0% found this document useful (0 votes)
52 views

Jadwal Peralatan: Pekerjaan: Lokasi: T. Anggaran

This document contains a schedule listing 22 pieces of construction equipment needed over a 6 month period for a construction project. It includes the type of equipment, quantity needed, and planned usage by month to complete the work within the estimated budget timeline.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
52 views

Jadwal Peralatan: Pekerjaan: Lokasi: T. Anggaran

This document contains a schedule listing 22 pieces of construction equipment needed over a 6 month period for a construction project. It includes the type of equipment, quantity needed, and planned usage by month to complete the work within the estimated budget timeline.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 2

JADWAL PERALA

Pekerjaan :
Lokasi :
T. Anggaran :

Bulan Ke-1 Bulan Ke-2


No. Jenis Peralatan Jumlah
M-1 M-2 M-3 M-4 M-5 M-6 M-7 M-8

1 Dump Truck 10 ton 6 Unit

2 Dump Truck 3,5 ton 4 Unit

3 Stone Cruser 30 Ton/ Jam 1 Unit

4 Aspal Mixing Plant (AMP) 1 Unit

5 Asphalt Finisher 8 Ton 1 Unit

6 Tandem Roller 8 Ton 1 Unit

7 Pneumatic Tyre Roller 8-10 Ton 1 Unit

8 Wheel Loader 1,5 M3 1 Unit

9 Motor Grader 100 HP 1 Unit

10 Excavator 0,9 M3 1 Unit

11 Vibrator Roller 5-9 Ton 1 Unit

12 Jack Hammer 1 Unit

13 Compresor 1 Unit

14 Water Tank Truck 1 Unit

15 Asphalt Distributor 1 Unit

16 Concrete Mixer 1 Unit


AL PERALATAN

Bulan Ke-3 Bulan Ke-4 Bulan Ke-5 Bulan Ke-6


Ket.
M-9 M-10 M-11 M-12 M-13 M-14 M-15 M-16 M-17 M-18 M-19 M-20 M-21 M-22