Ra Bill 1 - Final
Ra Bill 1 - Final
1 Structure 30.00
1.1. Sub-structure, Foundations
Marking, Earth Work, PCC, Footing, Column up to Plinth, Plinth Beam a Villa
6.00
First Floor
• Columns and Slope Roof 6.00 a Villa
• FF Roof Slab 7.00 a Villa
2 Masonry & Plastering 15.00
2.1. Masonry Works
• GF Masonry Works up to Roof including Lintel and Sunshades 2.00 a Villa
• FF Masonry Works up to Roof including Lintel, Lofts and Sunshades a Villa
2.00
• GF 1.00
• FF 1.00
5 Painting Works 10.00
• GF 3.00
• FF 3.00
• GF 2.00
• FF 2.00
• Marking, Wall Chasing, Pipe Works for Water & Waste Line incl Pressure
Testing
1.00
• Pipe Works for Water Line, Waste Line & Rain Water down take lines
0.50
• Gully Traps & Chambers with connections complete (Pumps & Valves),
Supply & Fixing Syntex Tank & Connections (Pumps & Valves) 0.25
TOTAL 100.00
NAME OF THE WORK : CONSTRUCTION OF "SHRIRAM SHRESHTA" VILLAS AT COIMBATORE
NAME OF THE OWNER : M/S. SHRIPROP CONSTRUCTIONS PVT LTD
NAME OF THE CONTRACTOR : M/S. SENTHIL CONSTRUCTION CORPORATION PVT.LTD
BILL NO : FIRST RUNNING BILL DATE: 17.12.14
BILLING PERIOD : 01.11.14 to 10.12.014
Block No of Percentage of
S.no Type Villa No Value of work completed
No Villas Built work completed
Rate
up
per sft Upto current Upto
area previous previous Current bill Cumulative bill
bill
Bill bill
1 4 3BHK 1 36A ( Mock up Villa) 1475 1395 Err:509 - Err:509 Err:509
AUTHORISED SIGNATORY
NAME OF WORK : CONSTRUCTION OF SHRESTA VILLAS AT MADUKKARAI,COIMBATORE
NAME OF OWNER : M/S. SHRIRAM PROPERTIES (COIMBATORE) PVT LTD
NAME OF CONTRACTOR : M/S. SENTHIL CONSTRUCTION CORPORATION PVT.LTD
BILL NO : FIRST RUNNING BILL A.SHEET FOR VILLA 36A
DATE :01.11.14 to 10.12.014
AREA 1475 SFT Overall
1. 4 6 7 8 9 10 13 14 15 16 19 20 21 25 26
3BHK 4BHK 4BHK 4BHK 4BHK 4BHK 4BHK 4BHK 3BHK 3BHK 3BHK 3BHK 3BHK 3BHK 3BHK
Description of work 36A 50 54 56 60 65 66 68 70 72 72a 73 74 77 78 83 91 113 115 117 119 120 121 123 124 126A 128 130 126 131 142 169 171A 171 174 177 178 187 194 226 231 234A 245
Structure
1 30
1.1. Sub-structure, Foundations
Marking, Earth Work, PCC, Footing, Column
up to Plinth, Plinth Beam 6 6 4 4 4 4 4 6 5 4 4 6 6 6 5 5 5 6 5 5 5 6 5 5 6 6 5 6 6 5 6 5 4 5 5 5 5 5 4 3 4 5 4 5
1.2. Super-structure - RCC frame
Ground Floor
• GF
3
• FF
3
2.3. Plastering in External Elevation in all floors
5 5
Flooring, Dado & Skirting
3 20
3.1. Flooring & Skirting
• GF-Foyer, Living, Dining, Kitchen,
Bedroom 4
• FF-All Bedrooms, lobby & Balconies
4
• Clay tiling at all Open terraces
2
• Car Park & All round villa flagging
concrete and other finishing Works 2
3.2. All Dadoo, Granite & Flooring
• GF Toilet, Dining & Kitchen Granite Works
with Sink 3
• FF All Toilets
3
3.3. Staircase & Landings, etc.,
2
Joinery & MS Railing Works
4 14
4.1. Door frames & Shutters
• GF
3
• FF
3
4.2. Window frames & Shutters
• GF
3
• FF
3
MS Railing Works for Windows, Staircase,
4.3.
Balcony & Terrace
• GF
1
• FF
1
Painting Works
5 10
5.1. Painting of Internal Walls & Ceilings
• GF
3
• FF
3
5.2. Painting for External Elevation
• GF
2
• FF
2
Water proofing Works in all floors
6 4
6.1. Toilet Water Proofing
2
6.2. Terrace, balcony water Proofing
2
Plumbing & Sanitary Works in all floors
7 4
7.1. Internal Plumbing and Sanitary Works
• Marking, Wall Chasing, Pipe Works for
Water & Waste Line incl Pressure testing
1
• Fixing CP & Sanitary fittings
2
7.2. External Plumbing and Sanitary lines
• Pipe Works for Water Line, Waste Line &
Rain Water down take lines 1
• Gully Traps & Chambers with connections
complete (Pumps & Valves), Supply & Fixing
0
Syntex Tank & Connections (Pumps & Valves)
• Testing, Commissioning and Handing Over
0
Miscellaneous Works in all floors
8 3
Expansion Joint Treatment Works & Flagging
8.1.
Concrete 1
8.2. MS Staircase to terrace & Fencing for site
2
TOTAL
100 39 4 4 4 4 4 9 5 4 4 6 6 6 5 5 5 6 5 5 5 6 5 5 9 6 5 6 9 5 9 5 4 5 5 5 5 5 4 3 4 5 4 5
NAME OF THE WORK : CONSTRUCTION OF "SHRIRAM SHRESHTA" VILLAS
NAME OF THE OWNER : M/S. SHRIPROP CONSTRUCTIONS PVT LTD
NAME OF THE CONTRACTOR : M/S. SENTHIL CONSTRUCTION CORPORATION PVT.LT
BILL NO : FIRST RUN DATE: 17.12.14
BILLING PERIOD : 01.11.14 to 10.12.014
Total value of
S.no Block No Type Villa No Area Rate/Sft Percentage of work completed
work
Upto previous
Bill
AUTHORISED SIGNATORY
AM SHRESHTA" VILLAS AT COIMBATORE
IONS PVT LTD
ON CORPORATION PVT.LTD
Upto previous
current bill Current bill Cumulative bill
bill
0 - 740,745 740,745
5873700
NAME OF THE WORK : CONSTRUCTION OF "SHRIRAM SHRESHTA" VILLAS AT COIMBATORE
NAME OF THE OWNER : M/S. SHRIPROP CONSTRUCTIONS PVT LTD
NAME OF THE CONTRACTOR : M/S. SENTHIL CONSTRUCTION CORPORATION PVT.LTD
BILL NO : FIRST RUNNING BILL DATE: 17.12.14
BILLING PERIOD : 01.11.14 to 10.12.014
Percentage of work
S.no Block No Type Villa No Area Rate/Sft Total value of work Value of work completed
completed
Upto previous Upto previous
current bill Current bill Cumulative bill
Bill bill
1 6 4BHK Villa-50 1685 1395 2,350,575 4% - 94,023 94,023
AUTHORISED SIGNATORY
NAME OF THE WORK : CONSTRUCTION OF "SHRIRAM SHRESHTA" VILLAS AT COIMBATORE
NAME OF THE OWNER : M/S. SHRIPROP CONSTRUCTIONS PVT LTD
NAME OF THE CONTRACTOR : M/S. SENTHIL CONSTRUCTION CORPORATION PVT.LTD
BILL NO : FIRST RUNNING BILL DATE: 17.12.14
BILLING PERIOD : 01.11.14 to 10.12.014
VILLA 32A (3 BHK) - 1475 sft x Rs. 1395/ sft Rs 2,057,625
Percentage of work
Value of work completed
completed
Payment
S.No Description of work Upto
modality current Upto
previous Current bill Cumulative bill
bill previous bill
Bill
Structure
1 30%
1.1. Sub-structure, Foundations
Percentage of work
Value of work completed
completed
Payment
S.No Description of work Upto
modality current Upto
previous Current bill Cumulative bill
bill previous bill
Bill
Structure
1 30%
1.1. Sub-structure, Foundations
Percentage of work
Value of work completed
completed
Payment
S.No Description of work Upto
modality current Upto
previous Current bill Cumulative bill
bill previous bill
Bill
Structure
1 30%
1.1. Sub-structure, Foundations
Percentage of work
Value of work completed
completed
Payment
S.No Description of work Upto
modality current Upto
previous Current bill Cumulative bill
bill previous bill
Bill
Structure
1 30%
1.1. Sub-structure, Foundations
Percentage of work
Value of work completed
completed
Payment
S.No Description of work Upto
modality current Upto
previous Current bill Cumulative bill
bill previous bill
Bill
Structure
1 30%
1.1. Sub-structure, Foundations
Percentage of work
Value of work completed
completed
Payment
S.No Description of work Upto
modality current Upto
previous Current bill Cumulative bill
bill previous bill
Bill
Structure
1 30%
1.1. Sub-structure, Foundations
Percentage of work
Value of work completed
completed
Payment
S.No Description of work Upto
modality current Upto
previous Current bill Cumulative bill
bill previous bill
Bill
Structure
1 30%
1.1. Sub-structure, Foundations
Percentage of work
Value of work completed
completed
Payment
S.No Description of work Upto
modality current Upto
previous Current bill Cumulative bill
bill previous bill
Bill
Structure
1 30%
1.1. Sub-structure, Foundations
Percentage of work
Value of work completed
completed
Payment
S.No Description of work Upto
modality current Upto
previous Current bill Cumulative bill
bill previous bill
Bill
Structure
1 30%
1.1. Sub-structure, Foundations
Percentage of work
Value of work completed
completed
Payment
S.No Description of work Upto
modality current Upto
previous Current bill Cumulative bill
bill previous bill
Bill
Structure
1 30%
1.1. Sub-structure, Foundations
Percentage of work
Value of work completed
completed
Payment
S.No Description of work Upto
modality current Upto
previous Current bill Cumulative bill
bill previous bill
Bill
Structure
1 30%
1.1. Sub-structure, Foundations
Percentage of work
Value of work completed
completed
Payment
S.No Description of work Upto
modality current Upto
previous Current bill Cumulative bill
bill previous bill
Bill
Structure
1 30%
1.1. Sub-structure, Foundations
Percentage of work
Value of work completed
completed
Payment
S.No Description of work Upto
modality current Upto
previous Current bill Cumulative bill
bill previous bill
Bill
Structure
1 30%
1.1. Sub-structure, Foundations
Percentage of work
Value of work completed
completed
Payment
S.No Description of work Upto
modality current Upto
previous Current bill Cumulative bill
bill previous bill
Bill
Structure
1 30%
1.1. Sub-structure, Foundations
Percentage of work
Value of work completed
completed
Payment
S.No Description of work Upto
modality current Upto
previous Current bill Cumulative bill
bill previous bill
Bill
Structure
1 30%
1.1. Sub-structure, Foundations
Percentage of work
Value of work completed
completed
Payment
S.No Description of work Upto
modality current Upto
previous Current bill Cumulative bill
bill previous bill
Bill
Structure
1 30%
1.1. Sub-structure, Foundations
Percentage of work
Value of work completed
completed
Payment
S.No Description of work Upto
modality current Upto
previous Current bill Cumulative bill
bill previous bill
Bill
Structure
1 30%
1.1. Sub-structure, Foundations
Percentage of work
Value of work completed
completed
Payment
S.No Description of work Upto
modality current Upto
previous Current bill Cumulative bill
bill previous bill
Bill
Structure
1 30%
1.1. Sub-structure, Foundations
Percentage of work
Value of work completed
completed
Payment
S.No Description of work Upto
modality current Upto
previous Current bill Cumulative bill
bill previous bill
Bill
Structure
1 30%
1.1. Sub-structure, Foundations
Percentage of work
Value of work completed
completed
Payment
S.No Description of work Upto
modality current Upto
previous Current bill Cumulative bill
bill previous bill
Bill
Structure
1 30%
1.1. Sub-structure, Foundations
Percentage of work
Value of work completed
completed
Payment
S.No Description of work Upto
modality current Upto
previous Current bill Cumulative bill
bill previous bill
Bill
Structure
1 30%
1.1. Sub-structure, Foundations
Percentage of work
Value of work completed
completed
Payment
S.No Description of work Upto
modality current Upto
previous Current bill Cumulative bill
bill previous bill
Bill
Structure
1 30%
1.1. Sub-structure, Foundations
Percentage of work
Value of work completed
completed
Payment
S.No Description of work Upto
modality current Upto
previous Current bill Cumulative bill
bill previous bill
Bill
Structure
1 30%
1.1. Sub-structure, Foundations
Percentage of work
Value of work completed
completed
Payment
S.No Description of work Upto
modality current Upto
previous Current bill Cumulative bill
bill previous bill
Bill
Structure
1 30%
1.1. Sub-structure, Foundations
Percentage of work
Value of work completed
completed
Payment
S.No Description of work Upto
modality current Upto
previous Current bill Cumulative bill
bill previous bill
Bill
Structure
1 30%
1.1. Sub-structure, Foundations
Percentage of work
Value of work completed
completed
Payment
S.No Description of work Upto
modality current Upto
previous Current bill Cumulative bill
bill previous bill
Bill
Structure
1 30%
1.1. Sub-structure, Foundations
Percentage of work
Value of work completed
completed
Payment
S.No Description of work Upto
modality current Upto
previous Current bill Cumulative bill
bill previous bill
Bill
Structure
1 30%
1.1. Sub-structure, Foundations
Percentage of work
Value of work completed
completed
Payment
S.No Description of work Upto
modality current Upto
previous Current bill Cumulative bill
bill previous bill
Bill
Structure
1 30%
1.1. Sub-structure, Foundations
Percentage of work
Value of work completed
completed
Payment
S.No Description of work Upto
modality current Upto
previous Current bill Cumulative bill
bill previous bill
Bill
Structure
1 30%
1.1. Sub-structure, Foundations
Percentage of work
Value of work completed
completed
Payment
S.No Description of work Upto
modality current Upto
previous Current bill Cumulative bill
bill previous bill
Bill
Structure
1 30%
1.1. Sub-structure, Foundations
Percentage of work
Value of work completed
completed
Payment
S.No Description of work Upto
modality current Upto
previous Current bill Cumulative bill
bill previous bill
Bill
Structure
1 30%
1.1. Sub-structure, Foundations
Percentage of work
Value of work completed
completed
Payment
S.No Description of work Upto
modality current Upto
previous Current bill Cumulative bill
bill previous bill
Bill
Structure
1 30%
1.1. Sub-structure, Foundations
Percentage of work
Value of work completed
completed
Payment
S.No Description of work Upto
modality current Upto
previous Current bill Cumulative bill
bill previous bill
Bill
Structure
1 30%
1.1. Sub-structure, Foundations
Percentage of work
Value of work completed
completed
Payment
S.No Description of work Upto
modality current Upto
previous Current bill Cumulative bill
bill previous bill
Bill
Structure
1 30%
1.1. Sub-structure, Foundations
Percentage of work
Value of work completed
completed
Payment
S.No Description of work Upto
modality current Upto
previous Current bill Cumulative bill
bill previous bill
Bill
Structure
1 30%
1.1. Sub-structure, Foundations
Percentage of work
Value of work completed
completed
Payment
S.No Description of work Upto
modality current Upto
previous Current bill Cumulative bill
bill previous bill
Bill
Structure
1 30%
1.1. Sub-structure, Foundations
Percentage of work
Value of work completed
completed
Payment
S.No Description of work Upto
modality current Upto
previous Current bill Cumulative bill
bill previous bill
Bill
Structure
1 30%
1.1. Sub-structure, Foundations
Percentage of work
Value of work completed
completed
Payment
S.No Description of work Upto
modality current Upto
previous Current bill Cumulative bill
bill previous bill
Bill
Structure
1 30%
1.1. Sub-structure, Foundations
Percentage of work
Value of work completed
completed
Payment
S.No Description of work Upto
modality current Upto
previous Current bill Cumulative bill
bill previous bill
Bill
Structure
1 30%
1.1. Sub-structure, Foundations
Percentage of work
Value of work completed
completed
Payment
S.No Description of work Upto
modality current Upto
previous Current bill Cumulative bill
bill previous bill
Bill
Structure
1 30%
1.1. Sub-structure, Foundations
Percentage of work
Value of work completed
completed
Payment
S.No Description of work Upto
modality current Upto
previous Current bill Cumulative bill
bill previous bill
Bill
Structure
1 30%
1.1. Sub-structure, Foundations
Percentage of work
Value of work completed
completed
Payment
S.No Description of work Upto
modality current Upto
previous Current bill Cumulative bill
bill previous bill
Bill
Structure
1 30%
1.1. Sub-structure, Foundations
Percentage of work
Value of work completed
completed
Payment
S.No Description of work Upto
modality current Upto
previous Current bill Cumulative bill
bill previous bill
Bill
Structure
1 30%
1.1. Sub-structure, Foundations