MOP Rehoming V1
MOP Rehoming V1
Check for the mandatory fields in Standard CR Template for if any of the mandatory fields is not
duly filled, CR should not be taken for execution
Check the data received from authorized RF engineer for correctness & all essential data.
It is recommended that the old and the new RNC are of the same version and release
If they are of different versions and releases, it may be that there are differences in
parameters and/or object classes between the two RNC versions.
Check for all required licenses for Re-hosting site is available and installed.
Note that if there are additional object classes in the new RNC, those can only be planned
with CM Editor or by importing a plan file.
Validate the CR input
Check the existence and usage of given IPNB in the RNC, either by exporting the dump or by
MML Command
IPNB id given in the CR for WBTS should not be used for any other purpose such as IuPS, IuCS
and IuR in the RNC.
Check whether the VLAN is created in the RNC for Iub
Procedure
WBTS Loading: -
Post-Test Plan
Verify the working status of all WBTS,WCEL and IPNB in new RNC
Ensure that WBTS in locked in OLD RNC
Verify the IPNB creation parameters as per the CR in RNC
Verify the prefix of the WBTS in both OLD (ZZ prefix)and NEW RNC(no prefix)
Verify all the IPs as per the CR input such as RNC IP address, NTP server IP, Far end SCTP IP,
TWAMP etc.,
Verify the neighbor definition of all WBTS
Perform DT for all the WBTS
Check active alarms on all WBTS
Verify LAC,CI and RAC as per the CR input