10.05 (1) Pretensioned Spun Concrete Pile, Furnished, D 60cm
10.05 (1) Pretensioned Spun Concrete Pile, Furnished, D 60cm
BACK UP DATA
CALCULATION SHEET
LOCAL ROAD BRIDGE STA. 171+038
10.05(1) Pretensioned Spun Concrete Pile, Furnished, D = 60cm
CONTRACT NO : HK.02.03/PPKII-PJBHSK/2108.01/2015
CONTRACT DATE : AUGUST 21st , 2015
BACK UP DATA
REQUEST OF WORK
LOCAL ROAD BRIDGE STA. 171+038
10.05(1) Pretensioned Spun Concrete Pile, Furnished, D = 60cm
CONTRACT NO : HK.02.03/PPKII-PJBHSK/2108.01/2015
CONTRACT DATE : AUGUST 21st , 2015
BACK UP DATA
CALCULATION SHEET
KEMADUH BRIDGE STA. 170+707
10.05(1) Pretensioned Spun Concrete Pile, Furnished, D = 60cm
CONTRACT NO : HK.02.03/PPKII-PJBHSK/2108.01/2015
CONTRACT DATE : AUGUST 21st , 2015
BACK UP DATA
REQUEST OF WORK
KEMADUH BRIDGE STA. 170+707
10.05(1) Pretensioned Spun Concrete Pile, Furnished, D = 60cm
CONTRACT NO : HK.02.03/PPKII-PJBHSK/2108.01/2015
CONTRACT DATE : AUGUST 21st , 2015
1 Abutment A1 / A2 2,261.00
Total Previous Page
Total This Page
Total Up To This Page
UNIT
Linear Meter
-
-
2,261.00
2,261.00
Submitted By,
CRBC-WIKA-PP, JO
ZHANG LIANG
Commercial Manager
SUMMARY QUANTITY
INTERIM PAYMENT CERTIFICATE (March 26th, 2017-April 25th, 2017)
1 Abutment A1 / A2 2,930.00
Total Previous Page
Total This Page
Total Up To This Page
UNIT
Linear Meter
-
-
2,930.00
2,930.00
Submitted By,
CRBC-WIKA-PP, JO
ZHANG LIANG
Commercial Manager
BACK UP QUANTITY
Package of Works : Toll Road Development of Solo - Kertosono Project Phase I
Contractor : CRBC - WIKA - PP. JO
Pay No. Item : 10.05(1)
Description : Pretensioned Spun Concrete Pile, Furnished, D = 60cm
Unit : Linear Meter
Location : Local Road Bridge ( STA 171 + 038 )
Sketch
PRANOWO RASDOWIDODO
QUANTITY ENGINEER
COM
RAHMAT ROMADHONA
NIP. 198406282010121004
RAHMAT ROMADHONA
BACK UP QUANTITY
Package ofNIP.
Works
198406282010121004: Toll Road Development of Solo - Kertosono Project Phase I
Contractor : CRBC - WIKA - PP. JO
Pay No. Item : 10.05(1)
Description : Pretensioned Spun Concrete Pile, Furnished, D = 60cm
Unit : Linear Meter
Location : Local Road Bridge ( STA 171 + 038 )
Sketch
PRANOWO RASDOWIDODO
QUANTITY ENGINEER
COM
RAHMAT ROMADHONA
NIP. 198406282010121004
RAHMAT ROMADHONA
BACK UP QUANTITY
Package ofNIP.
Works
198406282010121004: Toll Road Development of Solo - Kertosono Project Phase I
Contractor : CRBC - WIKA - PP. JO
Pay No. Item : 10.05(1)
Description : Pretensioned Spun Concrete Pile, Furnished, D = 60cm
Unit : Linear Meter
Location : Local Road Bridge ( STA 171 + 038 )
Sketch
PRANOWO RASDOWIDODO
QUANTITY ENGINEER
COM
RAHMAT ROMADHONA
NIP. 198406282010121004
UP QUANTITY
Sketch
Total Length
Remarks
Linear Meter
e=(a*c)+(b*d) Nopol
-
693.00
693.00
SUBMITTED BY,
CONTRACTOR
CRBC-WIKA-PP, JO
ZHANG LIANG
COMMERCIAL MANAGER
UP QUANTITY
Sketch
Total Length
Remarks
Linear Meter
e=(a*c)+(b*d) Nopol
77.00 E 9924 C
77.00 Z 9346 KS
77.00 Z 9346 KS
SUBMITTED BY,
CONTRACTOR
CRBC-WIKA-PP, JO
ZHANG LIANG
COMMERCIAL MANAGER
UP QUANTITY
Sketch
Total Length
Remarks
Linear Meter
e=(a*c)+(b*d) Nopol
SUBMITTED BY,
CONTRACTOR
CRBC-WIKA-PP, JO
ZHANG LIANG
COMMERCIAL MANAGER
BACK UP QUANTITY
Package of Works : Toll Road Development of Solo - Kertosono Project Phase I
Contractor : CRBC - WIKA - PP. JO
Pay No. Item : 10.05(1)
Description : Pretensioned Spun Concrete Pile, Furnished, D = 60cm
Unit : Linear Meter
Location :Kemaduh Bridge ( STA 170 + 707 )
Sketch
PRANOWO RASDOWIDODO
QUANTITY ENGINEER
COM
RAHMAT ROMADHONA
NIP. 198406282010121004
RAHMAT ROMADHONA
BACK UP QUANTITY
Package ofNIP.
Works
198406282010121004: Toll Road Development of Solo - Kertosono Project Phase I
Contractor : CRBC - WIKA - PP. JO
Pay No. Item : 10.05(1)
Description : Pretensioned Spun Concrete Pile, Furnished, D = 60cm
Unit : Linear Meter
Location :Kemaduh Bridge ( STA 170 + 707 )
Sketch
PRANOWO RASDOWIDODO
QUANTITY ENGINEER
COM
RAHMAT ROMADHONA
NIP. 198406282010121004
RAHMAT ROMADHONA
BACK UP QUANTITY
Package ofNIP.
Works
198406282010121004: Toll Road Development of Solo - Kertosono Project Phase I
Contractor : CRBC - WIKA - PP. JO
Pay No. Item : 10.05(1)
Description : Pretensioned Spun Concrete Pile, Furnished, D = 60cm
Unit : Linear Meter
Location :Kemaduh Bridge ( STA 170 + 707 )
Sketch
PRANOWO RASDOWIDODO
QUANTITY ENGINEER
COM
RAHMAT ROMADHONA
NIP. 198406282010121004
RAHMAT ROMADHONA
BACK UP QUANTITY
Package ofNIP.
Works
198406282010121004: Toll Road Development of Solo - Kertosono Project Phase I
Contractor : CRBC - WIKA - PP. JO
Pay No. Item : 10.05(1)
Description : Pretensioned Spun Concrete Pile, Furnished, D = 60cm
Unit : Linear Meter
Location :Kemaduh Bridge ( STA 170 + 707 )
Sketch
PRANOWO RASDOWIDODO
QUANTITY ENGINEER
COM
RAHMAT ROMADHONA
NIP. 198406282010121004
UP QUANTITY
Sketch
Total Length
Remarks
Linear Meter
e=(a*c)+(b*d) Nopol
60.00 KT 8012 LI
72.00 E 9924 C
72.00 B 9830 TYW
60.00 B 8976 PE
72.00 Z 9889 KT
72.00 Z 9346 KS
60.00 Z 9346 KS
72.00 B 9140 GZM
60.00 S 4172 UO
SUBMITTED BY,
CONTRACTOR
CRBC-WIKA-PP, JO
ZHANG LIANG
COMMERCIAL MANAGER
UP QUANTITY
Sketch
Total Length
Remarks
Linear Meter
e=(a*c)+(b*d) Nopol
72.00 Z 9889 KT
72.00 B 9140 GZM
72.00 Z 9889 KT
60.00 Z 9346 KS
72.00 B 9140 GZM
72.00 B 8976 PE
72.00 KT 8012 LI
72.00 S 4172 UO
60.00 KT 8012 LI
72.00 Z 9889 KT
72.00 B 9140 GZM
732.00
768.00
1,500.00
SUBMITTED BY,
CONTRACTOR
CRBC-WIKA-PP, JO
ZHANG LIANG
COMMERCIAL MANAGER
UP QUANTITY
Sketch
Total Length
Remarks
Linear Meter
e=(a*c)+(b*d) Nopol
72.00 B 8976 PE
72.00 KT 8012 LI
72.00 S 4172 UO
60.00 KT 8012 LI
72.00 B 8976 PE
72.00 KT 8012 LI
72.00 S 4172 UO
72.00 Z 9889 KT
60.00 KT 8012 LI
60.00 B 8976 PE
72.00 B 9140 GZM
1,500.00
756.00
2,256.00
SUBMITTED BY,
CONTRACTOR
CRBC-WIKA-PP, JO
ZHANG LIANG
COMMERCIAL MANAGER
UP QUANTITY
Sketch
Total Length
Remarks
Linear Meter
e=(a*c)+(b*d) Nopol
72.00 B 8976 PE
72.00 KT 8012 LI
72.00 S 4172 UO
72.00 Z 9889 KT
72.00 B 9140 GZM
72.00 B 8976 PE
72.00 KT 8012 LI
72.00 Z 9889 KT
32.00 B 9140 GZM
66.00 B 8976 PE
2,256.00
674.00
2,930.00
SUBMITTED BY,
CONTRACTOR
CRBC-WIKA-PP, JO
ZHANG LIANG
COMMERCIAL MANAGER