IADC WellSharp Kill Sheet
IADC WellSharp Kill Sheet
PRESENT MUD
Surface : __________(Bbls) ÷ ____________ = ______________
WEIGHT:
ppg
Line Surface Line Capacity True Pump Strokes to Pump
Output (Bbls/Stk) SLOW CIRCULATION RATE (SCR):
DRILL STRING CAPACITY: SCR taken @ _______________ (ft)
Drill #1: ________ ________ ________ x ________ = ________ Bbls Stks/min Pressure(psi) Bbl/min Pressure(psi)
Pipe Size (in) Weight (lb/ft) Bbls/ft Length (ft) DP Pump #1: __________ @ __________
Total Drill String Capacity (Bbls) True Pump Strokes, Surface to Bit SHOE TEST DATA:
Output (Bbls/Stks) _________
ANNULAR CAPACITY Depth #1
_________ @ Test MW of _________
Between CSG and DP: _______ Bbls/ft x _______ ft = _______ Bbls (psi) (ppg)
Between Liner #1 and DP: _______ Bbls/ft x _______ ft = _______ Bbls _________
Depth #2
Between Liner #2 and DP: _______ Bbls/ft x _______ ft = _______ Bbls _________ @ Test MW of _________
(psi) (ppg)
Between OH and DP/HWDP: _______ Bbls/ft x _______ ft = _______ Bbls _________
Between OH and DC: _______ Bbls/ft x _______ ft = _______ Bbls Depth #3
_________ @ Test MW of _________
Choke line capacity: _______ Bbls/ft x _______ ft = _______ Bbls (psi) (ppg)
KICK DATA
SIDPP: __________ psi SICP: __________ psi PIT GAIN: __________ Bbls Time of Incident: ____ : ____
DISCLAIMER: This Well Control Worksheet is intended solely for the use of the IADC and IADC accredited schools and organizations engaging in the teaching of the IADC WellCAP
Well Control classes. The IADC, its employees or others acting on its behalf, makes no warranties or guarantees expressed, implied or statutory, as to any matter whatsoever, with
respect to the use of this Well Control Worksheet.
Field Units Revised January 22, 2015
Subsea stack, W&W method, US (psi, ft, ppg) Page 1
CALCULATIONS
KILL MUD WEIGHT (KMW) KILL MUD
( ______________ ÷ 0.052 ÷ _______________ ) + _______________ = ___________ ppg WEIGHT
SIDPP (psi) True Vertical Depth (ft) Present Mud Weight (ppg)
INITIAL CIRCULATING PRESSURE (ICP) INITIAL CIRCULATING
_____________________________ + ____________________________ = ___________ psi PRESSURE
SIDPP (psi) Pump Pressure (psi) @ SCR of _______SPM
FINAL CIRCULATING PRESSURE (FCP) FINAL CIRCULATING
__________________________ x ______________ ÷ ______________ = ___________ psi PRESSURE
Pump Pressure (psi) @ SCR of _______SPM Kill Mud Weight (ppg) Present Mud Weight (ppg)
MAXIMUM ALLOWABLE MUD DENSITY (ppg)
MAX. ALLOWABLE
( ______________ ÷ 0.052 ÷ _______________ ) + _______________ = ___________ ppg MUD DENSITY
Surface LOT Pressure (psi) Shoe Depth (ft,TUD) LOT Mud Density (ppg)
MAXIMUM ALLOWABLE ANNULAR SURFACE PRESSURE (MAASP) (psi)
MAX. ALLOWABLE ANNULAR
( ______________ - _______________ ) x 0.052 x ________________ = ________ psi SURFACE PRESSURE
Max. Allowable Present Mud Density (ppg) Shoe Depth (ft,TUD)
Mud Density (ppg)
PRESSURE CHART
Theoretical Drill Pipe Actual Actual
Stroke or Volume Actual Drill Pipe Pressure
Pressure Casing Pressure Pit Volume Deviation
SURFACE 0 ICP
BIT FCP
SURFACE
______________ ÷ 10 = ____________
Strokes Bit to Surface Strokes per Step
DISCLAIMER: This Well Control Worksheet is intended solely for the use of the IADC and IADC accredited schools and organizations engaging in the teaching of the IADC WellCAP
Well Control classes. The IADC, its employees or others acting on its behalf, makes no warranties or guarantees expressed, implied or statutory, as to any matter whatsoever, with
respect to the use of this Well Control Worksheet.
Field Units Revised January 22, 2015
Subsea stack, W&W method, US (psi, ft, ppg) Page 2
GRAPHIC ANALYSIS
3000
1000
0
Stroke
Pressure
Time
FORMULAS
1. Pressure Gradient (psi/ft) = Mud Weight (ppg) x 0.052
2. Hydrostatic Pressure (psi) = Mud Weight (ppg) x 0.052 x Depth (ft, TVD)
4. Annular Capacity(bbls/ft) = (Inside Diameter of Casing2 (in.) or Hole Diameter2 (in.) - Outside Diameter of Pipe2 (in.)) ÷ 1029.4
5. Pipe Displacement (bbls/ft) = (Outside Diameter of pipe2 (in.) - Inside Diameter of pipe2 (in.)) ÷ 1029.4
7. MAASP (psi) = [Maximum Allowable Mud Weight (ppg) - Present Mud Weight (ppg)] x 0.052 x Shoe TVD (ft)
10. Formation Pressure (psi) = Hydrostatic Pressure Mud in Hole (psi) + SIDPP (psi)
11. EMW (ppg) @ Shoe = (SICP (psi) ÷ 0.052 ÷ Shoe Depth (ft, TVD) ) + Present Mud Weight (ppg)
13. Volume Increase from Adding Barite (bbls) = Number of Sacks (100 lb) added ÷ 14.9
14. Equivalent Mud Weight (ppg) @ __________ depth (ft) = [ DepthPressure x 0.052 ]+ Current Mud Weight
(ft, TVD)
(psi)
(ppg)
2
x [
Old Pump Rate (SPM) ]
New Pump Rate (SPM)
15. Estimated New Pump Pressure at New Pump Rate (psi) = Old Pump Pressure (psi)