Sequence of Operation
Sequence of Operation
FAN SECTION
0 CFM
2703 CFM
0 CFM
CLOSED
M
M17
2703 CFM
393 CFM
OPEN
M18
M
2477 CFM 226 CFM
2640 CFM 393 CFM 63 CFM
0 CFM
393 CFM
556 CFM
HALLWAY
SEQUENCE OF OPERATION
WHEN DUST COLLECTOR DC-4 IS OFF, MAHU-4 IS ALSO OFF,
MOTORIZED DAMPER M14 AND M16 ARE CLOSED, MOTORIZED
DAMPER M ADD, M15 ARE OPEN
WHEN DUST COLLECTOR DC-4 IS ON, MAHU-4 ALSO ON,
MOTORIZED DAMPER M14 &M16 ARE OPEN,
MOTORIZED DAMPER MADD & M15 WERE OPEN
DEDICATED AIR HANDLING UNIT AHU-4 IS CONTINUOUS RUNNING
AHU 4 - 6.5 TONS
MERV 14 FILTER ACCESS DOOR SECTION
FAN SECTION
0 CFM
2833 CFM
425 CFM
2408 CFM
M
OPEN 425 CFM
M
M16
M
ADDITIONAL M15 CLOSED
OPEN
CLOSED
M
M14
MAHU 4 - 7.5 TONS
895 CFM 1177 CFM 761 CFM
0 CFM 1430 CFM 0 CFM 978 CFM
0 CFM
556 CFM
339 CFM 339 CFM
556 CFM 425 CFM
SEQUENCE OF OPERATION
WHEN DUST COLLECTOR DC-3 IS OFF, MAHU-3 IS ALSO OFF, EXHAUST
FAN EF-3A & 3B IS ON, MOTORIZED DAMPER M9 IS CLOSED, MOTORIZED
DAMPER M10, M11, M12 AND M13 WERE OPEN
WHEN DUST COLLECTOR DC-3 IS ON, MAHU-3 ALSO ON,
EXHAUST FAN EF-3A & 3B OFF MOTORIZED DAMPER M9 IS OPEN,
AHU 3 - 7.5 TONS MOTORIZED DAMPER M10,M11,M12 & M13 WERE CLOSED
MERV 14 FILTER ACCESS DOOR SECTION
MERV 8 FILTER COOLING COIL SECTION DEDICATED AIR HANDLING UNIT AHU-3 IS CONTINUOUS RUNNING
FAN SECTION
0 CFM
CLOSED 3242 CFM
M M9
0 CFM
3242 CFM
681 CFM
M
M11
OPEN
MAHU 3 - 7.5 TONS
M
M12 M13
OPEN OPEN
0 CFM
HALLWAY HALLWAY
SEQUENCE OF OPERATION
WHEN DUST COLLECTOR DC-2 IS OFF, MAHU-2 IS ALSO OFF, EXHAUST
FAN EF-2A & 2B IS ON, MOTORIZED DAMPER M4 IS CLOSED, MOTORIZED
DAMPER M5, M6, M7 AND M8 WERE OPEN
WHEN DUST COLLECTOR DC-2 IS ON, MAHU-2 ALSO ON,
EXHAUST FAN EF-2A & 2B OFF MOTORIZED DAMPER M4 IS OPEN,
AHU 2 - 7.5 TONS
MOTORIZED DAMPER M5,M6,M7 & M8 WERE CLOSED
ACCESS DOOR SECTION
MERV 14 FILTER
DEDICATED AIR HANDLING UNIT AHU-2 IS CONTINUOUS RUNNING
MERV 8 FILTER COOLING COIL SECTION
FAN SECTION
0 CFM
CLOSED 3347 CFM
M4M
0 CFM
3347 CFM
681 CFM
M
M6 M7 M8
MAHU 2 - 7.5 TONS OPEN OPEN OPEN
0 CFM
HALLWAY HALLWAY
TO AHU-2
FAN SECTION
0 CFM
CLOSED 8567 CFM
0 CFM MM1 219 CFM
0 CFM
8567 CFM
681 CFM
M
M2
M
OPEN M3
OPEN
0 CFM
ANTE ROOM DIS ROOM RM MIXING ROOM 1 FILLING ROOM 1 LABELING ROOM 1
Area (sq. m.) 19.8 Area (sq. m.) 19.8 Area (sq. m.) 13.64/10.54 Area (sq. m.) 24.61 Area (sq. m.) 18.6/7.56
TO AHU-1
Height (m.) 3.0 Height (m.) 3.0 Height (m.) 3.5/8.5 Height (m.) 8.5 Height (m.) 8.5/3.5
MIN. ACH 20 MIN. ACH 20 MIN. ACH 20 MIN. ACH 20 MIN. ACH 20
Conditions (°C, % RH) NMT 24/NA Conditions (°C, % RH) NMT 24/NA Conditions (°C, % RH) NMT 24/NA Conditions (°C, % RH) Conditions (°C, % RH) NMT 24/NA
Cleanliness ISO 8 Cleanliness ISO 8 Cleanliness ISO 8 Cleanliness ISO 8 Cleanliness ISO 8
Diff. Pressure (Pa) NLT 5 Diff. Pressure (Pa) NLT 5 Diff. Pressure (Pa) NLT 5 Diff. Pressure (Pa) NLT 5 Diff. Pressure (Pa) NLT 5
HALLWAY HALLWAY
SECOND FLOOR
SEQUENCE OF OPERATION
WHEN DUST COLLECTOR DC-1 IS OFF, MAHU-1 IS ALSO OFF, EXHAUST
FAN EF-1 IS ON, MOTORIZED DAMPER M2 AND M3 ARE OPEN AND
MOTORIZED DAMPER M1 IS CLOSED
LINE 1
WHEN DUST COLLECTOR DC-1 IS ON, MAHU-1 ALSO ON,
EXHAUST FAN IS OFF MOTORIZED DAMPER M2 AND M3 ARE CLOSED
AND MOTORIZED DAMPER M1 IS OPEN
DEDICATED AIR HANDLING UNIT AHU-1 IS CONTINUOUS RUNNING