0% found this document useful (0 votes)
29 views1 page

Müéåd Méuåzééléï Aéléå Méu: Work Instruction For Wire Roll Change / Wire Finishing / Torch Change and Jig Modification

1. Wire rolls must be completed properly or else place in yellow bin. 2. Paper rolls that need reworking or are rejected must be placed in red bin. 3. Only licensed operators can change wire rolls.

Uploaded by

kdfdfyb
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
29 views1 page

Müéåd Méuåzééléï Aéléå Méu: Work Instruction For Wire Roll Change / Wire Finishing / Torch Change and Jig Modification

1. Wire rolls must be completed properly or else place in yellow bin. 2. Paper rolls that need reworking or are rejected must be placed in red bin. 3. Only licensed operators can change wire rolls.

Uploaded by

kdfdfyb
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 1

WORK INSTRUCTION FOR WIRE ROLL CHANGE / WIRE FINISHING / TORCH

CHANGE AND JIG MODIFICATION

1. AaÉU wire roll uÉãÎsQûlaÉ complete WûÉålÉå xÉå mÉWûsÉå xÉqÉÉmiÉ WûÉå
eÉÉL iÉoÉ ExÉ mÉÉOïû MüÉå yellow bin qÉå UZÉå !

2.पपरर कक चचक करर AaÉU पपरर rework WûÉå xÉMüiÉÉ Wãû iÉoÉ rework MüUå
lÉWûÏ iÉÉå reject MüUå iÉoÉ ExÉ mÉÉOïû MüÉå red bin qÉå UZÉå !

3. MåüuÉsÉ Licenced Operator


7
WûÏ wire roll कक change MüUå !

4. Wire Roll कक change MüUlÉå Måü oÉÉS Weld Penetration eÉÂU cÉåMü
4

MüUå !

5. Jig Modification, Torch कक Change MüUlÉå Måü oÉÉS Weld Penetration eÉÂU
cÉåMü MüUå !

MüÉåD mÉUåzÉÉlÉÏ AÉlÉå mÉU अपनर लपइन ललडर सर ततररत सरपकर करर!

You might also like