0% found this document useful (0 votes)
157 views8 pages

Bill of Quantity and Bill of Materials

The document provides pricing details for materials and labor for a proposed two-storey residential building with a roof deck, including: 1) Concrete and rebar works for column footings and columns, with material and labor costs listed for concrete mixture, rebar, sand and gravel. 2) Reinforcement details and material costs for #16 GI wire for column footing intersections. 3) Summary of material and labor costs for concreting and reinforcement of column footings and columns.

Uploaded by

reynold
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
157 views8 pages

Bill of Quantity and Bill of Materials

The document provides pricing details for materials and labor for a proposed two-storey residential building with a roof deck, including: 1) Concrete and rebar works for column footings and columns, with material and labor costs listed for concrete mixture, rebar, sand and gravel. 2) Reinforcement details and material costs for #16 GI wire for column footing intersections. 3) Summary of material and labor costs for concreting and reinforcement of column footings and columns.

Uploaded by

reynold
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 8

Proposed Two-Storey Residential Building with Roofdeck

I. Concreting Works II. Rebar Works


PRICE LIST PRICE LIST
MATERIAL PRICE MATERIAL PRICE
LAFARGE REPUBLIC PORTLAND PLUS 40KG ₱ 203.00 /bag 10 mm ₱ 125.00 /pc

REINFORCE
MENT BARS
WASHED SAND ₱ 600.00 /m³ 12 mm ₱ 192.00 /pc
CRUSHED GRAVEL 1" ₱ 850.00 /m³ 16 mm ₱ 315.00 /pc

Concreting of Column Footing #16 G.I. WIRE ₱ 180.00 /kg

CONCRETE MIXTURE
Total Volume of Column Footing (m³) 5.4 REINFORCEMENT BARS FOR COLUMN FOOTING (F1)

WIDTH 1.5 CLASS A Total Length for of RSB for Column

16 mmØ x 6m REINFORCEMENT
DIMENSIONS

633.6
LENGTH 1.5 Footing (m)
HEIGHT/THICKNESS 0.2
LENGTH 3.3 NUMBER OF RSB

STEEL BAR
NUMBER OF CF 12

DIMENSIONS
CEMENT ALONG (B) 1.5 9
40 kg./bag Portland TOTAL COST ALONG (L) 1.5 7
48.6
Cement
MATERIAL COST LABOR COST
₱ 12825.54 NUMBER OF FOOTING (F1) 12

16 mmØ x 6m REINFORCEMENT STEEL BAR


₱ 9865.8 ₱ 2959.74 ₱ 2375.1 /m³
TOTAL COST
105.6 pcs
SAND ₱ 43243.2
TOTAL COST MATERIAL COST ₱ 33264
2.7 m³ of Washed Sand
LABOR COST ₱ 9979.2
MATERIAL COST LABOR COST
₱ 2106
COST 19219.2 /m

#16 G.I. WIRE
₱ 1620 ₱ 486 ₱ 390 /m³
NUMBER OF INTERSECTIONS 63
GRAVEL NUMBER OF FOOTING 16
m³ of Crushed Gravel TOTAL COST LENGTH OF TIE WIRE 0.3 m
5.4
1"
MATERIAL COST LABOR COST
₱ 5967 302.4 meters 5.71 kg.

MATERIAL COST ₱ 1027.018868


₱ 4590 ₱ 1377 ₱ 1105 /m³
LABOR COST 308.1056604

Concreting of Column TOTAL COST ₱ 1335.124528

₱ 593.3886792 /m²
CONCRETE MIXTURE

Total Volume of Column (m³) 11.56


REINFORCEMENT BARS FOR COLUMN FOOTING (F2)
CLASS A

WIDTH 0.25
DIMENSIONS

LENGTH 0.4 Total Length for of RSB for Column


16 mmØ x 6m REINFORCEMENT

59.4
HEIGHT/THICKNESS 6.8 Footing (m)
NUMBER OF COLUMN 17
LENGTH 3.3 NUMBER OF RSB
STEEL BAR

CEMENT
DIMENSIONS

40 kg./bag Portland TOTAL COST ALONG (B) 1.5 9


104.04
Cement ALONG (L) 1.5 9
MATERIAL COST LABOR COST
₱ 27456.156
NUMBER OF FOOTING (F1) 1
₱ 21120.12 ₱ 6336.036 ₱ 2375.1 /m³
16 mmØ x 6m REINFORCEMENT STEEL BAR
SAND TOTAL COST
9.9 pcs
TOTAL COST ₱ 4054.05
5.78 m³ of Washed Sand
MATERIAL COST ₱ 3118.5
MATERIAL COST LABOR COST
₱ 4508.4
LABOR COST ₱ 935.55
COST ₱ 68.25 /m
₱ 3468 ₱ 1040.4 ₱ 390 /m³
#16 G.I. WIRE
GRAVEL NUMBER OF INTERSECTIONS 81
m³ of Crushed Gravel TOTAL COST NUMBER OF FOOTING 1
11.56
1" LENGTH OF TIE WIRE 0.3 m
MATERIAL COST LABOR COST
₱ 12773.8
24.3 meters 0.46 kg.
₱ 9826 ₱ 2947.8 ₱ 1105 /m³
MATERIAL COST 82.52830189

Concreting of Wall Footing LABOR COST ₱ 24.75849057

TOTAL COST ₱ 107.2867925

CONCRETE MIXTURE
Total Volume of Wall Footing (m³) 4.4925
₱ 47.68301887 /m²

CLASS A
WIDTH 0.5
DIMENSIONS

REINFORCEMENT BARS FOR COLUMN (C1)


THICKNESS 0.15
LENGTH OF WF1 59.9

REINFORCEMENT STEEL
Total Length for of RSB for Column (m) 718.08
CEMENT

16 mmØ x 6m
40 kg./bag Portland TOTAL COST

DIMENSIONS

BAR
40.4325 LENGTH OF COLUMN
Cement 6.8
MATERIAL COST LABOR COST
₱ 10670.13675
NUMBER OF RSB/COLUMN 6
NUMBER OF COLUMN 16
₱ 8207.7975 ₱ 2462.33925 ₱ 2375.1 /m³
16 mmØ x 6m REINFORCEMENT STEEL BAR

SAND 119.68 pcs TOTAL COST


TOTAL COST ₱ 49008.96
2.24625 m³ of Washed Sand
MATERIAL COST ₱ 37699.2
MATERIAL COST LABOR COST
₱ 1752.075
LABOR COST ₱ 11309.76
COST ₱ 68.25 /m
₱ 1347.75 ₱ 404.325 ₱ 390 /m³
#16 G.I. WIRE
GRAVEL NUMBER OF LATERAL TIES 41
m³ of Crushed Gravel TOTAL COST NUMBER OF RSB 6
4.4925
1" NUMBER OF COLUMN 16
MATERIAL COST LABOR COST
₱ 4964.2125
0.3
LENGTH OF TIE WIRE /m

₱ 3818.625 ₱ 1145.5875 ₱ 1105 /m³ 1180.8 meters 22.28 kg.

Concreting of Beam MATERIAL COST ₱ 4010.264151


LABOR COST ₱ 1203.079245
Total Volume of Beam (m³) 16.9425
CONCRETE MIXTURE

TOTAL COST ₱ 5213.343396


WIDTH 0.5 ₱ 766.6681465 /m
CLASS A
DIMENSIONS

THICKNESS 0.15
REINFORCEMENT BARS FOR COLUMN (C2)
LENGTH OF BEAMS 225.9
LENGTH OF FTB-1 34.95
REINFORCEMENT STEEL

Total Length for of RSB for Column (m) 59.84


LENGTH OF RCB-1 190.95
16 mmØ x 6m

CEMENT
DIMENSIONS

BAR

LENGTH OF COLUMN 6.8


40 kg./bag Portland TOTAL COST
152.4825
Cement NUMBER OF RSB/COLUMN 8
MATERIAL COST LABOR COST
₱ 40240.13175
NUMBER OF COLUMN 1
16 mmØ x 6m REINFORCEMENT STEEL BAR
₱ 30953.9475 ₱ 9286.18425 ₱ 80480.2635 /m³
TOTAL COST
9.97 pcs
SAND ₱ 4084.08
TOTAL COST MATERIAL COST ₱ 3141.6
8.47125 m³ of Washed Sand
LABOR COST ₱ 942.48
MATERIAL COST LABOR COST
₱ 6607.575
COST 68.25 /m

LENGTH OF COLUMN LATERAL TIES
₱ 5082.75 ₱ 1524.825 ₱ 13215.15 /m³ 996.71
(m)
GRAVEL PERIMETER OF COLUMN 1.3 m
m³ of Crushed Gravel TOTAL COST NUMBER OF COLUMN 17
16.9425
1" NUMBER OF LATERAL TIES 40.5
MATERIAL COST LABOR COST
₱ 18721.4625
NUMBER 11 TOTAL NUMBER OF LATERAL
TIES
SPACING 0.1 TIES
₱ 14401.125 ₱ 4320.3375 ₱ 37442.925 /m³
REMAINING LENGTH 5.7
41
Concreting of Slab (GF) SPACING 0.2
10 mmØ x 6m REINFORCEMENT STEEL BAR

CONCRETE MIXTURE
Total Volume of Slab (m³) 14.3445
TOTAL COST

CLASS A
166.12 pcs
THICKNESS 0.15 ₱ 26994.22917
DIMENSIONS

MATERIAL COST ₱ 20764.79167


TOTAL AREA 95.63
LABOR COST ₱ 6229.4375
CEMENT COST ₱ 27.08333333 /m
40 kg./bag Portland TOTAL COST #16 G.I. WIRE
86.067
Cement NUMBER OF LATERAL TIES 41
MATERIAL COST LABOR COST
₱ 22713.0813
NUMBER OF RSB 8
NUMBER OF COLUMN 1
₱ 17471.601 ₱ 5241.4803 ₱ 1583.4 /m³
0.3
LENGTH OF TIE WIRE /m
SAND
98.4 meters 1.86 kg.
TOTAL COST
7.17225 m³ of Washed Sand
MATERIAL COST ₱ 334.1886792
MATERIAL COST LABOR COST
₱ 5594.355
LABOR COST 100.2566038

TOTAL COST ₱ 434.445283
₱ 4303.35 ₱ 1291.005 ₱ 390 /m³
63.88901221 /m

GRAVEL
REINFORCEMENT BARS FOR WALL FOOTING
m³ of Crushed Gravel TOTAL COST
14.3445
1"
₱ 15850.6725 Total Length of RSB for Wall Footing (m) 197.67

REINFORCEMENT STEEL BARS


MATERIAL COST LABOR COST

12 mmØ and 10 mmØ


NUMBER OF RSB 3
₱ 12192.825 ₱ 3657.8475 ₱ 1105 /m³
LENGTH OF WALL FOOTING 59.9
DIMENSIONS

Concreting of Slab (2F and RD)


Total Length of Hoop Bars (m) 110.92
MIXTURE CLASS A

Total Volume of Slab (m³) 35.23545


SPACING OF HOOP BARS 0.3
CONCRETE

THICKNESS 0.15 WIDTH OF HOOP BARS 0.5


DIMENSIONS

12 mmØ x 6m REINFORCEMENT STEEL BAR


TOTAL AREA 234.903
TOTAL COST
32.95 pcs
CEMENT ₱ 8223.072
40 kg./bag Portland TOTAL COST MATERIAL COST ₱ 6325.44
317.11905
Cement LABOR COST ₱ 1897.632
MATERIAL COST LABOR COST
₱ 83687.7173
COST 41.6 /m

10 mmØ x 6m REINFORCEMENT STEEL BAR
₱ 64375.16715 ₱ 19312.5501 ₱ 2375.1 /m³
TOTAL COST
18.49 pcs
SAND ₱ 3003.993056
TOTAL COST MATERIAL COST ₱ 2310.763889
17.617725 m³ of Washed Sand
LABOR COST ₱ 693.2291667
MATERIAL COST LABOR COST
₱ 13741.8255
COST 27.08333333 /m

#16 G.I. WIRE
₱ 10570.635 ₱ 3171.1905 ₱ 390 /m³
NUMBER OF HOOP BARS 200.67
GRAVEL NUMBER OF RSB 3
m³ of Crushed Gravel TOTAL COST LENGTH OF TIE WIRE 0.3 m
35.23545
1"
MATERIAL COST LABOR COST
₱ 38935.17225 180.6 meters 3.41 kg.

MATERIAL COST ₱ 613.3584906


₱ 29950.1325 ₱ 8985.03975 ₱ 1105 /m³
LABOR COST 184.0075472

Concreting of Stairs TOTAL COST ₱ 797.3660377

₱ 13.31162 /m
CONCRETE MIXTURE

Total Volume of Column (m³) 0.9


REINFORCEMENT BARS FOR CONCRETE BEAM (FTB-1)
CLASS A
CONCRETE MIXTURE
REINFORCEMENT BARS FOR CONCRETE BEAM (FTB-1)

CLASS A
WIDTH 1.5
DIMENSIONS

LENGTH 0.2 Total Length of RSB for FTB-1 251.64 m


HEIGHT/THICKNESS 0.2 NUMBER OF RSB 6

DIMENSIONS
NUMBER OF STEPS 15 TOP BARS 3
CEMENT BOTTOM BARS 3
40 kg./bag Portland TOTAL COST TOTAL LENGTH OF FTB-1 34.95 m
8.1
Cement 12 mmØ x 6m REINFORCEMENT STEEL BAR
MATERIAL COST LABOR COST
₱ 2137.59
TOTAL COST
41.94 pcs
₱ 10468.224
₱ 1644.3 ₱ 493.29 ₱ 2375.1 /m³
MATERIAL COST ₱ 8052.48
SAND LABOR COST ₱ 2415.744
TOTAL COST COST ₱ 41.6 /m
0.45 m³ of Washed Sand

MATERIAL COST LABOR COST


₱ 351 Total Length of Stirrups for FTB-1 366.975

PERIMETER OF FTB-1 1.2 m


₱ 270 ₱ 81 ₱ 390 /m³
10 mmØ x 6m REINFORCEMENT STEEL BAR
GRAVEL TOTAL COST
61.16 pcs
m³ of Crushed Gravel TOTAL COST ₱ 9938.90625
0.9
1" MATERIAL COST ₱ 7645.3125
MATERIAL COST LABOR COST
₱ 994.5
LABOR COST ₱ 2293.59375
COST ₱ 284.375 /m
₱ 765 ₱ 229.5 ₱ 1105 /m³
#16 G.I. WIRE
NUMBER OF STIRRUPS 305.8125
NUMBER OF RSB 6
LENGTH OF TIE WIRE 0.3

550.4625 meters 10.39 kg.

MATERIAL COST ₱ 1869.495283


LABOR COST ₱ 560.8485849
TOTAL COST ₱ 2430.343868
₱ 810.1146226 /m

REINFORCEMENT BARS FOR CONCRETE BEAM (RCB-1)

Total Length of RSB for RCB-1 1833.12 m


WEB BARS 2
DIMENSIONS

TOP BARS 3
BOTTOM BARS 3
TOTAL LENGTH OF RCB-1 190.95 m
16 mmØ x 6m REINFORCEMENT STEEL BAR
TOTAL COST
305.52 pcs
₱ 125110.44
MATERIAL COST ₱ 96238.8
LABOR COST ₱ 28871.64
COST ₱ 68.25 /m

Total Length of Stirrups for RCB-1 2005.0

PERIMETER OF RCB-1 1.2 m


10 mmØ x 6m REINFORCEMENT STEEL BAR
TOTAL COST
334.16 pcs
₱ 54301.40625
MATERIAL COST ₱ 41770.3125
LABOR COST ₱ 12531.09375
COST ₱ 284.375 /m
#16 G.I. WIRE
NUMBER OF STIRRUPS 1670.8125
NUMBER OF RSB 8
LENGTH OF TIE WIRE 0.3

4009.95 meters 75.66 kg.

MATERIAL COST ₱ 13618.69811


LABOR COST ₱ 4085.609434
TOTAL COST ₱ 17704.30755
₱ 92.71698113 /m

REINFORCEMENT FOR GROUND FLOOR SLAB

Total Length of RSB for GF Slab 1547.46

A 7.05 m SPACING ALONG A 48


B 13.5 m 0.15 m ALONG B 91
LENGTH OF RSB 1289.55 m
ALONG A 648 m
ALONG B 641.55 m
12 mmØ x 6m REINFORCEMENT STEEL BAR
TOTAL COST
257.91 pcs
₱ 64374.336
MATERIAL COST ₱ 49518.72
LABOR COST ₱ 14855.616
COST ₱ 14.73771429 /m
#16 G.I. WIRE
NUMBER OR INTERSECTIONS 4368
LENGTH OF TIE WIRE 0.3 m

1310.4 meters 24.72 kg.

MATERIAL COST ₱ 4450.415094


LABOR COST ₱ 1335.124528
TOTAL COST ₱ 5785.539623
₱ 1.324528302 /m

REINFORCEMENT FOR 2F AND RD SLAB

Total Length of 12mmØ RSB 868.45

NUMBER OF STEEL BARS 3.221 m


AREA 269.62 m²
12 mmØ x 6m REINFORCEMENT STEEL BAR
TOTAL COST
144.74 pcs
₱ 36127.35443
MATERIAL COST ₱ 27790.27264
LABOR COST ₱ 8337.081792
COST ₱ 133.9936 /m

Total Length of 10mmØ RSB 868.45

NUMBER OF STEEL BARS 3.221 m


AREA 269.62 m²
10 mmØ x 6m REINFORCEMENT STEEL BAR
TOTAL COST
144.74 pcs
₱ 23520.41304
MATERIAL COST ₱ 18092.62542
LABOR COST ₱ 5427.787625
COST ₱ 87.23541667 /m
#16 G.I. WIRE
NUMBER OR INTERSECTIONS 269.62
LENGTH OF TIE WIRE 0.3 m
80.886 meters 1.53 kg.

MATERIAL COST ₱ 274.7071698


LABOR COST ₱ 82.41215094
TOTAL COST ₱ 357.1193208
₱ 1.324528302 /m²
III. Masonry Works III. Formworks
PRICE LIST PRICE LIST
MATERIAL PRICE MATERIAL PRICE
CONCRETE HOLLOW BLOCK 5" THK ₱ 9.00 /pc Form Lumber 2" x 3" x 12' Coco Lumber ₱ 132.00 /pc
CONCRETE HOLLOW BLOCK 4" THK ₱ 8.00 /pc Form Lumber 2" x 2" x 12' Coco Lumber ₱ 88.00 /pc
LAFARGE REPUBLIC PORTLAND PLUS 40KG ₱ 203.00 /bag 1/2"x4'x8' Ordinary Plywood ₱ 320.00 /pc

WASHED SAND 600.00 /m³ FORMS FOR COLUMN



CRUSHED GRAVEL 1" ₱ 850.00 /m³ SIDES OF THE COLUMN 0.65 m
SHORTER SIDE 0.25 m
CONCRETE HOLLOW BLOCKS FOR WALL (EXTERIOR)
LONGER SIDE 0.4 m
LATERAL PERIMETER OF THE
Total Area of Exterior Walls (m²) 167.929 1.5 m
COLUMN
GROUND FLOOR 85.3155 COLUMN HEIGHT 6.8
m
SECOND FLOOR 82.6135 NUMBER OF COLUMNS 17
TOTAL AREA 173.4 m²
CONCRETE HOLLOW BLOCK 5" THK 2099.1125 pcs.
1/2"x4'x8' Ordinary Plywood 17.77805118 pcs
CEMENT MORTAR (CLASS C)
CEMENT 1601.62 bag TOTAL COST ₱ 7395.67
SAND 177.17 m³ MATERIAL COST ₱ 5688.98
PLASTERING @ 12mm THK (CLASS B) LABOR COST ₱ 1706.69
AREA OF WALLS (TWO SIDES) 335.86 m² ₱ 42.651 /m²
CEMENT 48.36 bag WOOD FRAME OF COLUMNS
SAND 4.03 m³ Form Lumber 2" x 2" x 12' Coco

pcs
43.956
TOTAL COST ₱ 601323.43 Lumber
MATERIAL COST LABOR COST TOTAL COST ₱ 5028.59
CHB 5" THK ₱ 18892.0125 ₱ 5667.60375 MATERIAL COST ₱ 3868.15
CEMENT ₱ 334947.237 ₱ 100484.1711 LABOR COST ₱ 1160.44
SAND ₱ 108717.23 ₱ 32615.17038 ₱ 29.000 /m²
CHB 5" THK ₱ 146.25 /m² SCAFFOLDING FOR COLUMNS
CEMENT ₱ 2592.94945 /m²

bd. Ft. bd. Ft. bd. Ft. bd. Ft.


HORIZONTAL BRACES 2427.6
SAND ₱ 841.62 /m²

VERTICAL BRACES 809.2


CONCRETE HOLLOW BLOCKS FOR WALL (INTERIOR)

DIAGONAL BRACES 1352.52


Total Area of Interior Walls (m²) 150.005
Form Lumber 2" x 2" x 12' Coco
2540.310
GROUND FLOOR 65.2 Lumber
SECOND FLOOR 84.805 TOTAL COST ₱ 290611.46
MATERIAL COST ₱ 223547.28
CONCRETE HOLLOW BLOCK 4" THK 1875.0625 pcs.
LABOR COST ₱ 67064.18
CEMENT MORTAR (CLASS C) ₱ 1675.960 /m²
CEMENT 1430.67 bag Form Lumber 2" x 3" x 12' Coco
bd. Ft.

67.433
SAND 158.26 m³ Lumber
PLASTERING @ 8mm THK (CLASS B) TOTAL COST ₱ 11571.56
AREA OF WALLS (TWO SIDES) 300.01 m² MATERIAL COST ₱ 8901.20
CEMENT 28.80 bag LABOR COST ₱ 2670.36
SAND 2.40 m³ ₱ 66.733 /m²
TOTAL COST ₱ 529966.92 FORMS FOR BEAM
MATERIAL COST LABOR COST PERIMETER OF TWO SIDES FORM 0.95 m
CHB 5" THK ₱ 15000.5 ₱ 4500.15 TWO SIDE FORMS 0.25 m
CEMENT ₱ 296273.15 ₱ 88881.94513 BOTTOM FORM 0.35 m
SAND ₱ 96393.21 ₱ 28917.9639 LENGTH OF BEAM 225.9 m
CHB 5" THK ₱ 130 /m² TOTAL AREA 214.605 m²
CEMENT ₱ 2567.61505 /m²
1/2"x4'x8' Ordinary Plywood 22.003 pcs
SAND ₱ 835.38 /m²
TOTAL COST ₱ 9153.10
Total Length of RSB for Vertical Bars 405.1375 m
MATERIAL COST ₱ 7040.85

TOTAL WIDTH OF WALLS 107.77 m LABOR COST 2112.25



SPACING 0.8 m ₱ 42.651 /m²
LENGTH 3.00 m WOOD FRAME OF COLUMNS
12 mmØ x 6m REINFORCEMENT STEEL BAR

bd. Ft.
Form Lumber 2" x 3" x 12' Coco 68.942
TOTAL COST Lumber
67.52291667 pcs.
₱ 16853.72 TOTAL COST ₱ 11830.38
MATERIAL COST LABOR COST MATERIAL COST ₱ 9100.29
₱ 12964.4 ₱ 3889.32 LABOR COST ₱ 2730.09
COST ₱ 156.3860072 /m ₱ 55.126 /m²
SCAFFOLDING FOR COLUMNS
Total Length of RSB for Horizontal Bars 53.885 m

bd. Ft. bd. Ft.


HORIZONTAL BRACES 88.4775
HEIGHT OF WALL 3

VERTICAL BRACES 112.95


WIDTH 107.77
10 mmØ x 6m REINFORCEMENT STEEL BAR Form Lumber 2" x 2" x 12' Coco

pcs
88.478
TOTAL COST Lumber
8.98 pcs
₱ 1459.385417 TOTAL COST ₱ 10121.83
MATERIAL COST ₱ 1122.604167 MATERIAL COST ₱ 7786.02
LABOR COST ₱ 336.78125 LABOR COST ₱ 2335.81
COST ₱ 27.08333333 /m ₱ 47.165 /m²
Form Lumber 2" x 3" x 12' Coco

bd. Ft.
112.950
Lumber
TOTAL COST ₱ 19382.22
MATERIAL COST ₱ 14909.40
LABOR COST ₱ 4472.82

₱ 90.316 /m²