0% found this document useful (0 votes)
41 views

Emitting Frame

The document summarizes inspection records from measurements of the diagonal distances of an emitting frame taken on different dates using a measuring tape. Key details include: - Instrument used: Measuring tape - Dates of inspections: 30.01.08, 4.02.08, 1.02.08 - Reference drawing number: SY335.3 - Segment distances and vertical box numbers were recorded.

Uploaded by

Gopal Ramalingam
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
41 views

Emitting Frame

The document summarizes inspection records from measurements of the diagonal distances of an emitting frame taken on different dates using a measuring tape. Key details include: - Instrument used: Measuring tape - Dates of inspections: 30.01.08, 4.02.08, 1.02.08 - Reference drawing number: SY335.3 - Segment distances and vertical box numbers were recorded.

Uploaded by

Gopal Ramalingam
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 12

Instrument : Measuring Tape

Date of Inspection 30.01.08


Drawing/Document Ref No: SY335.3
DIAGONAL DISTANCE OF EMITTING FRAME Field No: 5

1 2

A B

3 4
C D

E F

G H

Sr,No: Segment Distance Sr,No:


Vertical Box No:
1 GH 10400
2 EF 10401 0 Bottom
1 VB 1
3 EH 11221 2 Top
4 GF 11220 0 Bottom
2 VB 2
5 CH 18020 1 Top
6 GD 18022 0 Bottom
3 VB3
7 AF 18022 3 Top
8 BE 18020 0 Bottom
4 VB4
-2 Top

NAME SIGNATURE & DATE QP No.:

Project SEPCO TATA PROJECTS LTD Rev. No :


Log Sheet No.:
Unit No. 5 SEPCO
Log Sheet No.:

Rating 135 MW VEDANTA / TCE


Format No. , Rev.
Instrument : Measuring Tape
Date of Inspection 4.02.08
Drawing/Document Ref No: SY335.3
DIAGONAL DISTANCE OF EMITTING FRAME Field No: 2

1 2

A B

3 4
C D

E F

G H

Sr,No: Segment Distance Sr,No:


Vertical Box No:
1 GH 10400
2 EF 10398 0 Bottom
1 VB 1
3 EH 11130 1 Top
4 GF 11132 0 Bottom
2 VB 2
5 CH 18035 1 Top
6 GD 18032 0 Bottom
3 VB3
7 AF 18035 -1 Top
8 BE 18035 0 Bottom
4 VB4
1 Top

NAME SIGNATURE & DATE QP No.:

Project SEPCO TATA PROJECTS LTD Rev. No :


Log Sheet No.:
Unit No. 5 SEPCO

Rating 135 MW VEDANTA / TCE


Format No. , Rev.
Instrument : Measuring Tape
Date of Inspection 4.02.08
Drawing/Document Ref No: SY335.3
DIAGONAL DISTANCE OF EMITTING FRAME Field No: 3

1 2

A B

3 4
C D

E F

G H

Sr,No: Segment Distance Sr,No:


Vertical Box No:
1 GH 10398
2 EF 10400 0 Bottom
1 VB 1
3 EH 11133 1 Top
4 GF 11135 0 Bottom
2 VB 2
5 CH 18035 0 Top
6 GD 18035 0 Bottom
3 VB3
7 AF 18030 -1 Top
8 BE 18030 0 Bottom
4 VB4
2 Top

NAME SIGNATURE & DATE QP No.:

Project SEPCO TATA PROJECTS LTD Rev. No :


Log Sheet No.:
Unit No. 5 SEPCO

Rating 135 MW VEDANTA / TCE


Format No. , Rev.
Instrument : Measuring Tape
Date of Inspection 01.02.08
Drawing/Document Ref No: SY335.3
DIAGONAL DISTANCE OF EMITTING FRAME Field No: 4

1 2

A B

3 4
C D

E F

G H

Sr,No: Segment Distance Sr,No:


Vertical Box No:
1 GH 10400
2 EF 10400 0 Bottom
1 VB 1
3 EH 11225 0 Top
4 GF 11226 0 Bottom
2 VB 2
5 CH 18025 -1 Top
6 GD 18026 0 Bottom
3 VB3
7 AF 18020 1 Top
8 BE 18025 0 Bottom
4 VB4
2 Top

NAME SIGNATURE & DATE QP No.:

Project SEPCO TATA PROJECTS LTD Rev. No :


Log Sheet No.:
Unit No. 5 SEPCO
Rating 135 MW VEDANTA / TCE
Format No. , Rev.
Instrument : Measuring Tape
Date of Inspection 01.02.08
Drawing/Document Ref No: SY335.3
DIAGONAL DISTANCE OF EMITTING FRAME Field No: 5

1 2

A B

3 4
C D

E F

G H

Sr,No: Segment Distance Sr,No:


Vertical Box No:
1 GH 10395
2 EF 10397 0 Bottom
1 VB 1
3 EH 11230 -1 Top
4 GF 11230 0 Bottom
2 VB 2
5 CH 18020 1 Top
6 GD 18023 0 Bottom
3 VB3
7 AF 18020 2 Top
8 BE 18024 0 Bottom
4 VB4
0 Top

NAME SIGNATURE & DATE QP No.:

Project SEPCO TATA PROJECTS LTD Rev. No :


Log Sheet No.:
Unit No. 5 SEPCO
Log Sheet No.:

Rating 135 MW VEDANTA / TCE


Format No. , Rev.
Instrument : Measuring Tape
Date of Inspection 01.02.08
Drawing/Document Ref No: SY335.3
DIAGONAL DISTANCE OF EMITTING FRAME Field No: 10

1 2

A B

3 4
C D

E F

G H

Sr,No: Segment Distance Sr,No:


Vertical Box No:
1 GH 10400
2 EF 10400 0 Bottom
1 VB 1
3 EH 11135 0 Top
4 GF 11132 0 Bottom
2 VB 2
5 CH 18025 2 Top
6 GD 18022 0 Bottom
3 VB3
7 AF 18020 -2 Top
8 BE 18022 0 Bottom
4 VB4
2 Top

NAME SIGNATURE & DATE QP No.:

Project SEPCO TATA PROJECTS LTD Rev. No :


Log Sheet No.:
Unit No. 5 SEPCO
Log Sheet No.:

Rating 135 MW VEDANTA / TCE


Format No. , Rev.

You might also like