Rubrics in Extension Cord Making

The rubric outlines 5 indicators for evaluating extension cord making projects: organization, functionality, punctuality, craftsmanship, and effort/participation. For each indicator, it provides descriptions and point values for excellent (20 points), good (15 points), basic (10 points), and poor (5 points) performance. For example, an excellent project is accurately organized, produces an excellent functioning cord, is submitted on time, shows exceptional care and effort from all members.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
100% found this document useful (7 votes)
2K views

Rubrics in Extension Cord Making

The rubric outlines 5 indicators for evaluating extension cord making projects: organization, functionality, punctuality, craftsmanship, and effort/participation. For each indicator, it provides descriptions and point values for excellent (20 points), good (15 points), basic (10 points), and poor (5 points) performance. For example, an excellent project is accurately organized, produces an excellent functioning cord, is submitted on time, shows exceptional care and effort from all members.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 1

RUBRICS IN EXTENSION CORD MAKING

Indicators 20 15 10 5
Organization -accurately followed - Folllowed the -merely followed the - followed the
the procedures in procedures in procedures in procedure in
producing an producing an producing an producing an
extension cord extension cord with extension cord extension cord with
some flaws major flaws-
Functionality -Produced an Produced a good Produced a basic Produced a poor
excellent extension extension cord extension cord extension cord
cord
Punctuality - -Submitted the -Submitted the Submitted the project Did not meet the
finished project before finished project on the beyond the expected expected time of
the expected time expected time time submission.
Craftmanship - work done with work done with good work done with basic work done with no
exceptional care and care and attention to care and attention to care and attention to
attention to detail detail and neatness detail and detail detail and detail
and neatness
Effort and - Work shows Work shows good Work shows basic Work shows no effort,
participation exceptional effort, effort, planning, and effort, planning, and planning, and pride.
planning, and pride. pride. Some of the pride. Only few of the Only interested
All the members members participated members participated members participated
participated in in crafting the project in crafting the project in crafting the project