Individual Performance Commitment and Review Form (Ipcrf)
Individual Performance Commitment and Review Form (Ipcrf)
(Mobile Teacher/DALSC)
Learning 2.Determine the strengths and 5-Conducted Functional Literacy test (FLT) to 80% & above of the learners .
Outcomes for weaknesses of the learners 4- Conducted Functional Literacy test (FLT) to 60- 79- % of the learners .
ALS within the rating period by 3- Conducted Functional Literacy test (FLT) to 40-59- % of the learners .
conducting Functional Literacy 2- Conducted Functional Literacy test (FLT) to 20-39 % of the learners .
test (FLT) to at least 75 1- Conducted Functional Literacy test (FLT) to 19-0 % of the learners .
learners.
5%
5 – Assisted 75 and above learners in preparing individual learning portfolio with
3.Assisted at least 75 learners in complete contents.
the preparation of Individual 4 - Assisted 65-74 learners in preparing individual learning portfolio with complete
Learning Portfolio contents.
15% 3 - Assisted 56-64 learners in preparing individual learning portfolio with complete
contents.
2 - Assisted 47-55 learners in preparing individual learning portfolio with complete
contents.
1 - Assisted 46 & below learners in preparing individual learning portfolio with
complete contents.
Management 1.. Gathered updated & 5 – 100% updated & complete data gathered on ALS Programs and Projects
Information complete data on ALS implemented as reflected in the 4 ALS MIS forms submitted.
System Programs and Projects
implemented as reflected 4 – 90% updated & complete data gathered on ALS Programs and Projects
in the ALS MIS implemented as reflected in the 4 ALS MIS forms.
(Management Information
System) forms: 3 – 80% updated & complete data gathered on ALS Programs and Projects
a. ALS MIS 001 - Profile of implemented as reflected in the 4 ALS MIS forms.
Prospective Learners in the
Household
b. ALS MIS 002A – Learners 2 – 70% updated & complete data gathered on ALS Programs and Projects
Profile implemented as reflected in the 4 ALS MIS forms.
enrolled in ALS Programs
a. ALS MIS 002B – Learners
Profile 1 – 60% and below updated & complete data gathered on ALS Programs and
Projects implemented as reflected in the 4 ALS MIS forms.
enrolled in ALS InfEd
Programs
b. ALS MIS 003 – Community
Learning Center & Learning
Facilitators/Service Providers
Profile
10% /.z
5– submitted 90-100% ALS report on time
4– submitted 70-80% ALS report on time
2. Submitted on time 100% of 3– submitted 50-69% ALS report on time
the following ALS reports: 2– submitted 30-49% ALS report on time
a. ALS Schedule of Activities 1– submitted 0-29% ALS report on time
b. ALS Master list of
Enrolment
c. Data of Enrolment
d. ALS MIS Forms
e. ALS Monthly Reports
- ORS
- MAR
f. ALS Quarterly
Accomplishment Reports
g. ALS Annual
Accomplishment
Report
h. As Required Surveys/
Mapping:
- Literacy Mapping
- Household Survey
- Family Mapping
- Population Survey
10%
Staff 1. Attended at least 1 ALS January to 10% 5 - Attended at least 1 ALS training workshop in the national level
Development Training-Workshop in any December
for ALS level. 4 – Attended at least 1 ALS training workshop in the regional level
Teachers
5% 3 – Attended at least 1 ALS training workshop in the division level
1 – No training attended.
5%
OVERALL
RATING FOR ACCOMPLISHMENTS
_________________________ __________________________
(Ratee) Rater Recommending Approval Approving Authority