Plant-2 Proposal Report For Pre S.D
Plant-2 Proposal Report For Pre S.D
Lines
Sl no IWL.No Job Desription
Size
CARRY OUT REPLACEMENT OF CLAMPED 2" LPG R/D PIPE LINE (2"-
1 9910-002-004-2016 2-P-76-F3) FROM 2-C-14 TO PLANT 72 , FUEL GAS HEADER & 2"
STORAGE
9910-002-004-2016 3" PIPE LINE (3"-2-P20-F3103-1) FROM 2-E-01 TUBE O/L TO 2-C-05
3 3"
LEAKED/CLAMPED WEST OF 2-C-01
9910-002-004-2016 3" PIPE LINE (3"-2-P49-F1102-PP) FROM TPA FROM 1-E-10C SHELL
13 3"
O/L TO 2-C-5 CORRODED DUE TO CUI.
9910-002-004-2016 1" UTILITY STEAM PIPE LINE CLAMPED PORTION IN THE PIPE RACK
20 1"
REGION WEST OF 2-C-01
LEAKY 1" STEAM TRACING TAKE OFF FROM 4" LP STEAM HDR IN
22 9910-002-004-2016 1/2"
THE TOP MOST PIPE RACK NEAR EAST SIDE OF 1-C-25
9910-002-004-2016 LEAKY/CLAMPED 2" UTILITY LP STEAM PIPE LINE IN THE PIPE RACk
23 2"
EAST SIDE OF 1-C-25
25 9910-002-004-2016 6" THICK SCALED 2-E-2A CWR 6 INCH PIPE LINE (CS PORTION) 6"
35 9910-002-001-2019 2" LINE FROM 2-C-33 SHELL TOP TO 2-C-14 AT SUPPORT LOCATIONS 2"
9910-002-001-2019 IN PLANT 2 BATTERY LIMIT 1.5" LINE TO 2E11 WAS FOUND SEVERLY
36 1.5"
CORRODED AT SUPPORT LOCATION
9910-001-002-2019 1.5"FLANGE
CAUSTIC DISCHARGE PIPE LINE FROM 2-G-5 TO 2-C-13 ORIFICE
37 1.5"
ROOT VALVE THREADED PORTION ONLINE CLAMPED
ANTICIPATED JOBS
5 9910-002-001-2019 4-6" LINE 2-C-02 TO 2-G-102 A/B&2 -G-01B AT SUPPORT LOCATION 1.5"
ADD-ON JOB
1 ADD-J 2" FUEL OIL LINE AT NORTH SIDE BATTERY LIMIT PLANT -2 2"
Details list
Pipe
Isometric no of Pipe joints Total pipe
MOC joints in Remarks
drawings pads in field joints
Shop
cs yes 66 0 4 4
cs yes 7 17 8 25
cs yes 5 0 2 2
cs yes 1 11 2 13
cs yes 5 6 0 6
cs yes 2 0 2 2
cs yes 7 1 2 3
cs yes 36 0 4 4
cs yes 8 18 2 20
cs yes 8 20 4 24
cs no 0 0 2 2
cs no 0 2 2 4
cs no 0 4 4
cs no 0 2 2
cs no 0 0 job dropped
cs yes 3 2 1 3
cs yes 1 16 3 19
cs no 0 2 2
cs yes 14 0 2 2
cs yes 16 2 2 4
cs no 0 0 anticipated replacement