10.05 (1) Pretensioned Spun Concrete Pile, Furnished, D 60cm

- The document is a request for payment from a contractor for precast concrete pile work on a toll road project in Indonesia. - It provides details of the work completed in April 2017, including the location, quantities and dates of delivery for piles installed at a local road bridge and Kemaduh Bridge. - The total quantity of precast piles requested for payment is 4,191 linear meters.

Uploaded by

anggoro
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
127 views44 pages

10.05 (1) Pretensioned Spun Concrete Pile, Furnished, D 60cm

- The document is a request for payment from a contractor for precast concrete pile work on a toll road project in Indonesia. - It provides details of the work completed in April 2017, including the location, quantities and dates of delivery for piles installed at a local road bridge and Kemaduh Bridge. - The total quantity of precast piles requested for payment is 4,191 linear meters.

Uploaded by

anggoro
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 44

THE DIRECTORATE GENERAL OF HIGHWAYS

MINISTRY OF PUBLIC WORK AND HOUSING


GOVERNMENT OF THE REPUBLIC OF INDONESIA

TOLL ROAD DEVELOPMENT OF SOLO - KERTOSONO PHASE I

BACK UP DATA
CALCULATION SHEET
LOCAL ROAD BRIDGE STA. 171+038
10.05(1) Pretensioned Spun Concrete Pile, Furnished, D = 60cm

MONTH : April 2017


PERIOD : March 26th Up to April 25th, 2017

CONTRACT NO : HK.02.03/PPKII-PJBHSK/2108.01/2015
CONTRACT DATE : AUGUST 21st , 2015

CONSULTANT SUPERVISOR CONTRACTOR

Dong Meyong Engginering


Consultant Architecture - PT Yodya
Dong Meyong Engginering
Consultant Architecture - PT Yodya
Karya (Persero) - PT Hasfarm Dian
Konsultan - PT Cipta Strada -
PT Wahana Mitra Amarta
THE DIRECTORATE GENERAL OF HIGHWAYS
MINISTRY OF PUBLIC WORK AND HOUSING
GOVERNMENT OF THE REPUBLIC OF INDONESIA

TOLL ROAD DEVELOPMENT OF SOLO - KERTOSONO PHASE I

BACK UP DATA
REQUEST OF WORK
LOCAL ROAD BRIDGE STA. 171+038
10.05(1) Pretensioned Spun Concrete Pile, Furnished, D = 60cm

MONTH : April 2017


PERIOD : March 26th Up to April 25th, 2017

CONTRACT NO : HK.02.03/PPKII-PJBHSK/2108.01/2015
CONTRACT DATE : AUGUST 21st , 2015

CONSULTANT SUPERVISOR CONTRACTOR

Dong Meyong Engginering


Consultant Architecture - PT Yodya
Dong Meyong Engginering
Consultant Architecture - PT Yodya
Karya (Persero) - PT Hasfarm Dian
Konsultan - PT Cipta Strada -
PT Wahana Mitra Amarta
THE DIRECTORATE GENERAL OF HIGHWAYS
MINISTRY OF PUBLIC WORK AND HOUSING
GOVERNMENT OF THE REPUBLIC OF INDONESIA

TOLL ROAD DEVELOPMENT OF SOLO - KERTOSONO PHASE I

BACK UP DATA
CALCULATION SHEET
KEMADUH BRIDGE STA. 170+707
10.05(1) Pretensioned Spun Concrete Pile, Furnished, D = 60cm

MONTH : April 2017


PERIOD : March 26th Up to April 25th, 2017

CONTRACT NO : HK.02.03/PPKII-PJBHSK/2108.01/2015
CONTRACT DATE : AUGUST 21st , 2015

CONSULTANT SUPERVISOR CONTRACTOR

Dong Meyong Engginering


Consultant Architecture - PT Yodya
Dong Meyong Engginering
Consultant Architecture - PT Yodya
Karya (Persero) - PT Hasfarm Dian
Konsultan - PT Cipta Strada -
PT Wahana Mitra Amarta
THE DIRECTORATE GENERAL OF HIGHWAYS
MINISTRY OF PUBLIC WORK AND HOUSING
GOVERNMENT OF THE REPUBLIC OF INDONESIA

TOLL ROAD DEVELOPMENT OF SOLO - KERTOSONO PHASE I

BACK UP DATA
REQUEST OF WORK
KEMADUH BRIDGE STA. 170+707
10.05(1) Pretensioned Spun Concrete Pile, Furnished, D = 60cm

MONTH : April 2017


PERIOD : March 26th Up to April 25th, 2017

CONTRACT NO : HK.02.03/PPKII-PJBHSK/2108.01/2015
CONTRACT DATE : AUGUST 21st , 2015

CONSULTANT SUPERVISOR CONTRACTOR

Dong Meyong Engginering


Consultant Architecture - PT Yodya
Dong Meyong Engginering
Consultant Architecture - PT Yodya
Karya (Persero) - PT Hasfarm Dian
Konsultan - PT Cipta Strada -
PT Wahana Mitra Amarta
SUMMARY QUANTITY
INTERIM PAYMENT CERTIFICATE (March 26th, 2017-April 25th, 2017)

Package of Works : Toll Road Development of Solo - Kertosono Project Phase I


Contractor : CRBC - WIKA - PP. JO
Consultant : DMEC - YK - HDK - CS - WMA. JO
Pay No. Item : 10.05(1)
Description : Pretensioned Spun Concrete Pile, Furnished, D = 60cm
Unit : Linear Meter
Location : Local Road Bridge, STA 171 + 038

NO. STA ( Location ) QUANTITY

Local Road Bridge ( STA 171 + 038 )

1 Abutment A1 / A2 2,261.00
Total Previous Page
Total This Page
Total Up To This Page

Seen By, Approved By,


Project Coordinator of Freeway DMEC-YK-HDK-CS-WMA, JO
Construction of Solo - Kertosono 2

ALIK MUSTAKIM PRANOWO RASDOWIDODO


NIP. 19820908 200912 1 001 Site Engineer
MARY QUANTITY
CATE (March 26th, 2017-April 25th, 2017)

UNIT

Linear Meter

-
-
2,261.00
2,261.00

Submitted By,
CRBC-WIKA-PP, JO

ZHANG LIANG
Commercial Manager
SUMMARY QUANTITY
INTERIM PAYMENT CERTIFICATE (March 26th, 2017-April 25th, 2017)

Package of Works : Toll Road Development of Solo - Kertosono Project Phase I


Contractor : CRBC - WIKA - PP. JO
Consultant : DMEC - YK - HDK - CS - WMA. JO
Pay No. Item : 10.05(1)
Description : Pretensioned Spun Concrete Pile, Furnished, D = 60cm
Unit : Linear Meter
Location : Kemaduh Bridge, STA 170 + 707

NO. STA ( Location ) QUANTITY

Kemaduh Bridge ( STA 170 + 707 )

1 Abutment A1 / A2 2,930.00
Total Previous Page
Total This Page
Total Up To This Page

Seen By, Approved By,


Project Coordinator of Freeway DMEC-YK-HDK-CS-WMA, JO
Construction of Solo - Kertosono 2

ALIK MUSTAKIM PRANOWO RASDOWIDODO


NIP. 19820908 200912 1 001 Site Engineer
MARY QUANTITY
CATE (March 26th, 2017-April 25th, 2017)

UNIT

Linear Meter

-
-
2,930.00
2,930.00

Submitted By,
CRBC-WIKA-PP, JO

ZHANG LIANG
Commercial Manager
BACK UP QUANTITY
Package of Works : Toll Road Development of Solo - Kertosono Project Phase I
Contractor : CRBC - WIKA - PP. JO
Pay No. Item : 10.05(1)
Description : Pretensioned Spun Concrete Pile, Furnished, D = 60cm
Unit : Linear Meter
Location : Local Road Bridge ( STA 171 + 038 )
Sketch

Configuration Pile (M) Each


Description TYPE
No.
BOTTOM MIDDLE BOTTOM MIDDLE
Date Time Nomor Delivery Order a b c d

1 08 April 2017 2:21 PM Tp.02.09/WB.M.02712/V/17 A2 7.00 7.00 4.00 7.00


4:45 PM Tp.02.09/WB.M.02713/V/17 A2 7.00 7.00 4.00 7.00

2 11 April 2017 11:05 AM Tp.02.09/WB.M.02714/V/17 A2 7.00 7.00 4.00 7.00


1:22 PM Tp.02.09/WB.M.02715/V/17 A2 7.00 7.00 4.00 7.00
2:42 PM Tp.02.09/WB.M.02716/V/17 A2 7.00 7.00 4.00 7.00

3 12 April 2017 11:05 AM Tp.02.09/WB.M.02717/V/17 A2 7.00 7.00 4.00 7.00


1:35 PM Tp.02.09/WB.M.02718/V/17 A2 7.00 7.00 4.00 7.00

4 13 April 2017 9:21 AM Tp.02.09/WB.M.02719/V/17 A2 7.00 7.00 4.00 7.00


12:41 PM Tp.02.09/WB.M.02720/V/17 A2 7.00 7.00 4.00 7.00

Total Previous page


Total this page
Total Up To this page

SEEN BY, APPROVE BY,


PROJECT OFFICER OF FREEWAY DMEC-YK-HDK-CS-WMA, JO
CONSTRUCTION OF C
SOLO-KERTOSONO 1

PRANOWO RASDOWIDODO
QUANTITY ENGINEER
COM
RAHMAT ROMADHONA
NIP. 198406282010121004
RAHMAT ROMADHONA
BACK UP QUANTITY
Package ofNIP.
Works
198406282010121004: Toll Road Development of Solo - Kertosono Project Phase I
Contractor : CRBC - WIKA - PP. JO
Pay No. Item : 10.05(1)
Description : Pretensioned Spun Concrete Pile, Furnished, D = 60cm
Unit : Linear Meter
Location : Local Road Bridge ( STA 171 + 038 )
Sketch

Configuration Pile (M) Each


Description TYPE
No.
BOTTOM MIDDLE BOTTOM MIDDLE
Date Time Nomor Delivery Order a b c d

5 15 April 2017 9:41 AM Tp.02.09/WB.M.02721/V/17 A2 7.00 7.00 4.00 7.00


11:51 AM Tp.02.09/WB.M.02722/V/17 A2 7.00 7.00 4.00 7.00
11:51 AM Tp.02.09/WB.M.02745/V/17 A2 7.00 7.00 4.00 7.00

6 16 April 2017 10:05 AM Tp.02.09/WB.M.02723/V/17 A2 7.00 7.00 4.00 7.00


11:25 AM Tp.02.09/WB.M.02724/V/17 A2 7.00 7.00 4.00 7.00
1:35 PM Tp.02.09/WB.M.02725/V/17 A2 7.00 7.00 4.00 7.00

7 17 April 2017 10:19 AM Tp.02.09/WB.M.02726/V/17 A2 7.00 7.00 4.00 7.00


11:39 AM Tp.02.09/WB.M.02727/V/17 A2 7.00 7.00 4.00 7.00
1:49 PM Tp.02.09/WB.M.02728/V/17 A2 7.00 7.00 4.00 7.00

8 18 April 2017 9:01 AM Tp.02.09/WB.M.02729/V/17 A2 7.00 7.00 4.00 7.00


10:21 AM Tp.02.09/WB.M.02730/V/17 A2 7.00 7.00 4.00 7.00
12:31 PM Tp.02.09/WB.M.02731/V/17 A2 7.00 7.00 4.00 7.00
Total Previous page
Total this page
Total Up To this page

SEEN BY, APPROVE BY,


PROJECT OFFICER OF FREEWAY DMEC-YK-HDK-CS-WMA, JO
CONSTRUCTION OF C
SOLO-KERTOSONO 1

PRANOWO RASDOWIDODO
QUANTITY ENGINEER
COM
RAHMAT ROMADHONA
NIP. 198406282010121004
RAHMAT ROMADHONA
BACK UP QUANTITY
Package ofNIP.
Works
198406282010121004: Toll Road Development of Solo - Kertosono Project Phase I
Contractor : CRBC - WIKA - PP. JO
Pay No. Item : 10.05(1)
Description : Pretensioned Spun Concrete Pile, Furnished, D = 60cm
Unit : Linear Meter
Location : Local Road Bridge ( STA 171 + 038 )
Sketch

Configuration Pile (M) Each


Description TYPE
No.
BOTTOM MIDDLE BOTTOM MIDDLE
Date Time Nomor Delivery Order a b c d

9 19 April 2017 1:09 PM Tp.02.09/WB.M.02732/V/17 A2 7.00 7.00 4.00 7.00


2:29 PM Tp.02.09/WB.M.02733/V/17 A2 7.00 7.00 4.00 7.00
4:39 PM Tp.02.09/WB.M.02734/V/17 A2 7.00 7.00 4.00 7.00

10 20 April 2017 2:16 PM Tp.02.09/WB.M.02736/V/17 A2 7.00 7.00 4.00 7.00


3:36 PM Tp.02.09/WB.M.02737/V/17 A2 - 7.00 - 11.00
5:46 PM Tp.02.09/WB.M.02738/V/17 A2 7.00 7.00 4.00 7.00

12 22 April 2017 10:25 AM Tp.02.09/WB.M.02742/V/17 A2 - 7.00 - 11.00


12:45 PM Tp.02.09/WB.M.02743/V/17 A2 - 7.00 - 11.00
2:55 PM Tp.02.09/WB.M.02744/V/17 A2 7.00 - 4.00 -
Total Previous page
Total this page
Total Up To this page

SEEN BY, APPROVE BY,


PROJECT OFFICER OF FREEWAY DMEC-YK-HDK-CS-WMA, JO
CONSTRUCTION OF C
SOLO-KERTOSONO 1

PRANOWO RASDOWIDODO
QUANTITY ENGINEER
COM
RAHMAT ROMADHONA
NIP. 198406282010121004
UP QUANTITY

Sketch

Total Length
Remarks
Linear Meter
e=(a*c)+(b*d) Nopol

77.00 B 9830 TYW


77.00 B 9924 C

77.00 B 9830 TYW


77.00 E 9924 C
77.00 Z 9346 KS

77.00 B 9830 TYW


77.00 Z 9346 KS

77.00 B 9830 TYW


77.00 E 9924 C

-
693.00
693.00

SUBMITTED BY,
CONTRACTOR
CRBC-WIKA-PP, JO

ZHANG LIANG
COMMERCIAL MANAGER
UP QUANTITY

Sketch

Total Length
Remarks
Linear Meter
e=(a*c)+(b*d) Nopol

77.00 E 9924 C
77.00 Z 9346 KS
77.00 Z 9346 KS

77.00 B 9830 TYW


77.00 E 9924 C
77.00 Z 9346 KS

77.00 B 9830 TYW


77.00 E 9924 C
77.00 Z 9346 KS

77.00 B 9830 TYW


77.00 E 9924 C
77.00 Z 9346 KS
693.00
924.00
1,617.00

SUBMITTED BY,
CONTRACTOR
CRBC-WIKA-PP, JO

ZHANG LIANG
COMMERCIAL MANAGER
UP QUANTITY

Sketch

Total Length
Remarks
Linear Meter
e=(a*c)+(b*d) Nopol

77.00 B 9830 TYW


77.00 E 9924 C
77.00 Z 9346 KS

77.00 B 9830 TYW


77.00 E 9924 C
77.00 Z 9346 KS

77.00 B 9830 TYW


77.00 E 9924 C
28.00 Z 9346 KS
1,617.00
644.00
2,261.00

SUBMITTED BY,
CONTRACTOR
CRBC-WIKA-PP, JO

ZHANG LIANG
COMMERCIAL MANAGER
BACK UP QUANTITY
Package of Works : Toll Road Development of Solo - Kertosono Project Phase I
Contractor : CRBC - WIKA - PP. JO
Pay No. Item : 10.05(1)
Description : Pretensioned Spun Concrete Pile, Furnished, D = 60cm
Unit : Linear Meter
Location :Kemaduh Bridge ( STA 170 + 707 )
Sketch

Configuration Pile (M) Each


Description TYPE
No.
BOTTOM MIDDLE BOTTOM MIDDLE
Date Time Nomor Delivery Order a b c d

1 04 April 2017 2:25 PM Tp.02.09/WB.M.02710/IV/17 A2 6.00 6.00 4.00 6.00

2 05 April 2017 12:22 PM Tp.02.09/WB.M.02746/V/17 A2 8.00 8.00 3.00 6.00


10:12 AM Tp.02.09/WB.M.02745/V/17 A2 8.00 8.00 3.00 6.00
4:25 PM Tp.02.09/WB.M.02740/IV/17 A2 6.00 6.00 4.00 6.00

3 06 April 2017 10:15 AM Tp.02.09/WB.M.02747/V/17 A2 8.00 8.00 3.00 6.00


12:55 PM Tp.02.09/WB.M.02748/V/17 A2 8.00 8.00 3.00 6.00
1:11 PM Tp.02.09/WB.M.02800/IV/17 A2 6.00 6.00 4.00 6.00
2:45 PM Tp.02.09/WB.M.02749/V/17 A2 8.00 8.00 3.00 6.00
3:41 PM Tp.02.09/WB.M.02801/IV/17 A2 6.00 6.00 4.00 6.00

4 07 April 2017 10:46 AM Tp.02.09/WB.M.02750/V/17 A2 8.00 8.00 3.00 6.00


1:25 PM Tp.02.09/WB.M.02802/IV/17 A2 6.00 6.00 4.00 6.00
Total Previous page
Total this page
Total Up To this page

SEEN BY, APPROVE BY,


PROJECT OFFICER OF FREEWAY DMEC-YK-HDK-CS-WMA, JO
CONSTRUCTION OF C
SOLO-KERTOSONO 1

PRANOWO RASDOWIDODO
QUANTITY ENGINEER
COM
RAHMAT ROMADHONA
NIP. 198406282010121004
RAHMAT ROMADHONA
BACK UP QUANTITY
Package ofNIP.
Works
198406282010121004: Toll Road Development of Solo - Kertosono Project Phase I
Contractor : CRBC - WIKA - PP. JO
Pay No. Item : 10.05(1)
Description : Pretensioned Spun Concrete Pile, Furnished, D = 60cm
Unit : Linear Meter
Location :Kemaduh Bridge ( STA 170 + 707 )
Sketch

Configuration Pile (M) Each


Description TYPE
No.
BOTTOM MIDDLE BOTTOM MIDDLE
Date Time Nomor Delivery Order a b c d

5 08 April 2017 10:27 AM Tp.02.09/WB.M.02751/V/17 A2 8.00 8.00 3.00 6.00


2:57 PM Tp.02.09/WB.M.02752/V/17 A2 8.00 8.00 3.00 6.00

6 10 April 2017 11:14 AM Tp.02.09/WB.M.02753/V/17 A2 8.00 8.00 3.00 6.00


3:34 PM Tp.02.09/WB.M.02808/IV/17 A2 6.00 6.00 4.00 6.00
3:44 PM Tp.02.09/WB.M.02754/V/17 A2 8.00 8.00 3.00 6.00

7 11 April 2017 9:41 AM Tp.02.09/WB.M.02755/V/17 A2 8.00 8.00 3.00 6.00


11:44 AM Tp.02.09/WB.M.02756/V/17 A2 8.00 8.00 3.00 6.00
2:51 PM Tp.02.09/WB.M.02757/V/17 A2 8.00 8.00 3.00 6.00

8 12 April 2017 2:52 PM Tp.02.09/WB.M.02809/IV/17 A2 6.00 6.00 4.00 6.00


10:14 AM Tp.02.09/WB.M.02758/V/17 A2 8.00 8.00 3.00 6.00
2:44 PM Tp.02.09/WB.M.02759/V/17 A2 8.00 8.00 3.00 6.00
Total Previous page
Total this page
Total Up To this page

SEEN BY, APPROVE BY,


PROJECT OFFICER OF FREEWAY DMEC-YK-HDK-CS-WMA, JO
CONSTRUCTION OF C
SOLO-KERTOSONO 1

PRANOWO RASDOWIDODO
QUANTITY ENGINEER
COM
RAHMAT ROMADHONA
NIP. 198406282010121004
RAHMAT ROMADHONA
BACK UP QUANTITY
Package ofNIP.
Works
198406282010121004: Toll Road Development of Solo - Kertosono Project Phase I
Contractor : CRBC - WIKA - PP. JO
Pay No. Item : 10.05(1)
Description : Pretensioned Spun Concrete Pile, Furnished, D = 60cm
Unit : Linear Meter
Location :Kemaduh Bridge ( STA 170 + 707 )
Sketch

Configuration Pile (M) Each


Description TYPE
No.
BOTTOM MIDDLE BOTTOM MIDDLE
Date Time Nomor Delivery Order a b c d

9 13 April 2017 10:18 AM Tp.02.09/WB.M.02760/V/17 A2 8.00 8.00 3.00 6.00


12:21 PM Tp.02.09/WB.M.02761/V/17 A2 8.00 8.00 3.00 6.00
3:28 PM Tp.02.09/WB.M.02762/V/17 A2 8.00 8.00 3.00 6.00

10 14 April 2017 3:23 PM Tp.02.09/WB.M.02810/IV/17 A2 6.00 6.00 4.00 6.00

11 15 April 2017 9:34 AM Tp.02.09/WB.M.02763/V/17 A2 8.00 8.00 3.00 6.00


11:37 AM Tp.02.09/WB.M.02764/V/17 A2 8.00 8.00 3.00 6.00
2:44 PM Tp.02.09/WB.M.02765/V/17 A2 8.00 8.00 3.00 6.00

12 16 April 2017 11:23 AM Tp.02.09/WB.M.02766/V/17 A2 8.00 8.00 3.00 6.00


1:51 PM Tp.02.09/WB.M.02811/IV/17 A2 6.00 6.00 4.00 6.00
3:33 PM Tp.02.09/WB.M.02812/IV/17 A2 6.00 6.00 3.00 7.00
3:53 PM Tp.02.09/WB.M.02767/V/17 A2 8.00 8.00 3.00 6.00
Total Previous page
Total this page
Total Up To this page

SEEN BY, APPROVE BY,


PROJECT OFFICER OF FREEWAY DMEC-YK-HDK-CS-WMA, JO
CONSTRUCTION OF C
SOLO-KERTOSONO 1

PRANOWO RASDOWIDODO
QUANTITY ENGINEER
COM
RAHMAT ROMADHONA
NIP. 198406282010121004
RAHMAT ROMADHONA
BACK UP QUANTITY
Package ofNIP.
Works
198406282010121004: Toll Road Development of Solo - Kertosono Project Phase I
Contractor : CRBC - WIKA - PP. JO
Pay No. Item : 10.05(1)
Description : Pretensioned Spun Concrete Pile, Furnished, D = 60cm
Unit : Linear Meter
Location :Kemaduh Bridge ( STA 170 + 707 )
Sketch

Configuration Pile (M) Each


Description TYPE
No.
BOTTOM MIDDLE BOTTOM MIDDLE
Date Time Nomor Delivery Order a b c d

13 17 April 2017 11:19 AM Tp.02.09/WB.M.02768/V/17 A2 8.00 8.00 3.00 6.00


1:22 PM Tp.02.09/WB.M.02769/V/17 A2 8.00 8.00 3.00 6.00
4:29 PM Tp.02.09/WB.M.02770/V/17 A2 8.00 8.00 3.00 6.00

14 18 April 2017 10:54 AM Tp.02.09/WB.M.02771/V/17 A2 8.00 8.00 3.00 6.00


1:59 PM Tp.02.09/WB.M.02772/V/17 A2 8.00 8.00 3.00 6.00

15 19 April 2017 10:45 AM Tp.02.09/WB.M.02773/V/17 A2 - 8.00 - 9.00


12:48 PM Tp.02.09/WB.M.02773/V/17 A2 - 8.00 - 9.00

16 20 April 2017 10:54 AM Tp.02.09/WB.M.02775/V/17 A2 - 8.00 - 9.00


1:59 PM Tp.02.09/WB.M.02776/V/17 A2 - 8.00 - 4.00

17 24 April 2017 3:33 PM Tp.02.09/WB.M.03326/IV/17 A2 - 6.00 - 11.00


Total Previous page
Total this page
Total Up To this page

SEEN BY, APPROVE BY,


PROJECT OFFICER OF FREEWAY DMEC-YK-HDK-CS-WMA, JO
CONSTRUCTION OF C
SOLO-KERTOSONO 1

PRANOWO RASDOWIDODO
QUANTITY ENGINEER
COM
RAHMAT ROMADHONA
NIP. 198406282010121004
UP QUANTITY

Sketch

Total Length
Remarks
Linear Meter
e=(a*c)+(b*d) Nopol

60.00 KT 8012 LI

72.00 E 9924 C
72.00 B 9830 TYW
60.00 B 8976 PE

72.00 Z 9889 KT
72.00 Z 9346 KS
60.00 Z 9346 KS
72.00 B 9140 GZM
60.00 S 4172 UO

72.00 B 9830 TYW


60.00 B 8976 PE
-
732.00
732.00

SUBMITTED BY,
CONTRACTOR
CRBC-WIKA-PP, JO

ZHANG LIANG
COMMERCIAL MANAGER
UP QUANTITY

Sketch

Total Length
Remarks
Linear Meter
e=(a*c)+(b*d) Nopol

72.00 Z 9889 KT
72.00 B 9140 GZM

72.00 Z 9889 KT
60.00 Z 9346 KS
72.00 B 9140 GZM

72.00 B 8976 PE
72.00 KT 8012 LI
72.00 S 4172 UO

60.00 KT 8012 LI
72.00 Z 9889 KT
72.00 B 9140 GZM
732.00
768.00
1,500.00

SUBMITTED BY,
CONTRACTOR
CRBC-WIKA-PP, JO

ZHANG LIANG
COMMERCIAL MANAGER
UP QUANTITY

Sketch

Total Length
Remarks
Linear Meter
e=(a*c)+(b*d) Nopol

72.00 B 8976 PE
72.00 KT 8012 LI
72.00 S 4172 UO

60.00 KT 8012 LI

72.00 B 8976 PE
72.00 KT 8012 LI
72.00 S 4172 UO

72.00 Z 9889 KT
60.00 KT 8012 LI
60.00 B 8976 PE
72.00 B 9140 GZM
1,500.00
756.00
2,256.00

SUBMITTED BY,
CONTRACTOR
CRBC-WIKA-PP, JO

ZHANG LIANG
COMMERCIAL MANAGER
UP QUANTITY

Sketch

Total Length
Remarks
Linear Meter
e=(a*c)+(b*d) Nopol

72.00 B 8976 PE
72.00 KT 8012 LI
72.00 S 4172 UO

72.00 Z 9889 KT
72.00 B 9140 GZM

72.00 B 8976 PE
72.00 KT 8012 LI

72.00 Z 9889 KT
32.00 B 9140 GZM

66.00 B 8976 PE
2,256.00
674.00
2,930.00

SUBMITTED BY,
CONTRACTOR
CRBC-WIKA-PP, JO

ZHANG LIANG
COMMERCIAL MANAGER