Technical Audit Report
Technical Audit Report
LAHORE
Maximum Load along with date Minimum Load along with date and
Auto Transformers
and time time
Oil level vs Temperature graph for oil level of Mentioned graph should be
9. 9.
conservator was not available on transformers T1 & T2. provided on the transformers.
There has been seepage of oil from oil pots of OLTC and Oil seepage should be
10. 10.
Main Conservator breathers. addressed.
Approach ladder / stand have not been provided for the Approach ladder / stand
11. 11. main cubical cabinet and motor drive unit cubical of the should be provided for
transformers. mentioned boxes.
Cable sheath of control cables of Motor Drive Unit Cable sheath should be
12. 12.
cubical are not grounded properly. grounded.
Some of the ground connecting loops of auto
Missing loops should be
13. 13. transformers found missing (e.g. Coupling pipe for
provided.
radiators).
Duct covers of cable ducts are missing in the Duct covers should be placed
14. 14. transformer cubical cabinet and some cable ducts are properly and broken cable
broken. ducts should be replaced.
Cable dressing in the transformer cubical cabinet and
Cable dressing should be done
15. 15. Motor drive unit cubical has not been done properly.
properly.
Also spare cores are lying open in cubical cabinet.
Vermin proofing is required in the main cubical cabinet
Vermin proofing should be up
16. 16. of the transformer, motor drive unit cubical and
to the mark.
Nitrogen cylinder cabinet.
Actuator wiring has been removed from the nitrogen
17. 17.
cylinder box.
Mentioned issues should be
No cable glands have been used in Nitrogen Cylinder resolved.
18. 18. box. Inappropriate cable glands have been used in the
transformer cubical cabinet.
The transformer neutral is grounded with 02 points but
It should be mentioned
19. 19. the points have not been differentiated that which
properly.
point is of earth electrode and which is of earth mesh.
The OGST (Oil Gas Separator Tank) have not been It should be bolted properly
20. 20.
bolted with foundation. with foundation.
Missing cable tags should be
Some of the cable tags in Transformer cubical cabinet
provided and cable tags
and motor drive unit cubical are missing. Cable tags
should be used inside the
21. 21. have been provided outside the transformer cubical
cubical cabinet of the
cabinet, due to this cable tags will become rusty and
transformer to avoid rust and
will deteriorate quickly.
deterioration.
Inappropriate cable ties have been used for binding
Appropriate cable ties should
22. 22. cable tags with control cables in transformer cubical
be used.
cabinet and motor drive unit cubical.
1.1 Auto Transformer T-1 Make: CHINT, China (220/132kV, 250 MVA)
1 0.6366Ω 0.3437Ω
HV-N
14 (Red 0.5775Ω 0.3111Ω
Phase)
27 0.6393Ω 0.3436Ω
SAT
1 0.6361Ω 0.3436Ω
HV-N results
are 2 The issue should be taken up
14 (Yellow 0.5771Ω 0.3113Ω with the manufacturer as the
times the
Phase) transformer is within
1. 27 0.6378Ω 0.3437Ω FAT
23. warranty and corrective
results
measures should be taken on
1 0.6364Ω 0.3439Ω
HV-N emergent basis.
14 (Blue 0.5774Ω 0.3118Ω
Phase)
27 0.6386Ω 0.3442Ω
LV-N
N/A 0.0036Ω 0.1816Ω SAT
(Red)
results
LV-N
N/A 0.0036Ω 0.1818Ω are much
(Yellow)
lower
LV-N than FAT
N/A 0.0036Ω 0.1826Ω
(Blue)
Tertiary
N/A 3.6mΩ 3.7mΩ
(R-Y) But here
Tertiary SAT are
N/A 3.59mΩ 3.78mΩ
(B-Y) same as
Tertiary FAT.
N/A 3.61mΩ 3.78mΩ
(R-B)
28. 6. Silica gel of main conservator breather is deteriorated. Silica gel should be replaced.
The ampere meter for measuring the current of HV The meter problem should
30. 8.
Winding temperature gauge CT is not working properly. be addressed.
1.2 Auto Transformer T-2 Make: XD, China (220/132/11kV, 160 MVA)
It should be tightened
The earth mesh riser for grounding of core for the emergently and necessary
51. 6. power transformer is not grounded properly (i.e. lose tests should be performed to
connection). analyze the transformer
condition.
02 out of 03 fans were not working when switched Fans problem should be
52. 7.
ON manually. addressed.
Cable sheath of control cables in Motor Drive Unit Cable sheath should be
53. 8.
cubical are not grounded properly. grounded.
Duct covers of cable ducts are missing in the Duct covers should be placed
54. 9. transformer cubical cabinet and some cable ducts properly and broken cable
are broken. ducts should be replaced.
Motor drive unit cubical has been grounded through It should be grounded directly
57. 12.
body. from earth mesh.
Silica gel of the breather of main conservator is The silica gel should be
58. 13.
deteriorated. replaced.
Approach ladder / stand have not been provided for Approach ladder / stand
59. 14. the main cubical cabinet and motor drive unit cubical should be provided for
of the transformer. mentioned boxes.
Supporting structure for the 11kV cables have not It should be grounded
61. 16.
been grounded properly (i.e. grounding cable lose). properly.
3. 220kV SWITCHYARD
Some of the cable ducts have been broken (e.g. Broken cable ducts should be
67. 6.
especially in CVT and CT junction box). replaced.
Functional tests of SF-6 Gauge have not been Functional tests of SF-6 gauge
72. 1. performed for any circuit breaker. Alarm & lockout should be performed as per
verification has not been carried out. SOP.
R 11.02µΩ
Y D2Q3 9.33µΩ
B 10.12µΩ
Anti-Pumping feature & Pole discrepancy feature of The said tests should be
76. 5.
Circuit Breakers has not been tested. performed as per SOP.
Approach ladder / stand have not been provided for Approach ladder / stand
79. 8.
the main cubical box of all the circuit breakers. should be provided.
There is no gland used for the entrance of SF6 gauge There should be proper cable
81. 10. cable in the junction box / CB box of the circuit gland for this very sensitive
breaker. cable.
5. 220kV ISOLATORS
R 11.01µΩ 73µΩ
The contact resistance in SAT
Y D3Q22 11.01µΩ 71µΩ has been reduced to a
minimum of 7-8 times, which
B 10.67µΩ 72µΩ makes testing procedure /
84. 2.
testing set doubtful. The test
R 10.97µΩ 72µΩ should be performed again
with another test set to verify
Y D3Q10 71.61µΩ 71µΩ
the results.
B 12.81µΩ 73µΩ
R 12.45µΩ
Y D2Q10 11.67µΩ
B 12.11µΩ
Functional tests of 220kV isolators have not been Functional tests should be
86. 4.
performed. performed.
Interlocking of isolators with circuit breakers has not Interlocking should be verified
87. 5.
been checked / verified. with circuit breaker.
Mechanical interlocking has not been verified of all Mechanical interlocking should
88. 6.
isolators. be verified.
Earthing pads for isolators in switchyard have not These pads should be bolted
93. 11.
been bolted with foundation. properly.
Applied voltage has not been mentioned in the ratio Applied voltage should be
96. 2.
test of the Voltage transformers. mentioned.
In CT Junction box space heater has been provided Corrective measures should
102. 8. very close to control cables, which are also not be taken to address the
dressed properly (i.e. lying out of the cable duct). problem.
Door of D3CT2 Junction box door hinge is not Mentioned problem should be
104. 10.
working properly. addressed.
7. 132kV SWITCHYARD
Some of the cable ducts have been broken (e.g. Broken cable ducts should be
110. 6.
especially in CVT and CT junction box). replaced.
The door of some MKs in 132kV is not being properly The door problem should be
114. 10.
closed. set right.
Cable sheath of some cables in MK (E7Q1) have not Cable sheath should be
115. 11.
been grounder properly. grounded properly.
Functional tests of SF-6 Gauge have not been Functional tests of SF-6 gauge
116. 1. performed for any circuit breaker. Alarm & lockout should be performed as per
verification has not been carried out. SOP.
Dew point test has been performed but some circuit These values should have been
breakers having a value of temperature recorded as recorded with attention and
118. 3.
+51℃ rather than negative (e.g. E5Q1 and E8Q1 these values needs proper
having a value of +51℃). verification.
9. 132KV ISOLATORS
R 6.72µΩ 61µΩ
The contact resistance in SAT
Y E0Q11 9.82µΩ 66µΩ has been reduced to a
minimum of 7-8 times, which
B 6.73µΩ 62µΩ makes testing procedure /
124. 1.
testing set doubtful. The test
R 6.35µΩ 54µΩ should be performed again with
another test set to verify the
Y E4Q10 5.28µΩ 52µΩ
results.
B 8.9µΩ 60µΩ
R 6.35µΩ 39µΩ
B 7.47µΩ 42µΩ
Earthing pads for isolators in switchyard have not These pads should be bolted
133. 10.
been bolted with foundation. properly.
Applied voltage has not been mentioned in the ratio Applied voltage should be
137. 4.
test of the Voltage transformers. mentioned.
Vermin proofing in the CT secondary box have not Vermin proofing should be
138. 5.
been done properly. done.
Light and heater was not functional in the junction Light and heater should be
139. 6.
box of CT (E10Q1). functional.
Monthly statement record for different months regarding T/L Losses checked and found that
the losses of the 220kV transmission lines are within limits.
The scheme has been amended without proper The scheme along with
approval for Over fluxing protection relay due to components should be
141. 1.
which Auto transformer T-1 has been tripped 02 approved from Protection and
times on over fluxing relay. Control, NTDC.
220kV T/Line ISPR (MICOM P443) has been tested It should have been tested
147. 7.
with default settings but not actual settings. with actual settings.
220kV Busbar protection relay has not been tested It should be tested thoroughly
150. 10.
properly. Only pickup test has been performed. including busbar stability test.
No record has been found for testing of Event Event and fault recorders
153. 13.
recorders and fault recorders. should be tested.
Time synchronization has not been done for all Time synchronization should
155. 15.
relays. be done.
Timing test has not been performed for 11kV Circuit Timing test should be
157. 17.
breakers. performed as per SOP.
Indications (e.g. VT MCB trip, VT Failure, AC/DC Trip As there are no backup energy
etc.) regarding primary energy meters of auto meters, indications regarding
160. 20.
transformers have not been made available in primary meters should be
control room. wired up to the control panels.
Mentioned indications /
Following indications has been observed on 132kV problems of 132kV busbar
busbar protection (Common Unit i.e. MICOM P741) common unit should be
167. 27. “Fiber Comm Error”, Circuit Fault Alarm Zx”, “Circuit removed / addressed. And if
Fault Alarm Lock Zx”, “PU Error Alarm Zx”, “PU Error necessary the said relay should
Lock Zx”. be tested again as the relay is
not working properly.
Tap changer operations from control room (Local as Tap changer operations should
170. 30.
well as from AVR) are not configured properly. be configured properly.
Manual control verification of fan groups of the Control of fan groups should
171. 31. transformers (i.e. Local and Remote) has not been be verified from all available
performed. points.
Vermin proofing is required in most of the relay and Vermin proofing should be up
174. 34.
control panels. to the mark.
Spare cables / cores have not been dressed properly These spare cores should be
175. 35.
and these are lying open outside the cable ducts. dressed properly.
Some of the cable glands in the relay and control The issue of cable glands
176. 36.
panels are not of proper size. should be resolved.
No record has been found for the testing of 11kV 11kV protection relays should
183. 43.
protection relays. be tested as per SOP.
C&DF test has not been performed for all surge C&DF test should be
190. 2.
arresters. performed as per SOP.
Temperature correction has not been applied to the It should be applied for proper
196. 3.
specific gravity reading of the cells. analysis and comparison.
220V
1 236V 113V 122V There is DC Grounding present
Bank A
202. 5. in the 110V DC should be
220V
2 236V 112V 122V rectified as early as possible.
Bank B
110V
3 118V 2V 114V
Bank A
110V
4 118V 59V 58V
Bank B
Main MCB (FE-160) of DB-P2 (Ground Floor) operating The MCB should be replaced
208. 6. lever is broken / damaged. And supply is also not and supply should be made
available in the said panel. available in the panel.
The boundary wall of the grid station is damaged from The boundary wall should be
216. 7. many places and there are no security check posts repaired and check posts
constructed. should be constructed.
Sand buckets and sand drums are not available in the Sand buckets and sand drums
218. 9.
switchyard. should be arranged.
Spares and T&P have not been handed over to Grid Spares and T&P should be
221. 12.
station staff. handed over to grid staff.