This document provides a payment schedule for work completed on a construction project to build villas. It outlines 8 key stages of construction work including structure, masonry and plastering, flooring, joinery, painting, waterproofing, plumbing and sanitary works, and miscellaneous works. For each stage, it lists the specific tasks and allocates a percentage of the total payment to be made once that work is complete. It then provides details of progress and invoices for work already completed on 43 villas of various sizes, with a total invoiced amount to date.

Uploaded by

Shailesh Waran
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
44 views53 pages

Ra Bill 1 - Final

This document provides a payment schedule for work completed on a construction project to build villas. It outlines 8 key stages of construction work including structure, masonry and plastering, flooring, joinery, painting, waterproofing, plumbing and sanitary works, and miscellaneous works. For each stage, it lists the specific tasks and allocates a percentage of the total payment to be made once that work is complete. It then provides details of progress and invoices for work already completed on 43 villas of various sizes, with a total invoiced amount to date.

Uploaded by

Shailesh Waran
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 53

PAYMENT MODALITIES 01 12 2014

SN Stages % Work Unit

1 Structure 30.00
1.1. Sub-structure, Foundations
Marking, Earth Work, PCC, Footing, Column up to Plinth, Plinth Beam a Villa
6.00

1.2. Super-structure - RCC frame


Ground Floor
• Columns & Staircase First Flight 4.00 a Villa
• GF Roof and Portico Roof Slab including Staircase Second Flight a Villa
7.00

First Floor
• Columns and Slope Roof 6.00 a Villa
• FF Roof Slab 7.00 a Villa
2 Masonry & Plastering 15.00
2.1. Masonry Works
• GF Masonry Works up to Roof including Lintel and Sunshades 2.00 a Villa
• FF Masonry Works up to Roof including Lintel, Lofts and Sunshades a Villa
2.00

2.2. Plastering of ceiling and walls


• GF 3.00 a Villa
• FF 3.00 a Villa
2.3. Plastering in External Elevation in all floors 5.00 a Villa
3 Flooring, Dado & Skirting 20.00
3.1. Flooring & Skirting
• GF-Foyer, Living, Dining, Kitchen, Bedroom 4.00 a Villa
• FF-All Bedrooms, lobby & Balconies 4.00 a Villa
• Clay tiling at all Open terraces 2.00 a Villa
• Car Park & All round villa flagging concrete and other finishing Works a Villa
2.00

3.2. All Dadoo, Granite & Flooring


• GF Toilet, Dining & Kitchen Granite Works with Sink 3.00 a Villa
• FF All Toilets 3.00 a Villa
3.3. Staircase & Landings, etc., 2.00 a Villa
4 Joinery & MS Railing Works 14.00
4.1. Door frames & Shutters
• GF 3.00 a Villa
• FF 3.00 a Villa
4.2. Window frames & Shutters
• GF 3.00 a Villa
• FF 3.00 a Villa
4.3. MS Railing Works for Windows, Staircase, Balcony & Terrace

• GF 1.00

• FF 1.00
5 Painting Works 10.00

5.1. Painting of Internal Walls & Ceilings

• GF 3.00

• FF 3.00

5.2. Painting for External Elevation

• GF 2.00

• FF 2.00

6 Water proofing Works in all floors 4.00

6.1. Toilet Water Proofing 2.00

6.2. Terrace, balcony water Proofing 2.00

7 Plumbing & Sanitary Works in all floors 4.00

7.1. Internal Plumbing and Sanitary Works

• Marking, Wall Chasing, Pipe Works for Water & Waste Line incl Pressure
Testing
1.00

• Fixing CP & Sanitary fittings 2.00


7.2. External Plumbing and Sanitary lines

• Pipe Works for Water Line, Waste Line & Rain Water down take lines
0.50

• Gully Traps & Chambers with connections complete (Pumps & Valves),
Supply & Fixing Syntex Tank & Connections (Pumps & Valves) 0.25

• Testing, Commissioning and Handing Over 0.25

8 Miscellaneous Works in all floors 3.00

8.1. Expansion Joint Treatment Works & Flagging Concrete 1.00

8.2. MS Staircase to terrace & Fencing for site 2.00

TOTAL 100.00
NAME OF THE WORK : CONSTRUCTION OF "SHRIRAM SHRESHTA" VILLAS AT COIMBATORE
NAME OF THE OWNER : M/S. SHRIPROP CONSTRUCTIONS PVT LTD
NAME OF THE CONTRACTOR : M/S. SENTHIL CONSTRUCTION CORPORATION PVT.LTD
BILL NO : FIRST RUNNING BILL DATE: 17.12.14
BILLING PERIOD : 01.11.14 to 10.12.014

Block No of Percentage of
S.no Type Villa No Value of work completed
No Villas Built work completed
Rate
up
per sft Upto current Upto
area previous previous Current bill Cumulative bill
bill
Bill bill
1 4 3BHK 1 36A ( Mock up Villa) 1475 1395 Err:509 - Err:509 Err:509

2 6 4BHK 3 50,54,56 1685 1395 12% - 282,069 282,069


3 7 4BHK 2 60,65 1685 1395 8% - 188,046 188,046

4 8 4BHK 4 66,68,70,72 1685 1395 22% - 517,127 517,127

5 9 4BHK 6 72a,73,74,77,78,83 1685 1395 33% - 775,690 775,690


6 10 4BHK 1 91 1685 1395 9% - 211,552 211,552
7 13 4BHK 4 113,115,117,119 1685 1395 22% - 517,127 517,127
8 14 4BHK 8 120,121,123,124, 126,126A,128,130 1685 1395 50% - 1,175,288 1,175,288

9 15 3BHK 1 131 1475 1395 9% - 185,186 185,186

10 16 3BHK 1 142 1475 1395 4% - 82,305 82,305


11 19 3BHK 5 169,171,171A,174,177 1475 1395 24% - 493,830 493,830
12 20 3BHK 2 178,187 1475 1395 9% - 185,186 185,186

13 21 3BHK 1 194 1475 1395 3% - 61,729 61,729


14 25 3BHK 3 226,231,234A 1475 1395 13% - 267,491 267,491
15 26 3BHK 1 245 1475 1395 6% - 123,458 123,458

43 Total value - Err:509 - Err:509 Err:509

For SENTHIL CONSTRUCTION CORPORATION P.LTD (CONSTRUCTION)

AUTHORISED SIGNATORY
NAME OF WORK : CONSTRUCTION OF SHRESTA VILLAS AT MADUKKARAI,COIMBATORE
NAME OF OWNER : M/S. SHRIRAM PROPERTIES (COIMBATORE) PVT LTD
NAME OF CONTRACTOR : M/S. SENTHIL CONSTRUCTION CORPORATION PVT.LTD
BILL NO : FIRST RUNNING BILL A.SHEET FOR VILLA 36A
DATE :01.11.14 to 10.12.014
AREA 1475 SFT Overall
1. 4 6 7 8 9 10 13 14 15 16 19 20 21 25 26

3BHK 4BHK 4BHK 4BHK 4BHK 4BHK 4BHK 4BHK 3BHK 3BHK 3BHK 3BHK 3BHK 3BHK 3BHK

Description of work 36A 50 54 56 60 65 66 68 70 72 72a 73 74 77 78 83 91 113 115 117 119 120 121 123 124 126A 128 130 126 131 142 169 171A 171 174 177 178 187 194 226 231 234A 245
Structure
1 30
1.1. Sub-structure, Foundations
Marking, Earth Work, PCC, Footing, Column
up to Plinth, Plinth Beam 6 6 4 4 4 4 4 6 5 4 4 6 6 6 5 5 5 6 5 5 5 6 5 5 6 6 5 6 6 5 6 5 4 5 5 5 5 5 4 3 4 5 4 5
1.2. Super-structure - RCC frame

Ground Floor

• Columns & Staircase First Flight


4 4 3 3 3 3
• GF Roof and Portico Roof Slab including
Staircase Second Flight 7 7
First Floor

• Columns and Slope Roof


6 6
• FF Roof Slab
7 7
Masonry & Plastering
2 15
2.1. Masonry Works
• GF Masonry Works up to Roof including
Lintel and Sunshades 2 2
• FF Masonry Works up to Roof including
Lintel, Lofts and Sunshades 2 2
2.2. Plastering of ceiling and walls

• GF
3
• FF
3
2.3. Plastering in External Elevation in all floors
5 5
Flooring, Dado & Skirting
3 20
3.1. Flooring & Skirting
• GF-Foyer, Living, Dining, Kitchen,
Bedroom 4
• FF-All Bedrooms, lobby & Balconies
4
• Clay tiling at all Open terraces
2
• Car Park & All round villa flagging
concrete and other finishing Works 2
3.2. All Dadoo, Granite & Flooring
• GF Toilet, Dining & Kitchen Granite Works
with Sink 3
• FF All Toilets
3
3.3. Staircase & Landings, etc.,
2
Joinery & MS Railing Works
4 14
4.1. Door frames & Shutters

• GF
3
• FF
3
4.2. Window frames & Shutters

• GF
3
• FF
3
MS Railing Works for Windows, Staircase,
4.3.
Balcony & Terrace
• GF
1
• FF
1
Painting Works
5 10
5.1. Painting of Internal Walls & Ceilings

• GF
3
• FF
3
5.2. Painting for External Elevation

• GF
2
• FF
2
Water proofing Works in all floors
6 4
6.1. Toilet Water Proofing
2
6.2. Terrace, balcony water Proofing
2
Plumbing & Sanitary Works in all floors
7 4
7.1. Internal Plumbing and Sanitary Works
• Marking, Wall Chasing, Pipe Works for
Water & Waste Line incl Pressure testing
1
• Fixing CP & Sanitary fittings
2
7.2. External Plumbing and Sanitary lines
• Pipe Works for Water Line, Waste Line &
Rain Water down take lines 1
• Gully Traps & Chambers with connections
complete (Pumps & Valves), Supply & Fixing
0
Syntex Tank & Connections (Pumps & Valves)
• Testing, Commissioning and Handing Over
0
Miscellaneous Works in all floors
8 3
Expansion Joint Treatment Works & Flagging
8.1.
Concrete 1
8.2. MS Staircase to terrace & Fencing for site
2

TOTAL
100 39 4 4 4 4 4 9 5 4 4 6 6 6 5 5 5 6 5 5 5 6 5 5 9 6 5 6 9 5 9 5 4 5 5 5 5 5 4 3 4 5 4 5
NAME OF THE WORK : CONSTRUCTION OF "SHRIRAM SHRESHTA" VILLAS
NAME OF THE OWNER : M/S. SHRIPROP CONSTRUCTIONS PVT LTD
NAME OF THE CONTRACTOR : M/S. SENTHIL CONSTRUCTION CORPORATION PVT.LT
BILL NO : FIRST RUN DATE: 17.12.14
BILLING PERIOD : 01.11.14 to 10.12.014

Total value of
S.no Block No Type Villa No Area Rate/Sft Percentage of work completed
work

Upto previous
Bill

1 4 3BHK villa 36A 1475 1395 2,057,625

Value 1475 2,057,625

For SENTHIL CONSTRUCTION CORPORATION P.LTD (CONSTRUCTION)

AUTHORISED SIGNATORY
AM SHRESHTA" VILLAS AT COIMBATORE
IONS PVT LTD
ON CORPORATION PVT.LTD

ntage of work completed Value of work completed

Upto previous
current bill Current bill Cumulative bill
bill

36% - 740,745 740,745

0 - 740,745 740,745
5873700
NAME OF THE WORK : CONSTRUCTION OF "SHRIRAM SHRESHTA" VILLAS AT COIMBATORE
NAME OF THE OWNER : M/S. SHRIPROP CONSTRUCTIONS PVT LTD
NAME OF THE CONTRACTOR : M/S. SENTHIL CONSTRUCTION CORPORATION PVT.LTD
BILL NO : FIRST RUNNING BILL DATE: 17.12.14
BILLING PERIOD : 01.11.14 to 10.12.014

Percentage of work
S.no Block No Type Villa No Area Rate/Sft Total value of work Value of work completed
completed
Upto previous Upto previous
current bill Current bill Cumulative bill
Bill bill
1 6 4BHK Villa-50 1685 1395 2,350,575 4% - 94,023 94,023

2 6 4BHK Villa-54 1685 1395 2,350,575 4% - 94,023 94,023

3 6 4BHK Villa-56 1685 1395 2,350,575 4% - 94,023 94,023

4 7 4BHK Villa-60 1685 1395 2,350,575 4% - 94,023 94,023

5 7 4BHK Villa-65 1685 1395 2,350,575 4% - 94,023 94,023

6 8 4BHK Villa-66 1685 1395 2,350,575 9% - 211,552 211,552

7 8 4BHK Villa-68 1685 1395 2,350,575 5% - 117,529 117,529

8 8 4BHK Villa-70 1685 1395 2,350,575 4% - 94,023 94,023

9 8 4BHK Villa-72 1685 1395 2,350,575 4% - 94,023 94,023

10 9 4BHK Villa-72a 1685 1395 2,350,575 6% - 141,035 141,035

11 9 4BHK Villa-73 1685 1395 2,350,575 6% - 141,035 141,035

12 9 4BHK Villa-74 1685 1395 2,350,575 6% - 141,035 141,035

13 9 4BHK Villa-77 1685 1395 2,350,575 5% - 117,529 117,529

14 9 4BHK Villa-78 1685 1395 2,350,575 5% - 117,529 117,529

15 9 4BHK Villa-83 1685 1395 2,350,575 5% - 117,529 117,529

16 10 4BHK Villa-91 1685 1395 2,350,575 9% - 211,552 211,552

17 13 4BHK Villa-113 1685 1395 2,350,575 5% - 117,529 117,529

18 13 4BHK Villa-115 1685 1395 2,350,575 5% - 117,529 117,529

19 13 4BHK Villa-117 1685 1395 2,350,575 6% - 141,035 141,035

20 13 4BHK Villa-119 1685 1395 2,350,575 6% - 141,035 141,035

21 14 4BHK Villa-120 1685 1395 2,350,575 5% - 117,529 117,529

22 14 4BHK Villa-121 1685 1395 2,350,575 5% - 117,529 117,529

23 14 4BHK Villa-123 1685 1395 2,350,575 9% - 211,552 211,552

24 14 4BHK Villa-124 1685 1395 2,350,575 6% - 141,035 141,035

25 14 4BHK Villa-126A 1685 1395 2,350,575 5% - 117,529 117,529

26 14 4BHK Villa-128 1685 1395 2,350,575 6% - 141,035 141,035

27 14 4BHK Villa-130 1685 1395 2,350,575 9% - 211,552 211,552

28 14 4BHK villa -126 1685 1395 2,350,575 5% - 117,529 117,529

29 15 3BHK Villa-131 1475 1395 2,057,625 9% - 185,186 185,186

30 16 3BHK Villa-142 1475 1395 2,057,625 5% - 102,881 102,881

31 19 3BHK Villa -169 1475 1395 2,057,625 4% - 82,305 82,305

32 19 3BHK Villa-171A 1475 1395 2,057,625 5% - 102,881 102,881

33 19 3BHK Villa-171 1475 1395 2,057,625 5% - 102,881 102,881

34 19 3BHK Villa-174 1475 1395 2,057,625 5% - 102,881 102,881

35 19 3BHK Villa-177 1475 1395 2,057,625 5% - 102,881 102,881

36 20 3BHK Villa-178 1475 1395 2,057,625 5% - 102,881 102,881

37 20 3BHK Villa-187 1475 1395 2,057,625 4% - 82,305 82,305

38 21 3BHK Villa-194 1475 1395 2,057,625 3% - 61,729 61,729

39 25 3BHK Villa-226 1475 1395 2,057,625 4% - 82,305 82,305

40 25 3BHK Villa-231 1475 1395 2,057,625 5% - 102,881 102,881

41 25 3BHK Villa-234A 1475 1395 2,057,625 4% - 82,305 82,305

42 26 3BHK Villa-245 1475 1395 2,057,625 5% - 102,881 102,881

Value 67830 94,622,850 2 - 5,066,082 5,066,082

For SENTHIL CONSTRUCTION CORPORATION P.LTD (CONSTRUCTION)

AUTHORISED SIGNATORY
NAME OF THE WORK : CONSTRUCTION OF "SHRIRAM SHRESHTA" VILLAS AT COIMBATORE
NAME OF THE OWNER : M/S. SHRIPROP CONSTRUCTIONS PVT LTD
NAME OF THE CONTRACTOR : M/S. SENTHIL CONSTRUCTION CORPORATION PVT.LTD
BILL NO : FIRST RUNNING BILL DATE: 17.12.14
BILLING PERIOD : 01.11.14 to 10.12.014
VILLA 32A (3 BHK) - 1475 sft x Rs. 1395/ sft Rs 2,057,625

Percentage of work
Value of work completed
completed
Payment
S.No Description of work Upto
modality current Upto
previous Current bill Cumulative bill
bill previous bill
Bill

Structure
1 30%
1.1. Sub-structure, Foundations

Marking, Earth Work, PCC, Footing, Column up to Plinth, Plinth Beam


6%

Marking & Earthwork 2% - 41,153 41,153


PCC for footing 1% - 20,576 20,576
RCC for footing 1% - 20,576 20,576
Column upto plinthbeam 1% - 20,576 20,576
RCC for plinth beam 1% - 20,576 20,576
- - -
1.2. Super-structure - RCC frame
- - -
Ground Floor
- - -
• Columns & Staircase First Flight
4% 4% - 82,305 82,305
• GF Roof and Portico Roof Slab including Staircase Second Flight
7% 7% - 144,034 144,034
First Floor
- - -
• Columns and Slope Roof
6% 6% - 123,458 123,458
• FF Roof Slab
7% 7% - 144,034 144,034
Masonry & Plastering
2 15% - - -
2.1. Masonry Works
- - -
• GF Masonry Works up to Roof including Lintel and Sunshades
2% 2% - 41,153 41,153
• FF Masonry Works up to Roof including Lintel, Lofts and Sunshades
2% 2% - 41,153 41,153
2.2. Plastering of ceiling and walls
- - -
• GF
3% - - -
• FF
3% - - -
2.3. Plastering in External Elevation in all floors
5% 2% - 41,153 41,153
Flooring, Dado & Skirting
3 20% - - -
3.1. Flooring & Skirting
- - -
• GF-Foyer, Living, Dining, Kitchen, Bedroom
4% - - -
• FF-All Bedrooms, lobby & Balconies
4% - - -
• Clay tiling at all Open terraces
• Car Park & All round villa flagging concrete and other finishing 2% - - -
Works 2% - - -
3.2. All Dadoo, Granite & Flooring
- - -
• GF Toilet, Dining & Kitchen Granite Works with Sink
3% - - -
• FF All Toilets
3% - - -
3.3. Staircase & Landings, etc.,
2% - - -
Joinery & MS Railing Works
4 14% - - -
4.1. Door frames & Shutters
- - -
• GF
3% - - -
• FF
3% - - -
4.2. Window frames & Shutters
- - -
• GF
3% - - -
• FF
3% - - -
4.3. MS Railing Works for Windows, Staircase, Balcony & Terrace
- - -
• GF
1% - - -
• FF
1% - - -
Painting Works
5 10% - - -
5.1. Painting of Internal Walls & Ceilings
- - -
• GF
3% - - -
• FF
3% - - -
5.2. Painting for External Elevation
- - -
• GF
2% - - -
• FF
2% - - -
Water proofing Works in all floors
6 4% - - -
6.1. Toilet Water Proofing
2% - - -
6.2. Terrace, balcony water Proofing
2% - - -
Plumbing & Sanitary Works in all floors
7 4% - - -
7.1. Internal Plumbing
• Marking, and Sanitary
Wall Chasing, PipeWorks
Works for Water & Waste Line incl - - -
Pressure testing
1% - - -
• Fixing CP & Sanitary fittings
2% - - -
7.2. External Plumbing and Sanitary lines
• Pipe Works for Water Line, Waste Line & Rain Water down take - - -
lines
• Gully Traps & Chambers with connections complete (Pumps & 0.50% - - -
Valves), Supply & Fixing Syntex Tank & Connections (Pumps & Valves) 0.25% - - -
• Testing, Commissioning and Handing Over
0.25% - - -
Miscellaneous Works in all floors
8 3% - - -
8.1. Expansion Joint Treatment Works & Flagging Concrete
1% - - -
8.2. MS Staircase to terrace & Fencing for site
2% - - -
- - -
TOTAL
100% 0% 36% - 740,745 740,745

Prepared by Checked by Verified by


SCCPL Er SCCPL Er SCPL Er
NAME OF THE WORK : CONSTRUCTION OF "SHRIRAM SHRESHTA" VILLAS AT COIMBATORE
NAME OF THE OWNER : M/S. SHRIPROP CONSTRUCTIONS PVT LTD
NAME OF THE CONTRACTOR : M/S. SENTHIL CONSTRUCTION CORPORATION PVT.LTD
BILL NO : FIRST RUNNING BILL DATE: 17.12.14
BILLING PERIOD : 01.11.14 to 10.12.014
VILLA 50 (4 BHK) - 1685 sft x Rs. 1395/ sft Rs 2,350,575

Percentage of work
Value of work completed
completed
Payment
S.No Description of work Upto
modality current Upto
previous Current bill Cumulative bill
bill previous bill
Bill

Structure
1 30%
1.1. Sub-structure, Foundations

Marking, Earth Work, PCC, Footing, Column up to Plinth, Plinth Beam


6%

Marking & Earthwork 2% - 47,012 47,012


PCC for footing 1% - 23,506 23,506
RCC for footing 1% - 23,506 23,506
Column upto plinthbeam - - -
RCC for plinth beam - - -
- - -
1.2. Super-structure - RCC frame
- - -
Ground Floor
- - -
• Columns & Staircase First Flight
4% - - -
• GF Roof and Portico Roof Slab including Staircase Second Flight
7% - - -
First Floor
- - -
• Columns and Slope Roof
6% - - -
• FF Roof Slab
7% - - -
Masonry & Plastering
2 15% - - -
2.1. Masonry Works
- - -
• GF Masonry Works up to Roof including Lintel and Sunshades
2% - - -
• FF Masonry Works up to Roof including Lintel, Lofts and Sunshades
2% - - -
2.2. Plastering of ceiling and walls
- - -
• GF
3% - - -
• FF
3% - - -
2.3. Plastering in External Elevation in all floors
5% - - -
Flooring, Dado & Skirting
3 20% - - -
3.1. Flooring & Skirting
- - -
• GF-Foyer, Living, Dining, Kitchen, Bedroom
4% - - -
• FF-All Bedrooms, lobby & Balconies
4% - - -
• Clay tiling at all Open terraces
• Car Park & All round villa flagging concrete and other finishing 2% - - -
Works 2% - - -
3.2. All Dadoo, Granite & Flooring
- - -
• GF Toilet, Dining & Kitchen Granite Works with Sink
3% - - -
• FF All Toilets
3% - - -
3.3. Staircase & Landings, etc.,
2% - - -
Joinery & MS Railing Works
4 14% - - -
4.1. Door frames & Shutters
- - -
• GF
3% - - -
• FF
3% - - -
4.2. Window frames & Shutters
- - -
• GF
3% - - -
• FF
3% - - -
4.3. MS Railing Works for Windows, Staircase, Balcony & Terrace
- - -
• GF
1% - - -
• FF
1% - - -
Painting Works
5 10% - - -
5.1. Painting of Internal Walls & Ceilings
- - -
• GF
3% - - -
• FF
3% - - -
5.2. Painting for External Elevation
- - -
• GF
2% - - -
• FF
2% - - -
Water proofing Works in all floors
6 4% - - -
6.1. Toilet Water Proofing
2% - - -
6.2. Terrace, balcony water Proofing
2% - - -
Plumbing & Sanitary Works in all floors
7 4% - - -
7.1. Internal Plumbing
• Marking, and Sanitary
Wall Chasing, PipeWorks
Works for Water & Waste Line incl - - -
Pressure testing
1% - - -
• Fixing CP & Sanitary fittings
2% - - -
7.2. External Plumbing and Sanitary lines
• Pipe Works for Water Line, Waste Line & Rain Water down take - - -
lines
• Gully Traps & Chambers with connections complete (Pumps & 0.50% - - -
Valves), Supply & Fixing Syntex Tank & Connections (Pumps & Valves) 0.25% - - -
• Testing, Commissioning and Handing Over
0.25% - - -
Miscellaneous Works in all floors
8 3% - - -
8.1. Expansion Joint Treatment Works & Flagging Concrete
1% - - -
8.2. MS Staircase to terrace & Fencing for site
2% - - -
- - -
TOTAL
100% 0% 4% - 94,023 94,023

Prepared by Checked by Verified by


SCCPL Er SCCPL Er SCPL Er
NAME OF THE WORK : CONSTRUCTION OF "SHRIRAM SHRESHTA" VILLAS AT COIMBATORE
NAME OF THE OWNER : M/S. SHRIPROP CONSTRUCTIONS PVT LTD
NAME OF THE CONTRACTOR : M/S. SENTHIL CONSTRUCTION CORPORATION PVT.LTD
BILL NO : FIRST RUNNING BILL DATE: 17.12.14
BILLING PERIOD : 01.11.14 to 10.12.014
VILLA 54 (4 BHK) - 1685 sft x Rs. 1395/ sft Rs 2,350,575

Percentage of work
Value of work completed
completed
Payment
S.No Description of work Upto
modality current Upto
previous Current bill Cumulative bill
bill previous bill
Bill

Structure
1 30%
1.1. Sub-structure, Foundations

Marking, Earth Work, PCC, Footing, Column up to Plinth, Plinth Beam


6%

Marking & Earthwork 2% - 47,012 47,012


PCC for footing 1% - 23,506 23,506
RCC for footing 1% - 23,506 23,506
Column upto plinthbeam - - -
RCC for plinth beam - - -
- - -
1.2. Super-structure - RCC frame
- - -
Ground Floor
- - -
• Columns & Staircase First Flight
4% - - -
• GF Roof and Portico Roof Slab including Staircase Second Flight
7% - - -
First Floor
- - -
• Columns and Slope Roof
6% - - -
• FF Roof Slab
7% - - -
Masonry & Plastering
2 15% - - -
2.1. Masonry Works
- - -
• GF Masonry Works up to Roof including Lintel and Sunshades
2% - - -
• FF Masonry Works up to Roof including Lintel, Lofts and Sunshades
2% - - -
2.2. Plastering of ceiling and walls
- - -
• GF
3% - - -
• FF
3% - - -
2.3. Plastering in External Elevation in all floors
5% - - -
Flooring, Dado & Skirting
3 20% - - -
3.1. Flooring & Skirting
- - -
• GF-Foyer, Living, Dining, Kitchen, Bedroom
4% - - -
• FF-All Bedrooms, lobby & Balconies
4% - - -
• Clay tiling at all Open terraces
• Car Park & All round villa flagging concrete and other finishing 2% - - -
Works 2% - - -
3.2. All Dadoo, Granite & Flooring
- - -
• GF Toilet, Dining & Kitchen Granite Works with Sink
3% - - -
• FF All Toilets
3% - - -
3.3. Staircase & Landings, etc.,
2% - - -
Joinery & MS Railing Works
4 14% - - -
4.1. Door frames & Shutters
- - -
• GF
3% - - -
• FF
3% - - -
4.2. Window frames & Shutters
- - -
• GF
3% - - -
• FF
3% - - -
4.3. MS Railing Works for Windows, Staircase, Balcony & Terrace
- - -
• GF
1% - - -
• FF
1% - - -
Painting Works
5 10% - - -
5.1. Painting of Internal Walls & Ceilings
- - -
• GF
3% - - -
• FF
3% - - -
5.2. Painting for External Elevation
- - -
• GF
2% - - -
• FF
2% - - -
Water proofing Works in all floors
6 4% - - -
6.1. Toilet Water Proofing
2% - - -
6.2. Terrace, balcony water Proofing
2% - - -
Plumbing & Sanitary Works in all floors
7 4% - - -
7.1. Internal Plumbing
• Marking, and Sanitary
Wall Chasing, PipeWorks
Works for Water & Waste Line incl - - -
Pressure testing
1% - - -
• Fixing CP & Sanitary fittings
2% - - -
7.2. External Plumbing and Sanitary lines
• Pipe Works for Water Line, Waste Line & Rain Water down take - - -
lines
• Gully Traps & Chambers with connections complete (Pumps & 0.50% - - -
Valves), Supply & Fixing Syntex Tank & Connections (Pumps & Valves) 0.25% - - -
• Testing, Commissioning and Handing Over
0.25% - - -
Miscellaneous Works in all floors
8 3% - - -
8.1. Expansion Joint Treatment Works & Flagging Concrete
1% - - -
8.2. MS Staircase to terrace & Fencing for site
2% - - -
- - -
TOTAL
100% 0% 4% - 94,023 94,023

Prepared by Checked by Verified by


SCCPL Er SCCPL Er SCPL Er
NAME OF THE WORK : CONSTRUCTION OF "SHRIRAM SHRESHTA" VILLAS AT COIMBATORE
NAME OF THE OWNER : M/S. SHRIPROP CONSTRUCTIONS PVT LTD
NAME OF THE CONTRACTOR : M/S. SENTHIL CONSTRUCTION CORPORATION PVT.LTD
BILL NO : FIRST RUNNING BILL DATE: 17.12.14
BILLING PERIOD : 01.11.14 to 10.12.014
VILLA 56 (4 BHK) - 1685 sft x Rs. 1395/ sft Rs 2,350,575

Percentage of work
Value of work completed
completed
Payment
S.No Description of work Upto
modality current Upto
previous Current bill Cumulative bill
bill previous bill
Bill

Structure
1 30%
1.1. Sub-structure, Foundations

Marking, Earth Work, PCC, Footing, Column up to Plinth, Plinth Beam


6%

Marking & Earthwork 2% - 47,012 47,012


PCC for footing 1% - 23,506 23,506
RCC for footing 1% - 23,506 23,506
Column upto plinthbeam - - -
RCC for plinth beam - - -
- - -
1.2. Super-structure - RCC frame
- - -
Ground Floor
- - -
• Columns & Staircase First Flight
4% - - -
• GF Roof and Portico Roof Slab including Staircase Second Flight
7% - - -
First Floor
- - -
• Columns and Slope Roof
6% - - -
• FF Roof Slab
7% - - -
Masonry & Plastering
2 15% - - -
2.1. Masonry Works
- - -
• GF Masonry Works up to Roof including Lintel and Sunshades
2% - - -
• FF Masonry Works up to Roof including Lintel, Lofts and Sunshades
2% - - -
2.2. Plastering of ceiling and walls
- - -
• GF
3% - - -
• FF
3% - - -
2.3. Plastering in External Elevation in all floors
5% - - -
Flooring, Dado & Skirting
3 20% - - -
3.1. Flooring & Skirting
- - -
• GF-Foyer, Living, Dining, Kitchen, Bedroom
4% - - -
• FF-All Bedrooms, lobby & Balconies
4% - - -
• Clay tiling at all Open terraces
• Car Park & All round villa flagging concrete and other finishing 2% - - -
Works 2% - - -
3.2. All Dadoo, Granite & Flooring
- - -
• GF Toilet, Dining & Kitchen Granite Works with Sink
3% - - -
• FF All Toilets
3% - - -
3.3. Staircase & Landings, etc.,
2% - - -
Joinery & MS Railing Works
4 14% - - -
4.1. Door frames & Shutters
- - -
• GF
3% - - -
• FF
3% - - -
4.2. Window frames & Shutters
- - -
• GF
3% - - -
• FF
3% - - -
4.3. MS Railing Works for Windows, Staircase, Balcony & Terrace
- - -
• GF
1% - - -
• FF
1% - - -
Painting Works
5 10% - - -
5.1. Painting of Internal Walls & Ceilings
- - -
• GF
3% - - -
• FF
3% - - -
5.2. Painting for External Elevation
- - -
• GF
2% - - -
• FF
2% - - -
Water proofing Works in all floors
6 4% - - -
6.1. Toilet Water Proofing
2% - - -
6.2. Terrace, balcony water Proofing
2% - - -
Plumbing & Sanitary Works in all floors
7 4% - - -
7.1. Internal Plumbing
• Marking, and Sanitary
Wall Chasing, PipeWorks
Works for Water & Waste Line incl - - -
Pressure testing
1% - - -
• Fixing CP & Sanitary fittings
2% - - -
7.2. External Plumbing and Sanitary lines
• Pipe Works for Water Line, Waste Line & Rain Water down take - - -
lines
• Gully Traps & Chambers with connections complete (Pumps & 0.50% - - -
Valves), Supply & Fixing Syntex Tank & Connections (Pumps & Valves) 0.25% - - -
• Testing, Commissioning and Handing Over
0.25% - - -
Miscellaneous Works in all floors
8 3% - - -
8.1. Expansion Joint Treatment Works & Flagging Concrete
1% - - -
8.2. MS Staircase to terrace & Fencing for site
2% - - -
- - -
TOTAL
100% 0% 4% - 94,023 94,023

Prepared by Checked by Verified by


SCCPL Er SCCPL Er SCPL Er
NAME OF THE WORK : CONSTRUCTION OF "SHRIRAM SHRESHTA" VILLAS AT COIMBATORE
NAME OF THE OWNER : M/S. SHRIPROP CONSTRUCTIONS PVT LTD
NAME OF THE CONTRACTOR : M/S. SENTHIL CONSTRUCTION CORPORATION PVT.LTD
BILL NO : FIRST RUNNING BILL DATE: 17.12.14
BILLING PERIOD : 01.11.14 to 10.12.014
VILLA 60 (4 BHK) - 1685 sft x Rs. 1395/ sft Rs 2,350,575

Percentage of work
Value of work completed
completed
Payment
S.No Description of work Upto
modality current Upto
previous Current bill Cumulative bill
bill previous bill
Bill

Structure
1 30%
1.1. Sub-structure, Foundations

Marking, Earth Work, PCC, Footing, Column up to Plinth, Plinth Beam


6%

Marking & Earthwork 2% - 47,012 47,012


PCC for footing 1% - 23,506 23,506
RCC for footing 1% - 23,506 23,506
Column upto plinthbeam - - -
RCC for plinth beam - - -
- - -
1.2. Super-structure - RCC frame
- - -
Ground Floor
- - -
• Columns & Staircase First Flight
4% - - -
• GF Roof and Portico Roof Slab including Staircase Second Flight
7% - - -
First Floor
- - -
• Columns and Slope Roof
6% - - -
• FF Roof Slab
7% - - -
Masonry & Plastering
2 15% - - -
2.1. Masonry Works
- - -
• GF Masonry Works up to Roof including Lintel and Sunshades
2% - - -
• FF Masonry Works up to Roof including Lintel, Lofts and Sunshades
2% - - -
2.2. Plastering of ceiling and walls
- - -
• GF
3% - - -
• FF
3% - - -
2.3. Plastering in External Elevation in all floors
5% - - -
Flooring, Dado & Skirting
3 20% - - -
3.1. Flooring & Skirting
- - -
• GF-Foyer, Living, Dining, Kitchen, Bedroom
4% - - -
• FF-All Bedrooms, lobby & Balconies
4% - - -
• Clay tiling at all Open terraces
• Car Park & All round villa flagging concrete and other finishing 2% - - -
Works 2% - - -
3.2. All Dadoo, Granite & Flooring
- - -
• GF Toilet, Dining & Kitchen Granite Works with Sink
3% - - -
• FF All Toilets
3% - - -
3.3. Staircase & Landings, etc.,
2% - - -
Joinery & MS Railing Works
4 14% - - -
4.1. Door frames & Shutters
- - -
• GF
3% - - -
• FF
3% - - -
4.2. Window frames & Shutters
- - -
• GF
3% - - -
• FF
3% - - -
4.3. MS Railing Works for Windows, Staircase, Balcony & Terrace
- - -
• GF
1% - - -
• FF
1% - - -
Painting Works
5 10% - - -
5.1. Painting of Internal Walls & Ceilings
- - -
• GF
3% - - -
• FF
3% - - -
5.2. Painting for External Elevation
- - -
• GF
2% - - -
• FF
2% - - -
Water proofing Works in all floors
6 4% - - -
6.1. Toilet Water Proofing
2% - - -
6.2. Terrace, balcony water Proofing
2% - - -
Plumbing & Sanitary Works in all floors
7 4% - - -
7.1. Internal Plumbing
• Marking, and Sanitary
Wall Chasing, PipeWorks
Works for Water & Waste Line incl - - -
Pressure testing
1% - - -
• Fixing CP & Sanitary fittings
2% - - -
7.2. External Plumbing and Sanitary lines
• Pipe Works for Water Line, Waste Line & Rain Water down take - - -
lines
• Gully Traps & Chambers with connections complete (Pumps & 0.50% - - -
Valves), Supply & Fixing Syntex Tank & Connections (Pumps & Valves) 0.25% - - -
• Testing, Commissioning and Handing Over
0.25% - - -
Miscellaneous Works in all floors
8 3% - - -
8.1. Expansion Joint Treatment Works & Flagging Concrete
1% - - -
8.2. MS Staircase to terrace & Fencing for site
2% - - -
- - -
TOTAL
100% 0% 4% - 94,023 94,023

Prepared by Checked by Verified by


SCCPL Er SCCPL Er SCPL Er
NAME OF THE WORK : CONSTRUCTION OF "SHRIRAM SHRESHTA" VILLAS AT COIMBATORE
NAME OF THE OWNER : M/S. SHRIPROP CONSTRUCTIONS PVT LTD
NAME OF THE CONTRACTOR : M/S. SENTHIL CONSTRUCTION CORPORATION PVT.LTD
BILL NO : FIRST RUNNING BILL DATE: 17.12.14
BILLING PERIOD : 01.11.14 to 10.12.014
VILLA 65 (4 BHK) - 1685 sft x Rs. 1395/ sft Rs 2,350,575

Percentage of work
Value of work completed
completed
Payment
S.No Description of work Upto
modality current Upto
previous Current bill Cumulative bill
bill previous bill
Bill

Structure
1 30%
1.1. Sub-structure, Foundations

Marking, Earth Work, PCC, Footing, Column up to Plinth, Plinth Beam


6%

Marking & Earthwork 2% - 47,012 47,012


PCC for footing 1% - 23,506 23,506
RCC for footing 1% - 23,506 23,506
Column upto plinthbeam - - -
RCC for plinth beam - - -
- - -
1.2. Super-structure - RCC frame
- - -
Ground Floor
- - -
• Columns & Staircase First Flight
4% - - -
• GF Roof and Portico Roof Slab including Staircase Second Flight
7% - - -
First Floor
- - -
• Columns and Slope Roof
6% - - -
• FF Roof Slab
7% - - -
Masonry & Plastering
2 15% - - -
2.1. Masonry Works
- - -
• GF Masonry Works up to Roof including Lintel and Sunshades
2% - - -
• FF Masonry Works up to Roof including Lintel, Lofts and Sunshades
2% - - -
2.2. Plastering of ceiling and walls
- - -
• GF
3% - - -
• FF
3% - - -
2.3. Plastering in External Elevation in all floors
5% - - -
Flooring, Dado & Skirting
3 20% - - -
3.1. Flooring & Skirting
- - -
• GF-Foyer, Living, Dining, Kitchen, Bedroom
4% - - -
• FF-All Bedrooms, lobby & Balconies
4% - - -
• Clay tiling at all Open terraces
• Car Park & All round villa flagging concrete and other finishing 2% - - -
Works 2% - - -
3.2. All Dadoo, Granite & Flooring
- - -
• GF Toilet, Dining & Kitchen Granite Works with Sink
3% - - -
• FF All Toilets
3% - - -
3.3. Staircase & Landings, etc.,
2% - - -
Joinery & MS Railing Works
4 14% - - -
4.1. Door frames & Shutters
- - -
• GF
3% - - -
• FF
3% - - -
4.2. Window frames & Shutters
- - -
• GF
3% - - -
• FF
3% - - -
4.3. MS Railing Works for Windows, Staircase, Balcony & Terrace
- - -
• GF
1% - - -
• FF
1% - - -
Painting Works
5 10% - - -
5.1. Painting of Internal Walls & Ceilings
- - -
• GF
3% - - -
• FF
3% - - -
5.2. Painting for External Elevation
- - -
• GF
2% - - -
• FF
2% - - -
Water proofing Works in all floors
6 4% - - -
6.1. Toilet Water Proofing
2% - - -
6.2. Terrace, balcony water Proofing
2% - - -
Plumbing & Sanitary Works in all floors
7 4% - - -
7.1. Internal Plumbing
• Marking, and Sanitary
Wall Chasing, PipeWorks
Works for Water & Waste Line incl - - -
Pressure testing
1% - - -
• Fixing CP & Sanitary fittings
2% - - -
7.2. External Plumbing and Sanitary lines
• Pipe Works for Water Line, Waste Line & Rain Water down take - - -
lines
• Gully Traps & Chambers with connections complete (Pumps & 0.50% - - -
Valves), Supply & Fixing Syntex Tank & Connections (Pumps & Valves) 0.25% - - -
• Testing, Commissioning and Handing Over
0.25% - - -
Miscellaneous Works in all floors
8 3% - - -
8.1. Expansion Joint Treatment Works & Flagging Concrete
1% - - -
8.2. MS Staircase to terrace & Fencing for site
2% - - -
- - -
TOTAL
100% 0% 4% - 94,023 94,023

Prepared by Checked by Verified by


SCCPL Er SCCPL Er SCPL Er
NAME OF THE WORK : CONSTRUCTION OF "SHRIRAM SHRESHTA" VILLAS AT COIMBATORE
NAME OF THE OWNER : M/S. SHRIPROP CONSTRUCTIONS PVT LTD
NAME OF THE CONTRACTOR : M/S. SENTHIL CONSTRUCTION CORPORATION PVT.LTD
BILL NO : FIRST RUNNING BILL DATE: 17.12.14
BILLING PERIOD : 01.11.14 to 10.12.014
VILLA 66 (4 BHK) - 1685 sft x Rs. 1395/ sft Rs 2,350,575

Percentage of work
Value of work completed
completed
Payment
S.No Description of work Upto
modality current Upto
previous Current bill Cumulative bill
bill previous bill
Bill

Structure
1 30%
1.1. Sub-structure, Foundations

Marking, Earth Work, PCC, Footing, Column up to Plinth, Plinth Beam


6%

Marking & Earthwork 2% - 47,012 47,012


PCC for footing 1% - 23,506 23,506
RCC for footing 1% - 23,506 23,506
Column upto plinthbeam 1% - 23,506 23,506
RCC for plinth beam 1% - 23,506 23,506
- - -
1.2. Super-structure - RCC frame
- - -
Ground Floor
- - -
• Columns & Staircase First Flight
4% 3% - 70,517 70,517
• GF Roof and Portico Roof Slab including Staircase Second Flight
7% - - -
First Floor
- - -
• Columns and Slope Roof
6% - - -
• FF Roof Slab
7% - - -
Masonry & Plastering
2 15% - - -
2.1. Masonry Works
- - -
• GF Masonry Works up to Roof including Lintel and Sunshades
2% - - -
• FF Masonry Works up to Roof including Lintel, Lofts and Sunshades
2% - - -
2.2. Plastering of ceiling and walls
- - -
• GF
3% - - -
• FF
3% - - -
2.3. Plastering in External Elevation in all floors
5% - - -
Flooring, Dado & Skirting
3 20% - - -
3.1. Flooring & Skirting
- - -
• GF-Foyer, Living, Dining, Kitchen, Bedroom
4% - - -
• FF-All Bedrooms, lobby & Balconies
4% - - -
• Clay tiling at all Open terraces
• Car Park & All round villa flagging concrete and other finishing 2% - - -
Works 2% - - -
3.2. All Dadoo, Granite & Flooring
- - -
• GF Toilet, Dining & Kitchen Granite Works with Sink
3% - - -
• FF All Toilets
3% - - -
3.3. Staircase & Landings, etc.,
2% - - -
Joinery & MS Railing Works
4 14% - - -
4.1. Door frames & Shutters
- - -
• GF
3% - - -
• FF
3% - - -
4.2. Window frames & Shutters
- - -
• GF
3% - - -
• FF
3% - - -
4.3. MS Railing Works for Windows, Staircase, Balcony & Terrace
- - -
• GF
1% - - -
• FF
1% - - -
Painting Works
5 10% - - -
5.1. Painting of Internal Walls & Ceilings
- - -
• GF
3% - - -
• FF
3% - - -
5.2. Painting for External Elevation
- - -
• GF
2% - - -
• FF
2% - - -
Water proofing Works in all floors
6 4% - - -
6.1. Toilet Water Proofing
2% - - -
6.2. Terrace, balcony water Proofing
2% - - -
Plumbing & Sanitary Works in all floors
7 4% - - -
7.1. Internal Plumbing
• Marking, and Sanitary
Wall Chasing, PipeWorks
Works for Water & Waste Line incl - - -
Pressure testing
1% - - -
• Fixing CP & Sanitary fittings
2% - - -
7.2. External Plumbing and Sanitary lines
• Pipe Works for Water Line, Waste Line & Rain Water down take - - -
lines
• Gully Traps & Chambers with connections complete (Pumps & 0.50% - - -
Valves), Supply & Fixing Syntex Tank & Connections (Pumps & Valves) 0.25% - - -
• Testing, Commissioning and Handing Over
0.25% - - -
Miscellaneous Works in all floors
8 3% - - -
8.1. Expansion Joint Treatment Works & Flagging Concrete
1% - - -
8.2. MS Staircase to terrace & Fencing for site
2% - - -
- - -
TOTAL
100% 0% 9% - 211,552 211,552

Prepared by Checked by Verified by


SCCPL Er SCCPL Er SCPL Er
NAME OF THE WORK : CONSTRUCTION OF "SHRIRAM SHRESHTA" VILLAS AT COIMBATORE
NAME OF THE OWNER : M/S. SHRIPROP CONSTRUCTIONS PVT LTD
NAME OF THE CONTRACTOR : M/S. SENTHIL CONSTRUCTION CORPORATION PVT.LTD
BILL NO : FIRST RUNNING BILL DATE: 17.12.14
BILLING PERIOD : 01.11.14 to 10.12.014
VILLA 68 (4 BHK) - 1685 sft x Rs. 1395/ sft Rs 2,350,575

Percentage of work
Value of work completed
completed
Payment
S.No Description of work Upto
modality current Upto
previous Current bill Cumulative bill
bill previous bill
Bill

Structure
1 30%
1.1. Sub-structure, Foundations

Marking, Earth Work, PCC, Footing, Column up to Plinth, Plinth Beam


6%

Marking & Earthwork 2% - 47,012 47,012


PCC for footing 1% - 23,506 23,506
RCC for footing 1% - 23,506 23,506
Column upto plinthbeam 1% - 23,506 23,506
RCC for plinth beam - - -
- - -
1.2. Super-structure - RCC frame
- - -
Ground Floor
- - -
• Columns & Staircase First Flight
4% - - -
• GF Roof and Portico Roof Slab including Staircase Second Flight
7% - - -
First Floor
- - -
• Columns and Slope Roof
6% - - -
• FF Roof Slab
7% - - -
Masonry & Plastering
2 15% - - -
2.1. Masonry Works
- - -
• GF Masonry Works up to Roof including Lintel and Sunshades
2% - - -
• FF Masonry Works up to Roof including Lintel, Lofts and Sunshades
2% - - -
2.2. Plastering of ceiling and walls
- - -
• GF
3% - - -
• FF
3% - - -
2.3. Plastering in External Elevation in all floors
5% - - -
Flooring, Dado & Skirting
3 20% - - -
3.1. Flooring & Skirting
- - -
• GF-Foyer, Living, Dining, Kitchen, Bedroom
4% - - -
• FF-All Bedrooms, lobby & Balconies
4% - - -
• Clay tiling at all Open terraces
• Car Park & All round villa flagging concrete and other finishing 2% - - -
Works 2% - - -
3.2. All Dadoo, Granite & Flooring
- - -
• GF Toilet, Dining & Kitchen Granite Works with Sink
3% - - -
• FF All Toilets
3% - - -
3.3. Staircase & Landings, etc.,
2% - - -
Joinery & MS Railing Works
4 14% - - -
4.1. Door frames & Shutters
- - -
• GF
3% - - -
• FF
3% - - -
4.2. Window frames & Shutters
- - -
• GF
3% - - -
• FF
3% - - -
4.3. MS Railing Works for Windows, Staircase, Balcony & Terrace
- - -
• GF
1% - - -
• FF
1% - - -
Painting Works
5 10% - - -
5.1. Painting of Internal Walls & Ceilings
- - -
• GF
3% - - -
• FF
3% - - -
5.2. Painting for External Elevation
- - -
• GF
2% - - -
• FF
2% - - -
Water proofing Works in all floors
6 4% - - -
6.1. Toilet Water Proofing
2% - - -
6.2. Terrace, balcony water Proofing
2% - - -
Plumbing & Sanitary Works in all floors
7 4% - - -
7.1. Internal Plumbing
• Marking, and Sanitary
Wall Chasing, PipeWorks
Works for Water & Waste Line incl - - -
Pressure testing
1% - - -
• Fixing CP & Sanitary fittings
2% - - -
7.2. External Plumbing and Sanitary lines
• Pipe Works for Water Line, Waste Line & Rain Water down take - - -
lines
• Gully Traps & Chambers with connections complete (Pumps & 0.50% - - -
Valves), Supply & Fixing Syntex Tank & Connections (Pumps & Valves) 0.25% - - -
• Testing, Commissioning and Handing Over
0.25% - - -
Miscellaneous Works in all floors
8 3% - - -
8.1. Expansion Joint Treatment Works & Flagging Concrete
1% - - -
8.2. MS Staircase to terrace & Fencing for site
2% - - -
- - -
TOTAL
100% 0% 5% - 117,529 117,529

Prepared by Checked by Verified by


SCCPL Er SCCPL Er SCPL Er
NAME OF THE WORK : CONSTRUCTION OF "SHRIRAM SHRESHTA" VILLAS AT COIMBATORE
NAME OF THE OWNER : M/S. SHRIPROP CONSTRUCTIONS PVT LTD
NAME OF THE CONTRACTOR : M/S. SENTHIL CONSTRUCTION CORPORATION PVT.LTD
BILL NO : FIRST RUNNING BILL DATE: 17.12.14
BILLING PERIOD : 01.11.14 to 10.12.014
VILLA 70 (4 BHK) - 1685 sft x Rs. 1395/ sft Rs 2,350,575

Percentage of work
Value of work completed
completed
Payment
S.No Description of work Upto
modality current Upto
previous Current bill Cumulative bill
bill previous bill
Bill

Structure
1 30%
1.1. Sub-structure, Foundations

Marking, Earth Work, PCC, Footing, Column up to Plinth, Plinth Beam


6%

Marking & Earthwork 2% - 47,012 47,012


PCC for footing 1% - 23,506 23,506
RCC for footing 1% - 23,506 23,506
Column upto plinthbeam - - -
RCC for plinth beam - - -
- - -
1.2. Super-structure - RCC frame
- - -
Ground Floor
- - -
• Columns & Staircase First Flight
4% - - -
• GF Roof and Portico Roof Slab including Staircase Second Flight
7% - - -
First Floor
- - -
• Columns and Slope Roof
6% - - -
• FF Roof Slab
7% - - -
Masonry & Plastering
2 15% - - -
2.1. Masonry Works
- - -
• GF Masonry Works up to Roof including Lintel and Sunshades
2% - - -
• FF Masonry Works up to Roof including Lintel, Lofts and Sunshades
2% - - -
2.2. Plastering of ceiling and walls
- - -
• GF
3% - - -
• FF
3% - - -
2.3. Plastering in External Elevation in all floors
5% - - -
Flooring, Dado & Skirting
3 20% - - -
3.1. Flooring & Skirting
- - -
• GF-Foyer, Living, Dining, Kitchen, Bedroom
4% - - -
• FF-All Bedrooms, lobby & Balconies
4% - - -
• Clay tiling at all Open terraces
• Car Park & All round villa flagging concrete and other finishing 2% - - -
Works 2% - - -
3.2. All Dadoo, Granite & Flooring
- - -
• GF Toilet, Dining & Kitchen Granite Works with Sink
3% - - -
• FF All Toilets
3% - - -
3.3. Staircase & Landings, etc.,
2% - - -
Joinery & MS Railing Works
4 14% - - -
4.1. Door frames & Shutters
- - -
• GF
3% - - -
• FF
3% - - -
4.2. Window frames & Shutters
- - -
• GF
3% - - -
• FF
3% - - -
4.3. MS Railing Works for Windows, Staircase, Balcony & Terrace
- - -
• GF
1% - - -
• FF
1% - - -
Painting Works
5 10% - - -
5.1. Painting of Internal Walls & Ceilings
- - -
• GF
3% - - -
• FF
3% - - -
5.2. Painting for External Elevation
- - -
• GF
2% - - -
• FF
2% - - -
Water proofing Works in all floors
6 4% - - -
6.1. Toilet Water Proofing
2% - - -
6.2. Terrace, balcony water Proofing
2% - - -
Plumbing & Sanitary Works in all floors
7 4% - - -
7.1. Internal Plumbing
• Marking, and Sanitary
Wall Chasing, PipeWorks
Works for Water & Waste Line incl - - -
Pressure testing
1% - - -
• Fixing CP & Sanitary fittings
2% - - -
7.2. External Plumbing and Sanitary lines
• Pipe Works for Water Line, Waste Line & Rain Water down take - - -
lines
• Gully Traps & Chambers with connections complete (Pumps & 0.50% - - -
Valves), Supply & Fixing Syntex Tank & Connections (Pumps & Valves) 0.25% - - -
• Testing, Commissioning and Handing Over
0.25% - - -
Miscellaneous Works in all floors
8 3% - - -
8.1. Expansion Joint Treatment Works & Flagging Concrete
1% - - -
8.2. MS Staircase to terrace & Fencing for site
2% - - -
- - -
TOTAL
100% 0% 4% - 94,023 94,023

Prepared by Checked by Verified by


SCCPL Er SCCPL Er SCPL Er
NAME OF THE WORK : CONSTRUCTION OF "SHRIRAM SHRESHTA" VILLAS AT COIMBATORE
NAME OF THE OWNER : M/S. SHRIPROP CONSTRUCTIONS PVT LTD
NAME OF THE CONTRACTOR : M/S. SENTHIL CONSTRUCTION CORPORATION PVT.LTD
BILL NO : FIRST RUNNING BILL DATE: 17.12.14
BILLING PERIOD : 01.11.14 to 10.12.014
VILLA 72A (4 BHK) - 1685 sft x Rs. 1395/ sft Rs 2,350,575

Percentage of work
Value of work completed
completed
Payment
S.No Description of work Upto
modality current Upto
previous Current bill Cumulative bill
bill previous bill
Bill

Structure
1 30%
1.1. Sub-structure, Foundations

Marking, Earth Work, PCC, Footing, Column up to Plinth, Plinth Beam


6%

Marking & Earthwork 2% - 47,012 47,012


PCC for footing 1% - 23,506 23,506
RCC for footing 1% - 23,506 23,506
Column upto plinthbeam 1% - 23,506 23,506
RCC for plinth beam 1% - 23,506 23,506
- - -
1.2. Super-structure - RCC frame
- - -
Ground Floor
- - -
• Columns & Staircase First Flight
4% - - -
• GF Roof and Portico Roof Slab including Staircase Second Flight
7% - - -
First Floor
- - -
• Columns and Slope Roof
6% - - -
• FF Roof Slab
7% - - -
Masonry & Plastering
2 15% - - -
2.1. Masonry Works
- - -
• GF Masonry Works up to Roof including Lintel and Sunshades
2% - - -
• FF Masonry Works up to Roof including Lintel, Lofts and Sunshades
2% - - -
2.2. Plastering of ceiling and walls
- - -
• GF
3% - - -
• FF
3% - - -
2.3. Plastering in External Elevation in all floors
5% - - -
Flooring, Dado & Skirting
3 20% - - -
3.1. Flooring & Skirting
- - -
• GF-Foyer, Living, Dining, Kitchen, Bedroom
4% - - -
• FF-All Bedrooms, lobby & Balconies
4% - - -
• Clay tiling at all Open terraces
• Car Park & All round villa flagging concrete and other finishing 2% - - -
Works 2% - - -
3.2. All Dadoo, Granite & Flooring
- - -
• GF Toilet, Dining & Kitchen Granite Works with Sink
3% - - -
• FF All Toilets
3% - - -
3.3. Staircase & Landings, etc.,
2% - - -
Joinery & MS Railing Works
4 14% - - -
4.1. Door frames & Shutters
- - -
• GF
3% - - -
• FF
3% - - -
4.2. Window frames & Shutters
- - -
• GF
3% - - -
• FF
3% - - -
4.3. MS Railing Works for Windows, Staircase, Balcony & Terrace
- - -
• GF
1% - - -
• FF
1% - - -
Painting Works
5 10% - - -
5.1. Painting of Internal Walls & Ceilings
- - -
• GF
3% - - -
• FF
3% - - -
5.2. Painting for External Elevation
- - -
• GF
2% - - -
• FF
2% - - -
Water proofing Works in all floors
6 4% - - -
6.1. Toilet Water Proofing
2% - - -
6.2. Terrace, balcony water Proofing
2% - - -
Plumbing & Sanitary Works in all floors
7 4% - - -
7.1. Internal Plumbing
• Marking, and Sanitary
Wall Chasing, PipeWorks
Works for Water & Waste Line incl - - -
Pressure testing
1% - - -
• Fixing CP & Sanitary fittings
2% - - -
7.2. External Plumbing and Sanitary lines
• Pipe Works for Water Line, Waste Line & Rain Water down take - - -
lines
• Gully Traps & Chambers with connections complete (Pumps & 0.50% - - -
Valves), Supply & Fixing Syntex Tank & Connections (Pumps & Valves) 0.25% - - -
• Testing, Commissioning and Handing Over
0.25% - - -
Miscellaneous Works in all floors
8 3% - - -
8.1. Expansion Joint Treatment Works & Flagging Concrete
1% - - -
8.2. MS Staircase to terrace & Fencing for site
2% - - -
- - -
TOTAL
100% 0% 6% - 141,035 141,035

Prepared by Checked by Verified by


SCCPL Er SCCPL Er SCPL Er
NAME OF THE WORK : CONSTRUCTION OF "SHRIRAM SHRESHTA" VILLAS AT COIMBATORE
NAME OF THE OWNER : M/S. SHRIPROP CONSTRUCTIONS PVT LTD
NAME OF THE CONTRACTOR : M/S. SENTHIL CONSTRUCTION CORPORATION PVT.LTD
BILL NO : FIRST RUNNING BILL DATE: 17.12.14
BILLING PERIOD : 01.11.14 to 10.12.014
VILLA 72 (4 BHK) - 1685 sft x Rs. 1395/ sft Rs 2,350,575

Percentage of work
Value of work completed
completed
Payment
S.No Description of work Upto
modality current Upto
previous Current bill Cumulative bill
bill previous bill
Bill

Structure
1 30%
1.1. Sub-structure, Foundations

Marking, Earth Work, PCC, Footing, Column up to Plinth, Plinth Beam


6%

Marking & Earthwork 2% - 47,012 47,012


PCC for footing 1% - 23,506 23,506
RCC for footing 1% - 23,506 23,506
Column upto plinthbeam - - -
RCC for plinth beam - - -
- - -
1.2. Super-structure - RCC frame
- - -
Ground Floor
- - -
• Columns & Staircase First Flight
4% - - -
• GF Roof and Portico Roof Slab including Staircase Second Flight
7% - - -
First Floor
- - -
• Columns and Slope Roof
6% - - -
• FF Roof Slab
7% - - -
Masonry & Plastering
2 15% - - -
2.1. Masonry Works
- - -
• GF Masonry Works up to Roof including Lintel and Sunshades
2% - - -
• FF Masonry Works up to Roof including Lintel, Lofts and Sunshades
2% - - -
2.2. Plastering of ceiling and walls
- - -
• GF
3% - - -
• FF
3% - - -
2.3. Plastering in External Elevation in all floors
5% - - -
Flooring, Dado & Skirting
3 20% - - -
3.1. Flooring & Skirting
- - -
• GF-Foyer, Living, Dining, Kitchen, Bedroom
4% - - -
• FF-All Bedrooms, lobby & Balconies
4% - - -
• Clay tiling at all Open terraces
• Car Park & All round villa flagging concrete and other finishing 2% - - -
Works 2% - - -
3.2. All Dadoo, Granite & Flooring
- - -
• GF Toilet, Dining & Kitchen Granite Works with Sink
3% - - -
• FF All Toilets
3% - - -
3.3. Staircase & Landings, etc.,
2% - - -
Joinery & MS Railing Works
4 14% - - -
4.1. Door frames & Shutters
- - -
• GF
3% - - -
• FF
3% - - -
4.2. Window frames & Shutters
- - -
• GF
3% - - -
• FF
3% - - -
4.3. MS Railing Works for Windows, Staircase, Balcony & Terrace
- - -
• GF
1% - - -
• FF
1% - - -
Painting Works
5 10% - - -
5.1. Painting of Internal Walls & Ceilings
- - -
• GF
3% - - -
• FF
3% - - -
5.2. Painting for External Elevation
- - -
• GF
2% - - -
• FF
2% - - -
Water proofing Works in all floors
6 4% - - -
6.1. Toilet Water Proofing
2% - - -
6.2. Terrace, balcony water Proofing
2% - - -
Plumbing & Sanitary Works in all floors
7 4% - - -
7.1. Internal Plumbing
• Marking, and Sanitary
Wall Chasing, PipeWorks
Works for Water & Waste Line incl - - -
Pressure testing
1% - - -
• Fixing CP & Sanitary fittings
2% - - -
7.2. External Plumbing and Sanitary lines
• Pipe Works for Water Line, Waste Line & Rain Water down take - - -
lines
• Gully Traps & Chambers with connections complete (Pumps & 0.50% - - -
Valves), Supply & Fixing Syntex Tank & Connections (Pumps & Valves) 0.25% - - -
• Testing, Commissioning and Handing Over
0.25% - - -
Miscellaneous Works in all floors
8 3% - - -
8.1. Expansion Joint Treatment Works & Flagging Concrete
1% - - -
8.2. MS Staircase to terrace & Fencing for site
2% - - -
- - -
TOTAL
100% 0% 4% - 94,023 94,023

Prepared by Checked by Verified by


SCCPL Er SCCPL Er SCPL Er
NAME OF THE WORK : CONSTRUCTION OF "SHRIRAM SHRESHTA" VILLAS AT COIMBATORE
NAME OF THE OWNER : M/S. SHRIPROP CONSTRUCTIONS PVT LTD
NAME OF THE CONTRACTOR : M/S. SENTHIL CONSTRUCTION CORPORATION PVT.LTD
BILL NO : FIRST RUNNING BILL DATE: 17.12.14
BILLING PERIOD : 01.11.14 to 10.12.014
VILLA 73 (4 BHK) - 1685 sft x Rs. 1395/ sft Rs 2,350,575

Percentage of work
Value of work completed
completed
Payment
S.No Description of work Upto
modality current Upto
previous Current bill Cumulative bill
bill previous bill
Bill

Structure
1 30%
1.1. Sub-structure, Foundations

Marking, Earth Work, PCC, Footing, Column up to Plinth, Plinth Beam


6%

Marking & Earthwork 2% - 47,012 47,012


PCC for footing 1% - 23,506 23,506
RCC for footing 1% - 23,506 23,506
Column upto plinthbeam 1% - 23,506 23,506
RCC for plinth beam 1% - 23,506 23,506
- - -
1.2. Super-structure - RCC frame
- - -
Ground Floor
- - -
• Columns & Staircase First Flight
4% - - -
• GF Roof and Portico Roof Slab including Staircase Second Flight
7% - - -
First Floor
- - -
• Columns and Slope Roof
6% - - -
• FF Roof Slab
7% - - -
Masonry & Plastering
2 15% - - -
2.1. Masonry Works
- - -
• GF Masonry Works up to Roof including Lintel and Sunshades
2% - - -
• FF Masonry Works up to Roof including Lintel, Lofts and Sunshades
2% - - -
2.2. Plastering of ceiling and walls
- - -
• GF
3% - - -
• FF
3% - - -
2.3. Plastering in External Elevation in all floors
5% - - -
Flooring, Dado & Skirting
3 20% - - -
3.1. Flooring & Skirting
- - -
• GF-Foyer, Living, Dining, Kitchen, Bedroom
4% - - -
• FF-All Bedrooms, lobby & Balconies
4% - - -
• Clay tiling at all Open terraces
• Car Park & All round villa flagging concrete and other finishing 2% - - -
Works 2% - - -
3.2. All Dadoo, Granite & Flooring
- - -
• GF Toilet, Dining & Kitchen Granite Works with Sink
3% - - -
• FF All Toilets
3% - - -
3.3. Staircase & Landings, etc.,
2% - - -
Joinery & MS Railing Works
4 14% - - -
4.1. Door frames & Shutters
- - -
• GF
3% - - -
• FF
3% - - -
4.2. Window frames & Shutters
- - -
• GF
3% - - -
• FF
3% - - -
4.3. MS Railing Works for Windows, Staircase, Balcony & Terrace
- - -
• GF
1% - - -
• FF
1% - - -
Painting Works
5 10% - - -
5.1. Painting of Internal Walls & Ceilings
- - -
• GF
3% - - -
• FF
3% - - -
5.2. Painting for External Elevation
- - -
• GF
2% - - -
• FF
2% - - -
Water proofing Works in all floors
6 4% - - -
6.1. Toilet Water Proofing
2% - - -
6.2. Terrace, balcony water Proofing
2% - - -
Plumbing & Sanitary Works in all floors
7 4% - - -
7.1. Internal Plumbing
• Marking, and Sanitary
Wall Chasing, PipeWorks
Works for Water & Waste Line incl - - -
Pressure testing
1% - - -
• Fixing CP & Sanitary fittings
2% - - -
7.2. External Plumbing and Sanitary lines
• Pipe Works for Water Line, Waste Line & Rain Water down take - - -
lines
• Gully Traps & Chambers with connections complete (Pumps & 0.50% - - -
Valves), Supply & Fixing Syntex Tank & Connections (Pumps & Valves) 0.25% - - -
• Testing, Commissioning and Handing Over
0.25% - - -
Miscellaneous Works in all floors
8 3% - - -
8.1. Expansion Joint Treatment Works & Flagging Concrete
1% - - -
8.2. MS Staircase to terrace & Fencing for site
2% - - -
- - -
TOTAL
100% 0% 6% - 141,035 141,035

Prepared by Checked by Verified by


SCCPL Er SCCPL Er SCPL Er
NAME OF THE WORK : CONSTRUCTION OF "SHRIRAM SHRESHTA" VILLAS AT COIMBATORE
NAME OF THE OWNER : M/S. SHRIPROP CONSTRUCTIONS PVT LTD
NAME OF THE CONTRACTOR : M/S. SENTHIL CONSTRUCTION CORPORATION PVT.LTD
BILL NO : FIRST RUNNING BILL DATE: 17.12.14
BILLING PERIOD : 01.11.14 to 10.12.014
VILLA 74 (4 BHK) - 1685 sft x Rs. 1395/ sft Rs 2,350,575

Percentage of work
Value of work completed
completed
Payment
S.No Description of work Upto
modality current Upto
previous Current bill Cumulative bill
bill previous bill
Bill

Structure
1 30%
1.1. Sub-structure, Foundations

Marking, Earth Work, PCC, Footing, Column up to Plinth, Plinth Beam


6%

Marking & Earthwork 2% - 47,012 47,012


PCC for footing 1% - 23,506 23,506
RCC for footing 1% - 23,506 23,506
Column upto plinthbeam 1% - 23,506 23,506
RCC for plinth beam 1% - 23,506 23,506
- - -
1.2. Super-structure - RCC frame
- - -
Ground Floor
- - -
• Columns & Staircase First Flight
4% - - -
• GF Roof and Portico Roof Slab including Staircase Second Flight
7% - - -
First Floor
- - -
• Columns and Slope Roof
6% - - -
• FF Roof Slab
7% - - -
Masonry & Plastering
2 15% - - -
2.1. Masonry Works
- - -
• GF Masonry Works up to Roof including Lintel and Sunshades
2% - - -
• FF Masonry Works up to Roof including Lintel, Lofts and Sunshades
2% - - -
2.2. Plastering of ceiling and walls
- - -
• GF
3% - - -
• FF
3% - - -
2.3. Plastering in External Elevation in all floors
5% - - -
Flooring, Dado & Skirting
3 20% - - -
3.1. Flooring & Skirting
- - -
• GF-Foyer, Living, Dining, Kitchen, Bedroom
4% - - -
• FF-All Bedrooms, lobby & Balconies
4% - - -
• Clay tiling at all Open terraces
• Car Park & All round villa flagging concrete and other finishing 2% - - -
Works 2% - - -
3.2. All Dadoo, Granite & Flooring
- - -
• GF Toilet, Dining & Kitchen Granite Works with Sink
3% - - -
• FF All Toilets
3% - - -
3.3. Staircase & Landings, etc.,
2% - - -
Joinery & MS Railing Works
4 14% - - -
4.1. Door frames & Shutters
- - -
• GF
3% - - -
• FF
3% - - -
4.2. Window frames & Shutters
- - -
• GF
3% - - -
• FF
3% - - -
4.3. MS Railing Works for Windows, Staircase, Balcony & Terrace
- - -
• GF
1% - - -
• FF
1% - - -
Painting Works
5 10% - - -
5.1. Painting of Internal Walls & Ceilings
- - -
• GF
3% - - -
• FF
3% - - -
5.2. Painting for External Elevation
- - -
• GF
2% - - -
• FF
2% - - -
Water proofing Works in all floors
6 4% - - -
6.1. Toilet Water Proofing
2% - - -
6.2. Terrace, balcony water Proofing
2% - - -
Plumbing & Sanitary Works in all floors
7 4% - - -
7.1. Internal Plumbing
• Marking, and Sanitary
Wall Chasing, PipeWorks
Works for Water & Waste Line incl - - -
Pressure testing
1% - - -
• Fixing CP & Sanitary fittings
2% - - -
7.2. External Plumbing and Sanitary lines
• Pipe Works for Water Line, Waste Line & Rain Water down take - - -
lines
• Gully Traps & Chambers with connections complete (Pumps & 0.50% - - -
Valves), Supply & Fixing Syntex Tank & Connections (Pumps & Valves) 0.25% - - -
• Testing, Commissioning and Handing Over
0.25% - - -
Miscellaneous Works in all floors
8 3% - - -
8.1. Expansion Joint Treatment Works & Flagging Concrete
1% - - -
8.2. MS Staircase to terrace & Fencing for site
2% - - -
- - -
TOTAL
100% 0% 6% - 141,035 141,035

Prepared by Checked by Verified by


SCCPL Er SCCPL Er SCPL Er
NAME OF THE WORK : CONSTRUCTION OF "SHRIRAM SHRESHTA" VILLAS AT COIMBATORE
NAME OF THE OWNER : M/S. SHRIPROP CONSTRUCTIONS PVT LTD
NAME OF THE CONTRACTOR : M/S. SENTHIL CONSTRUCTION CORPORATION PVT.LTD
BILL NO : FIRST RUNNING BILL DATE: 17.12.14
BILLING PERIOD : 01.11.14 to 10.12.014
VILLA 77 (4 BHK) - 1685 sft x Rs. 1395/ sft Rs 2,350,575

Percentage of work
Value of work completed
completed
Payment
S.No Description of work Upto
modality current Upto
previous Current bill Cumulative bill
bill previous bill
Bill

Structure
1 30%
1.1. Sub-structure, Foundations

Marking, Earth Work, PCC, Footing, Column up to Plinth, Plinth Beam


6%

Marking & Earthwork 2% - 47,012 47,012


PCC for footing 1% - 23,506 23,506
RCC for footing 1% - 23,506 23,506
Column upto plinthbeam 1% - 23,506 23,506
RCC for plinth beam - - -
- - -
1.2. Super-structure - RCC frame
- - -
Ground Floor
- - -
• Columns & Staircase First Flight
4% - - -
• GF Roof and Portico Roof Slab including Staircase Second Flight
7% - - -
First Floor
- - -
• Columns and Slope Roof
6% - - -
• FF Roof Slab
7% - - -
Masonry & Plastering
2 15% - - -
2.1. Masonry Works
- - -
• GF Masonry Works up to Roof including Lintel and Sunshades
2% - - -
• FF Masonry Works up to Roof including Lintel, Lofts and Sunshades
2% - - -
2.2. Plastering of ceiling and walls
- - -
• GF
3% - - -
• FF
3% - - -
2.3. Plastering in External Elevation in all floors
5% - - -
Flooring, Dado & Skirting
3 20% - - -
3.1. Flooring & Skirting
- - -
• GF-Foyer, Living, Dining, Kitchen, Bedroom
4% - - -
• FF-All Bedrooms, lobby & Balconies
4% - - -
• Clay tiling at all Open terraces
• Car Park & All round villa flagging concrete and other finishing 2% - - -
Works 2% - - -
3.2. All Dadoo, Granite & Flooring
- - -
• GF Toilet, Dining & Kitchen Granite Works with Sink
3% - - -
• FF All Toilets
3% - - -
3.3. Staircase & Landings, etc.,
2% - - -
Joinery & MS Railing Works
4 14% - - -
4.1. Door frames & Shutters
- - -
• GF
3% - - -
• FF
3% - - -
4.2. Window frames & Shutters
- - -
• GF
3% - - -
• FF
3% - - -
4.3. MS Railing Works for Windows, Staircase, Balcony & Terrace
- - -
• GF
1% - - -
• FF
1% - - -
Painting Works
5 10% - - -
5.1. Painting of Internal Walls & Ceilings
- - -
• GF
3% - - -
• FF
3% - - -
5.2. Painting for External Elevation
- - -
• GF
2% - - -
• FF
2% - - -
Water proofing Works in all floors
6 4% - - -
6.1. Toilet Water Proofing
2% - - -
6.2. Terrace, balcony water Proofing
2% - - -
Plumbing & Sanitary Works in all floors
7 4% - - -
7.1. Internal Plumbing
• Marking, and Sanitary
Wall Chasing, PipeWorks
Works for Water & Waste Line incl - - -
Pressure testing
1% - - -
• Fixing CP & Sanitary fittings
2% - - -
7.2. External Plumbing and Sanitary lines
• Pipe Works for Water Line, Waste Line & Rain Water down take - - -
lines
• Gully Traps & Chambers with connections complete (Pumps & 0.50% - - -
Valves), Supply & Fixing Syntex Tank & Connections (Pumps & Valves) 0.25% - - -
• Testing, Commissioning and Handing Over
0.25% - - -
Miscellaneous Works in all floors
8 3% - - -
8.1. Expansion Joint Treatment Works & Flagging Concrete
1% - - -
8.2. MS Staircase to terrace & Fencing for site
2% - - -
- - -
TOTAL
100% 0% 5% - 117,529 117,529

Prepared by Checked by Verified by


SCCPL Er SCCPL Er SCPL Er
NAME OF THE WORK : CONSTRUCTION OF "SHRIRAM SHRESHTA" VILLAS AT COIMBATORE
NAME OF THE OWNER : M/S. SHRIPROP CONSTRUCTIONS PVT LTD
NAME OF THE CONTRACTOR : M/S. SENTHIL CONSTRUCTION CORPORATION PVT.LTD
BILL NO : FIRST RUNNING BILL DATE: 17.12.14
BILLING PERIOD : 01.11.14 to 10.12.014
VILLA 78 (4 BHK) - 1685 sft x Rs. 1395/ sft Rs 2,350,575

Percentage of work
Value of work completed
completed
Payment
S.No Description of work Upto
modality current Upto
previous Current bill Cumulative bill
bill previous bill
Bill

Structure
1 30%
1.1. Sub-structure, Foundations

Marking, Earth Work, PCC, Footing, Column up to Plinth, Plinth Beam


6%

Marking & Earthwork 2% - 47,012 47,012


PCC for footing 1% - 23,506 23,506
RCC for footing 1% - 23,506 23,506
Column upto plinthbeam 1% - 23,506 23,506
RCC for plinth beam - - -
- - -
1.2. Super-structure - RCC frame
- - -
Ground Floor
- - -
• Columns & Staircase First Flight
4% - - -
• GF Roof and Portico Roof Slab including Staircase Second Flight
7% - - -
First Floor
- - -
• Columns and Slope Roof
6% - - -
• FF Roof Slab
7% - - -
Masonry & Plastering
2 15% - - -
2.1. Masonry Works
- - -
• GF Masonry Works up to Roof including Lintel and Sunshades
2% - - -
• FF Masonry Works up to Roof including Lintel, Lofts and Sunshades
2% - - -
2.2. Plastering of ceiling and walls
- - -
• GF
3% - - -
• FF
3% - - -
2.3. Plastering in External Elevation in all floors
5% - - -
Flooring, Dado & Skirting
3 20% - - -
3.1. Flooring & Skirting
- - -
• GF-Foyer, Living, Dining, Kitchen, Bedroom
4% - - -
• FF-All Bedrooms, lobby & Balconies
4% - - -
• Clay tiling at all Open terraces
• Car Park & All round villa flagging concrete and other finishing 2% - - -
Works 2% - - -
3.2. All Dadoo, Granite & Flooring
- - -
• GF Toilet, Dining & Kitchen Granite Works with Sink
3% - - -
• FF All Toilets
3% - - -
3.3. Staircase & Landings, etc.,
2% - - -
Joinery & MS Railing Works
4 14% - - -
4.1. Door frames & Shutters
- - -
• GF
3% - - -
• FF
3% - - -
4.2. Window frames & Shutters
- - -
• GF
3% - - -
• FF
3% - - -
4.3. MS Railing Works for Windows, Staircase, Balcony & Terrace
- - -
• GF
1% - - -
• FF
1% - - -
Painting Works
5 10% - - -
5.1. Painting of Internal Walls & Ceilings
- - -
• GF
3% - - -
• FF
3% - - -
5.2. Painting for External Elevation
- - -
• GF
2% - - -
• FF
2% - - -
Water proofing Works in all floors
6 4% - - -
6.1. Toilet Water Proofing
2% - - -
6.2. Terrace, balcony water Proofing
2% - - -
Plumbing & Sanitary Works in all floors
7 4% - - -
7.1. Internal Plumbing
• Marking, and Sanitary
Wall Chasing, PipeWorks
Works for Water & Waste Line incl - - -
Pressure testing
1% - - -
• Fixing CP & Sanitary fittings
2% - - -
7.2. External Plumbing and Sanitary lines
• Pipe Works for Water Line, Waste Line & Rain Water down take - - -
lines
• Gully Traps & Chambers with connections complete (Pumps & 0.50% - - -
Valves), Supply & Fixing Syntex Tank & Connections (Pumps & Valves) 0.25% - - -
• Testing, Commissioning and Handing Over
0.25% - - -
Miscellaneous Works in all floors
8 3% - - -
8.1. Expansion Joint Treatment Works & Flagging Concrete
1% - - -
8.2. MS Staircase to terrace & Fencing for site
2% - - -
- - -
TOTAL
100% 0% 5% - 117,529 117,529

Prepared by Checked by Verified by


SCCPL Er SCCPL Er SCPL Er
NAME OF THE WORK : CONSTRUCTION OF "SHRIRAM SHRESHTA" VILLAS AT COIMBATORE
NAME OF THE OWNER : M/S. SHRIPROP CONSTRUCTIONS PVT LTD
NAME OF THE CONTRACTOR : M/S. SENTHIL CONSTRUCTION CORPORATION PVT.LTD
BILL NO : FIRST RUNNING BILL DATE: 17.12.14
BILLING PERIOD : 01.11.14 to 10.12.014
VILLA 83 (4 BHK) - 1685 sft x Rs. 1395/ sft Rs 2,350,575

Percentage of work
Value of work completed
completed
Payment
S.No Description of work Upto
modality current Upto
previous Current bill Cumulative bill
bill previous bill
Bill

Structure
1 30%
1.1. Sub-structure, Foundations

Marking, Earth Work, PCC, Footing, Column up to Plinth, Plinth Beam


6%

Marking & Earthwork 2% - 47,012 47,012


PCC for footing 1% - 23,506 23,506
RCC for footing 1% - 23,506 23,506
Column upto plinthbeam 1% - 23,506 23,506
RCC for plinth beam - - -
- - -
1.2. Super-structure - RCC frame
- - -
Ground Floor
- - -
• Columns & Staircase First Flight
4% - - -
• GF Roof and Portico Roof Slab including Staircase Second Flight
7% - - -
First Floor
- - -
• Columns and Slope Roof
6% - - -
• FF Roof Slab
7% - - -
Masonry & Plastering
2 15% - - -
2.1. Masonry Works
- - -
• GF Masonry Works up to Roof including Lintel and Sunshades
2% - - -
• FF Masonry Works up to Roof including Lintel, Lofts and Sunshades
2% - - -
2.2. Plastering of ceiling and walls
- - -
• GF
3% - - -
• FF
3% - - -
2.3. Plastering in External Elevation in all floors
5% - - -
Flooring, Dado & Skirting
3 20% - - -
3.1. Flooring & Skirting
- - -
• GF-Foyer, Living, Dining, Kitchen, Bedroom
4% - - -
• FF-All Bedrooms, lobby & Balconies
4% - - -
• Clay tiling at all Open terraces
• Car Park & All round villa flagging concrete and other finishing 2% - - -
Works 2% - - -
3.2. All Dadoo, Granite & Flooring
- - -
• GF Toilet, Dining & Kitchen Granite Works with Sink
3% - - -
• FF All Toilets
3% - - -
3.3. Staircase & Landings, etc.,
2% - - -
Joinery & MS Railing Works
4 14% - - -
4.1. Door frames & Shutters
- - -
• GF
3% - - -
• FF
3% - - -
4.2. Window frames & Shutters
- - -
• GF
3% - - -
• FF
3% - - -
4.3. MS Railing Works for Windows, Staircase, Balcony & Terrace
- - -
• GF
1% - - -
• FF
1% - - -
Painting Works
5 10% - - -
5.1. Painting of Internal Walls & Ceilings
- - -
• GF
3% - - -
• FF
3% - - -
5.2. Painting for External Elevation
- - -
• GF
2% - - -
• FF
2% - - -
Water proofing Works in all floors
6 4% - - -
6.1. Toilet Water Proofing
2% - - -
6.2. Terrace, balcony water Proofing
2% - - -
Plumbing & Sanitary Works in all floors
7 4% - - -
7.1. Internal Plumbing
• Marking, and Sanitary
Wall Chasing, PipeWorks
Works for Water & Waste Line incl - - -
Pressure testing
1% - - -
• Fixing CP & Sanitary fittings
2% - - -
7.2. External Plumbing and Sanitary lines
• Pipe Works for Water Line, Waste Line & Rain Water down take - - -
lines
• Gully Traps & Chambers with connections complete (Pumps & 0.50% - - -
Valves), Supply & Fixing Syntex Tank & Connections (Pumps & Valves) 0.25% - - -
• Testing, Commissioning and Handing Over
0.25% - - -
Miscellaneous Works in all floors
8 3% - - -
8.1. Expansion Joint Treatment Works & Flagging Concrete
1% - - -
8.2. MS Staircase to terrace & Fencing for site
2% - - -
- - -
TOTAL
100% 0% 5% - 117,529 117,529

Prepared by Checked by Verified by


SCCPL Er SCCPL Er SCPL Er
NAME OF THE WORK : CONSTRUCTION OF "SHRIRAM SHRESHTA" VILLAS AT COIMBATORE
NAME OF THE OWNER : M/S. SHRIPROP CONSTRUCTIONS PVT LTD
NAME OF THE CONTRACTOR : M/S. SENTHIL CONSTRUCTION CORPORATION PVT.LTD
BILL NO : FIRST RUNNING BILL DATE: 17.12.14
BILLING PERIOD : 01.11.14 to 10.12.014
VILLA 91 (4 BHK) - 1685 sft x Rs. 1395/ sft Rs 2,350,575

Percentage of work
Value of work completed
completed
Payment
S.No Description of work Upto
modality current Upto
previous Current bill Cumulative bill
bill previous bill
Bill

Structure
1 30%
1.1. Sub-structure, Foundations

Marking, Earth Work, PCC, Footing, Column up to Plinth, Plinth Beam


6%

Marking & Earthwork 2% - 47,012 47,012


PCC for footing 1% - 23,506 23,506
RCC for footing 1% - 23,506 23,506
Column upto plinthbeam 1% - 23,506 23,506
RCC for plinth beam 1% - 23,506 23,506
- - -
1.2. Super-structure - RCC frame
- - -
Ground Floor
- - -
• Columns & Staircase First Flight
4% 3% - 70,517 70,517
• GF Roof and Portico Roof Slab including Staircase Second Flight
7% - - -
First Floor
- - -
• Columns and Slope Roof
6% - - -
• FF Roof Slab
7% - - -
Masonry & Plastering
2 15% - - -
2.1. Masonry Works
- - -
• GF Masonry Works up to Roof including Lintel and Sunshades
2% - - -
• FF Masonry Works up to Roof including Lintel, Lofts and Sunshades
2% - - -
2.2. Plastering of ceiling and walls
- - -
• GF
3% - - -
• FF
3% - - -
2.3. Plastering in External Elevation in all floors
5% - - -
Flooring, Dado & Skirting
3 20% - - -
3.1. Flooring & Skirting
- - -
• GF-Foyer, Living, Dining, Kitchen, Bedroom
4% - - -
• FF-All Bedrooms, lobby & Balconies
4% - - -
• Clay tiling at all Open terraces
• Car Park & All round villa flagging concrete and other finishing 2% - - -
Works 2% - - -
3.2. All Dadoo, Granite & Flooring
- - -
• GF Toilet, Dining & Kitchen Granite Works with Sink
3% - - -
• FF All Toilets
3% - - -
3.3. Staircase & Landings, etc.,
2% - - -
Joinery & MS Railing Works
4 14% - - -
4.1. Door frames & Shutters
- - -
• GF
3% - - -
• FF
3% - - -
4.2. Window frames & Shutters
- - -
• GF
3% - - -
• FF
3% - - -
4.3. MS Railing Works for Windows, Staircase, Balcony & Terrace
- - -
• GF
1% - - -
• FF
1% - - -
Painting Works
5 10% - - -
5.1. Painting of Internal Walls & Ceilings
- - -
• GF
3% - - -
• FF
3% - - -
5.2. Painting for External Elevation
- - -
• GF
2% - - -
• FF
2% - - -
Water proofing Works in all floors
6 4% - - -
6.1. Toilet Water Proofing
2% - - -
6.2. Terrace, balcony water Proofing
2% - - -
Plumbing & Sanitary Works in all floors
7 4% - - -
7.1. Internal Plumbing
• Marking, and Sanitary
Wall Chasing, PipeWorks
Works for Water & Waste Line incl - - -
Pressure testing
1% - - -
• Fixing CP & Sanitary fittings
2% - - -
7.2. External Plumbing and Sanitary lines
• Pipe Works for Water Line, Waste Line & Rain Water down take - - -
lines
• Gully Traps & Chambers with connections complete (Pumps & 0.50% - - -
Valves), Supply & Fixing Syntex Tank & Connections (Pumps & Valves) 0.25% - - -
• Testing, Commissioning and Handing Over
0.25% - - -
Miscellaneous Works in all floors
8 3% - - -
8.1. Expansion Joint Treatment Works & Flagging Concrete
1% - - -
8.2. MS Staircase to terrace & Fencing for site
2% - - -
- - -
TOTAL
100% 0% 9% - 211,552 211,552

Prepared by Checked by Verified by


SCCPL Er SCCPL Er SCPL Er
NAME OF THE WORK : CONSTRUCTION OF "SHRIRAM SHRESHTA" VILLAS AT COIMBATORE
NAME OF THE OWNER : M/S. SHRIPROP CONSTRUCTIONS PVT LTD
NAME OF THE CONTRACTOR : M/S. SENTHIL CONSTRUCTION CORPORATION PVT.LTD
BILL NO : FIRST RUNNING BILL DATE: 17.12.14
BILLING PERIOD : 01.11.14 to 10.12.014
VILLA 113 (4 BHK) - 1685 sft x Rs. 1395/ sft Rs 2,350,575

Percentage of work
Value of work completed
completed
Payment
S.No Description of work Upto
modality current Upto
previous Current bill Cumulative bill
bill previous bill
Bill

Structure
1 30%
1.1. Sub-structure, Foundations

Marking, Earth Work, PCC, Footing, Column up to Plinth, Plinth Beam


6%

Marking & Earthwork 2% - 47,012 47,012


PCC for footing 1% - 23,506 23,506
RCC for footing 1% - 23,506 23,506
Column upto plinthbeam 1% - 23,506 23,506
RCC for plinth beam - - -
- - -
1.2. Super-structure - RCC frame
- - -
Ground Floor
- - -
• Columns & Staircase First Flight
4% - - -
• GF Roof and Portico Roof Slab including Staircase Second Flight
7% - - -
First Floor
- - -
• Columns and Slope Roof
6% - - -
• FF Roof Slab
7% - - -
Masonry & Plastering
2 15% - - -
2.1. Masonry Works
- - -
• GF Masonry Works up to Roof including Lintel and Sunshades
2% - - -
• FF Masonry Works up to Roof including Lintel, Lofts and Sunshades
2% - - -
2.2. Plastering of ceiling and walls
- - -
• GF
3% - - -
• FF
3% - - -
2.3. Plastering in External Elevation in all floors
5% - - -
Flooring, Dado & Skirting
3 20% - - -
3.1. Flooring & Skirting
- - -
• GF-Foyer, Living, Dining, Kitchen, Bedroom
4% - - -
• FF-All Bedrooms, lobby & Balconies
4% - - -
• Clay tiling at all Open terraces
• Car Park & All round villa flagging concrete and other finishing 2% - - -
Works 2% - - -
3.2. All Dadoo, Granite & Flooring
- - -
• GF Toilet, Dining & Kitchen Granite Works with Sink
3% - - -
• FF All Toilets
3% - - -
3.3. Staircase & Landings, etc.,
2% - - -
Joinery & MS Railing Works
4 14% - - -
4.1. Door frames & Shutters
- - -
• GF
3% - - -
• FF
3% - - -
4.2. Window frames & Shutters
- - -
• GF
3% - - -
• FF
3% - - -
4.3. MS Railing Works for Windows, Staircase, Balcony & Terrace
- - -
• GF
1% - - -
• FF
1% - - -
Painting Works
5 10% - - -
5.1. Painting of Internal Walls & Ceilings
- - -
• GF
3% - - -
• FF
3% - - -
5.2. Painting for External Elevation
- - -
• GF
2% - - -
• FF
2% - - -
Water proofing Works in all floors
6 4% - - -
6.1. Toilet Water Proofing
2% - - -
6.2. Terrace, balcony water Proofing
2% - - -
Plumbing & Sanitary Works in all floors
7 4% - - -
7.1. Internal Plumbing
• Marking, and Sanitary
Wall Chasing, PipeWorks
Works for Water & Waste Line incl - - -
Pressure testing
1% - - -
• Fixing CP & Sanitary fittings
2% - - -
7.2. External Plumbing and Sanitary lines
• Pipe Works for Water Line, Waste Line & Rain Water down take - - -
lines
• Gully Traps & Chambers with connections complete (Pumps & 0.50% - - -
Valves), Supply & Fixing Syntex Tank & Connections (Pumps & Valves) 0.25% - - -
• Testing, Commissioning and Handing Over
0.25% - - -
Miscellaneous Works in all floors
8 3% - - -
8.1. Expansion Joint Treatment Works & Flagging Concrete
1% - - -
8.2. MS Staircase to terrace & Fencing for site
2% - - -
- - -
TOTAL
100% 0% 5% - 117,529 117,529

Prepared by Checked by Verified by


SCCPL Er SCCPL Er SCPL Er
NAME OF THE WORK : CONSTRUCTION OF "SHRIRAM SHRESHTA" VILLAS AT COIMBATORE
NAME OF THE OWNER : M/S. SHRIPROP CONSTRUCTIONS PVT LTD
NAME OF THE CONTRACTOR : M/S. SENTHIL CONSTRUCTION CORPORATION PVT.LTD
BILL NO : FIRST RUNNING BILL DATE: 17.12.14
BILLING PERIOD : 01.11.14 to 10.12.014
VILLA 115 (4 BHK) - 1685 sft x Rs. 1395/ sft Rs 2,350,575

Percentage of work
Value of work completed
completed
Payment
S.No Description of work Upto
modality current Upto
previous Current bill Cumulative bill
bill previous bill
Bill

Structure
1 30%
1.1. Sub-structure, Foundations

Marking, Earth Work, PCC, Footing, Column up to Plinth, Plinth Beam


6%

Marking & Earthwork 2% - 47,012 47,012


PCC for footing 1% - 23,506 23,506
RCC for footing 1% - 23,506 23,506
Column upto plinthbeam 1% - 23,506 23,506
RCC for plinth beam - - -
- - -
1.2. Super-structure - RCC frame
- - -
Ground Floor
- - -
• Columns & Staircase First Flight
4% - - -
• GF Roof and Portico Roof Slab including Staircase Second Flight
7% - - -
First Floor
- - -
• Columns and Slope Roof
6% - - -
• FF Roof Slab
7% - - -
Masonry & Plastering
2 15% - - -
2.1. Masonry Works
- - -
• GF Masonry Works up to Roof including Lintel and Sunshades
2% - - -
• FF Masonry Works up to Roof including Lintel, Lofts and Sunshades
2% - - -
2.2. Plastering of ceiling and walls
- - -
• GF
3% - - -
• FF
3% - - -
2.3. Plastering in External Elevation in all floors
5% - - -
Flooring, Dado & Skirting
3 20% - - -
3.1. Flooring & Skirting
- - -
• GF-Foyer, Living, Dining, Kitchen, Bedroom
4% - - -
• FF-All Bedrooms, lobby & Balconies
4% - - -
• Clay tiling at all Open terraces
• Car Park & All round villa flagging concrete and other finishing 2% - - -
Works 2% - - -
3.2. All Dadoo, Granite & Flooring
- - -
• GF Toilet, Dining & Kitchen Granite Works with Sink
3% - - -
• FF All Toilets
3% - - -
3.3. Staircase & Landings, etc.,
2% - - -
Joinery & MS Railing Works
4 14% - - -
4.1. Door frames & Shutters
- - -
• GF
3% - - -
• FF
3% - - -
4.2. Window frames & Shutters
- - -
• GF
3% - - -
• FF
3% - - -
4.3. MS Railing Works for Windows, Staircase, Balcony & Terrace
- - -
• GF
1% - - -
• FF
1% - - -
Painting Works
5 10% - - -
5.1. Painting of Internal Walls & Ceilings
- - -
• GF
3% - - -
• FF
3% - - -
5.2. Painting for External Elevation
- - -
• GF
2% - - -
• FF
2% - - -
Water proofing Works in all floors
6 4% - - -
6.1. Toilet Water Proofing
2% - - -
6.2. Terrace, balcony water Proofing
2% - - -
Plumbing & Sanitary Works in all floors
7 4% - - -
7.1. Internal Plumbing
• Marking, and Sanitary
Wall Chasing, PipeWorks
Works for Water & Waste Line incl - - -
Pressure testing
1% - - -
• Fixing CP & Sanitary fittings
2% - - -
7.2. External Plumbing and Sanitary lines
• Pipe Works for Water Line, Waste Line & Rain Water down take - - -
lines
• Gully Traps & Chambers with connections complete (Pumps & 0.50% - - -
Valves), Supply & Fixing Syntex Tank & Connections (Pumps & Valves) 0.25% - - -
• Testing, Commissioning and Handing Over
0.25% - - -
Miscellaneous Works in all floors
8 3% - - -
8.1. Expansion Joint Treatment Works & Flagging Concrete
1% - - -
8.2. MS Staircase to terrace & Fencing for site
2% - - -
- - -
TOTAL
100% 0% 5% - 117,529 117,529

Prepared by Checked by Verified by


SCCPL Er SCCPL Er SCPL Er
NAME OF THE WORK : CONSTRUCTION OF "SHRIRAM SHRESHTA" VILLAS AT COIMBATORE
NAME OF THE OWNER : M/S. SHRIPROP CONSTRUCTIONS PVT LTD
NAME OF THE CONTRACTOR : M/S. SENTHIL CONSTRUCTION CORPORATION PVT.LTD
BILL NO : FIRST RUNNING BILL DATE: 17.12.14
BILLING PERIOD : 01.11.14 to 10.12.014
VILLA 117 (4 BHK) - 1685 sft x Rs. 1395/ sft Rs 2,350,575

Percentage of work
Value of work completed
completed
Payment
S.No Description of work Upto
modality current Upto
previous Current bill Cumulative bill
bill previous bill
Bill

Structure
1 30%
1.1. Sub-structure, Foundations

Marking, Earth Work, PCC, Footing, Column up to Plinth, Plinth Beam


6%

Marking & Earthwork 2% - 47,012 47,012


PCC for footing 1% - 23,506 23,506
RCC for footing 1% - 23,506 23,506
Column upto plinthbeam 1% - 23,506 23,506
RCC for plinth beam 1% - 23,506 23,506
- - -
1.2. Super-structure - RCC frame
- - -
Ground Floor
- - -
• Columns & Staircase First Flight
4% - - -
• GF Roof and Portico Roof Slab including Staircase Second Flight
7% - - -
First Floor
- - -
• Columns and Slope Roof
6% - - -
• FF Roof Slab
7% - - -
Masonry & Plastering
2 15% - - -
2.1. Masonry Works
- - -
• GF Masonry Works up to Roof including Lintel and Sunshades
2% - - -
• FF Masonry Works up to Roof including Lintel, Lofts and Sunshades
2% - - -
2.2. Plastering of ceiling and walls
- - -
• GF
3% - - -
• FF
3% - - -
2.3. Plastering in External Elevation in all floors
5% - - -
Flooring, Dado & Skirting
3 20% - - -
3.1. Flooring & Skirting
- - -
• GF-Foyer, Living, Dining, Kitchen, Bedroom
4% - - -
• FF-All Bedrooms, lobby & Balconies
4% - - -
• Clay tiling at all Open terraces
• Car Park & All round villa flagging concrete and other finishing 2% - - -
Works 2% - - -
3.2. All Dadoo, Granite & Flooring
- - -
• GF Toilet, Dining & Kitchen Granite Works with Sink
3% - - -
• FF All Toilets
3% - - -
3.3. Staircase & Landings, etc.,
2% - - -
Joinery & MS Railing Works
4 14% - - -
4.1. Door frames & Shutters
- - -
• GF
3% - - -
• FF
3% - - -
4.2. Window frames & Shutters
- - -
• GF
3% - - -
• FF
3% - - -
4.3. MS Railing Works for Windows, Staircase, Balcony & Terrace
- - -
• GF
1% - - -
• FF
1% - - -
Painting Works
5 10% - - -
5.1. Painting of Internal Walls & Ceilings
- - -
• GF
3% - - -
• FF
3% - - -
5.2. Painting for External Elevation
- - -
• GF
2% - - -
• FF
2% - - -
Water proofing Works in all floors
6 4% - - -
6.1. Toilet Water Proofing
2% - - -
6.2. Terrace, balcony water Proofing
2% - - -
Plumbing & Sanitary Works in all floors
7 4% - - -
7.1. Internal Plumbing
• Marking, and Sanitary
Wall Chasing, PipeWorks
Works for Water & Waste Line incl - - -
Pressure testing
1% - - -
• Fixing CP & Sanitary fittings
2% - - -
7.2. External Plumbing and Sanitary lines
• Pipe Works for Water Line, Waste Line & Rain Water down take - - -
lines
• Gully Traps & Chambers with connections complete (Pumps & 0.50% - - -
Valves), Supply & Fixing Syntex Tank & Connections (Pumps & Valves) 0.25% - - -
• Testing, Commissioning and Handing Over
0.25% - - -
Miscellaneous Works in all floors
8 3% - - -
8.1. Expansion Joint Treatment Works & Flagging Concrete
1% - - -
8.2. MS Staircase to terrace & Fencing for site
2% - - -
- - -
TOTAL
100% 0% 6% - 141,035 141,035

Prepared by Checked by Verified by


SCCPL Er SCCPL Er SCPL Er
NAME OF THE WORK : CONSTRUCTION OF "SHRIRAM SHRESHTA" VILLAS AT COIMBATORE
NAME OF THE OWNER : M/S. SHRIPROP CONSTRUCTIONS PVT LTD
NAME OF THE CONTRACTOR : M/S. SENTHIL CONSTRUCTION CORPORATION PVT.LTD
BILL NO : FIRST RUNNING BILL DATE: 17.12.14
BILLING PERIOD : 01.11.14 to 10.12.014
VILLA 119 (4 BHK) - 1685 sft x Rs. 1395/ sft Rs 2,350,575

Percentage of work
Value of work completed
completed
Payment
S.No Description of work Upto
modality current Upto
previous Current bill Cumulative bill
bill previous bill
Bill

Structure
1 30%
1.1. Sub-structure, Foundations

Marking, Earth Work, PCC, Footing, Column up to Plinth, Plinth Beam


6%

Marking & Earthwork 2% - 47,012 47,012


PCC for footing 1% - 23,506 23,506
RCC for footing 1% - 23,506 23,506
Column upto plinthbeam 1% - 23,506 23,506
RCC for plinth beam 1% - 23,506 23,506
- - -
1.2. Super-structure - RCC frame
- - -
Ground Floor
- - -
• Columns & Staircase First Flight
4% - - -
• GF Roof and Portico Roof Slab including Staircase Second Flight
7% - - -
First Floor
- - -
• Columns and Slope Roof
6% - - -
• FF Roof Slab
7% - - -
Masonry & Plastering
2 15% - - -
2.1. Masonry Works
- - -
• GF Masonry Works up to Roof including Lintel and Sunshades
2% - - -
• FF Masonry Works up to Roof including Lintel, Lofts and Sunshades
2% - - -
2.2. Plastering of ceiling and walls
- - -
• GF
3% - - -
• FF
3% - - -
2.3. Plastering in External Elevation in all floors
5% - - -
Flooring, Dado & Skirting
3 20% - - -
3.1. Flooring & Skirting
- - -
• GF-Foyer, Living, Dining, Kitchen, Bedroom
4% - - -
• FF-All Bedrooms, lobby & Balconies
4% - - -
• Clay tiling at all Open terraces
• Car Park & All round villa flagging concrete and other finishing 2% - - -
Works 2% - - -
3.2. All Dadoo, Granite & Flooring
- - -
• GF Toilet, Dining & Kitchen Granite Works with Sink
3% - - -
• FF All Toilets
3% - - -
3.3. Staircase & Landings, etc.,
2% - - -
Joinery & MS Railing Works
4 14% - - -
4.1. Door frames & Shutters
- - -
• GF
3% - - -
• FF
3% - - -
4.2. Window frames & Shutters
- - -
• GF
3% - - -
• FF
3% - - -
4.3. MS Railing Works for Windows, Staircase, Balcony & Terrace
- - -
• GF
1% - - -
• FF
1% - - -
Painting Works
5 10% - - -
5.1. Painting of Internal Walls & Ceilings
- - -
• GF
3% - - -
• FF
3% - - -
5.2. Painting for External Elevation
- - -
• GF
2% - - -
• FF
2% - - -
Water proofing Works in all floors
6 4% - - -
6.1. Toilet Water Proofing
2% - - -
6.2. Terrace, balcony water Proofing
2% - - -
Plumbing & Sanitary Works in all floors
7 4% - - -
7.1. Internal Plumbing
• Marking, and Sanitary
Wall Chasing, PipeWorks
Works for Water & Waste Line incl - - -
Pressure testing
1% - - -
• Fixing CP & Sanitary fittings
2% - - -
7.2. External Plumbing and Sanitary lines
• Pipe Works for Water Line, Waste Line & Rain Water down take - - -
lines
• Gully Traps & Chambers with connections complete (Pumps & 0.50% - - -
Valves), Supply & Fixing Syntex Tank & Connections (Pumps & Valves) 0.25% - - -
• Testing, Commissioning and Handing Over
0.25% - - -
Miscellaneous Works in all floors
8 3% - - -
8.1. Expansion Joint Treatment Works & Flagging Concrete
1% - - -
8.2. MS Staircase to terrace & Fencing for site
2% - - -
- - -
TOTAL
100% 0% 6% - 141,035 141,035

Prepared by Checked by Verified by


SCCPL Er SCCPL Er SCPL Er
NAME OF THE WORK : CONSTRUCTION OF "SHRIRAM SHRESHTA" VILLAS AT COIMBATORE
NAME OF THE OWNER : M/S. SHRIPROP CONSTRUCTIONS PVT LTD
NAME OF THE CONTRACTOR : M/S. SENTHIL CONSTRUCTION CORPORATION PVT.LTD
BILL NO : FIRST RUNNING BILL DATE: 17.12.14
BILLING PERIOD : 01.11.14 to 10.12.014
VILLA 120 (4 BHK) - 1685 sft x Rs. 1395/ sft Rs 2,350,575

Percentage of work
Value of work completed
completed
Payment
S.No Description of work Upto
modality current Upto
previous Current bill Cumulative bill
bill previous bill
Bill

Structure
1 30%
1.1. Sub-structure, Foundations

Marking, Earth Work, PCC, Footing, Column up to Plinth, Plinth Beam


6%

Marking & Earthwork 2% - 47,012 47,012


PCC for footing 1% - 23,506 23,506
RCC for footing 1% - 23,506 23,506
Column upto plinthbeam 1% - 23,506 23,506
RCC for plinth beam - - -
- - -
1.2. Super-structure - RCC frame
- - -
Ground Floor
- - -
• Columns & Staircase First Flight
4% - - -
• GF Roof and Portico Roof Slab including Staircase Second Flight
7% - - -
First Floor
- - -
• Columns and Slope Roof
6% - - -
• FF Roof Slab
7% - - -
Masonry & Plastering
2 15% - - -
2.1. Masonry Works
- - -
• GF Masonry Works up to Roof including Lintel and Sunshades
2% - - -
• FF Masonry Works up to Roof including Lintel, Lofts and Sunshades
2% - - -
2.2. Plastering of ceiling and walls
- - -
• GF
3% - - -
• FF
3% - - -
2.3. Plastering in External Elevation in all floors
5% - - -
Flooring, Dado & Skirting
3 20% - - -
3.1. Flooring & Skirting
- - -
• GF-Foyer, Living, Dining, Kitchen, Bedroom
4% - - -
• FF-All Bedrooms, lobby & Balconies
4% - - -
• Clay tiling at all Open terraces
• Car Park & All round villa flagging concrete and other finishing 2% - - -
Works 2% - - -
3.2. All Dadoo, Granite & Flooring
- - -
• GF Toilet, Dining & Kitchen Granite Works with Sink
3% - - -
• FF All Toilets
3% - - -
3.3. Staircase & Landings, etc.,
2% - - -
Joinery & MS Railing Works
4 14% - - -
4.1. Door frames & Shutters
- - -
• GF
3% - - -
• FF
3% - - -
4.2. Window frames & Shutters
- - -
• GF
3% - - -
• FF
3% - - -
4.3. MS Railing Works for Windows, Staircase, Balcony & Terrace
- - -
• GF
1% - - -
• FF
1% - - -
Painting Works
5 10% - - -
5.1. Painting of Internal Walls & Ceilings
- - -
• GF
3% - - -
• FF
3% - - -
5.2. Painting for External Elevation
- - -
• GF
2% - - -
• FF
2% - - -
Water proofing Works in all floors
6 4% - - -
6.1. Toilet Water Proofing
2% - - -
6.2. Terrace, balcony water Proofing
2% - - -
Plumbing & Sanitary Works in all floors
7 4% - - -
7.1. Internal Plumbing
• Marking, and Sanitary
Wall Chasing, PipeWorks
Works for Water & Waste Line incl - - -
Pressure testing
1% - - -
• Fixing CP & Sanitary fittings
2% - - -
7.2. External Plumbing and Sanitary lines
• Pipe Works for Water Line, Waste Line & Rain Water down take - - -
lines
• Gully Traps & Chambers with connections complete (Pumps & 0.50% - - -
Valves), Supply & Fixing Syntex Tank & Connections (Pumps & Valves) 0.25% - - -
• Testing, Commissioning and Handing Over
0.25% - - -
Miscellaneous Works in all floors
8 3% - - -
8.1. Expansion Joint Treatment Works & Flagging Concrete
1% - - -
8.2. MS Staircase to terrace & Fencing for site
2% - - -
- - -
TOTAL
100% 0% 5% - 117,529 117,529

Prepared by Checked by Verified by


SCCPL Er SCCPL Er SCPL Er
NAME OF THE WORK : CONSTRUCTION OF "SHRIRAM SHRESHTA" VILLAS AT COIMBATORE
NAME OF THE OWNER : M/S. SHRIPROP CONSTRUCTIONS PVT LTD
NAME OF THE CONTRACTOR : M/S. SENTHIL CONSTRUCTION CORPORATION PVT.LTD
BILL NO : FIRST RUNNING BILL DATE: 17.12.14
BILLING PERIOD : 01.11.14 to 10.12.014
VILLA 121 (4 BHK) - 1685 sft x Rs. 1395/ sft Rs 2,350,575

Percentage of work
Value of work completed
completed
Payment
S.No Description of work Upto
modality current Upto
previous Current bill Cumulative bill
bill previous bill
Bill

Structure
1 30%
1.1. Sub-structure, Foundations

Marking, Earth Work, PCC, Footing, Column up to Plinth, Plinth Beam


6%

Marking & Earthwork 2% - 47,012 47,012


PCC for footing 1% - 23,506 23,506
RCC for footing 1% - 23,506 23,506
Column upto plinthbeam 1% - 23,506 23,506
RCC for plinth beam - - -
- - -
1.2. Super-structure - RCC frame
- - -
Ground Floor
- - -
• Columns & Staircase First Flight
4% - - -
• GF Roof and Portico Roof Slab including Staircase Second Flight
7% - - -
First Floor
- - -
• Columns and Slope Roof
6% - - -
• FF Roof Slab
7% - - -
Masonry & Plastering
2 15% - - -
2.1. Masonry Works
- - -
• GF Masonry Works up to Roof including Lintel and Sunshades
2% - - -
• FF Masonry Works up to Roof including Lintel, Lofts and Sunshades
2% - - -
2.2. Plastering of ceiling and walls
- - -
• GF
3% - - -
• FF
3% - - -
2.3. Plastering in External Elevation in all floors
5% - - -
Flooring, Dado & Skirting
3 20% - - -
3.1. Flooring & Skirting
- - -
• GF-Foyer, Living, Dining, Kitchen, Bedroom
4% - - -
• FF-All Bedrooms, lobby & Balconies
4% - - -
• Clay tiling at all Open terraces
• Car Park & All round villa flagging concrete and other finishing 2% - - -
Works 2% - - -
3.2. All Dadoo, Granite & Flooring
- - -
• GF Toilet, Dining & Kitchen Granite Works with Sink
3% - - -
• FF All Toilets
3% - - -
3.3. Staircase & Landings, etc.,
2% - - -
Joinery & MS Railing Works
4 14% - - -
4.1. Door frames & Shutters
- - -
• GF
3% - - -
• FF
3% - - -
4.2. Window frames & Shutters
- - -
• GF
3% - - -
• FF
3% - - -
4.3. MS Railing Works for Windows, Staircase, Balcony & Terrace
- - -
• GF
1% - - -
• FF
1% - - -
Painting Works
5 10% - - -
5.1. Painting of Internal Walls & Ceilings
- - -
• GF
3% - - -
• FF
3% - - -
5.2. Painting for External Elevation
- - -
• GF
2% - - -
• FF
2% - - -
Water proofing Works in all floors
6 4% - - -
6.1. Toilet Water Proofing
2% - - -
6.2. Terrace, balcony water Proofing
2% - - -
Plumbing & Sanitary Works in all floors
7 4% - - -
7.1. Internal Plumbing
• Marking, and Sanitary
Wall Chasing, PipeWorks
Works for Water & Waste Line incl - - -
Pressure testing
1% - - -
• Fixing CP & Sanitary fittings
2% - - -
7.2. External Plumbing and Sanitary lines
• Pipe Works for Water Line, Waste Line & Rain Water down take - - -
lines
• Gully Traps & Chambers with connections complete (Pumps & 0.50% - - -
Valves), Supply & Fixing Syntex Tank & Connections (Pumps & Valves) 0.25% - - -
• Testing, Commissioning and Handing Over
0.25% - - -
Miscellaneous Works in all floors
8 3% - - -
8.1. Expansion Joint Treatment Works & Flagging Concrete
1% - - -
8.2. MS Staircase to terrace & Fencing for site
2% - - -
- - -
TOTAL
100% 0% 5% - 117,529 117,529

Prepared by Checked by Verified by


SCCPL Er SCCPL Er SCPL Er
NAME OF THE WORK : CONSTRUCTION OF "SHRIRAM SHRESHTA" VILLAS AT COIMBATORE
NAME OF THE OWNER : M/S. SHRIPROP CONSTRUCTIONS PVT LTD
NAME OF THE CONTRACTOR : M/S. SENTHIL CONSTRUCTION CORPORATION PVT.LTD
BILL NO : FIRST RUNNING BILL DATE: 17.12.14
BILLING PERIOD : 01.11.14 to 10.12.014
VILLA 123 (4 BHK) - 1685 sft x Rs. 1395/ sft Rs 2,350,575

Percentage of work
Value of work completed
completed
Payment
S.No Description of work Upto
modality current Upto
previous Current bill Cumulative bill
bill previous bill
Bill

Structure
1 30%
1.1. Sub-structure, Foundations

Marking, Earth Work, PCC, Footing, Column up to Plinth, Plinth Beam


6%

Marking & Earthwork 2% - 47,012 47,012


PCC for footing 1% - 23,506 23,506
RCC for footing 1% - 23,506 23,506
Column upto plinthbeam 1% - 23,506 23,506
RCC for plinth beam 1% - 23,506 23,506
- - -
1.2. Super-structure - RCC frame
- - -
Ground Floor
- - -
• Columns & Staircase First Flight
4% 3% - 70,517 70,517
• GF Roof and Portico Roof Slab including Staircase Second Flight
7% - - -
First Floor
- - -
• Columns and Slope Roof
6% - - -
• FF Roof Slab
7% - - -
Masonry & Plastering
2 15% - - -
2.1. Masonry Works
- - -
• GF Masonry Works up to Roof including Lintel and Sunshades
2% - - -
• FF Masonry Works up to Roof including Lintel, Lofts and Sunshades
2% - - -
2.2. Plastering of ceiling and walls
- - -
• GF
3% - - -
• FF
3% - - -
2.3. Plastering in External Elevation in all floors
5% - - -
Flooring, Dado & Skirting
3 20% - - -
3.1. Flooring & Skirting
- - -
• GF-Foyer, Living, Dining, Kitchen, Bedroom
4% - - -
• FF-All Bedrooms, lobby & Balconies
4% - - -
• Clay tiling at all Open terraces
• Car Park & All round villa flagging concrete and other finishing 2% - - -
Works 2% - - -
3.2. All Dadoo, Granite & Flooring
- - -
• GF Toilet, Dining & Kitchen Granite Works with Sink
3% - - -
• FF All Toilets
3% - - -
3.3. Staircase & Landings, etc.,
2% - - -
Joinery & MS Railing Works
4 14% - - -
4.1. Door frames & Shutters
- - -
• GF
3% - - -
• FF
3% - - -
4.2. Window frames & Shutters
- - -
• GF
3% - - -
• FF
3% - - -
4.3. MS Railing Works for Windows, Staircase, Balcony & Terrace
- - -
• GF
1% - - -
• FF
1% - - -
Painting Works
5 10% - - -
5.1. Painting of Internal Walls & Ceilings
- - -
• GF
3% - - -
• FF
3% - - -
5.2. Painting for External Elevation
- - -
• GF
2% - - -
• FF
2% - - -
Water proofing Works in all floors
6 4% - - -
6.1. Toilet Water Proofing
2% - - -
6.2. Terrace, balcony water Proofing
2% - - -
Plumbing & Sanitary Works in all floors
7 4% - - -
7.1. Internal Plumbing
• Marking, and Sanitary
Wall Chasing, PipeWorks
Works for Water & Waste Line incl - - -
Pressure testing
1% - - -
• Fixing CP & Sanitary fittings
2% - - -
7.2. External Plumbing and Sanitary lines
• Pipe Works for Water Line, Waste Line & Rain Water down take - - -
lines
• Gully Traps & Chambers with connections complete (Pumps & 0.50% - - -
Valves), Supply & Fixing Syntex Tank & Connections (Pumps & Valves) 0.25% - - -
• Testing, Commissioning and Handing Over
0.25% - - -
Miscellaneous Works in all floors
8 3% - - -
8.1. Expansion Joint Treatment Works & Flagging Concrete
1% - - -
8.2. MS Staircase to terrace & Fencing for site
2% - - -
- - -
TOTAL
100% 0% 9% - 211,552 211,552

Prepared by Checked by Verified by


SCCPL Er SCCPL Er SCPL Er
NAME OF THE WORK : CONSTRUCTION OF "SHRIRAM SHRESHTA" VILLAS AT COIMBATORE
NAME OF THE OWNER : M/S. SHRIPROP CONSTRUCTIONS PVT LTD
NAME OF THE CONTRACTOR : M/S. SENTHIL CONSTRUCTION CORPORATION PVT.LTD
BILL NO : FIRST RUNNING BILL DATE: 17.12.14
BILLING PERIOD : 01.11.14 to 10.12.014
VILLA 124 (4 BHK) - 1685 sft x Rs. 1395/ sft Rs 2,350,575

Percentage of work
Value of work completed
completed
Payment
S.No Description of work Upto
modality current Upto
previous Current bill Cumulative bill
bill previous bill
Bill

Structure
1 30%
1.1. Sub-structure, Foundations

Marking, Earth Work, PCC, Footing, Column up to Plinth, Plinth Beam


6%

Marking & Earthwork 2% - 47,012 47,012


PCC for footing 1% - 23,506 23,506
RCC for footing 1% - 23,506 23,506
Column upto plinthbeam 1% - 23,506 23,506
RCC for plinth beam 1% - 23,506 23,506
- - -
1.2. Super-structure - RCC frame
- - -
Ground Floor
- - -
• Columns & Staircase First Flight
4% - - -
• GF Roof and Portico Roof Slab including Staircase Second Flight
7% - - -
First Floor
- - -
• Columns and Slope Roof
6% - - -
• FF Roof Slab
7% - - -
Masonry & Plastering
2 15% - - -
2.1. Masonry Works
- - -
• GF Masonry Works up to Roof including Lintel and Sunshades
2% - - -
• FF Masonry Works up to Roof including Lintel, Lofts and Sunshades
2% - - -
2.2. Plastering of ceiling and walls
- - -
• GF
3% - - -
• FF
3% - - -
2.3. Plastering in External Elevation in all floors
5% - - -
Flooring, Dado & Skirting
3 20% - - -
3.1. Flooring & Skirting
- - -
• GF-Foyer, Living, Dining, Kitchen, Bedroom
4% - - -
• FF-All Bedrooms, lobby & Balconies
4% - - -
• Clay tiling at all Open terraces
• Car Park & All round villa flagging concrete and other finishing 2% - - -
Works 2% - - -
3.2. All Dadoo, Granite & Flooring
- - -
• GF Toilet, Dining & Kitchen Granite Works with Sink
3% - - -
• FF All Toilets
3% - - -
3.3. Staircase & Landings, etc.,
2% - - -
Joinery & MS Railing Works
4 14% - - -
4.1. Door frames & Shutters
- - -
• GF
3% - - -
• FF
3% - - -
4.2. Window frames & Shutters
- - -
• GF
3% - - -
• FF
3% - - -
4.3. MS Railing Works for Windows, Staircase, Balcony & Terrace
- - -
• GF
1% - - -
• FF
1% - - -
Painting Works
5 10% - - -
5.1. Painting of Internal Walls & Ceilings
- - -
• GF
3% - - -
• FF
3% - - -
5.2. Painting for External Elevation
- - -
• GF
2% - - -
• FF
2% - - -
Water proofing Works in all floors
6 4% - - -
6.1. Toilet Water Proofing
2% - - -
6.2. Terrace, balcony water Proofing
2% - - -
Plumbing & Sanitary Works in all floors
7 4% - - -
7.1. Internal Plumbing
• Marking, and Sanitary
Wall Chasing, PipeWorks
Works for Water & Waste Line incl - - -
Pressure testing
1% - - -
• Fixing CP & Sanitary fittings
2% - - -
7.2. External Plumbing and Sanitary lines
• Pipe Works for Water Line, Waste Line & Rain Water down take - - -
lines
• Gully Traps & Chambers with connections complete (Pumps & 0.50% - - -
Valves), Supply & Fixing Syntex Tank & Connections (Pumps & Valves) 0.25% - - -
• Testing, Commissioning and Handing Over
0.25% - - -
Miscellaneous Works in all floors
8 3% - - -
8.1. Expansion Joint Treatment Works & Flagging Concrete
1% - - -
8.2. MS Staircase to terrace & Fencing for site
2% - - -
- - -
TOTAL
100% 0% 6% - 141,035 141,035

Prepared by Checked by Verified by


SCCPL Er SCCPL Er SCPL Er
NAME OF THE WORK : CONSTRUCTION OF "SHRIRAM SHRESHTA" VILLAS AT COIMBATORE
NAME OF THE OWNER : M/S. SHRIPROP CONSTRUCTIONS PVT LTD
NAME OF THE CONTRACTOR : M/S. SENTHIL CONSTRUCTION CORPORATION PVT.LTD
BILL NO : FIRST RUNNING BILL DATE: 17.12.14
BILLING PERIOD : 01.11.14 to 10.12.014
VILLA 126 (4 BHK) - 1685 sft x Rs. 1395/ sft Rs 2,350,575

Percentage of work
Value of work completed
completed
Payment
S.No Description of work Upto
modality current Upto
previous Current bill Cumulative bill
bill previous bill
Bill

Structure
1 30%
1.1. Sub-structure, Foundations

Marking, Earth Work, PCC, Footing, Column up to Plinth, Plinth Beam


6%

Marking & Earthwork 2% - 47,012 47,012


PCC for footing 1% - 23,506 23,506
RCC for footing 1% - 23,506 23,506
Column upto plinthbeam 1% - 23,506 23,506
RCC for plinth beam - - -
- - -
1.2. Super-structure - RCC frame
- - -
Ground Floor
- - -
• Columns & Staircase First Flight
4% - - -
• GF Roof and Portico Roof Slab including Staircase Second Flight
7% - - -
First Floor
- - -
• Columns and Slope Roof
6% - - -
• FF Roof Slab
7% - - -
Masonry & Plastering
2 15% - - -
2.1. Masonry Works
- - -
• GF Masonry Works up to Roof including Lintel and Sunshades
2% - - -
• FF Masonry Works up to Roof including Lintel, Lofts and Sunshades
2% - - -
2.2. Plastering of ceiling and walls
- - -
• GF
3% - - -
• FF
3% - - -
2.3. Plastering in External Elevation in all floors
5% - - -
Flooring, Dado & Skirting
3 20% - - -
3.1. Flooring & Skirting
- - -
• GF-Foyer, Living, Dining, Kitchen, Bedroom
4% - - -
• FF-All Bedrooms, lobby & Balconies
4% - - -
• Clay tiling at all Open terraces
• Car Park & All round villa flagging concrete and other finishing 2% - - -
Works 2% - - -
3.2. All Dadoo, Granite & Flooring
- - -
• GF Toilet, Dining & Kitchen Granite Works with Sink
3% - - -
• FF All Toilets
3% - - -
3.3. Staircase & Landings, etc.,
2% - - -
Joinery & MS Railing Works
4 14% - - -
4.1. Door frames & Shutters
- - -
• GF
3% - - -
• FF
3% - - -
4.2. Window frames & Shutters
- - -
• GF
3% - - -
• FF
3% - - -
4.3. MS Railing Works for Windows, Staircase, Balcony & Terrace
- - -
• GF
1% - - -
• FF
1% - - -
Painting Works
5 10% - - -
5.1. Painting of Internal Walls & Ceilings
- - -
• GF
3% - - -
• FF
3% - - -
5.2. Painting for External Elevation
- - -
• GF
2% - - -
• FF
2% - - -
Water proofing Works in all floors
6 4% - - -
6.1. Toilet Water Proofing
2% - - -
6.2. Terrace, balcony water Proofing
2% - - -
Plumbing & Sanitary Works in all floors
7 4% - - -
7.1. Internal Plumbing
• Marking, and Sanitary
Wall Chasing, PipeWorks
Works for Water & Waste Line incl - - -
Pressure testing
1% - - -
• Fixing CP & Sanitary fittings
2% - - -
7.2. External Plumbing and Sanitary lines
• Pipe Works for Water Line, Waste Line & Rain Water down take - - -
lines
• Gully Traps & Chambers with connections complete (Pumps & 0.50% - - -
Valves), Supply & Fixing Syntex Tank & Connections (Pumps & Valves) 0.25% - - -
• Testing, Commissioning and Handing Over
0.25% - - -
Miscellaneous Works in all floors
8 3% - - -
8.1. Expansion Joint Treatment Works & Flagging Concrete
1% - - -
8.2. MS Staircase to terrace & Fencing for site
2% - - -
- - -
TOTAL
100% 0% 5% - 117,529 117,529

Prepared by Checked by Verified by


SCCPL Er SCCPL Er SCPL Er
NAME OF THE WORK : CONSTRUCTION OF "SHRIRAM SHRESHTA" VILLAS AT COIMBATORE
NAME OF THE OWNER : M/S. SHRIPROP CONSTRUCTIONS PVT LTD
NAME OF THE CONTRACTOR : M/S. SENTHIL CONSTRUCTION CORPORATION PVT.LTD
BILL NO : FIRST RUNNING BILL DATE: 17.12.14
BILLING PERIOD : 01.11.14 to 10.12.014
VILLA 126A (4 BHK) - 1685 sft x Rs. 1395/ sft Rs 2,350,575

Percentage of work
Value of work completed
completed
Payment
S.No Description of work Upto
modality current Upto
previous Current bill Cumulative bill
bill previous bill
Bill

Structure
1 30%
1.1. Sub-structure, Foundations

Marking, Earth Work, PCC, Footing, Column up to Plinth, Plinth Beam


6%

Marking & Earthwork 2% - 47,012 47,012


PCC for footing 1% - 23,506 23,506
RCC for footing 1% - 23,506 23,506
Column upto plinthbeam 1% - 23,506 23,506
RCC for plinth beam - - -
- - -
1.2. Super-structure - RCC frame
- - -
Ground Floor
- - -
• Columns & Staircase First Flight
4% - - -
• GF Roof and Portico Roof Slab including Staircase Second Flight
7% - - -
First Floor
- - -
• Columns and Slope Roof
6% - - -
• FF Roof Slab
7% - - -
Masonry & Plastering
2 15% - - -
2.1. Masonry Works
- - -
• GF Masonry Works up to Roof including Lintel and Sunshades
2% - - -
• FF Masonry Works up to Roof including Lintel, Lofts and Sunshades
2% - - -
2.2. Plastering of ceiling and walls
- - -
• GF
3% - - -
• FF
3% - - -
2.3. Plastering in External Elevation in all floors
5% - - -
Flooring, Dado & Skirting
3 20% - - -
3.1. Flooring & Skirting
- - -
• GF-Foyer, Living, Dining, Kitchen, Bedroom
4% - - -
• FF-All Bedrooms, lobby & Balconies
4% - - -
• Clay tiling at all Open terraces
• Car Park & All round villa flagging concrete and other finishing 2% - - -
Works 2% - - -
3.2. All Dadoo, Granite & Flooring
- - -
• GF Toilet, Dining & Kitchen Granite Works with Sink
3% - - -
• FF All Toilets
3% - - -
3.3. Staircase & Landings, etc.,
2% - - -
Joinery & MS Railing Works
4 14% - - -
4.1. Door frames & Shutters
- - -
• GF
3% - - -
• FF
3% - - -
4.2. Window frames & Shutters
- - -
• GF
3% - - -
• FF
3% - - -
4.3. MS Railing Works for Windows, Staircase, Balcony & Terrace
- - -
• GF
1% - - -
• FF
1% - - -
Painting Works
5 10% - - -
5.1. Painting of Internal Walls & Ceilings
- - -
• GF
3% - - -
• FF
3% - - -
5.2. Painting for External Elevation
- - -
• GF
2% - - -
• FF
2% - - -
Water proofing Works in all floors
6 4% - - -
6.1. Toilet Water Proofing
2% - - -
6.2. Terrace, balcony water Proofing
2% - - -
Plumbing & Sanitary Works in all floors
7 4% - - -
7.1. Internal Plumbing
• Marking, and Sanitary
Wall Chasing, PipeWorks
Works for Water & Waste Line incl - - -
Pressure testing
1% - - -
• Fixing CP & Sanitary fittings
2% - - -
7.2. External Plumbing and Sanitary lines
• Pipe Works for Water Line, Waste Line & Rain Water down take - - -
lines
• Gully Traps & Chambers with connections complete (Pumps & 0.50% - - -
Valves), Supply & Fixing Syntex Tank & Connections (Pumps & Valves) 0.25% - - -
• Testing, Commissioning and Handing Over
0.25% - - -
Miscellaneous Works in all floors
8 3% - - -
8.1. Expansion Joint Treatment Works & Flagging Concrete
1% - - -
8.2. MS Staircase to terrace & Fencing for site
2% - - -
- - -
TOTAL
100% 0% 5% - 117,529 117,529

Prepared by Checked by Verified by


SCCPL Er SCCPL Er SCPL Er
NAME OF THE WORK : CONSTRUCTION OF "SHRIRAM SHRESHTA" VILLAS AT COIMBATORE
NAME OF THE OWNER : M/S. SHRIPROP CONSTRUCTIONS PVT LTD
NAME OF THE CONTRACTOR : M/S. SENTHIL CONSTRUCTION CORPORATION PVT.LTD
BILL NO : FIRST RUNNING BILL DATE: 17.12.14
BILLING PERIOD : 01.11.14 to 10.12.014
VILLA 128 (4 BHK) - 1685 sft x Rs. 1395/ sft Rs 2,350,575

Percentage of work
Value of work completed
completed
Payment
S.No Description of work Upto
modality current Upto
previous Current bill Cumulative bill
bill previous bill
Bill

Structure
1 30%
1.1. Sub-structure, Foundations

Marking, Earth Work, PCC, Footing, Column up to Plinth, Plinth Beam


6%

Marking & Earthwork 2% - 47,012 47,012


PCC for footing 1% - 23,506 23,506
RCC for footing 1% - 23,506 23,506
Column upto plinthbeam 1% - 23,506 23,506
RCC for plinth beam 1% - 23,506 23,506
- - -
1.2. Super-structure - RCC frame
- - -
Ground Floor
- - -
• Columns & Staircase First Flight
4% - - -
• GF Roof and Portico Roof Slab including Staircase Second Flight
7% - - -
First Floor
- - -
• Columns and Slope Roof
6% - - -
• FF Roof Slab
7% - - -
Masonry & Plastering
2 15% - - -
2.1. Masonry Works
- - -
• GF Masonry Works up to Roof including Lintel and Sunshades
2% - - -
• FF Masonry Works up to Roof including Lintel, Lofts and Sunshades
2% - - -
2.2. Plastering of ceiling and walls
- - -
• GF
3% - - -
• FF
3% - - -
2.3. Plastering in External Elevation in all floors
5% - - -
Flooring, Dado & Skirting
3 20% - - -
3.1. Flooring & Skirting
- - -
• GF-Foyer, Living, Dining, Kitchen, Bedroom
4% - - -
• FF-All Bedrooms, lobby & Balconies
4% - - -
• Clay tiling at all Open terraces
• Car Park & All round villa flagging concrete and other finishing 2% - - -
Works 2% - - -
3.2. All Dadoo, Granite & Flooring
- - -
• GF Toilet, Dining & Kitchen Granite Works with Sink
3% - - -
• FF All Toilets
3% - - -
3.3. Staircase & Landings, etc.,
2% - - -
Joinery & MS Railing Works
4 14% - - -
4.1. Door frames & Shutters
- - -
• GF
3% - - -
• FF
3% - - -
4.2. Window frames & Shutters
- - -
• GF
3% - - -
• FF
3% - - -
4.3. MS Railing Works for Windows, Staircase, Balcony & Terrace
- - -
• GF
1% - - -
• FF
1% - - -
Painting Works
5 10% - - -
5.1. Painting of Internal Walls & Ceilings
- - -
• GF
3% - - -
• FF
3% - - -
5.2. Painting for External Elevation
- - -
• GF
2% - - -
• FF
2% - - -
Water proofing Works in all floors
6 4% - - -
6.1. Toilet Water Proofing
2% - - -
6.2. Terrace, balcony water Proofing
2% - - -
Plumbing & Sanitary Works in all floors
7 4% - - -
7.1. Internal Plumbing
• Marking, and Sanitary
Wall Chasing, PipeWorks
Works for Water & Waste Line incl - - -
Pressure testing
1% - - -
• Fixing CP & Sanitary fittings
2% - - -
7.2. External Plumbing and Sanitary lines
• Pipe Works for Water Line, Waste Line & Rain Water down take - - -
lines
• Gully Traps & Chambers with connections complete (Pumps & 0.50% - - -
Valves), Supply & Fixing Syntex Tank & Connections (Pumps & Valves) 0.25% - - -
• Testing, Commissioning and Handing Over
0.25% - - -
Miscellaneous Works in all floors
8 3% - - -
8.1. Expansion Joint Treatment Works & Flagging Concrete
1% - - -
8.2. MS Staircase to terrace & Fencing for site
2% - - -
- - -
TOTAL
100% 0% 6% - 141,035 141,035

Prepared by Checked by Verified by


SCCPL Er SCCPL Er SCPL Er
NAME OF THE WORK : CONSTRUCTION OF "SHRIRAM SHRESHTA" VILLAS AT COIMBATORE
NAME OF THE OWNER : M/S. SHRIPROP CONSTRUCTIONS PVT LTD
NAME OF THE CONTRACTOR : M/S. SENTHIL CONSTRUCTION CORPORATION PVT.LTD
BILL NO : FIRST RUNNING BILL DATE: 17.12.14
BILLING PERIOD : 01.11.14 to 10.12.014
VILLA 130 (4 BHK) - 1685 sft x Rs. 1395/ sft Rs 2,350,575

Percentage of work
Value of work completed
completed
Payment
S.No Description of work Upto
modality current Upto
previous Current bill Cumulative bill
bill previous bill
Bill

Structure
1 30%
1.1. Sub-structure, Foundations

Marking, Earth Work, PCC, Footing, Column up to Plinth, Plinth Beam


6%

Marking & Earthwork 2% - 47,012 47,012


PCC for footing 1% - 23,506 23,506
RCC for footing 1% - 23,506 23,506
Column upto plinthbeam 1% - 23,506 23,506
RCC for plinth beam 1% - 23,506 23,506
- - -
1.2. Super-structure - RCC frame
- - -
Ground Floor
- - -
• Columns & Staircase First Flight
4% 3% - 70,517 70,517
• GF Roof and Portico Roof Slab including Staircase Second Flight
7% - - -
First Floor
- - -
• Columns and Slope Roof
6% - - -
• FF Roof Slab
7% - - -
Masonry & Plastering
2 15% - - -
2.1. Masonry Works
- - -
• GF Masonry Works up to Roof including Lintel and Sunshades
2% - - -
• FF Masonry Works up to Roof including Lintel, Lofts and Sunshades
2% - - -
2.2. Plastering of ceiling and walls
- - -
• GF
3% - - -
• FF
3% - - -
2.3. Plastering in External Elevation in all floors
5% - - -
Flooring, Dado & Skirting
3 20% - - -
3.1. Flooring & Skirting
- - -
• GF-Foyer, Living, Dining, Kitchen, Bedroom
4% - - -
• FF-All Bedrooms, lobby & Balconies
4% - - -
• Clay tiling at all Open terraces
• Car Park & All round villa flagging concrete and other finishing 2% - - -
Works 2% - - -
3.2. All Dadoo, Granite & Flooring
- - -
• GF Toilet, Dining & Kitchen Granite Works with Sink
3% - - -
• FF All Toilets
3% - - -
3.3. Staircase & Landings, etc.,
2% - - -
Joinery & MS Railing Works
4 14% - - -
4.1. Door frames & Shutters
- - -
• GF
3% - - -
• FF
3% - - -
4.2. Window frames & Shutters
- - -
• GF
3% - - -
• FF
3% - - -
4.3. MS Railing Works for Windows, Staircase, Balcony & Terrace
- - -
• GF
1% - - -
• FF
1% - - -
Painting Works
5 10% - - -
5.1. Painting of Internal Walls & Ceilings
- - -
• GF
3% - - -
• FF
3% - - -
5.2. Painting for External Elevation
- - -
• GF
2% - - -
• FF
2% - - -
Water proofing Works in all floors
6 4% - - -
6.1. Toilet Water Proofing
2% - - -
6.2. Terrace, balcony water Proofing
2% - - -
Plumbing & Sanitary Works in all floors
7 4% - - -
7.1. Internal Plumbing
• Marking, and Sanitary
Wall Chasing, PipeWorks
Works for Water & Waste Line incl - - -
Pressure testing
1% - - -
• Fixing CP & Sanitary fittings
2% - - -
7.2. External Plumbing and Sanitary lines
• Pipe Works for Water Line, Waste Line & Rain Water down take - - -
lines
• Gully Traps & Chambers with connections complete (Pumps & 0.50% - - -
Valves), Supply & Fixing Syntex Tank & Connections (Pumps & Valves) 0.25% - - -
• Testing, Commissioning and Handing Over
0.25% - - -
Miscellaneous Works in all floors
8 3% - - -
8.1. Expansion Joint Treatment Works & Flagging Concrete
1% - - -
8.2. MS Staircase to terrace & Fencing for site
2% - - -
- - -
TOTAL
100% 0% 9% - 211,552 211,552

Prepared by Checked by Verified by


SCCPL Er SCCPL Er SCPL Er
NAME OF THE WORK : CONSTRUCTION OF "SHRIRAM SHRESHTA" VILLAS AT COIMBATORE
NAME OF THE OWNER : M/S. SHRIPROP CONSTRUCTIONS PVT LTD
NAME OF THE CONTRACTOR : M/S. SENTHIL CONSTRUCTION CORPORATION PVT.LTD
BILL NO : FIRST RUNNING BILL DATE: 17.12.14
BILLING PERIOD : 01.11.14 to 10.12.014
VILLA 131 (3 BHK) - 1475 sft x Rs. 1395/ sft Rs 2,057,625

Percentage of work
Value of work completed
completed
Payment
S.No Description of work Upto
modality current Upto
previous Current bill Cumulative bill
bill previous bill
Bill

Structure
1 30%
1.1. Sub-structure, Foundations

Marking, Earth Work, PCC, Footing, Column up to Plinth, Plinth Beam


6%

Marking & Earthwork 2% - 41,153 41,153


PCC for footing 1% - 20,576 20,576
RCC for footing 1% - 20,576 20,576
Column upto plinthbeam 1% - 20,576 20,576
RCC for plinth beam 1% - 20,576 20,576
- - -
1.2. Super-structure - RCC frame
- - -
Ground Floor
- - -
• Columns & Staircase First Flight
4% 3% - 61,729 61,729
• GF Roof and Portico Roof Slab including Staircase Second Flight
7% - - -
First Floor
- - -
• Columns and Slope Roof
6% - - -
• FF Roof Slab
7% - - -
Masonry & Plastering
2 15% - - -
2.1. Masonry Works
- - -
• GF Masonry Works up to Roof including Lintel and Sunshades
2% - - -
• FF Masonry Works up to Roof including Lintel, Lofts and Sunshades
2% - - -
2.2. Plastering of ceiling and walls
- - -
• GF
3% - - -
• FF
3% - - -
2.3. Plastering in External Elevation in all floors
5% - - -
Flooring, Dado & Skirting
3 20% - - -
3.1. Flooring & Skirting
- - -
• GF-Foyer, Living, Dining, Kitchen, Bedroom
4% - - -
• FF-All Bedrooms, lobby & Balconies
4% - - -
• Clay tiling at all Open terraces
• Car Park & All round villa flagging concrete and other finishing 2% - - -
Works 2% - - -
3.2. All Dadoo, Granite & Flooring
- - -
• GF Toilet, Dining & Kitchen Granite Works with Sink
3% - - -
• FF All Toilets
3% - - -
3.3. Staircase & Landings, etc.,
2% - - -
Joinery & MS Railing Works
4 14% - - -
4.1. Door frames & Shutters
- - -
• GF
3% - - -
• FF
3% - - -
4.2. Window frames & Shutters
- - -
• GF
3% - - -
• FF
3% - - -
4.3. MS Railing Works for Windows, Staircase, Balcony & Terrace
- - -
• GF
1% - - -
• FF
1% - - -
Painting Works
5 10% - - -
5.1. Painting of Internal Walls & Ceilings
- - -
• GF
3% - - -
• FF
3% - - -
5.2. Painting for External Elevation
- - -
• GF
2% - - -
• FF
2% - - -
Water proofing Works in all floors
6 4% - - -
6.1. Toilet Water Proofing
2% - - -
6.2. Terrace, balcony water Proofing
2% - - -
Plumbing & Sanitary Works in all floors
7 4% - - -
7.1. Internal Plumbing
• Marking, and Sanitary
Wall Chasing, PipeWorks
Works for Water & Waste Line incl - - -
Pressure testing
1% - - -
• Fixing CP & Sanitary fittings
2% - - -
7.2. External Plumbing and Sanitary lines
• Pipe Works for Water Line, Waste Line & Rain Water down take - - -
lines
• Gully Traps & Chambers with connections complete (Pumps & 0.50% - - -
Valves), Supply & Fixing Syntex Tank & Connections (Pumps & Valves) 0.25% - - -
• Testing, Commissioning and Handing Over
0.25% - - -
Miscellaneous Works in all floors
8 3% - - -
8.1. Expansion Joint Treatment Works & Flagging Concrete
1% - - -
8.2. MS Staircase to terrace & Fencing for site
2% - - -
- - -
TOTAL
100% 0% 9% - 185,186 185,186

Prepared by Checked by Verified by


SCCPL Er SCCPL Er SCPL Er
NAME OF THE WORK : CONSTRUCTION OF "SHRIRAM SHRESHTA" VILLAS AT COIMBATORE
NAME OF THE OWNER : M/S. SHRIPROP CONSTRUCTIONS PVT LTD
NAME OF THE CONTRACTOR : M/S. SENTHIL CONSTRUCTION CORPORATION PVT.LTD
BILL NO : FIRST RUNNING BILL DATE: 17.12.14
BILLING PERIOD : 01.11.14 to 10.12.014
VILLA 142 (3 BHK) - 1475 sft x Rs. 1395/ sft Rs 2,057,625

Percentage of work
Value of work completed
completed
Payment
S.No Description of work Upto
modality current Upto
previous Current bill Cumulative bill
bill previous bill
Bill

Structure
1 30%
1.1. Sub-structure, Foundations

Marking, Earth Work, PCC, Footing, Column up to Plinth, Plinth Beam


6%

Marking & Earthwork 2% - 41,153 41,153


PCC for footing 1% - 20,576 20,576
RCC for footing 1% - 20,576 20,576
Column upto plinthbeam 1% - 20,576 20,576
RCC for plinth beam - - -
- - -
1.2. Super-structure - RCC frame
- - -
Ground Floor
- - -
• Columns & Staircase First Flight
4% - - -
• GF Roof and Portico Roof Slab including Staircase Second Flight
7% - - -
First Floor
- - -
• Columns and Slope Roof
6% - - -
• FF Roof Slab
7% - - -
Masonry & Plastering
2 15% - - -
2.1. Masonry Works
- - -
• GF Masonry Works up to Roof including Lintel and Sunshades
2% - - -
• FF Masonry Works up to Roof including Lintel, Lofts and Sunshades
2% - - -
2.2. Plastering of ceiling and walls
- - -
• GF
3% - - -
• FF
3% - - -
2.3. Plastering in External Elevation in all floors
5% - - -
Flooring, Dado & Skirting
3 20% - - -
3.1. Flooring & Skirting
- - -
• GF-Foyer, Living, Dining, Kitchen, Bedroom
4% - - -
• FF-All Bedrooms, lobby & Balconies
4% - - -
• Clay tiling at all Open terraces
• Car Park & All round villa flagging concrete and other finishing 2% - - -
Works 2% - - -
3.2. All Dadoo, Granite & Flooring
- - -
• GF Toilet, Dining & Kitchen Granite Works with Sink
3% - - -
• FF All Toilets
3% - - -
3.3. Staircase & Landings, etc.,
2% - - -
Joinery & MS Railing Works
4 14% - - -
4.1. Door frames & Shutters
- - -
• GF
3% - - -
• FF
3% - - -
4.2. Window frames & Shutters
- - -
• GF
3% - - -
• FF
3% - - -
4.3. MS Railing Works for Windows, Staircase, Balcony & Terrace
- - -
• GF
1% - - -
• FF
1% - - -
Painting Works
5 10% - - -
5.1. Painting of Internal Walls & Ceilings
- - -
• GF
3% - - -
• FF
3% - - -
5.2. Painting for External Elevation
- - -
• GF
2% - - -
• FF
2% - - -
Water proofing Works in all floors
6 4% - - -
6.1. Toilet Water Proofing
2% - - -
6.2. Terrace, balcony water Proofing
2% - - -
Plumbing & Sanitary Works in all floors
7 4% - - -
7.1. Internal Plumbing
• Marking, and Sanitary
Wall Chasing, PipeWorks
Works for Water & Waste Line incl - - -
Pressure testing
1% - - -
• Fixing CP & Sanitary fittings
2% - - -
7.2. External Plumbing and Sanitary lines
• Pipe Works for Water Line, Waste Line & Rain Water down take - - -
lines
• Gully Traps & Chambers with connections complete (Pumps & 0.50% - - -
Valves), Supply & Fixing Syntex Tank & Connections (Pumps & Valves) 0.25% - - -
• Testing, Commissioning and Handing Over
0.25% - - -
Miscellaneous Works in all floors
8 3% - - -
8.1. Expansion Joint Treatment Works & Flagging Concrete
1% - - -
8.2. MS Staircase to terrace & Fencing for site
2% - - -
- - -
TOTAL
100% 0% 5% - 102,881 102,881

Prepared by Checked by Verified by


SCCPL Er SCCPL Er SCPL Er
NAME OF THE WORK : CONSTRUCTION OF "SHRIRAM SHRESHTA" VILLAS AT COIMBATORE
NAME OF THE OWNER : M/S. SHRIPROP CONSTRUCTIONS PVT LTD
NAME OF THE CONTRACTOR : M/S. SENTHIL CONSTRUCTION CORPORATION PVT.LTD
BILL NO : FIRST RUNNING BILL DATE: 17.12.14
BILLING PERIOD : 01.11.14 to 10.12.014
VILLA 169 (3 BHK) - 1475 sft x Rs. 1395/ sft Rs 2,057,625

Percentage of work
Value of work completed
completed
Payment
S.No Description of work Upto
modality current Upto
previous Current bill Cumulative bill
bill previous bill
Bill

Structure
1 30%
1.1. Sub-structure, Foundations

Marking, Earth Work, PCC, Footing, Column up to Plinth, Plinth Beam


6%

Marking & Earthwork 2% - 41,153 41,153


PCC for footing 1% - 20,576 20,576
RCC for footing 1% - 20,576 20,576
Column upto plinthbeam - - -
RCC for plinth beam - - -
- - -
1.2. Super-structure - RCC frame
- - -
Ground Floor
- - -
• Columns & Staircase First Flight
4% - - -
• GF Roof and Portico Roof Slab including Staircase Second Flight
7% - - -
First Floor
- - -
• Columns and Slope Roof
6% - - -
• FF Roof Slab
7% - - -
Masonry & Plastering
2 15% - - -
2.1. Masonry Works
- - -
• GF Masonry Works up to Roof including Lintel and Sunshades
2% - - -
• FF Masonry Works up to Roof including Lintel, Lofts and Sunshades
2% - - -
2.2. Plastering of ceiling and walls
- - -
• GF
3% - - -
• FF
3% - - -
2.3. Plastering in External Elevation in all floors
5% - - -
Flooring, Dado & Skirting
3 20% - - -
3.1. Flooring & Skirting
- - -
• GF-Foyer, Living, Dining, Kitchen, Bedroom
4% - - -
• FF-All Bedrooms, lobby & Balconies
4% - - -
• Clay tiling at all Open terraces
• Car Park & All round villa flagging concrete and other finishing 2% - - -
Works 2% - - -
3.2. All Dadoo, Granite & Flooring
- - -
• GF Toilet, Dining & Kitchen Granite Works with Sink
3% - - -
• FF All Toilets
3% - - -
3.3. Staircase & Landings, etc.,
2% - - -
Joinery & MS Railing Works
4 14% - - -
4.1. Door frames & Shutters
- - -
• GF
3% - - -
• FF
3% - - -
4.2. Window frames & Shutters
- - -
• GF
3% - - -
• FF
3% - - -
4.3. MS Railing Works for Windows, Staircase, Balcony & Terrace
- - -
• GF
1% - - -
• FF
1% - - -
Painting Works
5 10% - - -
5.1. Painting of Internal Walls & Ceilings
- - -
• GF
3% - - -
• FF
3% - - -
5.2. Painting for External Elevation
- - -
• GF
2% - - -
• FF
2% - - -
Water proofing Works in all floors
6 4% - - -
6.1. Toilet Water Proofing
2% - - -
6.2. Terrace, balcony water Proofing
2% - - -
Plumbing & Sanitary Works in all floors
7 4% - - -
7.1. Internal Plumbing
• Marking, and Sanitary
Wall Chasing, PipeWorks
Works for Water & Waste Line incl - - -
Pressure testing
1% - - -
• Fixing CP & Sanitary fittings
2% - - -
7.2. External Plumbing and Sanitary lines
• Pipe Works for Water Line, Waste Line & Rain Water down take - - -
lines
• Gully Traps & Chambers with connections complete (Pumps & 0.50% - - -
Valves), Supply & Fixing Syntex Tank & Connections (Pumps & Valves) 0.25% - - -
• Testing, Commissioning and Handing Over
0.25% - - -
Miscellaneous Works in all floors
8 3% - - -
8.1. Expansion Joint Treatment Works & Flagging Concrete
1% - - -
8.2. MS Staircase to terrace & Fencing for site
2% - - -
- - -
TOTAL
100% 0% 4% - 82,305 82,305

Prepared by Checked by Verified by


SCCPL Er SCCPL Er SCPL Er
NAME OF THE WORK : CONSTRUCTION OF "SHRIRAM SHRESHTA" VILLAS AT COIMBATORE
NAME OF THE OWNER : M/S. SHRIPROP CONSTRUCTIONS PVT LTD
NAME OF THE CONTRACTOR : M/S. SENTHIL CONSTRUCTION CORPORATION PVT.LTD
BILL NO : FIRST RUNNING BILL DATE: 17.12.14
BILLING PERIOD : 01.11.14 to 10.12.014
VILLA 171 (3 BHK) - 1475 sft x Rs. 1395/ sft Rs 2,057,625

Percentage of work
Value of work completed
completed
Payment
S.No Description of work Upto
modality current Upto
previous Current bill Cumulative bill
bill previous bill
Bill

Structure
1 30%
1.1. Sub-structure, Foundations

Marking, Earth Work, PCC, Footing, Column up to Plinth, Plinth Beam


6%

Marking & Earthwork 2% - 41,153 41,153


PCC for footing 1% - 20,576 20,576
RCC for footing 1% - 20,576 20,576
Column upto plinthbeam 1% - 20,576 20,576
RCC for plinth beam - - -
- - -
1.2. Super-structure - RCC frame
- - -
Ground Floor
- - -
• Columns & Staircase First Flight
4% - - -
• GF Roof and Portico Roof Slab including Staircase Second Flight
7% - - -
First Floor
- - -
• Columns and Slope Roof
6% - - -
• FF Roof Slab
7% - - -
Masonry & Plastering
2 15% - - -
2.1. Masonry Works
- - -
• GF Masonry Works up to Roof including Lintel and Sunshades
2% - - -
• FF Masonry Works up to Roof including Lintel, Lofts and Sunshades
2% - - -
2.2. Plastering of ceiling and walls
- - -
• GF
3% - - -
• FF
3% - - -
2.3. Plastering in External Elevation in all floors
5% - - -
Flooring, Dado & Skirting
3 20% - - -
3.1. Flooring & Skirting
- - -
• GF-Foyer, Living, Dining, Kitchen, Bedroom
4% - - -
• FF-All Bedrooms, lobby & Balconies
4% - - -
• Clay tiling at all Open terraces
• Car Park & All round villa flagging concrete and other finishing 2% - - -
Works 2% - - -
3.2. All Dadoo, Granite & Flooring
- - -
• GF Toilet, Dining & Kitchen Granite Works with Sink
3% - - -
• FF All Toilets
3% - - -
3.3. Staircase & Landings, etc.,
2% - - -
Joinery & MS Railing Works
4 14% - - -
4.1. Door frames & Shutters
- - -
• GF
3% - - -
• FF
3% - - -
4.2. Window frames & Shutters
- - -
• GF
3% - - -
• FF
3% - - -
4.3. MS Railing Works for Windows, Staircase, Balcony & Terrace
- - -
• GF
1% - - -
• FF
1% - - -
Painting Works
5 10% - - -
5.1. Painting of Internal Walls & Ceilings
- - -
• GF
3% - - -
• FF
3% - - -
5.2. Painting for External Elevation
- - -
• GF
2% - - -
• FF
2% - - -
Water proofing Works in all floors
6 4% - - -
6.1. Toilet Water Proofing
2% - - -
6.2. Terrace, balcony water Proofing
2% - - -
Plumbing & Sanitary Works in all floors
7 4% - - -
7.1. Internal Plumbing
• Marking, and Sanitary
Wall Chasing, PipeWorks
Works for Water & Waste Line incl - - -
Pressure testing
1% - - -
• Fixing CP & Sanitary fittings
2% - - -
7.2. External Plumbing and Sanitary lines
• Pipe Works for Water Line, Waste Line & Rain Water down take - - -
lines
• Gully Traps & Chambers with connections complete (Pumps & 0.50% - - -
Valves), Supply & Fixing Syntex Tank & Connections (Pumps & Valves) 0.25% - - -
• Testing, Commissioning and Handing Over
0.25% - - -
Miscellaneous Works in all floors
8 3% - - -
8.1. Expansion Joint Treatment Works & Flagging Concrete
1% - - -
8.2. MS Staircase to terrace & Fencing for site
2% - - -
- - -
TOTAL
100% 0% 5% - 102,881 102,881

Prepared by Checked by Verified by


SCCPL Er SCCPL Er SCPL Er
NAME OF THE WORK : CONSTRUCTION OF "SHRIRAM SHRESHTA" VILLAS AT COIMBATORE
NAME OF THE OWNER : M/S. SHRIPROP CONSTRUCTIONS PVT LTD
NAME OF THE CONTRACTOR : M/S. SENTHIL CONSTRUCTION CORPORATION PVT.LTD
BILL NO : FIRST RUNNING BILL DATE: 17.12.14
BILLING PERIOD : 01.11.14 to 10.12.014
VILLA 171A (3 BHK) - 1475 sft x Rs. 1395/ sft Rs 2,057,625

Percentage of work
Value of work completed
completed
Payment
S.No Description of work Upto
modality current Upto
previous Current bill Cumulative bill
bill previous bill
Bill

Structure
1 30%
1.1. Sub-structure, Foundations

Marking, Earth Work, PCC, Footing, Column up to Plinth, Plinth Beam


6%

Marking & Earthwork 2% - 41,153 41,153


PCC for footing 1% - 20,576 20,576
RCC for footing 1% - 20,576 20,576
Column upto plinthbeam 1% - 20,576 20,576
RCC for plinth beam - - -
- - -
1.2. Super-structure - RCC frame
- - -
Ground Floor
- - -
• Columns & Staircase First Flight
4% - - -
• GF Roof and Portico Roof Slab including Staircase Second Flight
7% - - -
First Floor
- - -
• Columns and Slope Roof
6% - - -
• FF Roof Slab
7% - - -
Masonry & Plastering
2 15% - - -
2.1. Masonry Works
- - -
• GF Masonry Works up to Roof including Lintel and Sunshades
2% - - -
• FF Masonry Works up to Roof including Lintel, Lofts and Sunshades
2% - - -
2.2. Plastering of ceiling and walls
- - -
• GF
3% - - -
• FF
3% - - -
2.3. Plastering in External Elevation in all floors
5% - - -
Flooring, Dado & Skirting
3 20% - - -
3.1. Flooring & Skirting
- - -
• GF-Foyer, Living, Dining, Kitchen, Bedroom
4% - - -
• FF-All Bedrooms, lobby & Balconies
4% - - -
• Clay tiling at all Open terraces
• Car Park & All round villa flagging concrete and other finishing 2% - - -
Works 2% - - -
3.2. All Dadoo, Granite & Flooring
- - -
• GF Toilet, Dining & Kitchen Granite Works with Sink
3% - - -
• FF All Toilets
3% - - -
3.3. Staircase & Landings, etc.,
2% - - -
Joinery & MS Railing Works
4 14% - - -
4.1. Door frames & Shutters
- - -
• GF
3% - - -
• FF
3% - - -
4.2. Window frames & Shutters
- - -
• GF
3% - - -
• FF
3% - - -
4.3. MS Railing Works for Windows, Staircase, Balcony & Terrace
- - -
• GF
1% - - -
• FF
1% - - -
Painting Works
5 10% - - -
5.1. Painting of Internal Walls & Ceilings
- - -
• GF
3% - - -
• FF
3% - - -
5.2. Painting for External Elevation
- - -
• GF
2% - - -
• FF
2% - - -
Water proofing Works in all floors
6 4% - - -
6.1. Toilet Water Proofing
2% - - -
6.2. Terrace, balcony water Proofing
2% - - -
Plumbing & Sanitary Works in all floors
7 4% - - -
7.1. Internal Plumbing
• Marking, and Sanitary
Wall Chasing, PipeWorks
Works for Water & Waste Line incl - - -
Pressure testing
1% - - -
• Fixing CP & Sanitary fittings
2% - - -
7.2. External Plumbing and Sanitary lines
• Pipe Works for Water Line, Waste Line & Rain Water down take - - -
lines
• Gully Traps & Chambers with connections complete (Pumps & 0.50% - - -
Valves), Supply & Fixing Syntex Tank & Connections (Pumps & Valves) 0.25% - - -
• Testing, Commissioning and Handing Over
0.25% - - -
Miscellaneous Works in all floors
8 3% - - -
8.1. Expansion Joint Treatment Works & Flagging Concrete
1% - - -
8.2. MS Staircase to terrace & Fencing for site
2% - - -
- - -
TOTAL
100% 0% 5% - 102,881 102,881

Prepared by Checked by Verified by


SCCPL Er SCCPL Er SCPL Er
NAME OF THE WORK : CONSTRUCTION OF "SHRIRAM SHRESHTA" VILLAS AT COIMBATORE
NAME OF THE OWNER : M/S. SHRIPROP CONSTRUCTIONS PVT LTD
NAME OF THE CONTRACTOR : M/S. SENTHIL CONSTRUCTION CORPORATION PVT.LTD
BILL NO : FIRST RUNNING BILL DATE: 17.12.14
BILLING PERIOD : 01.11.14 to 10.12.014
VILLA 174 (3 BHK) - 1475 sft x Rs. 1395/ sft Rs 2,057,625

Percentage of work
Value of work completed
completed
Payment
S.No Description of work Upto
modality current Upto
previous Current bill Cumulative bill
bill previous bill
Bill

Structure
1 30%
1.1. Sub-structure, Foundations

Marking, Earth Work, PCC, Footing, Column up to Plinth, Plinth Beam


6%

Marking & Earthwork 2% - 41,153 41,153


PCC for footing 1% - 20,576 20,576
RCC for footing 1% - 20,576 20,576
Column upto plinthbeam 1% - 20,576 20,576
RCC for plinth beam - - -
- - -
1.2. Super-structure - RCC frame
- - -
Ground Floor
- - -
• Columns & Staircase First Flight
4% - - -
• GF Roof and Portico Roof Slab including Staircase Second Flight
7% - - -
First Floor
- - -
• Columns and Slope Roof
6% - - -
• FF Roof Slab
7% - - -
Masonry & Plastering
2 15% - - -
2.1. Masonry Works
- - -
• GF Masonry Works up to Roof including Lintel and Sunshades
2% - - -
• FF Masonry Works up to Roof including Lintel, Lofts and Sunshades
2% - - -
2.2. Plastering of ceiling and walls
- - -
• GF
3% - - -
• FF
3% - - -
2.3. Plastering in External Elevation in all floors
5% - - -
Flooring, Dado & Skirting
3 20% - - -
3.1. Flooring & Skirting
- - -
• GF-Foyer, Living, Dining, Kitchen, Bedroom
4% - - -
• FF-All Bedrooms, lobby & Balconies
4% - - -
• Clay tiling at all Open terraces
• Car Park & All round villa flagging concrete and other finishing 2% - - -
Works 2% - - -
3.2. All Dadoo, Granite & Flooring
- - -
• GF Toilet, Dining & Kitchen Granite Works with Sink
3% - - -
• FF All Toilets
3% - - -
3.3. Staircase & Landings, etc.,
2% - - -
Joinery & MS Railing Works
4 14% - - -
4.1. Door frames & Shutters
- - -
• GF
3% - - -
• FF
3% - - -
4.2. Window frames & Shutters
- - -
• GF
3% - - -
• FF
3% - - -
4.3. MS Railing Works for Windows, Staircase, Balcony & Terrace
- - -
• GF
1% - - -
• FF
1% - - -
Painting Works
5 10% - - -
5.1. Painting of Internal Walls & Ceilings
- - -
• GF
3% - - -
• FF
3% - - -
5.2. Painting for External Elevation
- - -
• GF
2% - - -
• FF
2% - - -
Water proofing Works in all floors
6 4% - - -
6.1. Toilet Water Proofing
2% - - -
6.2. Terrace, balcony water Proofing
2% - - -
Plumbing & Sanitary Works in all floors
7 4% - - -
7.1. Internal Plumbing
• Marking, and Sanitary
Wall Chasing, PipeWorks
Works for Water & Waste Line incl - - -
Pressure testing
1% - - -
• Fixing CP & Sanitary fittings
2% - - -
7.2. External Plumbing and Sanitary lines
• Pipe Works for Water Line, Waste Line & Rain Water down take - - -
lines
• Gully Traps & Chambers with connections complete (Pumps & 0.50% - - -
Valves), Supply & Fixing Syntex Tank & Connections (Pumps & Valves) 0.25% - - -
• Testing, Commissioning and Handing Over
0.25% - - -
Miscellaneous Works in all floors
8 3% - - -
8.1. Expansion Joint Treatment Works & Flagging Concrete
1% - - -
8.2. MS Staircase to terrace & Fencing for site
2% - - -
- - -
TOTAL
100% 0% 5% - 102,881 102,881

Prepared by Checked by Verified by


SCCPL Er SCCPL Er SCPL Er
NAME OF THE WORK : CONSTRUCTION OF "SHRIRAM SHRESHTA" VILLAS AT COIMBATORE
NAME OF THE OWNER : M/S. SHRIPROP CONSTRUCTIONS PVT LTD
NAME OF THE CONTRACTOR : M/S. SENTHIL CONSTRUCTION CORPORATION PVT.LTD
BILL NO : FIRST RUNNING BILL DATE: 17.12.14
BILLING PERIOD : 01.11.14 to 10.12.014
VILLA 177 (3 BHK) - 1475 sft x Rs. 1395/ sft Rs 2,057,625

Percentage of work
Value of work completed
completed
Payment
S.No Description of work Upto
modality current Upto
previous Current bill Cumulative bill
bill previous bill
Bill

Structure
1 30%
1.1. Sub-structure, Foundations

Marking, Earth Work, PCC, Footing, Column up to Plinth, Plinth Beam


6%

Marking & Earthwork 2% - 41,153 41,153


PCC for footing 1% - 20,576 20,576
RCC for footing 1% - 20,576 20,576
Column upto plinthbeam 1% - 20,576 20,576
RCC for plinth beam - - -
- - -
1.2. Super-structure - RCC frame
- - -
Ground Floor
- - -
• Columns & Staircase First Flight
4% - - -
• GF Roof and Portico Roof Slab including Staircase Second Flight
7% - - -
First Floor
- - -
• Columns and Slope Roof
6% - - -
• FF Roof Slab
7% - - -
Masonry & Plastering
2 15% - - -
2.1. Masonry Works
- - -
• GF Masonry Works up to Roof including Lintel and Sunshades
2% - - -
• FF Masonry Works up to Roof including Lintel, Lofts and Sunshades
2% - - -
2.2. Plastering of ceiling and walls
- - -
• GF
3% - - -
• FF
3% - - -
2.3. Plastering in External Elevation in all floors
5% - - -
Flooring, Dado & Skirting
3 20% - - -
3.1. Flooring & Skirting
- - -
• GF-Foyer, Living, Dining, Kitchen, Bedroom
4% - - -
• FF-All Bedrooms, lobby & Balconies
4% - - -
• Clay tiling at all Open terraces
• Car Park & All round villa flagging concrete and other finishing 2% - - -
Works 2% - - -
3.2. All Dadoo, Granite & Flooring
- - -
• GF Toilet, Dining & Kitchen Granite Works with Sink
3% - - -
• FF All Toilets
3% - - -
3.3. Staircase & Landings, etc.,
2% - - -
Joinery & MS Railing Works
4 14% - - -
4.1. Door frames & Shutters
- - -
• GF
3% - - -
• FF
3% - - -
4.2. Window frames & Shutters
- - -
• GF
3% - - -
• FF
3% - - -
4.3. MS Railing Works for Windows, Staircase, Balcony & Terrace
- - -
• GF
1% - - -
• FF
1% - - -
Painting Works
5 10% - - -
5.1. Painting of Internal Walls & Ceilings
- - -
• GF
3% - - -
• FF
3% - - -
5.2. Painting for External Elevation
- - -
• GF
2% - - -
• FF
2% - - -
Water proofing Works in all floors
6 4% - - -
6.1. Toilet Water Proofing
2% - - -
6.2. Terrace, balcony water Proofing
2% - - -
Plumbing & Sanitary Works in all floors
7 4% - - -
7.1. Internal Plumbing
• Marking, and Sanitary
Wall Chasing, PipeWorks
Works for Water & Waste Line incl - - -
Pressure testing
1% - - -
• Fixing CP & Sanitary fittings
2% - - -
7.2. External Plumbing and Sanitary lines
• Pipe Works for Water Line, Waste Line & Rain Water down take - - -
lines
• Gully Traps & Chambers with connections complete (Pumps & 0.50% - - -
Valves), Supply & Fixing Syntex Tank & Connections (Pumps & Valves) 0.25% - - -
• Testing, Commissioning and Handing Over
0.25% - - -
Miscellaneous Works in all floors
8 3% - - -
8.1. Expansion Joint Treatment Works & Flagging Concrete
1% - - -
8.2. MS Staircase to terrace & Fencing for site
2% - - -
- - -
TOTAL
100% 0% 5% - 102,881 102,881

Prepared by Checked by Verified by


SCCPL Er SCCPL Er SCPL Er
NAME OF THE WORK : CONSTRUCTION OF "SHRIRAM SHRESHTA" VILLAS AT COIMBATORE
NAME OF THE OWNER : M/S. SHRIPROP CONSTRUCTIONS PVT LTD
NAME OF THE CONTRACTOR : M/S. SENTHIL CONSTRUCTION CORPORATION PVT.LTD
BILL NO : FIRST RUNNING BILL DATE: 17.12.14
BILLING PERIOD : 01.11.14 to 10.12.014
VILLA 178 (3 BHK) - 1475 sft x Rs. 1395/ sft Rs 2,057,625

Percentage of work
Value of work completed
completed
Payment
S.No Description of work Upto
modality current Upto
previous Current bill Cumulative bill
bill previous bill
Bill

Structure
1 30%
1.1. Sub-structure, Foundations

Marking, Earth Work, PCC, Footing, Column up to Plinth, Plinth Beam


6%

Marking & Earthwork 2% - 41,153 41,153


PCC for footing 1% - 20,576 20,576
RCC for footing 1% - 20,576 20,576
Column upto plinthbeam 1% - 20,576 20,576
RCC for plinth beam - - -
- - -
1.2. Super-structure - RCC frame
- - -
Ground Floor
- - -
• Columns & Staircase First Flight
4% - - -
• GF Roof and Portico Roof Slab including Staircase Second Flight
7% - - -
First Floor
- - -
• Columns and Slope Roof
6% - - -
• FF Roof Slab
7% - - -
Masonry & Plastering
2 15% - - -
2.1. Masonry Works
- - -
• GF Masonry Works up to Roof including Lintel and Sunshades
2% - - -
• FF Masonry Works up to Roof including Lintel, Lofts and Sunshades
2% - - -
2.2. Plastering of ceiling and walls
- - -
• GF
3% - - -
• FF
3% - - -
2.3. Plastering in External Elevation in all floors
5% - - -
Flooring, Dado & Skirting
3 20% - - -
3.1. Flooring & Skirting
- - -
• GF-Foyer, Living, Dining, Kitchen, Bedroom
4% - - -
• FF-All Bedrooms, lobby & Balconies
4% - - -
• Clay tiling at all Open terraces
• Car Park & All round villa flagging concrete and other finishing 2% - - -
Works 2% - - -
3.2. All Dadoo, Granite & Flooring
- - -
• GF Toilet, Dining & Kitchen Granite Works with Sink
3% - - -
• FF All Toilets
3% - - -
3.3. Staircase & Landings, etc.,
2% - - -
Joinery & MS Railing Works
4 14% - - -
4.1. Door frames & Shutters
- - -
• GF
3% - - -
• FF
3% - - -
4.2. Window frames & Shutters
- - -
• GF
3% - - -
• FF
3% - - -
4.3. MS Railing Works for Windows, Staircase, Balcony & Terrace
- - -
• GF
1% - - -
• FF
1% - - -
Painting Works
5 10% - - -
5.1. Painting of Internal Walls & Ceilings
- - -
• GF
3% - - -
• FF
3% - - -
5.2. Painting for External Elevation
- - -
• GF
2% - - -
• FF
2% - - -
Water proofing Works in all floors
6 4% - - -
6.1. Toilet Water Proofing
2% - - -
6.2. Terrace, balcony water Proofing
2% - - -
Plumbing & Sanitary Works in all floors
7 4% - - -
7.1. Internal Plumbing
• Marking, and Sanitary
Wall Chasing, PipeWorks
Works for Water & Waste Line incl - - -
Pressure testing
1% - - -
• Fixing CP & Sanitary fittings
2% - - -
7.2. External Plumbing and Sanitary lines
• Pipe Works for Water Line, Waste Line & Rain Water down take - - -
lines
• Gully Traps & Chambers with connections complete (Pumps & 0.50% - - -
Valves), Supply & Fixing Syntex Tank & Connections (Pumps & Valves) 0.25% - - -
• Testing, Commissioning and Handing Over
0.25% - - -
Miscellaneous Works in all floors
8 3% - - -
8.1. Expansion Joint Treatment Works & Flagging Concrete
1% - - -
8.2. MS Staircase to terrace & Fencing for site
2% - - -
- - -
TOTAL
100% 0% 5% - 102,881 102,881

Prepared by Checked by Verified by


SCCPL Er SCCPL Er SCPL Er
NAME OF THE WORK : CONSTRUCTION OF "SHRIRAM SHRESHTA" VILLAS AT COIMBATORE
NAME OF THE OWNER : M/S. SHRIPROP CONSTRUCTIONS PVT LTD
NAME OF THE CONTRACTOR : M/S. SENTHIL CONSTRUCTION CORPORATION PVT.LTD
BILL NO : FIRST RUNNING BILL DATE: 17.12.14
BILLING PERIOD : 01.11.14 to 10.12.014
VILLA 187 (3 BHK) - 1475 sft x Rs. 1395/ sft Rs 2,057,625

Percentage of work
Value of work completed
completed
Payment
S.No Description of work Upto
modality current Upto
previous Current bill Cumulative bill
bill previous bill
Bill

Structure
1 30%
1.1. Sub-structure, Foundations

Marking, Earth Work, PCC, Footing, Column up to Plinth, Plinth Beam


6%

Marking & Earthwork 2% - 41,153 41,153


PCC for footing 1% - 20,576 20,576
RCC for footing 1% - 20,576 20,576
Column upto plinthbeam - - -
RCC for plinth beam - - -
- - -
1.2. Super-structure - RCC frame
- - -
Ground Floor
- - -
• Columns & Staircase First Flight
4% - - -
• GF Roof and Portico Roof Slab including Staircase Second Flight
7% - - -
First Floor
- - -
• Columns and Slope Roof
6% - - -
• FF Roof Slab
7% - - -
Masonry & Plastering
2 15% - - -
2.1. Masonry Works
- - -
• GF Masonry Works up to Roof including Lintel and Sunshades
2% - - -
• FF Masonry Works up to Roof including Lintel, Lofts and Sunshades
2% - - -
2.2. Plastering of ceiling and walls
- - -
• GF
3% - - -
• FF
3% - - -
2.3. Plastering in External Elevation in all floors
5% - - -
Flooring, Dado & Skirting
3 20% - - -
3.1. Flooring & Skirting
- - -
• GF-Foyer, Living, Dining, Kitchen, Bedroom
4% - - -
• FF-All Bedrooms, lobby & Balconies
4% - - -
• Clay tiling at all Open terraces
• Car Park & All round villa flagging concrete and other finishing 2% - - -
Works 2% - - -
3.2. All Dadoo, Granite & Flooring
- - -
• GF Toilet, Dining & Kitchen Granite Works with Sink
3% - - -
• FF All Toilets
3% - - -
3.3. Staircase & Landings, etc.,
2% - - -
Joinery & MS Railing Works
4 14% - - -
4.1. Door frames & Shutters
- - -
• GF
3% - - -
• FF
3% - - -
4.2. Window frames & Shutters
- - -
• GF
3% - - -
• FF
3% - - -
4.3. MS Railing Works for Windows, Staircase, Balcony & Terrace
- - -
• GF
1% - - -
• FF
1% - - -
Painting Works
5 10% - - -
5.1. Painting of Internal Walls & Ceilings
- - -
• GF
3% - - -
• FF
3% - - -
5.2. Painting for External Elevation
- - -
• GF
2% - - -
• FF
2% - - -
Water proofing Works in all floors
6 4% - - -
6.1. Toilet Water Proofing
2% - - -
6.2. Terrace, balcony water Proofing
2% - - -
Plumbing & Sanitary Works in all floors
7 4% - - -
7.1. Internal Plumbing
• Marking, and Sanitary
Wall Chasing, PipeWorks
Works for Water & Waste Line incl - - -
Pressure testing
1% - - -
• Fixing CP & Sanitary fittings
2% - - -
7.2. External Plumbing and Sanitary lines
• Pipe Works for Water Line, Waste Line & Rain Water down take - - -
lines
• Gully Traps & Chambers with connections complete (Pumps & 0.50% - - -
Valves), Supply & Fixing Syntex Tank & Connections (Pumps & Valves) 0.25% - - -
• Testing, Commissioning and Handing Over
0.25% - - -
Miscellaneous Works in all floors
8 3% - - -
8.1. Expansion Joint Treatment Works & Flagging Concrete
1% - - -
8.2. MS Staircase to terrace & Fencing for site
2% - - -
- - -
TOTAL
100% 0% 4% - 82,305 82,305

Prepared by Checked by Verified by


SCCPL Er SCCPL Er SCPL Er
NAME OF THE WORK : CONSTRUCTION OF "SHRIRAM SHRESHTA" VILLAS AT COIMBATORE
NAME OF THE OWNER : M/S. SHRIPROP CONSTRUCTIONS PVT LTD
NAME OF THE CONTRACTOR : M/S. SENTHIL CONSTRUCTION CORPORATION PVT.LTD
BILL NO : FIRST RUNNING BILL DATE: 17.12.14
BILLING PERIOD : 01.11.14 to 10.12.014
VILLA 194 (3 BHK) - 1475 sft x Rs. 1395/ sft Rs 2,057,625

Percentage of work
Value of work completed
completed
Payment
S.No Description of work Upto
modality current Upto
previous Current bill Cumulative bill
bill previous bill
Bill

Structure
1 30%
1.1. Sub-structure, Foundations

Marking, Earth Work, PCC, Footing, Column up to Plinth, Plinth Beam


6%

Marking & Earthwork 2% - 41,153 41,153


PCC for footing 1% - 20,576 20,576
RCC for footing - - -
Column upto plinthbeam - - -
RCC for plinth beam - - -
- - -
1.2. Super-structure - RCC frame
- - -
Ground Floor
- - -
• Columns & Staircase First Flight
4% - - -
• GF Roof and Portico Roof Slab including Staircase Second Flight
7% - - -
First Floor
- - -
• Columns and Slope Roof
6% - - -
• FF Roof Slab
7% - - -
Masonry & Plastering
2 15% - - -
2.1. Masonry Works
- - -
• GF Masonry Works up to Roof including Lintel and Sunshades
2% - - -
• FF Masonry Works up to Roof including Lintel, Lofts and Sunshades
2% - - -
2.2. Plastering of ceiling and walls
- - -
• GF
3% - - -
• FF
3% - - -
2.3. Plastering in External Elevation in all floors
5% - - -
Flooring, Dado & Skirting
3 20% - - -
3.1. Flooring & Skirting
- - -
• GF-Foyer, Living, Dining, Kitchen, Bedroom
4% - - -
• FF-All Bedrooms, lobby & Balconies
4% - - -
• Clay tiling at all Open terraces
• Car Park & All round villa flagging concrete and other finishing 2% - - -
Works 2% - - -
3.2. All Dadoo, Granite & Flooring
- - -
• GF Toilet, Dining & Kitchen Granite Works with Sink
3% - - -
• FF All Toilets
3% - - -
3.3. Staircase & Landings, etc.,
2% - - -
Joinery & MS Railing Works
4 14% - - -
4.1. Door frames & Shutters
- - -
• GF
3% - - -
• FF
3% - - -
4.2. Window frames & Shutters
- - -
• GF
3% - - -
• FF
3% - - -
4.3. MS Railing Works for Windows, Staircase, Balcony & Terrace
- - -
• GF
1% - - -
• FF
1% - - -
Painting Works
5 10% - - -
5.1. Painting of Internal Walls & Ceilings
- - -
• GF
3% - - -
• FF
3% - - -
5.2. Painting for External Elevation
- - -
• GF
2% - - -
• FF
2% - - -
Water proofing Works in all floors
6 4% - - -
6.1. Toilet Water Proofing
2% - - -
6.2. Terrace, balcony water Proofing
2% - - -
Plumbing & Sanitary Works in all floors
7 4% - - -
7.1. •Internal Plumbing
Marking, and Sanitary
Wall Chasing, PipeWorks
Works for Water & Waste Line incl - - -
Pressure testing
1% - - -
• Fixing CP & Sanitary fittings
2% - - -
7.2. External Plumbing and Sanitary lines
• Pipe Works for Water Line, Waste Line & Rain Water down take - - -
lines
• Gully Traps & Chambers with connections complete (Pumps & 0.50% - - -
Valves), Supply & Fixing Syntex Tank & Connections (Pumps & Valves) 0.25% - - -
• Testing, Commissioning and Handing Over
0.25% - - -
Miscellaneous Works in all floors
8 3% - - -
8.1. Expansion Joint Treatment Works & Flagging Concrete
1% - - -
8.2. MS Staircase to terrace & Fencing for site
2% - - -
- - -
TOTAL
100% 0% 3% - 61,729 61,729

Prepared by Checked by Verified by


SCCPL Er SCCPL Er SCPL Er
NAME OF THE WORK : CONSTRUCTION OF "SHRIRAM SHRESHTA" VILLAS AT COIMBATORE
NAME OF THE OWNER : M/S. SHRIPROP CONSTRUCTIONS PVT LTD
NAME OF THE CONTRACTOR : M/S. SENTHIL CONSTRUCTION CORPORATION PVT.LTD
BILL NO : FIRST RUNNING BILL DATE: 17.12.14
BILLING PERIOD : 01.11.14 to 10.12.014
VILLA 226 (3 BHK) - 1475 sft x Rs. 1395/ sft Rs 2,057,625

Percentage of work
Value of work completed
completed
Payment
S.No Description of work Upto
modality current Upto
previous Current bill Cumulative bill
bill previous bill
Bill

Structure
1 30%
1.1. Sub-structure, Foundations

Marking, Earth Work, PCC, Footing, Column up to Plinth, Plinth Beam


6%

Marking & Earthwork 2% - 41,153 41,153


PCC for footing 1% - 20,576 20,576
RCC for footing 1% - 20,576 20,576
Column upto plinthbeam - - -
RCC for plinth beam - - -
- - -
1.2. Super-structure - RCC frame
- - -
Ground Floor
- - -
• Columns & Staircase First Flight
4% - - -
• GF Roof and Portico Roof Slab including Staircase Second Flight
7% - - -
First Floor
- - -
• Columns and Slope Roof
6% - - -
• FF Roof Slab
7% - - -
Masonry & Plastering
2 15% - - -
2.1. Masonry Works
- - -
• GF Masonry Works up to Roof including Lintel and Sunshades
2% - - -
• FF Masonry Works up to Roof including Lintel, Lofts and Sunshades
2% - - -
2.2. Plastering of ceiling and walls
- - -
• GF
3% - - -
• FF
3% - - -
2.3. Plastering in External Elevation in all floors
5% - - -
Flooring, Dado & Skirting
3 20% - - -
3.1. Flooring & Skirting
- - -
• GF-Foyer, Living, Dining, Kitchen, Bedroom
4% - - -
• FF-All Bedrooms, lobby & Balconies
4% - - -
• Clay tiling at all Open terraces
• Car Park & All round villa flagging concrete and other finishing 2% - - -
Works 2% - - -
3.2. All Dadoo, Granite & Flooring
- - -
• GF Toilet, Dining & Kitchen Granite Works with Sink
3% - - -
• FF All Toilets
3% - - -
3.3. Staircase & Landings, etc.,
2% - - -
Joinery & MS Railing Works
4 14% - - -
4.1. Door frames & Shutters
- - -
• GF
3% - - -
• FF
3% - - -
4.2. Window frames & Shutters
- - -
• GF
3% - - -
• FF
3% - - -
4.3. MS Railing Works for Windows, Staircase, Balcony & Terrace
- - -
• GF
1% - - -
• FF
1% - - -
Painting Works
5 10% - - -
5.1. Painting of Internal Walls & Ceilings
- - -
• GF
3% - - -
• FF
3% - - -
5.2. Painting for External Elevation
- - -
• GF
2% - - -
• FF
2% - - -
Water proofing Works in all floors
6 4% - - -
6.1. Toilet Water Proofing
2% - - -
6.2. Terrace, balcony water Proofing
2% - - -
Plumbing & Sanitary Works in all floors
7 4% - - -
7.1. Internal Plumbing
• Marking, and Sanitary
Wall Chasing, PipeWorks
Works for Water & Waste Line incl - - -
Pressure testing
1% - - -
• Fixing CP & Sanitary fittings
2% - - -
7.2. External Plumbing and Sanitary lines
• Pipe Works for Water Line, Waste Line & Rain Water down take - - -
lines
• Gully Traps & Chambers with connections complete (Pumps & 0.50% - - -
Valves), Supply & Fixing Syntex Tank & Connections (Pumps & Valves) 0.25% - - -
• Testing, Commissioning and Handing Over
0.25% - - -
Miscellaneous Works in all floors
8 3% - - -
8.1. Expansion Joint Treatment Works & Flagging Concrete
1% - - -
8.2. MS Staircase to terrace & Fencing for site
2% - - -
- - -
TOTAL
100% 0% 4% - 82,305 82,305

Prepared by Checked by Verified by


SCCPL Er SCCPL Er SCPL Er
NAME OF THE WORK : CONSTRUCTION OF "SHRIRAM SHRESHTA" VILLAS AT COIMBATORE
NAME OF THE OWNER : M/S. SHRIPROP CONSTRUCTIONS PVT LTD
NAME OF THE CONTRACTOR : M/S. SENTHIL CONSTRUCTION CORPORATION PVT.LTD
BILL NO : FIRST RUNNING BILL DATE: 17.12.14
BILLING PERIOD : 01.11.14 to 10.12.014
VILLA 231 (3 BHK) - 1475 sft x Rs. 1395/ sft Rs 2,057,625

Percentage of work
Value of work completed
completed
Payment
S.No Description of work Upto
modality current Upto
previous Current bill Cumulative bill
bill previous bill
Bill

Structure
1 30%
1.1. Sub-structure, Foundations

Marking, Earth Work, PCC, Footing, Column up to Plinth, Plinth Beam


6%

Marking & Earthwork 2% - 41,153 41,153


PCC for footing 1% - 20,576 20,576
RCC for footing 1% - 20,576 20,576
Column upto plinthbeam 1% - 20,576 20,576
RCC for plinth beam - - -
- - -
1.2. Super-structure - RCC frame
- - -
Ground Floor
- - -
• Columns & Staircase First Flight
4% - - -
• GF Roof and Portico Roof Slab including Staircase Second Flight
7% - - -
First Floor
- - -
• Columns and Slope Roof
6% - - -
• FF Roof Slab
7% - - -
Masonry & Plastering
2 15% - - -
2.1. Masonry Works
- - -
• GF Masonry Works up to Roof including Lintel and Sunshades
2% - - -
• FF Masonry Works up to Roof including Lintel, Lofts and Sunshades
2% - - -
2.2. Plastering of ceiling and walls
- - -
• GF
3% - - -
• FF
3% - - -
2.3. Plastering in External Elevation in all floors
5% - - -
Flooring, Dado & Skirting
3 20% - - -
3.1. Flooring & Skirting
- - -
• GF-Foyer, Living, Dining, Kitchen, Bedroom
4% - - -
• FF-All Bedrooms, lobby & Balconies
4% - - -
• Clay tiling at all Open terraces
• Car Park & All round villa flagging concrete and other finishing 2% - - -
Works 2% - - -
3.2. All Dadoo, Granite & Flooring
- - -
• GF Toilet, Dining & Kitchen Granite Works with Sink
3% - - -
• FF All Toilets
3% - - -
3.3. Staircase & Landings, etc.,
2% - - -
Joinery & MS Railing Works
4 14% - - -
4.1. Door frames & Shutters
- - -
• GF
3% - - -
• FF
3% - - -
4.2. Window frames & Shutters
- - -
• GF
3% - - -
• FF
3% - - -
4.3. MS Railing Works for Windows, Staircase, Balcony & Terrace
- - -
• GF
1% - - -
• FF
1% - - -
Painting Works
5 10% - - -
5.1. Painting of Internal Walls & Ceilings
- - -
• GF
3% - - -
• FF
3% - - -
5.2. Painting for External Elevation
- - -
• GF
2% - - -
• FF
2% - - -
Water proofing Works in all floors
6 4% - - -
6.1. Toilet Water Proofing
2% - - -
6.2. Terrace, balcony water Proofing
2% - - -
Plumbing & Sanitary Works in all floors
7 4% - - -
7.1. Internal Plumbing
• Marking, and Sanitary
Wall Chasing, PipeWorks
Works for Water & Waste Line incl - - -
Pressure testing
1% - - -
• Fixing CP & Sanitary fittings
2% - - -
7.2. External Plumbing and Sanitary lines
• Pipe Works for Water Line, Waste Line & Rain Water down take - - -
lines
• Gully Traps & Chambers with connections complete (Pumps & 0.50% - - -
Valves), Supply & Fixing Syntex Tank & Connections (Pumps & Valves) 0.25% - - -
• Testing, Commissioning and Handing Over
0.25% - - -
Miscellaneous Works in all floors
8 3% - - -
8.1. Expansion Joint Treatment Works & Flagging Concrete
1% - - -
8.2. MS Staircase to terrace & Fencing for site
2% - - -
- - -
TOTAL
100% 0% 5% - 102,881 102,881

Prepared by Checked by Verified by


SCCPL Er SCCPL Er SCPL Er
NAME OF THE WORK : CONSTRUCTION OF "SHRIRAM SHRESHTA" VILLAS AT COIMBATORE
NAME OF THE OWNER : M/S. SHRIPROP CONSTRUCTIONS PVT LTD
NAME OF THE CONTRACTOR : M/S. SENTHIL CONSTRUCTION CORPORATION PVT.LTD
BILL NO : FIRST RUNNING BILL DATE: 17.12.14
BILLING PERIOD : 01.11.14 to 10.12.014
VILLA 234A (3 BHK) - 1475 sft x Rs. 1395/ sft Rs 2,057,625

Percentage of work
Value of work completed
completed
Payment
S.No Description of work Upto
modality current Upto
previous Current bill Cumulative bill
bill previous bill
Bill

Structure
1 30%
1.1. Sub-structure, Foundations

Marking, Earth Work, PCC, Footing, Column up to Plinth, Plinth Beam


6%

Marking & Earthwork 2% - 41,153 41,153


PCC for footing 1% - 20,576 20,576
RCC for footing 1% - 20,576 20,576
Column upto plinthbeam - - -
RCC for plinth beam - - -
- - -
1.2. Super-structure - RCC frame
- - -
Ground Floor
- - -
• Columns & Staircase First Flight
4% - - -
• GF Roof and Portico Roof Slab including Staircase Second Flight
7% - - -
First Floor
- - -
• Columns and Slope Roof
6% - - -
• FF Roof Slab
7% - - -
Masonry & Plastering
2 15% - - -
2.1. Masonry Works
- - -
• GF Masonry Works up to Roof including Lintel and Sunshades
2% - - -
• FF Masonry Works up to Roof including Lintel, Lofts and Sunshades
2% - - -
2.2. Plastering of ceiling and walls
- - -
• GF
3% - - -
• FF
3% - - -
2.3. Plastering in External Elevation in all floors
5% - - -
Flooring, Dado & Skirting
3 20% - - -
3.1. Flooring & Skirting
- - -
• GF-Foyer, Living, Dining, Kitchen, Bedroom
4% - - -
• FF-All Bedrooms, lobby & Balconies
4% - - -
• Clay tiling at all Open terraces
• Car Park & All round villa flagging concrete and other finishing 2% - - -
Works 2% - - -
3.2. All Dadoo, Granite & Flooring
- - -
• GF Toilet, Dining & Kitchen Granite Works with Sink
3% - - -
• FF All Toilets
3% - - -
3.3. Staircase & Landings, etc.,
2% - - -
Joinery & MS Railing Works
4 14% - - -
4.1. Door frames & Shutters
- - -
• GF
3% - - -
• FF
3% - - -
4.2. Window frames & Shutters
- - -
• GF
3% - - -
• FF
3% - - -
4.3. MS Railing Works for Windows, Staircase, Balcony & Terrace
- - -
• GF
1% - - -
• FF
1% - - -
Painting Works
5 10% - - -
5.1. Painting of Internal Walls & Ceilings
- - -
• GF
3% - - -
• FF
3% - - -
5.2. Painting for External Elevation
- - -
• GF
2% - - -
• FF
2% - - -
Water proofing Works in all floors
6 4% - - -
6.1. Toilet Water Proofing
2% - - -
6.2. Terrace, balcony water Proofing
2% - - -
Plumbing & Sanitary Works in all floors
7 4% - - -
7.1. Internal Plumbing
• Marking, and Sanitary
Wall Chasing, PipeWorks
Works for Water & Waste Line incl - - -
Pressure testing
1% - - -
• Fixing CP & Sanitary fittings
2% - - -
7.2. External Plumbing and Sanitary lines
• Pipe Works for Water Line, Waste Line & Rain Water down take - - -
lines
• Gully Traps & Chambers with connections complete (Pumps & 0.50% - - -
Valves), Supply & Fixing Syntex Tank & Connections (Pumps & Valves) 0.25% - - -
• Testing, Commissioning and Handing Over
0.25% - - -
Miscellaneous Works in all floors
8 3% - - -
8.1. Expansion Joint Treatment Works & Flagging Concrete
1% - - -
8.2. MS Staircase to terrace & Fencing for site
2% - - -
- - -
TOTAL
100% 0% 4% - 82,305 82,305

Prepared by Checked by Verified by


SCCPL Er SCCPL Er SCPL Er
NAME OF THE WORK : CONSTRUCTION OF "SHRIRAM SHRESHTA" VILLAS AT COIMBATORE
NAME OF THE OWNER : M/S. SHRIPROP CONSTRUCTIONS PVT LTD
NAME OF THE CONTRACTOR : M/S. SENTHIL CONSTRUCTION CORPORATION PVT.LTD
BILL NO : FIRST RUNNING BILL DATE: 17.12.14
BILLING PERIOD : 01.11.14 to 10.12.014
VILLA 245 (3 BHK) - 1475 sft x Rs. 1395/ sft Rs 2,057,625

Percentage of work
Value of work completed
completed
Payment
S.No Description of work Upto
modality current Upto
previous Current bill Cumulative bill
bill previous bill
Bill

Structure
1 30%
1.1. Sub-structure, Foundations

Marking, Earth Work, PCC, Footing, Column up to Plinth, Plinth Beam


6%

Marking & Earthwork 2% - 41,153 41,153


PCC for footing 1% - 20,576 20,576
RCC for footing 1% - 20,576 20,576
Column upto plinthbeam 1% - 20,576 20,576
RCC for plinth beam - - -
- - -
1.2. Super-structure - RCC frame
- - -
Ground Floor
- - -
• Columns & Staircase First Flight
4% - - -
• GF Roof and Portico Roof Slab including Staircase Second Flight
7% - - -
First Floor
- - -
• Columns and Slope Roof
6% - - -
• FF Roof Slab
7% - - -
Masonry & Plastering
2 15% - - -
2.1. Masonry Works
- - -
• GF Masonry Works up to Roof including Lintel and Sunshades
2% - - -
• FF Masonry Works up to Roof including Lintel, Lofts and Sunshades
2% - - -
2.2. Plastering of ceiling and walls
- - -
• GF
3% - - -
• FF
3% - - -
2.3. Plastering in External Elevation in all floors
5% - - -
Flooring, Dado & Skirting
3 20% - - -
3.1. Flooring & Skirting
- - -
• GF-Foyer, Living, Dining, Kitchen, Bedroom
4% - - -
• FF-All Bedrooms, lobby & Balconies
4% - - -
• Clay tiling at all Open terraces
• Car Park & All round villa flagging concrete and other finishing 2% - - -
Works 2% - - -
3.2. All Dadoo, Granite & Flooring
- - -
• GF Toilet, Dining & Kitchen Granite Works with Sink
3% - - -
• FF All Toilets
3% - - -
3.3. Staircase & Landings, etc.,
2% - - -
Joinery & MS Railing Works
4 14% - - -
4.1. Door frames & Shutters
- - -
• GF
3% - - -
• FF
3% - - -
4.2. Window frames & Shutters
- - -
• GF
3% - - -
• FF
3% - - -
4.3. MS Railing Works for Windows, Staircase, Balcony & Terrace
- - -
• GF
1% - - -
• FF
1% - - -
Painting Works
5 10% - - -
5.1. Painting of Internal Walls & Ceilings
- - -
• GF
3% - - -
• FF
3% - - -
5.2. Painting for External Elevation
- - -
• GF
2% - - -
• FF
2% - - -
Water proofing Works in all floors
6 4% - - -
6.1. Toilet Water Proofing
2% - - -
6.2. Terrace, balcony water Proofing
2% - - -
Plumbing & Sanitary Works in all floors
7 4% - - -
7.1. Internal Plumbing
• Marking, and Sanitary
Wall Chasing, PipeWorks
Works for Water & Waste Line incl - - -
Pressure testing
1% - - -
• Fixing CP & Sanitary fittings
2% - - -
7.2. External Plumbing and Sanitary lines
• Pipe Works for Water Line, Waste Line & Rain Water down take - - -
lines
• Gully Traps & Chambers with connections complete (Pumps & 0.50% - - -
Valves), Supply & Fixing Syntex Tank & Connections (Pumps & Valves) 0.25% - - -
• Testing, Commissioning and Handing Over
0.25% - - -
Miscellaneous Works in all floors
8 3% - - -
8.1. Expansion Joint Treatment Works & Flagging Concrete
1% - - -
8.2. MS Staircase to terrace & Fencing for site
2% - - -
- - -
TOTAL
100% 0% 5% - 102,881 102,881