The document provides a configuration checklist for SAP PP (Production Planning) with 36 items. It lists the IMG path for each configuration step, such as defining distribution keys, determining persons responsible for resources, defining planner groups, and specifying scheduling parameters. The checklist covers master data, materials management, process management, process orders, and number range configuration.
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0 ratings0% found this document useful (0 votes)
129 views
Configuration Checklist For SAP PP
The document provides a configuration checklist for SAP PP (Production Planning) with 36 items. It lists the IMG path for each configuration step, such as defining distribution keys, determining persons responsible for resources, defining planner groups, and specifying scheduling parameters. The checklist covers master data, materials management, process management, process orders, and number range configuration.
IMG -> Production Planning for Process Industries -> Master
Data -> Resource -> General Data -> Standard Value -> Define Parameter
6) Define Setup Groups and Setup Group Categories
IMG -> Production Planning for Process Industries -> Master
Data -> Master Recipe -> Data for operations and phases -> Define set up groups and set up group categories 7) Define copy setting between plants-Process
IMG -> Production Planning for Process Industries -> Process
Management -> Tools -> Define copy setting between plants
8) Define Set Up Control Recipe destination
IMG -> Production Planning for Process Industries -> Process
Management -> Control Recipe/PI sheet -> Set up control recipe destination
9) Define MRP controller
IMG -> Material Management -> Consumption based Planning
-> Master Data -> Define MRP controller
10) Special Procurement
IMG -> Material Management -> Consumption based Planning
-> Master Data -> Define Special procurement types
11) Define Floats (Scheduled Margin Key)
IMG -> Material Management -> Consumption based Planning