Design of Anchor Block 4 (As Per Penstock L Section Drawing No. Lodhama-II/Civil/GA/3/Rev-1)

This document provides design details for Anchor Block 4 of a penstock, including dimensions, forces, and calculations. Key details include: - The penstock diameter is 1.52m and design flow is 7.8 cumecs - Total horizontal and vertical forces on the anchor block were calculated as 2001.31kN, 0kN, and -551.54kN for normal conditions and 20% higher for seismic - Forces were also calculated for contracting conditions, giving total forces of 1367.23kN, 0kN, and -313.15kN for normal and higher for seismic

Uploaded by

Souvik Das
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
215 views

Design of Anchor Block 4 (As Per Penstock L Section Drawing No. Lodhama-II/Civil/GA/3/Rev-1)

This document provides design details for Anchor Block 4 of a penstock, including dimensions, forces, and calculations. Key details include: - The penstock diameter is 1.52m and design flow is 7.8 cumecs - Total horizontal and vertical forces on the anchor block were calculated as 2001.31kN, 0kN, and -551.54kN for normal conditions and 20% higher for seismic - Forces were also calculated for contracting conditions, giving total forces of 1367.23kN, 0kN, and -313.15kN for normal and higher for seismic

Uploaded by

Souvik Das
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 20

Design of Anchor Block 4

(As per Penstock L section drawing no. Lodhama-II/Civil/GA/3/Rev-1)

Diameter of Penstock, D = 1.52


F.S.L at Forebay = 411.30
Penstock C\L El. at Anchor Block = 357.33
Static Head at this point, h = 53.97
Cross - Sectional area of Penstock, A = 1.81
% increased in Water Hammer = 61.40

Maximum Head at this point including Water Hammer, H = 87.10


Designed flow through Penstock, q = 7.80
Nos of Penstock = 1.00
Flow in each Penstock, Q = 7.80
Unit Weight of Water, w = 10.00
Velocity through each Penstock, V = 4.299
Accelaration due to gravity, g = 9.81
Thickness of Penstock, t = 16.00
Length of the Penstock from Anchor Uphill to Expansion Joint, L1 = 2.00
Length of the Penstock from Anchor Downhill to Expansion Joint, L2 = 8.00
Length between anchor to adjacent uphill pier = 6.00
Length between anchor to adjacent downhill pier = 6.00
Angle of Penstock @ upstream of Anchor , au = 11.00
Angle of Penstock @ downstream of Anchor , ad = 27.00
Horizontal deflction = 0.00
Desnsity of Steel, d steel = 78.5
P = Deadweight of Penstock from anchor Uphill to expansion joint
= 3.14D x t x L1 x dsteel = 11.995

W = Weight of Water in Penstock P (Uphill)=Ax w x L1 = 36.292

P' = Deadweight of Penstock from anchor Downhill to expansion joint


= 3.14D x t x L1 x dsteel = 47.981

W' = Weight of Water in Penstock P' (Downhill)=Ax w x L2 = 145.167

p = Weight of Penstock & contained water from anchor to adjacent


= 144.861
uphill pier
p' = Weight of Penstock & contained water from anchor to adjacent
= 144.861
downhill pier
Coefficient of friction between penstock & pier, f = 0.600
Coefficient of friction between packing and Steel Liner, m = 0.260
Packing Length in m, e = 0.200
Fricion of Expansion joint per m of circumference, f' =1.5 mwHe, = 67.94
Inside diameter of the Penstock ,d = 1520.00
Unit Weight of Concrete, gc = 25.0
Allowable Bearing Pressure= = 250.0
(No soil testing report is available. Assumed 250 Kn/sq.m
m
m
m
m
m2

m
Cumecs
Nos
Cumecs
kN/m3
m/sec
m/sec2
mm (at this location)
m
m (From L section
m Drawing)

m
Degree
Degree
Degree
kN/m3

kN

kN

kN

kN

kN

kN

(IS5330, Pg-9)
(IS5330, Pg-9)
m (Assumed)
kN/m
mm
kN/m3
kN/m2
rt is available. Assumed 250 Kn/sq.m
Forces in the Anchor Block as per IS 5330 - 1984
Force Description Value
Hydrostatic force acting along axis of Penstock on each
1/1' side bend FS = wAH 1580.55

Dynamic force acting against outside of bend


2/2' 34.18
Fd = QwV/g

Force due to dead weight of pipe from anchor uphill to


3 expansion joint, tending to slide downhill over pier, Du = P sinau 2.29

Force due to dead weight of pipe from anchor downhill to


4 expansion joint, tending to slide downhill over pier, Dd = P' sinad 21.78

Sliding friction of Pipe on piers due to expansion or contraction uphill from


5 anchor Spu = fcosau(P+W-p/2) -14.22

Sliding friction of Pipe on piers due to expansion or contraction downhill


6 from anchor Spd = fcosad(P'+W'-p'/2) 64.54

7 Sliding friction of uphill expansion joint, Seu = f'p(d+2t)/1000 331.26

8 Sliding friction of downhill expansion joint, Sed = f'p(d+2t)/1000 331.26

Hydrostatic pressure on exposed end of penstock in uphill expansion joint


9 67.25
Fu = wHx3.14xtx(d+t)/106

Hydrostatic pressure on exposed end of penstock in downhill expansion


10 67.25
joint Fd = wHx3.14xtx(d+t)/106

Check for Expanding Condition


Z Y

U/S D/S U/S


11 X

27

Elevation Plan

1
2
(1+2+3+5+7+9)
3 2001.31

5
7 1'
9 2'
4
6

8 Original
10

2001.31

132.630885

2056.00

In X-Z Plane In X-Z Plane

0.00

In Y-Z Plane In Y-Z Plane


Normal condition
Total Horizontal Force in X Direction(Fx) = 132.63
Total Horizontal Force in Y Direction (FY) = 0.00
Total Vertical Force (Fz) = -551.54
Seismic condition
Total Horizontal Force in X Direction(Fx) = 159.16
Total Horizontal Force in Y Direction (FY) = 0.00 increased by 20% for seismic
Total Vertical Force (Fz) = -661.84
Check for Contracting Condition
Z
Y
U/S D/S
11 X U/S

27

Elevation

Plan

1
2

3 1+2+3-5-7+9
1367.23
5
7 1'
9 2'
4
6

8 Original
10

-313.14581
1+2+3-5-7+9
1367.23 215.52

4+6+8-1'-2'-10
1264.40

In X-Z Plane In X-Z Plane

0
0.00
0
In Y-Z Plane In Y-Z Plane

Normal condition
Total Horizontal Force in X Direction (Fx) = 215.52
Total Horizontal Force in Y Direction (Fy) = 0.00
Total Vertical Force (Fz) = -313.15
Seismic condition
Total Horizontal Force in X Direction (Fx) = 258.63
Total Horizontal Force in Y Direction (Fy) = 0.00 increased by 20% for seismic
Total Vertical Force (Fz) = -375.77
Value

kN

kN

kN

kN

kN

kN

kN

kN

kN

kN

D/S

0.00
X
(1'+2'+4'+6+8+10)
2056.00

Original

-551.5365169

In X-Z Plane

0
ncreased by 20% for seismic

D/S

0.00
X

4+6+8-1'-2'-10
1264.40
ncreased by 20% for seismic
5

2.5 2.5

0 a 11.00 o q
0.49
0 n 27 p 1.76
0.6 0.60
0.60
U/s 3 1.55 m
j 0.60
K 0.60
0.85

L 1.71

2 2.37 2.37
F

0 2.365611 2.85
2.5 5.16
c d z
4.1256108
0 0.00
0

e 0.00 f Z'

1.76
0
g h
t 0
s Elevation r i
2.50 b
Point of application of Load f
X' Point of application of Load f
Dia= 1.52
Width= 4
Angle U= 11
Angle D = 27 M 0
p 0.00 atbq
2.5 2.5 ano
onpq
N 4 nmp
U/S 4 ctsd
esrf/2
esrf/2
grih
C Y' Water JK
Water KL
d L x' Total=
Plan
Weight of AB with water= 2452.88 Kn

Total weight of AB with water = 2453 KN

Normal Condition

Check for overturning


Expanding condition Contracting condition
XZ Plane XZ Plane
Net V= 1901 Net V= 2140
Mo= 1793.394 Mo= 1456.501
Ms= 6306.78 Ms= 6306.78
Ms/Mo= 3.516673 >2.5 OK Ms/Mo= 4.3300901 >2.5 OK

Check for Bearing Pressure


Eexpanding Condition Contracting condition
XZ Plane XZ Plane
Xc=(Ms-Mo)/Net V= 2.37 Xc=(Ms-Mo)/Net V= 2.2667649891
e=(base/2-Xc)= 0.13 m <B/6= 0.83 OK e=(base/2-Xc)= 0.23 m <B/6= 0.83
Pressure Max=Net V*(1+6*e/B)/base area= 109.5 Kn/Sq.m Pressure Max=Net V*(1+6*e/B)/base area= 136.9305
< 250 OK <
Check for Sliding for resultant Horizontal force Check for Sliding for resultant Horizontal force
Expanding condition Contracting condition
Resultant Horizontal force = Sqrt( Fx^2+ Fy^2)= 132.63088 KN Resultant Horizontal force = Sqrt( Fx^2+ Fy^2)=
Net V= 1901 Net V= 2140
sliding factor = Resultant horizontal /Net V= 0.0698 Sliding factor = Resultant horizontal /Net V=
< 0.4 OK <
Seismic condition

Check for overturning


Expanding condition Contracting condition
XZ Plane XZ Plane
Net V= 1791 Net V= 2077
Mo= 2385.085 Mo= 1747.801
Ms= 5957.63 Ms= 6306.78
Ms/Mo= 2.4978693 >2.5 not OK Ms/Mo= 3.6084084 >2.5 OK

Check for Bearing Pressure


Eexpanding Condition Contracting condition
XZ Plane XZ Plane
Xc=(Ms-Mo)/Net V= 1.99 Xc=(Ms-Mo)/Net V= 2.1948695236
e=(base/2-Xc)= 0.51 m <B/6= 0.83 OK e=(base/2-Xc)= 0.31 m <B/6= 0.83
Pressure Max=Net V*(1+6*e/B)/base area= 143.9 Kn/Sq.m Pressure Max=Net V*(1+6*e/B)/base area= 141.8827
< 332.5 OK <
Check for Sliding Check for Sliding
Expanding condition Contracting condition
Resultant Horizontal force = Sqrt( Fx^2+ Fy^2)= 159.15706 KN Resultant Horizontal force = Sqrt( Fx^2+ Fy^2)=
Net V= 1791 Net V= 2077
sliding factor = Resultant horizontal /Net V= 0.0889 Sliding factor = Resultant horizontal /Net V=
< 0.4 OK <
Reinforcement

as per clause no. 34.5.2 of IS 456:2000 "The nominal reinforcement Designed by


for concrete sections of thickness greater than 1 m shall be 360 mmz
per metre length in each direction on each face." Checked by

area of 12 dia bar= 113.076 sq.mm


Reviewed by
Spacing Req= 314.1 mm
Provide 12dia bar 150mm c/c bothway
Approved By
X' calculation from b
Des. Area Width Vol U.weight Wt Lever arm Kn-m
atbq 33.8 4 135.2 25 3380 2.5 8450
less ano -0.61 4 -2 25 -61 3.333333 -202.479
less onpq -1.21488 4 -5 25 -121 1.25 -151.86
less nmp -1.59227 4 -6 25 -159 0.833333 -132.689
less ctsd -4.4 4 -18 25 -440 3.750 -1650
less esrf 0.00 4 0 25 0 2.50 0
grih 0.00 4 0.00 25 0.00 2.50 0
Less Water JK -4.62 15.00 -69.31 3.75 -259.901
Less Water KL -5.09 15.00 -76.35 1.25 -95.4412
less corner 0 25 0 2.5 0

Total= 94.23 2452.88 5957.63


X'b= 2.43
X'c= 2.57
Z' calculation from b
Des. Weight LA Kn-M
atbq 3380 3.38 11424.4
ano -61 6.60 -400.789
onpq -121 6.52 -791.738
nmp -159 5.849 -931.388
ctsd -440 0.88 -387.2
esrf 0 0.88 0
grih 0 0 0
Water JK -69 5.14 -356.43
Water KL -76 4.34 -331.50
corner 0 6.27 0
Total= 2453 8225.356
Z'b= 3.353
Point of application of Load from penstock from b zb= 4.885611
Point of application of Load from penstock from c zc= 3.125611

Y' calculation from point D


Area Width Vol U. wt Weight LA Kn-M
33.8 4 135.2 25 3380 2 6760
-1 4 -2 25 -60.7438 2 -121
-1 4 -5 25 -121.488 2 -243
-2 4 -6 25 -159.227 2 -318
-4 4 -18 25 -440 2 -880
0 4 0 25 0 2 0
0.0 4 0 25 0 2.00 0
0.00 4 0 25 0 2.00 0
-4.62 15.00 -69.31 2 -138.614
-5.0902 15.00 -76.353 2.0 -152.706
94.23101 2452.882 4906
Y'd= 2.000
OK
Kn/Sq.m
250 OK

215.52148 KN

0.1007234
0.4 OK
OK
Kn/Sq.m
332.5 OK

258.62578 KN

0.1245125
0.4 OK