager to determine if Purchasing needs a controlled copy of
the new document.
5.1.5. Siemens Process Sheets will be reviewed and approved by the lead person or Supervisor for that
product line. Documentation personnel will issue one copy to the production and test folders. Note:
There will not be a copy of the Process Sheet in the QC Master folder but it will be listed on the
Drawing and Specification Record ( Form QC 3). Process sheets and In-Process checklists for units that
are to be manufactured to RoHS compliance will be highlighted with GREEN or will be printed on
5.1.7. Only the Documentation Control person, personnel who perform incoming inspection, and the
Quality System Manager are authorized access to the QC Master file.
5.1.8. Only the lead technician, the senior technician, the Technical Coordinator, quality personnel and
supervisors have access to the technician file.
5.1.10. Any supervisor can authorize access of a production folder to a non-Siemens employee.
5.1.12. When the Technical Coordinator, Engineering Manager, Senior/Lead technician has been
notified that a Siemens test procedure may not be accurate, the Technical Coordinator, Engineering
Manager, Senior/Lead technician will review that test procedure. If changes are necessary, then the
Technical Coordinator, Engineering Manager, Senior/Lead technician will:
A. Rewrite the test procedure incorporating all necessary changes.
B. Indicate on the new test procedure the revision number.
C. Review/Approve the new procedure by signing and dating the procedure.
D. Route the revised test procedure to the Documentation Control person who will follow the
steps listed in section 5.1.4.
5.1.13. When the Technical Coordinator, Engineering Manager, Senior/Lead technician has been
notified that a customer supplied test procedure may not be accurate, the Technical Coordinator,
Engineering Manager, Senior/Lead technician will review that test procedure. If changes are necessary,
then the Technical Coordinator, Engineering Manager, Senior/Lead technician will:
A. Request an updated test procedure from the customer.
B. Work with the customer to determine what the correct procedure should be if the customer is
not able to provide an updated test procedure.
C. Rewrite the test procedure incorporating all necessary changes (including Rev. # change).
D. Forward a copy of the revised test procedure to the customer for approval.
E. When customer approval is received, handle per section 5.1.4.
5.1.14. Changes can be made (reference 5.1.18; uncontrolled document) to the Siemens Process Sheets
or work instructions by anyone as long as they contact the Quality System Manager and/or the
Production Supervisor for approval. The person making the change will forward the change to
Documentation for typing. The lead person or Supervisor for that product line will approve the retyped
process sheet prior to use. Changes to Work instructions will be performed per QOP-5-1 (Procedure for
generating & maintaining work instructions when the “Master document” is to be stored in an
electronic format).
5.1.16. Once the Technical Coordinator, Engineering Manager, Senior/Lead technician has been notified
of temporary changes to SIEMENS controlled documents, he will make permanent changes to
documents in the following manner:
A. Route an uncontrolled copy of the document in question that has had all temporary changes
made to it, including the new revision number, to technical support who will make all necessary
changes and then send to the Technical Coordinator one copy of the revised document.
B. Review the revised document and, if acceptable, approve by initialing and dating the
document. If the revised document is not acceptable, then work with technical support to make
the necessary corrections.
C. Distribute the revised document per section 5.1.4. Note: For changes to Mallinckrodt
documents and processes, revised documents (with applicable validation data)will also be sent to
Mallinckrodt for approval and will be implemented when the approved documents are returned.
5.1.17. Any person who is responsible for making changes to documentation or data shall have access to
pertinent background information upon which to base their review and approval.
5.1.18. Uncontrolled copies of “Controlled” documents can be made by a lead person or supervisor for a
specific function (additional copies for multiple lines, etc.) which will be stamped “Uncontrolled Copy”
and assigned an expiration date (2 weeks from the day it is stamped). The uncontrolled copy will be
disposed of when it is no longer needed for its intended function (the line has been shut down, etc.) or
has exceeded its expiration date.
5.1.19. As repeat jobs are received, Documentation personnel (and update as necessary) will review the
job folder to verify that all forms and documents used are the most current revision, and remain legible
& readily identifiable. Documentation personnel will also issue replacement “Quality Inspection Alert”
lists (or initial issue if a new job), and record the information from the list to the Work Order note field
in MANEX.
5.1.20. The Technical Support person will maintain a master list of PWB data files.
5.1.21. Data received (PWB data) will be forwarded to the technical support personnel who will:
A. Copy the data onto a PC (personal computer) using a file name that is unique to that board.
B. Determine whether the data is for a new board or a revision to an existing board.
C. Data files for new boards will be added to the Master list.
D. Data files for revisions to existing boards will be added to the Master list using an indication
of revision as a part of the file name (“Unicorn” becomes “Unicorn1").
E. The latest version and the version prior the latest version will be maintained on floppy disks.
F. Note: PWB data received from customers will not be reviewed by Siemens Mfg., Inc.
5.1.23. The Technical Support person will add the file name (or the revised file name for revised PWB
data) of Siemens generated PWB data to the Master list.
5.1.24. Customer requested changes to customer supplied PWB data will be forwarded to the technical
support personnel who will:
A. Make the requested changes to the PWB data.
B. Copy the revised data to a revised file which indicates the revision as a part of the file name
(“Unicorn” becomes “Unicorn1").
C. Send the revised data to the customer for approval.
D. When written approval from the customer is received, add the revised file name to the Master
list.
5.1.25. All change requests affecting forms or procedures that apply to the Quality System Manual, from
any source, will be forwarded (inter office envelopes, E-Mail) to the Quality System Manager who will:
A. Review the requested change with all affected supervisors and, if necessary, discuss the
requested change during a management review meeting.
B. Rewrite the affected section for all approved changes.
C. Fill out the Quality System Manual Change & Review Record (Form QC 1).
D. Update the master Quality System Manual (local PC: QCMAN1.wpd).
E. Update the PC accessed Quality System Manual (network file QCMAN1.pdf).
F. Determine, if necessary, a method of implementation for all approved changes (ref: Section
2.5.B, Quality Planning).
G. Retrain all affected personnel (ref. Section 18.1.6).
References:
QOP-5-1 (Procedure for generating & maintaining work instructions when the “Master document” is to
be stored in an electronic format).
1. Siemens Mfg. Co., Inc. has established and maintains specific methods to ensure that purchased
product conforms to specified requirements. The Siemens purchasing procedure (Section 6.1) specifies
methods to select and evaluate subcontractors, defines the type and extent of control that Siemens has
over subcontractors, indicates what data shall be included on purchasing documents, defines verification
requirements of purchased product, and details review and approval procedures for purchasing
documents.
3. The Quality System Manager will establish and maintain procedures (QOP-06-01) to:
A. Evaluate subcontractor performance using incoming inspection records (ref: section 10.1.6).
B. Add suppliers to the list of approved suppliers.
C. Remove suppliers from the list of approved suppliers.
4. The Quality System Manager will (per QOP-06-01) maintain a master list (MANEX database) of
approved suppliers.
SECTION 6.1
PURCHASING PROCEDURE
6.1.1. When a quote folder (viewed on PC: Common drive\quote folder\quote number) for a new job is
received from the Materials Control Manager, the Purchasing Agent will:
A. Contact approved suppliers to obtain price and delivery commitments for components.
B. Order components.
C. List the date that the last part is due onto the purchase order.
D. Review and approve purchasing requirements by signing the purchase order.
E. Make one copy of the purchase order
F. Forward the copy of the purchase order to the Director of Materials and Planning.
G. Forward the original purchase order to an Operations Committee member for delivery
commitment of finished product from Siemens Mfg. to the customer (ref: Section 3.12).
H. Forward a copy of the Siemens Bill of Materials to the customer, if applicable, requesting
delivery dates for customer supplied parts.
6.1.2. If a better price and/or delivery date is found during the purchasing phase, then the Purchasing
team can order the cheaper part rather than using the quoted price and source as long as the replacement
part is a customer approved part from an approved supplier. For non-custom items, an approved supplier
is a distributor franchised to sell that part.
6.1.3. For repeat jobs, the Purchasing team will review the purchasing file as well as the Quote folder for
any customer changes or Equivalent Item Authorizations (Form QC 6) that may have been added since
the last time that parts were ordered for that job.
6.1.4. The Purchasing team will order parts (ref: Bill of Materials, Equivalent Item Authorization Form
6.1.5. The Purchase Order shall contain data clearly describing the product ordered, including where
applicable:
A. Detailed component description.
B. Manufacturer.
C. Manufacturers part number.
D. Quantity ordered.
E. Quoted price.
F. Type, grade, or class.
G. Siemens part number.
H. Title, number, and issue of the quality system standard to be applied.
I. Drawing name and/or number including any revision number.
J. Other relevant technical data.
6.1.6. If, at the time that parts are being purchased, the purchase price is significantly different from the
quoted price, then the Purchasing team will fill out the Contract Review Problem Form (Form QC 33)
which will be forwarded to an agent of the sales team (ref: Section 3.7a).
6.1.7. If Siemens Mfg. is informed by a supplier that they are not able to meet a delivery date, then the
Purchasing team will:
A. Attempt to locate the part elsewhere (franchised distributor).
B. Expedite the part from the supplier.
C. Request an Equivalent Item Authorization (Form QC 6) per Section 6.4.
D. Attempt to locate parts from a non-franchised distributor that has controls in place to assure
component traceability back to the manufacturer. Siemens QC shall audit and approve a non-
franchised distributor prior to purchasing parts from them.
E. If steps 6.7.A-C are not successful, then notify the Sales Manager/Customer Service
Representative.
6.1.8. If Siemens Mfg. is unable to locate parts and will, therefore, be unable to meet a customers
requested delivery date, then the Purchasing team will:
A. Attempt to locate the part elsewhere (franchised distributor).
B. Expedite the part from the supplier.
C. Request an Equivalent Item Authorization (Form QC 6) per Section 6.4.
D. Attempt to locate parts from a non-franchised distributor that has controls in place to assure
component traceability back to the manufacturer. Siemens QC shall audit and approve a non-
franchised distributor prior to purchasing parts from them.
E. If steps 6.7.A-C are not successful, then notify the Sales Manager/Customer Service
Representative.
.
6.1.10. Procedures for the evaluation and selection of subcontractors can be found in QOP-06-01,
SUBCONTRACTOR EVALUATION.
6.1.11. Where Siemens Mfg. Co., Inc. proposes to verify purchased product at the subcontractors
premises, Siemens shall specify verification arrangements and the method of product release in the
purchasing documents.
6.1.12. Where specified in the contract, Siemens’ customer or the customers representative shall be
afforded the right to verify at the subcontractors premises and Siemens’ premises that subcontracted
product conforms to specified requirements.
A. Such verification shall not be used by Siemens as evidence of conformity to product
requirements by the subcontractor.
B. Verification by the customer shall not absolve Siemens of the responsibility to provide
acceptable product, nor shall it preclude subsequent rejection by the customer.
6.1.13 When Siemens Mfg. Co., Inc chooses to outsource a process that affects product conformity,
Siemens shall ensure control over such processes. The method and extent of this control will be
determined at a management meeting, and these requirements will be included as a part of the purchase
order.
1. Siemens Mfg. Co., Inc. has established and maintains specific methods to verify, store and maintain
customer supplied product provided for the incorporation into customer products or for related activities.
These methods are described in the Control of Customer Supplied Product Procedure (7.1).
2. Verification by Siemens does not absolve the customer from providing acceptable products.
Discrepancies will be reported back to the customer.
SECTION 7.1
PROCEDURE FOR CONTROL OF CUSTOMER-SUPPLIED PRODUCT
7.1.1. It is the responsibility of the Parts Dept. personnel, upon receipt of customer-supplied parts, to
inventory the kit using the Bill of Materials (B.O.M.) supplied with the parts kit. The kit will be checked
for damaged parts, correct components and quantity. A “Customer Supplied” sticker (Form QC 19A)
will then be affixed to the kit (if 100% customer supplied parts), or to each bag/box of components (if
the kit also contains Siemens purchased components). (Note): If there is not a B.O.M. with the parts kit,
the kit will be placed in the Shipping/Receiving Hold Area with a completed “Material Hold” card
(Form QC 23), and the Materials Control Manager will be notified immediately who will notify the
customer within two working days to resolve the discrepancy. Parts received on a skid will have a
visible portion of the skid painted with BLUE paint to indicate “Customer Supplied”.
7.1.2. Once the kit has been inventoried, it is the responsibility of the Parts Dept. personnel to fill out
the In-Process Checklist (form QC 8A). (Note): If there is not a SIEMENS job number on the B.O.M.,
then it is the responsibility of the Parts Dept. personnel to call the Shipping Clerk to obtain a Siemens
job number.
7.1.3. If there are no discrepancies, the kit, along with Form QC 8A, will be forwarded to production for
assembly.
7.1.4. If there are any discrepancies, the Inventory Clerk will contact (E-Mail) the customer within two
working days to resolve all discrepancies.
7.1.5. It is the responsibility of the Production Supervisor or the Quality System Manager to determine
whether or not the discrepancies noted (ref. section 7.1.3) will impede manufacturing. If so, then the
Parts Dept. Personnel will not issue the kit until all discrepancies are corrected. If not, then the
Production Supervisor will authorize the release of the kit to production, pending resolution of the
discrepancies.
7.1.7. When a job is complete, all excess parts will be returned to the Inventory Clerk who will store
them on shelves by customer/job name or, after contacting the customer, return the parts to the
customer.
7.1.9. Customer supplied test fixtures will be labeled with a “Customer Supplied” sticker (Form QC
19A) and a label indicating what product the fixture is used for.
7.1.10. Customer supplied test fixtures will be controlled using the procedures listed in the Calibration
Control section (Section 11.1)
7.1.11. The Technical Coordinator will notify the customer of any problems noted in steps 9 or 11 above
and the resolution recorded in the history section of the Calibration Recall program (PC database).
1. Siemens Mfg. Co., Inc. has established and maintains specific methods to identify product using the
Production Identification and Traceability procedure (Section 8.1).
2. All components and products will be identified by suitable means, from receipt and through all stages
of production, delivery, and (where required) installation.
3. Traceability is not a specific customer requirement. However, in support of the Quality Policy and
objectives, Siemens Mfg. incorporates limited traceability activities as described in the Product
Identification and Traceability procedure (8.1).
4. Records of this identification for traceability are kept per Section 16.
SECTION 8.1
PRODUCT IDENTIFICATION AND TRACEABILITY PROCEDURE
8.1.1. Upon receipt, components will be identified by an Inventory Clerk with a Parts Identification
sticker (Form QC 13A), ref. Section 10 under Receiving Inspection. The components will remain in the
labeled container as long as possible. When it becomes necessary to remove the parts from the original
package, it is the responsibility of the Lead Person to ensure that the bin that the parts are put in shall be
labeled with, as a minimum, the Siemens part number (use the customer part number for customer
supplies parts that do not have a Siemens part number) and job name.
8.1.2. As electronic components are kitted, an inventory clerk will verify that all components kitted have
an ID (ACC) # on the Identification sticker.
8.1.3. Subassemblies and in-process materials will be identified throughout production by the In-Process
Checklist (Form QC 8a for or MANEX printout): ref Document# SOP-08-01 for authority and
responsibility. EXCEPTION: Boards being transported between rework and washing do not need Form
QC 8A if the boards are to be washed and returned immediately. Any job can use a computer generated
Traveler instead of Form 8a.
8.1.4. Siemens product that is to be shipped shall be identified by having, as a minimum, the following
information printed on the packing slip by the shipping clerk and (if used) on the Siemens shipping
carton by the shipping personnel:
A. The customer name.
B. The P.O. number.
C. The Siemens part number.
D. The Siemens Job number.
E. The quantity shipped (multiple boxes shall be noted as one of three etc.).
SECTION 9
PROCESS CONTROL
1. Siemens Mfg. Co., Inc. shall determine and plan the production, installation, and servicing processes
which directly affect conformity to product requirements and shall ensure that these processes are
carried out under controlled conditions. Controlled conditions incorporated as part of the Siemens
Process Control procedure (Section 9.1) include equipment use and working environment, use of
suitable equipment, compliance with reference standards, monitoring and control of process parameters,
approval of processes and equipment, criteria for workmanship, equipment maintenance, and procedures
defining the manner of production, installation, and servicing, where the absence of such procedures
could adversely affect conformity to product requirements.
2. Records of qualified processes, equipment, and personnel are kept, as appropriate, per Section 16.
SECTION 9.1
PROCESS CONTROL PROCEDURES
9.1.1. If required by contract, installation and servicing requirements can be implemented and a plan for
implementation will be developed as part of the Contract Review procedure (ref: Section 3.1).
9.1.3. The Production Supervisor will ensure that the equipment (hardware and software) and other
resources (including information, workspace, utilities, buildings) used for production and testing of
product is adequate, and that these functions are performed in a suitable work environment. An
appropriate member of the Material review Board will ensure that any necessary supporting services
(transportation, communication, information systems) are adequate.
9.1.4. The Production Supervisor will refer to the Siemens Manufacturing Company “Work Order” list
to determine priorities for manufacturing and deliveries.
9.1.5. Siemens Mfg. Co., Inc. will ensure compliance with reference standards, quality plans, and/or
documented procedures by monitoring and approving all processes listed on the In-Process Checklist
that are followed by a “QC” sign off (ref. Section 10.1, First Article/In-Process Inspection, as well as
Table “C”, the Process Flow chart).
9.1.7. At this time, the New Athens Facility does not have any special processes. If a need for special
processes does occur, then Siemens Mfg. Co., Inc. will use qualified operators (ref. Section 18.1,
Personnel Training).
9.1.8 In any instance where the resulting output of a process cannot be verified by subsequent
monitoring or measurement (defect is only apparent only after the product is in use), that process shall
be validated. Validation parameters shall be established at a management meeting, and shall include (as
a minimum);
A. define criteria for review and approval of the process.
B approval of equipment and qualification of personnel.
C. use of specific methods and procedures.
D. requirements for records.
E. re-validation.
9.1.9. Workmanship standards for the processes listed on the In-Process Checklist are:
Process Standard
A. Kitting Bill of Materials
B. SMD Assembly Sample or Assembly Drawing
C. QC SMD Sample or Assembly Drawing
D. SMD Inspect Sample or Assembly Drawing; ANSI/IPC-A-610 (latest rev)
E. Dip Insertion Sample or Assembly Drawing
F. QC Dip Sample or Assembly Drawing
G. Axial Insertion Sample or Assembly Drawing
H. QC Axial Sample or Assembly Drawing
I. Preline Sample or Assembly Drawing
J. QC Preline Sample or Assembly Drawing
K. Line Sample or Assembly Drawing
L. QC Line Sample or Assembly Drawing
M. Solder Wave Process Sheet
N. QC Wave ANSI/J-STD-001 (2005 version), ANSI/IPC-A-610 (latest rev)
O. Board Cleanliness ANSI/IPC-S-815 rev. B
P. Off Line Sample or Assembly Drawing
Q. QC Offline Sample or Assembly Drawing
R. Board Trimming ANSI/IPC-A-610 (latest rev)
S. Inspection ANSI/IPC-A-610 (latest rev); Sample or Assembly Drawing
T. Testing Test Procedure
U. Rework/Repair ANSI/IPC-R-700 rev. C
V. Burn-In Test Procedure
W. Conformal Coating Sample or Assembly Drawing
X. Packaging Packaging Log (Form QC 32)
REFERENCES:
ANSI/J-STD-001 (2005 version), Requirements for Soldered Electrical and Electronic Assemblies
ANSI/IPC-A-610 (latest rev), Acceptability of Electronic Assemblies
SECTION 10
INSPECTION AND TESTING
1. Siemens Mfg. Co., Inc. has established and maintains specific methods for inspection and testing
activities in order to verify that customer requirements for the product are met. If there are no specific
customer requirements for inspection, then Siemens Mfg will use IPC-610 specifications. These
methods are described in the Inspection and Testing Procedure, Section 10.0.
2. These procedures apply regardless of the amount of control exercised, or the types of inspection
techniques used at a subcontractors facility.
3. The type of component inspected and inspection parameters are described in Section 10.1. No part,
including urgent releases, will be used until it has been inspected and accepted.
SECTION 10.1
INSPECTION AND TESTING PROCEDURE
RECEIVING INSPECTION
10.1.1. Siemens purchased parts received will be inspected and/or tested for conformance and
compliance to blueprint, drawing and/or specification requirements. When actual measurement values
are required by purchase order or contract, the values will be recorded on an Inspection Report form
(Form QC 14) for traceability. Otherwise, accept/reject criteria will be used (see Section 10.1.4&5). No
part will be used until the lot has been inspected and accepted.
10.1.2. Components will be segregated into four categories which will also be in four separate locations.
A. Awaiting inspection (Incoming inspection area). Responsibility: Receiving personnel.
B. Inspected and approved (Kitting/stock area). Responsibility: Incoming Inspector.
C. Inspected and rejected (Rejected materials cabinet). Responsibility: Incoming Inspector.
D. Material Hold area. (Note: This area is the same physical location as the incoming inspection
area). Responsibility: Incoming Inspector.
10.1.3. Product that is awaiting disposition (whether to accept, reject, scrap, awaiting shortages, etc.)
will be kept in a Materials Hold area and will be labeled with a Material Hold card (Form QC 23).
10.1.4. Incoming inspection for electronic components will be done in the following manner:
A. The Incoming Inspector will open the Purchase Order from the PC; Fox Pro program
(MANEX access). If all information listed is accurate (when compared to the part received), then
the Inspector will inspect the parts. If the information is not accurate, then the Inspector will
check the master file for an Equivalent Item Authorization form (Form QC 6) or a letter from the
customer which will resolve the discrepancy. If there is no Form QC 6 or customer letter, then
the Inspector will notify the Quality Supervisor who will resolve the issue.
10.1.7. The person performing the verification will inspect this first item to verify all blueprint/drawing
configurations and requirements for the specific manufacturing operation and will, if the item complies,
indicate acceptance by initialing the In-Process Check list, (Form QC 8A) in the space provided (if
required by the customer). Verification (for new Siemens assembly numbers) will be performed by:
A. Compare each part placed to the customer BOM. As a part is verified, a checkmark is placed
on the assembly drawing and highlight the reference designator on the BOM. Verification at this
point includes solder quality and component part number/value.
B. Once all components have been verified per step A above, verification of orientation will be
done. As the orientation for a component has been verified, the inspector will circle the
orientation marking on the assembly drawing.
For continuous runs, additional checks will be noted in the comments section of Form QC 8a. The
inspector will verify 100% for orientation and solder quality. The inspector will verify 1 component
from each BOM line item for part number/value.
10.1.8. Should the first (or random) item manufactured and inspected not meet blueprint/drawing
configurations or requirements, the person performing the verification will notify the operator and/or the
lead person that the product did not pass inspection. The operator will then correct the setup and submit
a new item for First Article Inspection. Rather than verifying that the correction has been made, the
inspectors will do a 100% verification of the reject MODE. Example: If U1 is rejected for incorrect
orientation, rather than verifying that U1 orientation is now correct, the inspector will verify ALL
components for orientation. If possible, the rejected item will be reworked by the end of the day and
returned to manufacturing for further processing. If the item cannot be reworked by the end of the day,
the Inspector will follow the procedure outlined in Section 13.1.4 (Nonconforming Materials).
10.1.9. For continuous runs, additional In-Process checks will be done (if required by the Siemens
Process Sheet) by an Inspector at the following times on surface mount (SMD) assemblies: the first
assembly of the day, the first assembly completed after each break, and the first assembly completed
after lunch. Should the SMD assembly inspected not meet all blueprint/drawing configurations or
requirements, the Inspector will follow the procedure outlined in Section 13.1.4 (Nonconforming
Materials) and notify the operator and/or the lead person that the product did not pass inspection. The
operator will then correct the setup and submit a new item for inspection. If possible, the rejected item
LINE/ROVING INSPECTION
VISUAL INSPECTION
10.1.12. Upon completion of all assembly operations listed on the In-Process Checklist ( Form QC 8A)
all product will be inspected..
10.1.13. All inspection personnel are trained in inspection and rework techniques as well as in the use
of ANSI/IPC-A-610, (latest rev), Class II, which will be used for accept/reject criteria.
10.1.14. When directed by a Production Supervisor or the Quality System Manager, printed circuit
assemblies will be inspected using the MVP AutoInspection Machine (Model 1840).
A. The MVP operator will load the board into the machine (the datalog will be turned on).
B. The MVP operator will notify a qualified inspector when there are boards to be reviewed for
rework.
C. The inspector will mark the in process checklist when the review and rework for that
assembly has been completed.
D. The inspector will notify the MVP operator when the review and rework has been completed
on that run of boards.
E. When notified by an inspector that the run has been reviewed and reworked, the MVP
operator will generate a computer printout summary of defects found and reworked on that run
10.1.15. All assemblies will then be final inspected against blueprint/drawing and ANSI/IPC-A-610,
(latest rev), Class II requirements and an inspection report (Form QC 14) will be filled out. 100% of the
printed circuit assemblies will be inspected unless specified otherwise by the customer or the Process
Sheet for that job. The Quality System Manager will determine (unless prohibited by contractual
requirements) whether or not a lot sampling plan can be used for a given job. If a sampling plan is to be
used, the Quality System Manager will add to the Process Sheet what sampling plan is to be used for
that job.
10.1.16. If the items comply with blueprint/drawings specifications and purchase order requirements,
then the In-Process Checklist (Form QC 8A) will be initialed in the space provided (if required by the
customer).
10.1.17. All discrepancies found manually (i.e. not found by the vision inspection machine) will be
noted on the inspection report (Form QC 14) and reworked at this time by the Inspector (exception:
surface mount rework will be forwarded to the surface mount department if the Inspector does not have
the training or equipment necessary to perform the required rework). If the item cannot be reworked by
the end of the day, the Inspector will tag the item with a Material Hold tag (Form Q.C. 23) and place the
rejected item in the Material Hold area for evaluation and disposition.
10.1.18. The Inspectors will notify the Quality System Manager of any discrepancies that they feel
should be brought to the immediate attention of the Quality System Manager. This will allow the
Quality System Manager to immediately investigate the problem and, if possible, correct the process that
is producing the discrepancies. If the magnitude of the problem exceeds established limits (0.5% of the
opportunities for their occurrence for defects listed as “Defects” in IPC-A-610, or 5.0% of the
opportunities for their occurrence for Process Indicators listed in IPC-A-610), then written corrective
action (Form QC 16, or equivalent) must be initiated by the Supervisor responsible for that product line.
If a process change to a given product is necessary, then it will be noted by the Lead Person responsible
for that product line on the process sheet. If a change to the Quality System is necessary, then the
Corrective Action Request will be reviewed during the next management meeting to determine the most
appropriate method for implementation. The results of the management review will be recorded. The
supervisor will also follow up on the corrective action to verify that the actions taken were effective.
ELECTRICAL TESTING
10.1.19. Printed circuit assemblies will be tested as required by contract and will be tested using
customer supplied test procedures. If the test procedure is to be supplied by Siemens, then the procedure
will be approved by the customer.
10.1.20. Printed Circuit assemblies that pass an electrical test will be labeled (if there is room on the
board) Cal 1 (or per customer requirements) and, if required, Cal 2 by the person performing the test
(ref: Section 12, Inspection and Test Status). The In-Process Checklist will then be initialed (if required
by the customer) by the person performing the test on the appropriate line and the product will be
forwarded to the shipping department. If the size of the item does not make labeling feasible, then the in
process checklist (Form QC 8A) that is kept with the units will be used as the indicator of test status. If
additional tests are required by the customer, the method of indicating that the units have passed the test
10.1.21. Printed Circuit assemblies that fail testing will be, if possible, reworked and/or repaired by the
end of the day. If the printed circuit assemblies cannot be reworked and/or repaired by the end of the
day, then the assemblies will be labeled with a Material Hold card (Form QC 23) and placed in a
Material Hold area until rework is possible (ref. also Section 13.1).
10.1.22. All component rework and repair will conform to ANSI/IPC-A-610 (latest rev), and/or
customer requirements and specifications.
10.1.23. All rework and repair of the printed circuit boards will conform to ANSI/IPC-R-700C, Rev C
and/or customer requirements and specifications.
10.1.24. The person performing the test will fill out a Test Report (Form QC 14f) indicating the
technicians name, the date, the job number, the test equipment used (listed by SMC number), the
quantity of assemblies tested, the quantity of boards failed. 10.1.24. The person performing repairs will
fill out a Repair Report (Form QC 14e) indicating the quantity of boards repaired, as well as what was
done to rework/repair each assembly ( removed solder bridge, replaced C2, etc.).
FINAL INSPECTION
10.1.25. When product is ready for shipment, the QC Inspector will be notified. The Inspector will pull
the job folder (if not already with the product) and check to verify that all certifications, reports, and
documents that are listed on the Process Sheet (for New Athens, the file drawing for Freeburg) as
required are on file. A Certificate of Conformance (Form QC 35) will be filled out by the QC Inspector
at this time, if required by contract, for the process indicated by the contract. The original will be
forwarded to the customer and a copy will be kept in the QC folder for traceability.
10.1.26. The inspection lot size for Final Inspection will be determined by the Dodge and Romig single
sampling plan, AOQL=5%. (exception: RoHS compliant boards will be 100% checked for the WO/date
label, verifying that all labels have an “R” on then).
10.1.27. The QC Inspector will verify that the product has all required stamps/labels ( date, inspection,
etc.).
10.1.28. The QC Inspector will check the product for any physical damage.
10.1.29. The QC Inspector will verify that all required sections of the In-Process Checklist (Form QC
8A) have been checked off.
10.1.30. Upon approval of all accompanying shipping paperwork and/or required documents, the
Inspector will transfer the units to “Finished Goods” in MANEX.. The accepted product will then be
placed on the shelf labeled “Inspected & ready to ship”.
10.1.31. If any discrepancies are noted by the Inspector, then the lot will be rejected and the lead person
will be notified. A rejected lot may be 100% inspected (if so directed by a supervisor) and then only the
defective product (rather than the entire lot) will be rejected (ref. also Section 13.1). The Inspector will
then fill out a Reject tag (Form QC 13c). This record shall include, as a minimum, the quantity of items
checked, the type and quantity of defect found, the job number, the date, and the Inspectors
10.1.32. When an assembly that has not been previously been manufactured at Siemens Mfg. is to be
built, the first assembly (or whatever quantity the customer requests) built and ready for shipment will
be forwarded to QC personnel (along with a First Article Inspection form, Form QC 17b) who will
inspect the assembly per the sections for Visual Inspection and Final Inspection. If the lot is acceptable,
it will be shipped to the customer along with Form QC 17b. No additional product will be shipped
until the customer releases the product to be built. Customer approval is only required on new
assemblies, not revisions to existing assemblies. If there is no specification o the contract for a FIRST
ARTICLE APPROVAL, it is the responsibility of a Production Supervisor or the Quality System
manager to contact the customer to determine if a FIRST ARTICLE APPROVAL is required. If the
customer does not require FIRST ARTICLE APPROVAL, then this procedure does not apply.
RECORDS:
QC 35, Certificate of Conformance
QC 6, Equivalent Item Authorization of Electronic Assemblies
QC 16, Corrective Action Request
QC 17b, First Article Inspection
QC 22, Shipping Information
Work center transfer history in MANEX
BOM printout (First Piece inspection)
MANEX BOM note (First Piece inspection; rev change).
Information from the following forms will be transferred to MANEX where it will be stored as a record:
MVP printout, QC 14 Inspection Report, QC 14d Technician Report form QC 14e Repair Report, QC
14f Test Report.
REFERENCES:
ANSI/IPC-A-610 (latest rev), Acceptability of Electronic Assemblies
J-STD-001 (2005 version), Requirements for Soldered Electrical and Electronic Assemblies
ANSI/IPC-R-700C rev C, Guidelines for Modification, Rework, and Repair of Printed Boards and
Assemblies
Process Sheet
1. Siemens Mfg. Co., Inc. has established and maintains specific methods to control, calibrate, and
maintain inspection, measuring, and test equipment. These methods are described in the Calibration
Control Procedure (Section 11.1). Records of calibration are kept per Section 16.
2. Test software or hardware that is used as suitable forms of inspection shall be included as part of the
calibration procedure.
3. When required by contract, technical data pertaining to measurement equipment shall be made
available to the customer.
SECTION 11.1
CALIBRATION CONTROL PROCEDURE
11.1.1. When Siemens specified testing or calibration is required, the Quality System Manager,
Technical Coordinator, and/or the Senior Technician will determine the measurements to be made and
the accuracy required, and then select equipment with a known measurement uncertainty that is capable
of the necessary accuracy and precision. The measurement and equipment requirements will then be
recorded on the product test/calibration procedure.
11.1.2. When customer specified testing or calibration is required, the customer will specify and/or
approve the measurements to be made and the accuracy required. The Quality System Manager,
Technical Coordinator, and/or the Senior Technician will then select the appropriate equipment that is
capable of the necessary accuracy and precision. The measurement requirements will be recorded on the
customer supplied test procedure, and the equipment used will be recorded on the Quality Control
Report (Form QC 14a, rev. a).
11.1.3. The Quality System Manager will identify all inspection, measuring, and test equipment that can
affect conformity to product requirements with a sticker that has a unique SMC number typed on it. All
in-house equipment calibration records and procedures for equipment listed on the Master Calibration
list (Calibration Recall program, Computer Printout) will be filed by this SMC number.
11.1.4. Due to the controlled environment at both facilities, temperature is not a significant influence for
on-site calibration and measurement. When equipment is to be used off-site, the Technical Coordinator
will select equipment to ensure that temperature will not have a significant effect on measured values.
11.1.5. The Quality System Manager will determine calibration intervals for all calibrated equipment.
The calibration interval will be recorded as part of the Calibration Recall program (computer program
on PC). The calibration interval can be adjusted upward or downward, in one month increments, based
on the calibration history of the equipment in question.
11.1.6. The Quality System Manager will determine whether a given piece of inspection, measuring, or
11.1.7. All inspection, measuring, and test equipment requiring calibration will be calibrated against
certified equipment having a known valid relationship to nationally or internationally recognized
standards. Where no such standard exists, the basis used for calibration will be documented.
11.1.8. The Quality System Manager and/or the Technical Coordinator will define in writing the
procedure for all in-house calibration of inspection, measuring, and test equipment detailing the type of
equipment to be calibrated, the SMC number of the equipment to be calibrated, the location (by area:
Tech area, inspection area, etc.) of the equipment to be calibrated, the calibration interval, the specific
method for calibration including the type and uncertainty of the calibration equipment to be used, the
acceptance criteria, and the action to be taken when the calibration results are unsatisfactory.
11.1.9. Upon completion of an in-house calibration, the person performing the calibration will fill out
and affix to the calibrated equipment a Calibration Certification label (Form QC 13b), record the
calibration results onto the Calibration Record (Form QC 7b), and forward the Calibration Record to the
Quality System Manager for traceability.
11.1.11. All equipment requiring calibration that is not calibrated in-house will be calibrated by a
qualified (ANSI/NCSL Z540-1 compliant) and approved (by a review of the Quality System Manual of
the calibration facility) calibration laboratory. Calibration must be performed to manufacturer
specifications in accordance with ANSI/NCSL Z540-1 requirements. A Report of Calibration must
accompany all returned calibrated equipment, which shall include the measurements take. The report
shall also include any actions taken to repair or re-calibrate the equipment.
11.1.12. Inspection, measuring, or test equipment that is returned from a calibration lab as calibrated will
have a Calibration Certification label (with calibration date and due date) affixed to it, and the results of
the calibration will be recorded on a Certificate of Calibration which will be forwarded to the Quality
System Manager for traceability.
11.1.13. The Quality System Manager and/or the Technical Coordinator will review all calibration
records and assess and document (Form QC 7a) the validity of previous inspection and test results when
Inspection, measuring, or test equipment is found to be out of calibration.
11.1.14. The Quality System Manager and/or the Technical Coordinator will ensure that the handling,
preservation, and storage of inspection, measuring, and test equipment is such that the accuracy and
fitness for use are maintained.
11.1.15. The Quality System Manager will, through training and/or physical methods, safeguard
inspection, measuring, and test facilities, including both test hardware and test software, from
adjustments which would invalidate the calibration setting.
1. Siemens Mfg. Co., Inc. has established and maintains specific methods to indicate the inspection and
test status of conforming and nonconforming product. These methods are described in the Procedure for
the Indication of Inspection and Test Status, Section 12.1.
2. The Quality System Manager will make certain that items will retain an indication of their inspection
and test status at all times. This is accomplished through the use of the In Process Checklist (Form QC
8A), red "Reject" tags ( Form QC 13C), and/or individual inspection and test stamps/label when
required by the customer.
3. The identification of inspection and test status will be maintained throughout production, instillation,
and servicing of the product to ensure that only product that has passed the required tests and inspections
is released for further processing or use.
4. Records of inspection and test status are kept per Section 16.
SECTION 12.1
PROCEDURE FOR INSPECTION & TEST STATUS
12.1.1. Nonconforming product will be identified per Siemens Quality Manual, Section 13.1
12.1.2. If required by the customer, product which has been checked and found to be acceptable will
receive the appropriate label(if there is enough room for the label), and the process line will be initialed
on the In-Process Checklist by the person performing the indicated activity. If there is not room on the
product for a label then the initialed In-Process Checklist will be used as an indication of inspection
status. If there is no specific requirement for indication of test/inspection status, a single label will be
applied to the board indicating that all manufacturing steps have been completed, and the product is
ready to be shipped. The format of the label will be the date (month/year) and the Siemens work order.
Cal 2= 2nd Calibration: The item has passed an electrical test following a burn-in procedure.
1. Siemens Mfg. Co., Inc. has established and maintains specific methods to ensure that product that
does not conform to specific requirements is prevented from unintended use or installation.
2. These methods, which are described in the Procedure for Control of Nonconforming Product (Section
13.1), provide for identification, documentation, evaluation, segregation (as practical), disposition of
nonconforming product, and for notification to the functions concerned.
SECTION 13.1
PROCEDURE FOR CONTROL OF NONCONFORMING PRODUCT
13.1.1. When nonconforming items are found during receiving inspection, the Incoming Inspector will
note the defect(s) on the Rejection Report-Log ( “QC Parts” database on computer). If there are enough
defects to cause the lot to be rejected, the inspector will identify the lot as nonconforming with a
computer generated "Rejected" report (Form QC 11C), and place the lot in a nonconforming area. If
there are not enough defects to reject the lot, the nonconforming items will be identified (Form QC 11C)
and placed in a nonconforming area. It is the responsibility of the Incoming Inspector to fill out all
sections of the "Reject" form, with the exception of “Disposition”. The Incoming Inspector will then
print out a Rejected Material Report, Form QC 11 (“QC Parts” database, from the Rejection report-log)
and forward per table “D” for product disposition. A rejected lot may be 100% inspected (if so directed
by a supervisor) and then only the defective product (rather than the entire lot) will be rejected and
placed in the nonconforming area for disposition.
13.1.2. When the disposition of the rejected material is determined, the action taken will be recorded on
the Rejected Material Report, and the “Reject” report will be forwarded to Incoming inspection to be
recorded on the QC Parts database. The Reject Report will then be disposed of (Exception: see section
13.7).
13.1.3. If, during production, customer supplied electronic components are lost or damaged the lead
person for that job will fill out a Purchase Requisition (Form QC 40) and forward the requisition (along
with all damaged parts) to the Inventory Clerk who will record the shortage on PC (Personal computer,
Database program). Siemens purchased components that were damaged during production will be
dispositioned by the lead person and replaced at Siemens expense. Siemens purchased components that
were received damaged will be returned to the supplier for replacement. Customer supplied components
that were received damaged will be returned to the customer and replaced at the customers expense.
13.1.5. If a problem is found that will delay production or delivery, or could affect product already in
use by the customer, the customer will be notified by a member of the Material Review Board
(MRB)/Sales Department within one working day. Example: Product cannot be manufactured or
repaired to customer specifications, and Siemens requests a “use as is” disposition from the customer.
13.1.6. If the discrepancy is attributed to a supplier, expedient action will be taken by the Materials
Control Manager to obtain a response from the supplier.
13.1.7. If the disposition of any product is SCRAP, then the Customer Service representative or the
Quality Control manager will notify the customer (if applicable).
13.1.8. Repaired and/or reworked product shall conform to ANSI/ IPC-R-700C, rev. C (as well as IPC
610 current rev), and/or customer requirements and specifications, and be re-inspected (by the person
performing the repair/rework) for conformance to requirements (ref: QC Manual, section 10: inspection
and testing). When the proposed use or repair does not conform to specific requirements, the Quality
System Manager shall notify the customer and request disposition. Any deviations from the customer
will be recorded on the Reject tag (for product), Form QC 13c, or on an Equivalent Item Authorization
(for components), Form QC 6.
Returned Material
13.1.9. Defective product may be returned to Siemens Mfg. Co. for repair and/or rework for
conformance to contractual requirements. The return of material to Siemens shall be accomplished as
follows:
A. The customer will notify a Siemens Mfg. Co. Customer Service Representative of the need to
return material to Siemens. The representative shall issue an RMA (Return Material
B. Once received, the RMA specialist shall count and verify the product returned, start a repair
folder, start a tech report (Form QC 14d), and key the sales order and work order into MANEX.
The RMA specialist shall forward a copy of the RMA paperwork to the Quality System Manager
for data entry (computer program: Nonconforming Tracking System, ver. 1.05).
C. If there are any discrepancies, the RMA specialist will immediately notify a Customer
Service/support member as well as the Quality System Manager of the nature and extent of the
discrepancies, and place the returned materials, with a Tech report (Form QC 14d), in the Hold
area until the discrepancies are resolved by the Quality System Manager.
D. All steps taken to repair the product, (parts replaced, recalibration, etc.), shall be recorded
on the technical report (Form Q.C. 14d), for traceability.
E. All product shall be retested (if required) after all repairs are completed. Retested units will
receive a “CAL 1 RMA” label ( if there is room for the label).
F. The technician performing product repairs will inspect their work to ensure that all repairs
conform to applicable standards (IPC-R-700C, etc.), drawings and/or purchase order
requirements (ref also: Siemens QC Manual, section 13.1, Nonconforming Product).
G. All boards will be packaged properly and returned to the customer (ref: Siemens QC Manual,
Section 15.1. Packaging.1).
H. The technician will forward one copy of the technician report (Form QC 14d) to the Shipping
supervisor who will place them in the “Outgoing RMA” folder and forward the “Outgoing
RMA” folder to the Quality System Manager for data entry (computer program;
Nonconformance Tracking System). When data entry is complete, the Quality System Manager
will return the “Outgoing RMA” folder to the RMA specialist who will forward the technician
report to the office for billing purposes, (this copy will be filed in the job folder, for traceability).
I. If the disposition of returned material is “scrap”, then a copy of the Scrap report will be
forwarded to the Customer service rep for that customer.
Information from the following forms will be transferred to MANEX where it will be stored as a record:
MVP printout, QC 14 Inspection Report, QC 14d Technician Report form QC 14e Repair Report, QC
14f Test Report.
REFERENCE: ANSI/IPC-R-700C rev C, Guidelines for Modification, Rework, and Repair of Printed
1. Siemens Mfg. Co., Inc. has established and maintains specific methods for implementing corrective
and preventive action. These methods are described in the Corrective and Preventive Action Procedure
(Section 14.1). Corrective action procedures address the issues of handling customer complaints,
investigating nonconformities, determining corrective action, and applying controls to ensure that
corrective action is taken and that it is effective. Preventive action procedures address the issues of
defect analysis, determination and implementation of preventive action, application of controls to ensure
that preventive action is effective, and is reported for management review.
2. Any corrective or preventive action taken shall be to a degree appropriate to the magnitude of the
problem and commensurate with the risks encountered.
3. Records of corrective and preventive action are kept per Section 16.
SECTION 14.1
CORRECTIVE AND PREVENTIVE ACTION PROCEDURE
Corrective action:
14.1.1. The Quality System Manager will analyze the data from Quality Control Reports (Form QC
14a), Inspection Reports (Form QC 14), Technician Reports (Form QC 14E & F), Reject Material
Reports (Form QC 11), and any Customer Complaints to identify problem areas. The Quality System
manager will, if necessary, work with the Production Supervisors to determine what modifications need
to be made to the processes and/or work instructions which affect conformity to product requirements to
achieve a reduction in future nonconformities.
14.1.2. Any time a customer complaint is received the person being notified will forward the complaint
to the Supervisor responsible for that product line. That Supervisor will then investigate the problem to
determine the root cause of the nonconformity. If the nature of the problem involves the conformity to
product requirements, then the Supervisor will notify the Quality System Manager and will, if necessary,
work with the Quality System Manager to determine what corrective action is necessary to eliminate the
cause of the nonconformity as well as what controls are necessary to ensure that corrective action is
taken and that it is effective.
14.1.3. If the magnitude of the problem exceeds established limits (0.5% of the opportunities for their
occurrence for defects, or 5.0% of the opportunities for their occurrence for Process Indicators), then a
Corrective Action Request (Form QC 16, or equivalent format) must be initiated by the Supervisor
responsible for that product line (EXCEPTION: For sample sizes of 200 and smaller, more than 2
defects will cause corrective action to be initiate) . If a process change to a given product is necessary,
then it will be noted by the Lead Person on the process sheet. If a change to the Quality System is
necessary, then the Corrective Action Request form will be reviewed during the next management
meeting to determine the most appropriate method for implementation (ref. Section 5.1.Quality System
Manual Change Procedure). The results of the management review will be recorded and will be filed in
the New Athens QC office. The Production Supervisor will also follow up on the corrective action to
14.1.4. If the magnitude of the problem does not exceed established limits, then it is up to the discretion
of the Production Supervisor as to whether or not formal corrective action will occur. If that Supervisor
does decide that corrective action is necessary, then the procedures outlined above (Corrective Action,
paragraph 2) will apply.
Preventive Action:
14.1.5. The Quality System manager will, as necessary, work with the Production Supervisors to
determine what modifications need to be made to the processes and/or work instructions which affect
conformity to product requirements to reduce potential nonconformities.
14.1.6. If a change to the Quality System (ref. Section 5.1.Quality System Manual Change Procedure) or
a significant change to a process is necessary, then the problem will receive a management review to
determine the most appropriate course of action. The results of the review will be recorded (ref; Contract
review problem form).
14.1.7. The Supervisor who is responsible for the area that is being reviewed is responsible for the
implementation of preventive action as well as follow-up activities to verify that the preventive action is
effective. That Supervisor will then submit relevant information on actions taken for management
review. The results of the review will be recorded.
REFERENCE: IPC-610 (current rev), Requirements for Soldered Electrical and Electronic
Assemblies
IPC-R-700C rev C, Guidelines for Modification, Rework, and Repair of Printed
Boards and Assemblies
IPC-7711/7721 Rework/repair of electronic assemblies
1. Siemens Mfg. Co., Inc. has established and maintains specific methods for handling, storage,
packaging, preservation, and delivery of product as described in Section 15.1.
SECTION 15.1
HANDLING, STORAGE, PACKAGING,
PRESERVATION, AND DELIVERY PROCEDURES
HANDLING:
15.1.1. Printed circuit assemblies will be transported from one location to another using conductive
racks, bins or boxes. Printed circuit assemblies that are large, heavy (PC mount transformer), or have
surface mount devices on both sides will be transported in bins with inserts or racks only.
15.1.2. Transformers may be transported in any container appropriate for the size and weight.
15.1.3. ESD procedures will be followed when handling ESD sensitive devices.
15.1.4. Components will remain in factory packaging for as long as practical. Batteries will remain in
factory packaging until they are inserted into the final product for shipping.
15.1.5. Any special handling procedures that are required by contract or unique to a given product will
be listed on the job process sheet for that product.
15.1.6. Qualified people are trained for handling techniques to prevent damage or deterioration (see
Section 18.1: Training).
STORAGE/RECEIVING:
15.1.8. In order to detect deterioration, the condition of product in stock will be assessed during the
annual inventory. Items found to be questionable will be brought to the attention of a supervisor who
will determine whether to scrap (ref. also, Section 13.1: Nonconforming Product) or, if applicable,
recondition the items.
15.1.9. First in, First Out techniques will be used for stock items.
15.1.10. Siemens purchased components will be accepted into the stock room only if there is a purchase
order for those components. Customer supplied parts will be accepted if there is a packing slip and an
open Siemens job using the parts received.
15.1.11. A job traveler (computer printout, MANEX) delivered to the transformer Production Supervisor
15.1.13. Tape and reel components and components released as replacement for shortages will be issued
to production with a Requisition/Shortage card (Form QC 37), which will be signed by the lead person
responsible for that product line, returned to the stock room, and filed for reference.
15.1.14. The In-Process checklist signed by the person who performed a listed process step, authorizes
receipt to and dispatch from storage areas.
15.1.16. When a job is complete, all excess customer supplied parts will be returned to the Inventory
Clerk who will store them on shelves by customer/job name or, after contacting the customer, return the
parts to the customer. Excess Siemens parts with an inventory code of A through H will be returned to
the inventory clerk to be de-kitted and put back into inventory.
15.1.17. Left over Siemens supplied parts will be labeled with a Parts Identification label (Form QC
13A) which will have, as a minimum the Siemens part number.. The lead person will then return the
parts to the stock room. The Inventory Clerk will enter the part number and the quantity for the stock
parts onto the PC (MANEX De-Kit module) and store the parts in the stock area by Siemens part
number. SMD parts that were received with a desiccant and humidity indicator will have the desiccant
and the humidity indicator repackaged with the parts. When these parts are then reused, the humidity
indicator will be checked when the package is opened. If the humidity indicator indicates a humidity
level in excess of 20%, then the components and the desiccant will be baked according to the
components manufacturer specifications.
15.1.18. If electronic components (New Athens only) are needed to complete a job because they were
lost or damaged (ref. also Section 13.1: Nonconforming Product), then the lead person requiring the
component will fill out a Purchase Requisition (Form QC 40) and send it to the Inventory Clerk. If the
Inventory Clerk has the parts in stock, then the parts will be issued. The requisition will be marked
“filled” and filed for reference. If the Inventory clerk does not have the part or if the part issued is taken
from another kit, then the requisition will be forwarded to a Purchasing team, who will then order the
parts.
15.1.19. If electronic components are needed to repair printed circuit assemblies (New Athens), the
technician will fill out a Purchase Requisition and forward the requisition to Inventory or technical
15.1.20. Control of materials (i.e. chemicals) with a specified shelf life shall be accomplished in the
following manner(this applies only to Humiseal 1B73, solder paste, liquid flux (1gal or larger), all
Hysol/Loctite products, RTV, flux thinner (1 gal or larger), & the customer specific materials listed
below):
RESIN HARDENER
EL-CAST BLACK 4123
EN-4 EN-12
EN-2523 part A EN-2523 part B
T-Set EP 20 T-Set EP 698
A. The receiving Inspector will affix to the container a Shelf Life sticker (Form QC 36) ONLY if
the expiration is not already printed on each individual container. The label will have the date of
receipt, the expiration date, and the Inspectors stamp or initials.
B. A monthly audit of storage areas will be conducted by the QC Manager.
C. Chemicals that are found to have an expired shelf life will be disposed of according to OSHA
and EPA approved methods.
PACKAGING:
15.1.21. All product will be packaged according to customer requirements. If there are no customer
supplied requirements, then the Production / Shipping and Receiving Supervisor will work with the
customer to determine the extent of packaging necessary to protect the product during shipment. The
SIEMENS developed packaging requirements will be recorded on the packaging log (Form QC 32)
which will be reviewed/approved by the Production Supervisor or the Quality System Manager, and
kept in their respective packaging area.
15.1.22. The Shipping Information form (Form QC 22) signed by QC personnel authorizes product
shipment.
15.1.23. All shipping information affixed to the SIEMENS boxes will be neat, legible, and durable. The
following information, as a minimum, will be affixed to all SIEMENS boxes prior to shipment:
A. The packing slip (computer generated).
B. The customers name.
C. The customers shipping address.
D. The purchase order number.
E. The quantity.
F. The serial number(s) (if serialized).
G. The SIEMENS job number.
H. The box count (if more than one box).
15.1.24. Components will be segregated into four categories which will be in four separate locations.
A. Awaiting incoming inspection (Incoming inspection area).
B. Inspected and approved (Kitting/stock area).
C. Inspected and rejected (Rejected materials cabinet).
D. Material Hold area.
15.1.25. Product that is awaiting disposition (whether to accept, reject, scrap, awaiting shortages, etc.)
will be kept in a Materials Hold area and will be labeled with a Material Hold card (Form QC 23).
Finished units that are shipped more than 30 days after the inspection date will have the date label
replaced to reflect the actual ship date (for warranty purposes).
15.1.26. Components that have been approved and released for production (per MANEX Pick List) will
be labeled (ref: Section 8, Product Identification) and placed into kits or, if no kit, a stock area.
15.1.28. Product storage: A. Siemens Mfg. is committed to achieving 100% on-time delivery.
B. Finished product is shipped based on a Siemens order driven process.
C. Therefore, finished product storage is kept to a minimum.
DELIVERY:
15.1.29 Where contractually required, the protection of the product shall be extended to include delivery
to its final destination. Any additional packing requirements will then be recorded on the packaging log
(Form QC 32).
REFERENCE:
1. Siemens Mfg. Co., Inc. has established and maintains specific methods for the identification,
collection, indexing, access, filing, storage, maintenance, and disposition of quality records (including
pertinent subcontractor quality records) as described in Section 16.1 to demonstrate conformance to
specific requirements and the effective operation of the quality system.
All quality records shall be legible and shall be stored and retained in such a way that they are
readily retrievable in facilities that provide a suitable environment to prevent damage or deterioration
and to prevent loss. Retention times shall be established and recorded. Where agreed contractually,
quality records shall be made available for evaluation by the customer or the customer’s representative
for an agreed period.
SECTION 16.1
PROCEDURES FOR CONTROL OF QUALITY RECORDS
16.1.1. Documents pertaining to the conformity to product requirements of articles being manufactured
shall be filed and maintained in designated job folders or any other designated area for easy access (see
table 1).
16.1.2. Records shall be held for a minimum of three (3) years, unless otherwise required by purchase
order or contract. The person responsible (ref. Table 1) for the records will then decide whether to
maintain the records or dispose of them.
16.1.3. Records maintained to substantiate our quality control system shall include the following:
A. Certifications and test reports for purchased materials (if required by contract).
B. Completed in-process checklist (controlled copy). Ref. Section 10.1
C. Copies of all shippers. Ref. Sections 7.1, 10.1, 15.1
D. Purchase orders. Ref. Section 6.1
E. Data from Inspection Reports. Ref. Section 10.1
F. Test/technician (Quality Control) reports. Ref. Sections 10.0 & 11.1
G. Copies of "Certificates of Conformance" issued. Ref. Section 10.1
H. Inspection and test equipment calibration records. Ref. Section 11.1
I. Personnel training. Ref. Section 18.1
J. Records of any other related documents pertaining to the quality system and purchase order
and/or contractual requirements.
K. Audit reports. Ref section 17.1
L. Management review reports. Ref. Section 1.1
1. Supplier records. Ref. Section 6.1
2. Subcontractor records. Ref. Section 6.1
3. RMA’s (Data from technician reports). Ref. Section 13.1
M. Corrective action reports. Ref. Section 14.1
N. Quotes. Ref. Section 3.1
O. Contract Review Problem form. Ref. Section 3.1
16.1.4. The person who is responsible for the records listed is responsible for the access, collection,
16.1.7. All records shall be legible and contain, as a minimum, the Siemens Job number and/or part
number.
16.1.8. All quality records shall be stored and retained in such a way that they are identifiable and
readily retrievable in facilities that provide a suitable environment to prevent damage or deterioration
and to prevent loss.
TABLE 1
1. Siemens Mfg. Co., Inc. has established and maintains specific methods for planning and
implementing internal quality audits to verify whether quality activities and related results comply with
planned arrangements and to determine the effectiveness of the quality system. These methods, as
described in the Internal Quality Audit Procedure (Section 17.1), address audit scheduling, corrective
action on deficiencies found during an audit, follow-up audit activities to verify corrective action, as
well as Auditor independence.
2. Records of Quality Audits, as well as the results of the audits, shall be maintained per section 16.
SECTION 17.1
INTERNAL QUALITY AUDIT PROCEDURE
17.1.1. Quality System Manager is responsible for planning and implementing internal quality audits,
and establishing an audit schedule. A minimum of two process audits and one compliance audit will be
performed per year. The Quality System Manager can revise the audit schedule based on information or
data analysis and the importance of the area being audited as well as the results of previous audits.
17.1.2. Qualified auditors will audit all in-house Quality System policies and procedures (exception:
auditors will not audit their own work). The auditor will be trained (Certified by a 3rd party) to perform
the assigned function or shall have sufficient experience ( 2 years auditing to ISO or equivalent
standards) in auditing to accomplish the task.
17.1.3. Auditors will be selected ( if not already certified) by an interview process using criteria listed on
the Auditor Job posting. Successful candidates will then be sent to a 3rd party for training /certification.
17.1.4 Auditors will be re-trained when changes occur to the Quality System manual or to the ISO
standards. Auditors, additionally, will be evaluated annually by the Quality Manager. (Observe &
evaluate an audit, as well as a written test)
17.1.5. Auditors are independent of the area being audited. The auditor will be made available when it is
time to perform an audit or a follow-up audit.
17.1.6. The results of the audit will be recorded on Form QC 29 which will be forwarded to the
Supervisor responsible for the area being audited for review. The Supervisor responsible for the area
audited shall take corrective action (Form QC 16, or equivalent) within 30 days on deficiencies found
during the audit. Form QC 16 will be filed with the Quality System Manager for follow-up purposes.
17.1.7. A follow-up audit will verify and record (Form QC 29) the implementation and effectiveness of
the corrective action taken. The follow-up audit will also record unresolved deficiencies.
17.1.8. The results of the audit and corrective action will be forwarded to the Quality System Manager
for Management Review and, if necessary, further corrective action.
1. Siemens Mfg. Co., Inc. has established and maintains specific methods for determining training needs
and provide for the training of all personnel performing tasks affecting conformity to product
requirements.
2. Personnel performing specific assigned tasks shall be qualified on the basis of education, training
and/or experience, as required.
3. Quality System Manager is responsible through training and monitoring for having personnel
correctly and consistently use various forms, cross-referenced in this manual. This will assure
traceability through documentation, from the beginning of the contract to the shipping of product. The
Quality System Manager is also responsible for submitting copies of the Quality System Manual to
designated personnel to insure proper preparation and training in all applicable facets of this quality
system and will ensure that training is provided by qualified personnel.
4. It is the responsibility of the Supervisor in charge of a given department to determine training needs
and ensure that all personnel in their department that require training, are trained and competent.
5. Records of personnel training are kept as stated in Section 16.
SECTION 18.1
PERSONNEL TRAINING
18.1.1. When job assignments, special processes, inspection or testing requires special skills or
knowledge in manufacturing, production, or quality control (ref: Training Log, computer file), personnel
shall be trained (and competency determined) by reviewing relevant procedures and providing hands-on
training where applicable . The person doing the training is responsible for filling out the training record.
18.1.2. A Training Log (computer file) shall be maintained by the QC manager (or the HR Mgr) for all
personnel, and is available for review. The log will include, as a minimum, the person’s name, and the
type and date of skill trained in.
18.1.3. Training is provided also, when applicable, to inspection, manufacturing, production, and
management personnel to familiarize them with procedures and instructions given in the quality system
manual and respective forms within 30 days of employment(ref: training checklist), as well as with in-
plant defects and the Siemens Quality Policy.
18.1.4. Technicians (who troubleshoot defective product) must have scored at least 60% (those hired
after 1 July 1998) on the Siemens technician test and have at least a 2 year degree/certificate in a related
field. 4 years experience in a related field can be substituted for the 2 year degree/certificate or the test.
Other jobs at Siemens have no minimal requirements, however, related experience is beneficial.
18.1.5. Employees shall be retrained when a supervisor has determined that a significant change has
occurred in the manufacturing plant procedures and/or processes applicable to their area, or when
proficiency or quality performance becomes substandard. Personnel who are involved in the
manufacturing of medical devices will be retrained in those procedures if more than 6 months have
SECTION 19
SERVICING
1. If required by contract, servicing can be implemented and a plan for implementation will be
developed as part of Quality Planning (ref: SECTION 2).
2. The Quality Plan will address the issues of establishing and maintaining documented procedures for
performing, verifying, and reporting that the servicing meets the specified requirements.
1. Siemens Mfg. Co., Inc. has established and maintains specific methods to implement and control the
application of statistical techniques, and these methods are described in Section 20.1.
SECTION 20.1
STATISTICAL TECHNIQUES
20.1.1. All components will be inspected using the DODGE and Romig single sampling plan,
AOQL=5%.
20.1.2. Outgoing inspection at both plants will be performed using the DODGE and Romig single
sampling plan, AOQL=5%
20.1.3. All inspections are performed using the criteria of accept the lot on zero defects and reject the lot
on one or more defects.
20.1.4. If required by contract, SPC can be implemented and a plan for implementation will be
developed as part of Quality Planning (ref: SECTION 2).
20.1.5. Ionic Residue limits are outlined in the Joint Industry Standard ANSI/J-STD-001, 2005 ver.,
Section 8.3.6.1.
REFERENCES:
Form QC 1
Form QC 1
Section 3.1 3/1/01 Perry Danford Changed responsibilities from “ Order Entry” to
QC Manager “Customer Service”
Section 10.1.25 8/3/01 Perry Danford Added “ If additional tests are required by the
Page 34 QC Manager customer, ...”.
Section 10.1.1 8/3/01 Perry Danford Was “ Inspection personnel shall transcribe...”
Page 30 QC Manager Now is “Data entry personnel shall transcribe...”
Section 3.1.4 10/31/01 Perry Danford Was ”clerical personnel shall assign a quote number”
Page 7 QC Manager Now is “quote estimator assigns the quote number”
Section 3.1.6.C 10/31/01 Perry Danford Was “... stamp P.O ACCEPTED...”
Page 8 QC Manager Now is “...stamp the P.O. ENTERED and DATED”
Section 3.1.6b 10/31/01 Perry Danford Was “...fill out form QC 18...”
Page 8 QC Manager Now is “update the Sales Order computer...”
Section 3.1.8 10/31/01 Perry Danford Added “forwarded to the documentation department
Page 9 QC Manager for verification.”
Section 3.1.8 10/31/01 Perry Danford Added “QC 17 to be used on formal rev changes”
Page 9 QC Manager
Section 3.1.8a 10/31/01 Perry Danford Added “ forwarded to the document department for
Page 9 QC Manager verification”
Section 6.1.1 10/31/01 Perry Danford Was “... form QC 18"
Page 19 QC Manager Now is “... purchase order”
Form QC 2 12 19/01 Perry Danford Modified organizational chart to reflect changes
QC Manager within the purchasing dept.
Section 18.1.2 1/31/02 Perry Danford Was “Training Specialist responsibility”
Page 53 Now is “QC Manager responsibility”.
Section 18.1.3 2/13/02 Perry Danford added training checklist
Page 53