The document provides observations and recommendations for structural elements of a building project. It notes issues with the raft foundation lacking top reinforcement between walls and a wall being reinforced with substandard steel. It recommends reducing the thickness and reinforcement of several floor slabs and ensuring proper anchorage of rebar in cantilever slabs. The client is advised to have the project consultant review all recommendations.

Uploaded by

Yang W Ong
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
58 views

Comment

The document provides observations and recommendations for structural elements of a building project. It notes issues with the raft foundation lacking top reinforcement between walls and a wall being reinforced with substandard steel. It recommends reducing the thickness and reinforcement of several floor slabs and ensuring proper anchorage of rebar in cantilever slabs. The client is advised to have the project consultant review all recommendations.

Uploaded by

Yang W Ong
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

Type A Comment

Location Observation Remark

Raft Foundation No top reinforcement Consultant to review


between wall

Wall Wall reinforced with BRC A8 To replace all BRC A8


(3.95 kg/m^2) with BRC B6
(3.73 kg/m^2)

Slab

FS 2 215mm thk reinforced with To reduce thickness to


A10 (B) 175mm thick reinforced with
A9 (B)

FS7 165mm thk reinforced with A8 (B) To reduce thickness to 125mm


thick reinforced with A7 (B)

*To add additional 1T12 (T&B) for


crack control
*Additional 3T16 (B) as hidden
strip beam

FS 3 215 mm thk reinforced with To reduce thickness to 115mm


A10 (B) thick reinforced with A7

*To add additional 1T12 (T & B)


for crack control
*Additional 2T12 (B) as hidden
strip beam

FS 5 215mm thk reinforced with A10(B) To reduce to 115mm thick


reinforced with BRC A7 (B)

Cantilever Slab Insufficient Anchorage Length To ensure all top rebars for
cantilever slab is anchored 40 dia.
beyond the supporting beam

Note.

* Only structural element review has been carried out. Structural integrity and robustness is the sole responsibility of the
project consultant

* The above view represent an alternative design proposal within the confine of normal design parameter. The Client
is to seek project consultant's approval prior to the implementation of each recommendation.