Pukal 7

The document contains layout plans for two floors of a building at a scale of 1:200. The first floor plan shows rooms labeled PUKAL-5, 7, 9, and 17 and includes areas for classes, medical procedures, toilets, doctor and nurse stations, storage, and more. The second floor plan is similar but shows rooms labeled VIP, Super VIP, and includes an area for management. Additional pages include elevation views labeled 1 through 4.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
52 views44 pages

Pukal 7

The document contains layout plans for two floors of a building at a scale of 1:200. The first floor plan shows rooms labeled PUKAL-5, 7, 9, and 17 and includes areas for classes, medical procedures, toilets, doctor and nurse stations, storage, and more. The second floor plan is similar but shows rooms labeled VIP, Super VIP, and includes an area for management. Additional pages include elevation views labeled 1 through 4.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 44

PUKAL - 17

PUKAL - 5

PUKAL - 7

PUKAL - 9

LAYOUT PLAN 1 : 200


A
R
TA
U
± 0.00

R. ISOLASI TOILET
- 0.10
TOILET
- 0.10
TOILET
- 0.10
TOILET
- 0.10
± 0.00

R. KELAS 3 R. KELAS 3 R. KELAS 3 R. KELAS 3 R. KELAS 3 R. KELAS 3 R. KELAS 3


± 0.00 ± 0.00 ± 0.00 ± 0.00 ± 0.00 ± 0.00 ± 0.00

DEPO OBAT
R. TINDAKAN
± 0.00
± 0.00 TOILET TOILET TOILET
SPOEL HOCK - 0.10 - 0.10 - 0.10
± 0.00

± 0.00 ± 0.00
KE GENERAL CHECK UP

TOILET TOILET TOILET


TOILET
- 0.10 - 0.10 - 0.10
- 0.10
NURSE STATION R. DOKTER
± 0.00 ± 0.00
R. KELAS 3 R. KELAS 3 R. KELAS 3 R. KELAS 3 R. KELAS 3 R. KELAS 3 R. KELAS 3
± 0.00 ± 0.00 ± 0.00 ± 0.00 ± 0.00 ± 0.00 ± 0.00

NURSE RESTING
± 0.00 TOILET TOILET
PANTRY TOILET TOILET TOILET
- 0.10 - 0.10
± 0.00 - 0.10 - 0.10 - 0.10

- DENAH LANTAI 1 1:200

02
+ 4.50

R. MANAJEMEN TOILET
+ 4.40
TOILET
+ 4.40
TOILET
+ 4.40
TOILET
+ 4.40
TOILET
+ 4.40
+ 4.50

R. KELAS VIP R. KELAS VIP R. KELAS VIP R. KELAS VIP R. KELAS VIP
+ 4.50 + 4.50 + 4.50 + 4.50 +4.50 R. KELAS SUPER VIP
+ 4.50
R. TINDAKAN
+ 4.50 TOILET TOILET
SPOEL HOCK + 4.40 + 4.40
+ 4.50

+ 4.50 + 4.50 R. TUNGGU


+ 4.50

TOILET
TOILET TOILET T
+ 4.40 + 4.40
+ 4.40
NURSE STATION R. DOKTER
+ 4.50 + 4.50
R. KELAS SUPER VIP
R. KELAS VIP R. KELAS VIP R. KELAS VIP R. KELAS VIP R. KELAS VIP + 4.50
+ 4.50 + 4.50 + 4.50 + 4.50 +4.50

NURSE RESTING
+ 4.50 TOILET TOILET
PANTRY TOILET TOILET TOILET
+ 4.40 + 4.40 + 4.40
+ 4.50 + 4.40 + 4.40

+ 4.50

- DENAH LANTAI 2 1:200

03
- TAMPAK SATU (1) 1:200

04
- TAMPAK DUA (2) 1:200

05
- TAMPAK TIGA (3) 1:200

06
- TAMPAK EMPAT (4) 1:200

07
- POTONGAN A-A 1:200

08
Balok 30 / 55 Balok 30 / 55

- POTONGAN B-B 1:200

09
- DENAH LAYOUT R. KELAS 3 NON SKALA

10
- INTERIOR R. KELAS 3 NON SKALA

11
- DENAH LAYOUT R. KELAS VIP NON SKALA

12
- INTERIOR R. KELAS VIP NON SKALA

13
- DENAH LAYOUT R. KELAS SUPER NON SKALA
VIP

14
- INTERIOR R. KELAS SUPER VIP NON SKALA

15
± 0.00

- 0.10

± 0.00 ± 0.00 ± 0.00 ± 0.00 ± 0.00 ± 0.00 ± 0.00

± 0.00

-0.10 -0.10 -0.10 -0.10

± 0.00 ± 0.00
± 0.00

± 0.00 ± 0.00 ± 0.00 ± 0.00 ± 0.00 ± 0.00 ± 0.00

± 0.00
- 0.10

± 0.00

± 0.00

- RENCANA FINISHING DINDING 1:200


DAN LANTAI (LANTAI 1)

16
- RENCANA FINISHING DINDING 1:200
DAN LANTAI (LANTAI 2)

17
ELEV. PLAFON
+ 3.50

ELEV. ELEV. ELEV. ELEV. ELEV.


PLAFON PLAFON PLAFON PLAFON PLAFON
ELEV. PLAFON + 3.50 + 3.50 + 3.50 + 3.50 + 3.50
+ 3.50

ELEV. PLAFON ELEV. PLAFON ELEV. PLAFON ELEV. PLAFON ELEV. PLAFON ELEV. PLAFON ELEV. PLAFON
+ 3.50 + 3.50 + 3.50 + 3.50 + 3.50 + 3.50 + 3.50
ELEV. PLAFON
ELEV.
ELEV. PLAFON ELEV. + 3.50
PLAFON ELEV. ELEV. ELEV.
+ 3.50 + 3.50 PLAFON PLAFON PLAFON PLAFON
+ 3.50 + 3.50 + 3.50 + 3.50

ELEV. PLAFON ELEV. PLAFON


ELEV. PLAFON + 3.50 + 3.50
+ 3.50

ELEV. ELEV. ELEV. ELEV.


PLAFON PLAFON PLAFON PLAFON
ELEV. PLAFON + 3.50 + 3.50 + 3.50 + 3.50
+ 3.50 ELEV.
PLAFON
+ 3.50
ELEV. PLAFON ELEV. PLAFON ELEV. PLAFON ELEV. PLAFON ELEV. PLAFON ELEV. PLAFON ELEV. PLAFON
+ 3.50 + 3.50 + 3.50 + 3.50 + 3.50 + 3.50 + 3.50
ELEV.
PLAFON ELEV. ELEV. ELEV. ELEV. ELEV.
ELEV.
+ 3.50
PLAFON PLAFON PLAFON PLAFON PLAFON PLAFON
+ 3.50 + 3.50 + 3.50 + 3.50 + 3.50 + 3.50

ELEV. PLAFON
+ 3.50

- RENCANA PLAFOND LANTAI 1 1:200

18
ELEV. PLAFON
+ 8.00

ELEV. ELEV. ELEV. ELEV. ELEV.


PLAFON PLAFON PLAFON PLAFON PLAFON
ELEV. PLAFON + 8.00 + 8.00 + 8.00
+ 8.00 + 8.00
+ 8.00

ELEV. PLAFON ELEV. PLAFON ELEV. PLAFON ELEV. PLAFON ELEV. PLAFON ELEV. PLAFON
+ 8.00 + 8.00 + 8.00 + 8.00 + 8.00 + 8.00
ELEV.
ELEV. PLAFON PLAFON ELEV. ELEV. ELEV.
+ 8.00 + 8.00 PLAFON PLAFON
PLAFON
+ 8.00 + 8.00 + 8.00
ELEV.
PLAFON
+ 8.00
ELEV. PLAFON
+ 8.00

ELEV. ELEV. ELEV.


PLAFON PLAFON PLAFON
ELEV. PLAFON + 8.00 + 8.00 + 8.00
+ 8.00 ELEV.
PLAFON
+ 8.00
ELEV. PLAFON ELEV. PLAFON ELEV. PLAFON ELEV. PLAFON ELEV. PLAFON ELEV. PLAFON ELEV.
+ 8.00 + 8.00 + 8.00 + 8.00 + 8.00 + 8.00 PLAFON
+ 8.00
ELEV.
PLAFON ELEV. ELEV. ELEV. ELEV.
+ 8.00 PLAFON PLAFON PLAFON PLAFON
+ 8.00 + 8.00 + 8.00 + 8.00

ELEV. PLAFON
+ 8.00

ELEV. PLAFON
+ 8.00

- RENCANA PLAFOND LANTAI 2 1:200

19
TOILET TOILET TOILET TOILET
- 0.10 - 0.10 - 0.10 - 0.10

TYPE E TYPE E TYPE E TYPE E

TYPE E TYPE E TYPE E

TOILET TOILET TOILET


- 0.10 - 0.10 - 0.10

TOILET TOILET TOILET


TOILET - 0.10 - 0.10 - 0.10
- 0.10

TYPE D TYPE A TYPE A TYPE A

TYPE B TYPE A TYPE A TYPE A

TOILET TOILET
TOILET TOILET TOILET
- 0.10 - 0.10
- 0.10 - 0.10 - 0.10

TYPE B

- RENCANA KM/WC 1:200


LANTAI 1

20
TOILET TOILET TOILET TOILET TOILET
+ 4.40 + 4.40 + 4.40 + 4.40

TYPE B TYPE A TYPE A TYPE C

TYPE A TYPE A

TOILET TOILET
+ 4.40 + 4.40

TOILET TOILET
TOILET
+ 4.40 + 4.40 + 4.40

TYPE D
TYPE A TYPE A

TYPE B TYPE A TYPE A TYPE C

TOILET TOILET
TOILET TOILET
+ 4.40 + 4.40 + 4.40
+ 4.40 + 4.40

- RENCANA KM/WC 1:200


LANTAI 2

21
Homogeneus Tile 60 x 60
(antislip)
- 0.10
- 0.10 - 0.10

Homogeneus Tile
60 x 60 (antislip)

- 0.10

- DETAIL KM/WC LANTAI 1 1:50

22
Homogeneus Tile
60 x 60 (antislip)

- 0.10

Homogeneus Tile
60 x 60 (antislip)

- 0.10

- DETAIL KM/WC LANTAI 1 1:50

23
Homogeneus Tile 60 x 60
(antislip)
+ 4.40
+ 4.40 + 4.40

Homogeneus Tile
60 x 60 (antislip)

+ 4.40

- DETAIL KM/WC LANTAI 2 1:50

24
Homogeneus Tile
60 x 60 (antislip)
+ 4.40

- DETAIL KM/WC LANTAI 2

25
R. ISOLASI TOILET
- 0.10
TOILET
- 0.10
TOILET
- 0.10
TOILET
- 0.10
± 0.00

R. KELAS 3 R. KELAS 3 R. KELAS 3 R. KELAS 3 R. KELAS 3 R. KELAS 3 R. KELAS 3


± 0.00 ± 0.00 ± 0.00 ± 0.00 ± 0.00 ± 0.00 ± 0.00

DEPO OBAT
R. TINDAKAN
± 0.00
± 0.00 TOILET TOILET TOILET
SPOEL HOCK - 0.10 - 0.10 - 0.10
± 0.00

KE GENERAL CHECK UP

TOILET TOILET TOILET


TOILET
- 0.10 - 0.10 - 0.10
- 0.10
NURSE STATION R. DOKTER
± 0.00 ± 0.00
R. KELAS 3 R. KELAS 3 R. KELAS 3 R. KELAS 3 R. KELAS 3 R. KELAS 3 R. KELAS 3
± 0.00 ± 0.00 ± 0.00 ± 0.00 ± 0.00 ± 0.00 ± 0.00

NURSE RESTING
± 0.00 TOILET TOILET
PANTRY TOILET TOILET TOILET
- 0.10 - 0.10
± 0.00 - 0.10 - 0.10 - 0.10

- RENCANA PINTU DAN JENDELA 1:200


LANTAI 1

26
TOILET TOILET TOILET TOILET TOILET
+ 4.40 + 4.40 + 4.40 + 4.40 + 4.40

TOILET TOILET
+ 4.40 + 4.40

TOILET TOILET
TOILET
+ 4.40 + 4.40
+ 4.40

TOILET TOILET
TOILET TOILET TOILET
+ 4.40 + 4.40 + 4.40
+ 4.40 + 4.40

- RENCANA PINTU DAN JENDELA 1:200


LANTAI 2

27
Kusen : Aluminium Finish Powder Coating 4"
Daun Pintu : Double Multiplek 9mm Lapis HPL
- DETAIL KUSEN PINTU P1 1:30

Rangka : Kayu kering oven


Daun Ventilasi : Slimar Aluminium Powder Coating
Kaca : Kaca bening t = 5 mm
Hardware & accesories

28
Kusen : Aluminium Finish Powder Coating 4"
Daun Pintu : Double Multiplek 9mm Lapis HPL
- DETAIL KUSEN PINTU P2 1:30

Rangka : Kayu kering oven


Daun Ventilasi : Slimar Aluminium Powder Coating
Kaca : Kaca bening t = 5 mm
Hardware & accesories

29
Kusen : Aluminium Finish Powder Coating 4"
Daun Pintu : Double Multiplek 9mm Lapis HPL+
- DETAIL KUSEN PINTU P3 1:30

Aluminium Sheet bagian dalam


Rangka : Kayu kering oven
Daun Ventilasi : Slimar Aluminium Powder Coating
Kaca : Kaca bening t = 5 mm
Hardware & accesories
30
C

POT. A

POT. B

Kusen : Aluminium Finish Powder Coating 4"


Daun Pintu : Double Multiplek 9mm Lapis HPL
- DETAIL KUSEN PINTU P5 1:30

Rangka : Kayu kering oven


Daun Ventilasi : Slimar Aluminium Powder Coating
Kaca : Kaca bening t = 5 mm
Hardware & accesories

31
Kusen : Aluminium Finish Powder Coating 4"
Daun Jendela : Slimar Aluminium Powder Coating
- DETAIL KUSEN PINTU PS 1:30

Kaca : Kaca bening t = 5 mm


Hardware & accesories

32
Kusen : Aluminium Finish Powder Coating 4"
Daun Jendela : Slimar Aluminium Powder Coating
- DETAIL KUSEN JENDELA J1 1:30

Kaca : Kaca bening t = 5 mm


Hardware & accesories

33
Kusen : Aluminium Finish Powder Coating 4"
Daun Jendela : Slimar Aluminium Powder Coating
- DETAIL KUSEN JENDELA J2 1:30

Kaca : Kaca bening t = 5 mm


Hardware & accesories

34
Kusen : Aluminium Finish Powder Coating 4"
Daun Jendela : Slimar Aluminium Powder Coating
- DETAIL KUSEN JENDELA J3 1:30

Kaca : Kaca bening t = 5 mm


Hardware & accesories

35
A

Kusen : Aluminium Finish Powder Coating 4"


Daun Jendela : Slimar Aluminium Powder Coating
- DETAIL KUSEN JENDELA J4 1:30

Kaca : Kaca bening t = 5 mm


Hardware & accesories

36
B

POT. A

POT. B

Kusen : Aluminium Finish Powder Coating 4"


Daun Jendela : Slimar Aluminium Powder Coating
- DETAIL KUSEN BOVEN BV1 1:30

Kaca : Kaca bening t = 5 mm


Hardware & accesories

37
B

POT. A

Kusen : Aluminium Finish Powder Coating 4"


Daun Jendela : Slimar Aluminium Powder Coating
- DETAIL KUSEN BOVEN BV2 1:30

Kaca : Kaca bening t = 5 mm


Hardware & accesories

38
Kusen : Aluminium Finish Powder Coating 4"
Daun Jendela : Slimar Aluminium Powder Coating
- DETAIL KUSEN BOVEN BV3 1:30

Kaca : Kaca bening t = 5 mm


Hardware & accesories

39
B

Kusen : Aluminium Finish Powder Coating 4"


Daun Jendela : Slimar Aluminium Powder Coating
- DETAIL KUSEN JENDELA GEVEL 1:30

Kaca : Kaca bening t = 5 mm


Hardware & accesories

40
- DETAIL SUNSCREEN ALUMINIUM 1:30

41
KEY PLAN
NTS

LT.2
+ 4.50

SPESI+KERAMIK
T=3 CM

SPESI+KERAMIK
T=3 CM

DENAH TANGGA DARI LANTAI 1 DENAH TANGGA DARI LANTAI 2 DENAH TANGGA DARI LANTAI 2
SKALA 1 : 50 SKALA 1 : 50 SKALA 1 : 50

PIPA BESI FINISHED CAT DUKO Ø2"


PIPA BESI FINISHED CAT DUKO Ø2"

LT.2
PIPA BESI FINISHED CAT DUKO Ø2"
PIPA BESI FINISHED CAT DUKO Ø2"

30
+3.50
16

PLAT TANGGA t=15cm

KERAMIK+SPESI t=3cm

DETAIL TANGGA A DETAIL TANGGA B DETAIL TANGGA C


SKALA 1 : 50 SKALA 1 : 50 SKALA 1 : 50 - RENCANA DAN DETAIL TANGGA 1:50

42
- RENCANA SALURAN AIR HUJAN 1:200

43
MT

DETAIL SALURAN AIR HUJAN DETAIL BAK KONTROL


SKALA 1:15 SKALA 1:15

MT MT

POT. A BAK KONTROL POT. B BAK KONTROL


SKALA 1:15 SKALA 1:15 - DETAIL SALURAN AIR HUJAN 1:15

44