Bill of Quantity and Bill of Materials
Bill of Quantity and Bill of Materials
REINFORCE
MENT BARS
WASHED SAND ₱ 600.00 /m³ 12 mm ₱ 192.00 /pc
CRUSHED GRAVEL 1" ₱ 850.00 /m³ 16 mm ₱ 315.00 /pc
CONCRETE MIXTURE
Total Volume of Column Footing (m³) 5.4 REINFORCEMENT BARS FOR COLUMN FOOTING (F1)
16 mmØ x 6m REINFORCEMENT
DIMENSIONS
633.6
LENGTH 1.5 Footing (m)
HEIGHT/THICKNESS 0.2
LENGTH 3.3 NUMBER OF RSB
STEEL BAR
NUMBER OF CF 12
DIMENSIONS
CEMENT ALONG (B) 1.5 9
40 kg./bag Portland TOTAL COST ALONG (L) 1.5 7
48.6
Cement
MATERIAL COST LABOR COST
₱ 12825.54 NUMBER OF FOOTING (F1) 12
₱ 593.3886792 /m²
CONCRETE MIXTURE
WIDTH 0.25
DIMENSIONS
59.4
HEIGHT/THICKNESS 6.8 Footing (m)
NUMBER OF COLUMN 17
LENGTH 3.3 NUMBER OF RSB
STEEL BAR
CEMENT
DIMENSIONS
CONCRETE MIXTURE
Total Volume of Wall Footing (m³) 4.4925
₱ 47.68301887 /m²
CLASS A
WIDTH 0.5
DIMENSIONS
REINFORCEMENT STEEL
Total Length for of RSB for Column (m) 718.08
CEMENT
16 mmØ x 6m
40 kg./bag Portland TOTAL COST
DIMENSIONS
BAR
40.4325 LENGTH OF COLUMN
Cement 6.8
MATERIAL COST LABOR COST
₱ 10670.13675
NUMBER OF RSB/COLUMN 6
NUMBER OF COLUMN 16
₱ 8207.7975 ₱ 2462.33925 ₱ 2375.1 /m³
16 mmØ x 6m REINFORCEMENT STEEL BAR
THICKNESS 0.15
REINFORCEMENT BARS FOR COLUMN (C2)
LENGTH OF BEAMS 225.9
LENGTH OF FTB-1 34.95
REINFORCEMENT STEEL
CEMENT
DIMENSIONS
BAR
CONCRETE MIXTURE
Total Volume of Slab (m³) 14.3445
TOTAL COST
CLASS A
166.12 pcs
THICKNESS 0.15 ₱ 26994.22917
DIMENSIONS
₱ 13.31162 /m
CONCRETE MIXTURE
CLASS A
WIDTH 1.5
DIMENSIONS
DIMENSIONS
NUMBER OF STEPS 15 TOP BARS 3
CEMENT BOTTOM BARS 3
40 kg./bag Portland TOTAL COST TOTAL LENGTH OF FTB-1 34.95 m
8.1
Cement 12 mmØ x 6m REINFORCEMENT STEEL BAR
MATERIAL COST LABOR COST
₱ 2137.59
TOTAL COST
41.94 pcs
₱ 10468.224
₱ 1644.3 ₱ 493.29 ₱ 2375.1 /m³
MATERIAL COST ₱ 8052.48
SAND LABOR COST ₱ 2415.744
TOTAL COST COST ₱ 41.6 /m
0.45 m³ of Washed Sand
TOP BARS 3
BOTTOM BARS 3
TOTAL LENGTH OF RCB-1 190.95 m
16 mmØ x 6m REINFORCEMENT STEEL BAR
TOTAL COST
305.52 pcs
₱ 125110.44
MATERIAL COST ₱ 96238.8
LABOR COST ₱ 28871.64
COST ₱ 68.25 /m
pcs
43.956
TOTAL COST ₱ 601323.43 Lumber
MATERIAL COST LABOR COST TOTAL COST ₱ 5028.59
CHB 5" THK ₱ 18892.0125 ₱ 5667.60375 MATERIAL COST ₱ 3868.15
CEMENT ₱ 334947.237 ₱ 100484.1711 LABOR COST ₱ 1160.44
SAND ₱ 108717.23 ₱ 32615.17038 ₱ 29.000 /m²
CHB 5" THK ₱ 146.25 /m² SCAFFOLDING FOR COLUMNS
CEMENT ₱ 2592.94945 /m²
67.433
SAND 158.26 m³ Lumber
PLASTERING @ 8mm THK (CLASS B) TOTAL COST ₱ 11571.56
AREA OF WALLS (TWO SIDES) 300.01 m² MATERIAL COST ₱ 8901.20
CEMENT 28.80 bag LABOR COST ₱ 2670.36
SAND 2.40 m³ ₱ 66.733 /m²
TOTAL COST ₱ 529966.92 FORMS FOR BEAM
MATERIAL COST LABOR COST PERIMETER OF TWO SIDES FORM 0.95 m
CHB 5" THK ₱ 15000.5 ₱ 4500.15 TWO SIDE FORMS 0.25 m
CEMENT ₱ 296273.15 ₱ 88881.94513 BOTTOM FORM 0.35 m
SAND ₱ 96393.21 ₱ 28917.9639 LENGTH OF BEAM 225.9 m
CHB 5" THK ₱ 130 /m² TOTAL AREA 214.605 m²
CEMENT ₱ 2567.61505 /m²
1/2"x4'x8' Ordinary Plywood 22.003 pcs
SAND ₱ 835.38 /m²
TOTAL COST ₱ 9153.10
Total Length of RSB for Vertical Bars 405.1375 m
MATERIAL COST ₱ 7040.85
bd. Ft.
Form Lumber 2" x 3" x 12' Coco 68.942
TOTAL COST Lumber
67.52291667 pcs.
₱ 16853.72 TOTAL COST ₱ 11830.38
MATERIAL COST LABOR COST MATERIAL COST ₱ 9100.29
₱ 12964.4 ₱ 3889.32 LABOR COST ₱ 2730.09
COST ₱ 156.3860072 /m ₱ 55.126 /m²
SCAFFOLDING FOR COLUMNS
Total Length of RSB for Horizontal Bars 53.885 m
pcs
88.478
TOTAL COST Lumber
8.98 pcs
₱ 1459.385417 TOTAL COST ₱ 10121.83
MATERIAL COST ₱ 1122.604167 MATERIAL COST ₱ 7786.02
LABOR COST ₱ 336.78125 LABOR COST ₱ 2335.81
COST ₱ 27.08333333 /m ₱ 47.165 /m²
Form Lumber 2" x 3" x 12' Coco
bd. Ft.
112.950
Lumber
TOTAL COST ₱ 19382.22
MATERIAL COST ₱ 14909.40
LABOR COST ₱ 4472.82
₱ 90.316 /m²