Plant-2 Proposal Report For Pre S.D

This document lists piping replacement and repair jobs at a refinery plant. It includes over 40 individual piping lines of various sizes that require replacement due to corrosion, pitting, leaks or clamping. It also lists some anticipated additional jobs including replacing an 8-inch flare header and various vessel nozzles. The jobs will be carried out as part of a planned maintenance shutdown.

Uploaded by

Dheeraj Dheeru
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
58 views

Plant-2 Proposal Report For Pre S.D

This document lists piping replacement and repair jobs at a refinery plant. It includes over 40 individual piping lines of various sizes that require replacement due to corrosion, pitting, leaks or clamping. It also lists some anticipated additional jobs including replacing an 8-inch flare header and various vessel nozzles. The jobs will be carried out as part of a planned maintenance shutdown.

Uploaded by

Dheeraj Dheeru
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 6

REFINERY-1 M&I SHUTDOWN-

PLANT-2 PIPING REPLACEMENT- IWL JOB-PROPO

Confirmed job list for Pipe Replacement & Pad welding

Lines
Sl no IWL.No Job Desription
Size

CARRY OUT REPLACEMENT OF CLAMPED 2" LPG R/D PIPE LINE (2"-
1 9910-002-004-2016 2-P-76-F3) FROM 2-C-14 TO PLANT 72 , FUEL GAS HEADER & 2"
STORAGE

3" REFLUX PIPE LINE FROM 2-C-02 TO 2-C-01 ( 3"-2-P11-F3103)


2 9910-002-004-2016 3"
BADLY CORRODED PORTION OF CONTROL VALVE NEAR 2-C-01

9910-002-004-2016 3" PIPE LINE (3"-2-P20-F3103-1) FROM 2-E-01 TUBE O/L TO 2-C-05
3 3"
LEAKED/CLAMPED WEST OF 2-C-01

2" 2-C-01 BOTTOM DRAIN PIPE LINE (2"2-P59-F3103) DEEPLY


4 9910-002-004-2016 2"
PITTED PROTIONS

5 9910-002-004-2016 2-E-8 SHELL INLET PIPE LINE (3"-2-P51-F1102-PP) 3"

1.5" LSRN COOLER 2-E-8 SHELL OUTLET PIPELINE (1.5"-2-P55-


6 9910-002-004-2016 1.5"
F1102)AT SUPPORT LOCATIONS

3" 2-C-21 PSC O/L PIPE LINE (3"2-BD92-F1102) TO PLANT -2 UNIT


7 9910-002-004-2016 3"
8" FLARE HEADER

2-C-24 TO 2-C-08 LSRN/ LSRG 1.5 INCH PIPE LINE (1.5"-2-P57-


8 9910-002-004-2016 F1102) AT PIPE RACK SUPPORT LOCATION

9910-002-004-2016 1.5" PIPE LINE (1.5"-2-P72-F3103)FROM 2-C-13 TO 2-E-11 DEEPLY


9 1.5"
PITTED AT SUPPORT LOCATIONS

9910-002-004-2016 3" LSRNTO


R/D PIPE LINE (3"-2-P53-F1102) FROM 2-E-8 SHELL OUTLET
10 3"
STORAGE DEEPLY PITTED AT SUPPORT LOCATIONS

9910-002-004-2016 3" LSRGTO


R/D PIPE LINE (3"-2-P42-F1102) FROM 2-E-7 SHELL OUTLET
11 3"
STORAGE DEEPLY PITTED AT SUPPORT LOCATIONS

3" PLANT -2 OFF GAS PIPE LINE TO PLANT -2 (3"-2-P12A-F3103)


12 9910-002-004-2016 3"
NORTH OF 1-E-7 AT SUPORT LOCATIONS

9910-002-004-2016 3" PIPE LINE (3"-2-P49-F1102-PP) FROM TPA FROM 1-E-10C SHELL
13 3"
O/L TO 2-C-5 CORRODED DUE TO CUI.

9910-002-004-2016 REPLACEMENT OF LEAKY/CLAMPED 2-C-2 BOTTOM DRAIN 1,1/2"


15 2"
PIPE LINES & 2-C-40 BOTTOM DRAIN 2" PIPE LINES
9910-002-004-2016 REPLACEMENT OF LEAKY/CLAMPED 2-K-40 DISCHARGE 3" PIPE LINE
16 4"
TO PLANT -12

9910-002-004-2016 REPLACEMENT PIPELINE


OF LEAKY/CLAMPED BOILER FEED WATER TO LEB-2" 2",6"
17 AT PLANT -2 BATTERY LIMIT

REPLACEMENT OFLEAKY CLAMPED PLANT-4 OFF GAS 2 INCH PIPE


18 9910-002-004-2016 LINE TO PLANT 12 (LEAK /CLAMPED NEAR PLANT 2 SAMPLE 2"
BOOTH)

9910-002-004-2016 3" STEAM CONDENSATE PIPELINE CLAMPED PORTION NEAR PLANT


19 3"
-2 NOTHSIDE BATTERY LIMIT

LEAKY CLAMPED 1-1/2" LP CONDENSATE PIPE LINE AT TOP


20 9910-002-004-2016 1 1/2"
PIPERACK ELEVATION NEAR 2-C-01

9910-002-004-2016 1" UTILITY STEAM PIPE LINE CLAMPED PORTION IN THE PIPE RACK
20 1"
REGION WEST OF 2-C-01

LEAKY 1" PSV SAFETY STEAM PIPE LINE PERTAINING TO 2-C-01 IN


21 9910-002-004-2016 1"
THE TOP OF THE VESSEL AND AT BOTTOM DRAIN

LEAKY 1" STEAM TRACING TAKE OFF FROM 4" LP STEAM HDR IN
22 9910-002-004-2016 1/2"
THE TOP MOST PIPE RACK NEAR EAST SIDE OF 1-C-25

9910-002-004-2016 LEAKY/CLAMPED 2" UTILITY LP STEAM PIPE LINE IN THE PIPE RACk
23 2"
EAST SIDE OF 1-C-25

REPLACEMENT OF LEAKY CLAMPED 2 INCH 2-C-2 BOOT DRAIN & 2-


C-40 BOTTOM DRAIN TO CBD DRUM AS PER THE SKETCH ATTACHED
24 9910-002-004-2016 AND 2"
AS PER THE FOLLOWING SPECIFICATION (UNDER GROUND
LEAK)

25 9910-002-004-2016 6" THICK SCALED 2-E-2A CWR 6 INCH PIPE LINE (CS PORTION) 6"

26 9910-002-004-2016 6" CWS PIPE LINE TO 2-E-2A TUBE INLET 3"

27 9910-002-004-2016 3" CWS PIPE LINE TO 2-E-40 TUBE OUTLET 3"

28 9910-002-004-2016 6" CWS PIPE LINE TO 2-E-40 TUBE INLET 6"

29 9910-002-004-2016 2" CWS PIPE LINE TO 2-E-10 TUBE OUTLET 2"

30 9910-002-004-2016 3" CWS PIPE LINE TO 2-E-21 TUBE INLET 3"

31 9910-002-004-2016 6" LEB CWS PIPE LINE FROM REF-1 6"


32 9910-002-004-2019 2" LINE FROM 2-C-32 TO 2-C-14 (LPG) 2"

1.5" LINE FROM 2-C-16 DRAIN TO FLARE HEADER AT SUPPORT


33 9910-002-004-2019 1.5"
LOCATION (1.5"-2-K17-F1154)

1.5" LINE FROM 2-E-09 BOTTOM SHELL OUTLET AT SUPPORT


34 9910-002-001-2019 1.5"
LOCATION (1.5"-2-P27-F1102)

35 9910-002-001-2019 2" LINE FROM 2-C-33 SHELL TOP TO 2-C-14 AT SUPPORT LOCATIONS 2"

9910-002-001-2019 IN PLANT 2 BATTERY LIMIT 1.5" LINE TO 2E11 WAS FOUND SEVERLY
36 1.5"
CORRODED AT SUPPORT LOCATION

9910-001-002-2019 1.5"FLANGE
CAUSTIC DISCHARGE PIPE LINE FROM 2-G-5 TO 2-C-13 ORIFICE
37 1.5"
ROOT VALVE THREADED PORTION ONLINE CLAMPED

CLAMPED 8" FLARE HEADER TO BE REPLACED CONNECTING PLANT


38 9910-002-001-2016 2 FLARE HEADERTO PLANT 1 FLARE HEADER DOWNSTREAN OF 8"
BLOCK VALVE ( CLAMPED LINE LIST)

ANTICIPATED JOBS

ANTICIPATE COMPLETE REPLACEMENT OF 8" PLANT-2 UNIT FLARE


1 9910-002-004-2016 HEADER (8"-2-BD1-F1101-PP) AND CONNECTED BRANCH PIPE 8"
LINES TO RESPECTIVE EQUIPMENTS

ANTICIPATE REPLACEMENT OF COLUMN/VESSEL NOZZLES IN


2 9910-002-004-2016 PLANT-2

ANTICIPATE REPLACEMENT OF 2E40 PSV OUTLET TO 2C40


3 9910-002-004-2016 3"
OVERHEAD TOP

4 9910-002-001-2019 2"LINE FROM 2-C-14 TO 2-C-19 AT SUPPORT LOCATION 2"

5 9910-002-001-2019 4-6" LINE 2-C-02 TO 2-G-102 A/B&2 -G-01B AT SUPPORT LOCATION 1.5"

ADD-ON JOB

1 ADD-J 2" FUEL OIL LINE AT NORTH SIDE BATTERY LIMIT PLANT -2 2"

3" CONDENSATE PIPE LINE AT NORTH PIPE RACK LEAK ABSORVED


2 ADD-J 3"
AND ITS TO BE REPLACED
-1 M&I SHUTDOWN-2019
NT- IWL JOB-PROPOSAL FOR PRE ACTIVITIES

Details list

Pipe
Isometric no of Pipe joints Total pipe
MOC joints in Remarks
drawings pads in field joints
Shop

cs yes 66 0 4 4

cs yes 7 17 8 25

cs yes 5 0 2 2

cs yes 1 11 2 13

cs yes 5 6 0 6

cs yes 2 0 2 2

only pad welding, no pipe


cs yes 1 0 0 0 replacement

cs yes 0 job dropped

cs yes 7 1 2 3

cs yes 36 0 4 4

only pad welding , no pipe


cs yes 36 0 replacement

cs yes 8 18 2 20

cs yes 8 20 4 24

only pad welding, no pipe


cs yes 11 0 replacement
cs yes 22 1 2 3

After insulation removal then


cs yes 9 0 gauging need to checke on pipe
lines for replacement

only pad welding, no pipe


cs yes 43 0 replacement

cs no 0 0 2 2

partial replacement to be done r,


cs no 0 0 remove insulation & gauging

cs no 0 2 2 4

cs no 0 4 4

cs no 0 2 2

insulation to be removed, check


cs no 0 4 4 gauging on pipe

under ground piping need to be


cs yes 0 Deem(15) Deem(4) 19 checked after digged

cooling water pipe line holded by


cs no 0 0 inspection due under ground piping
excvation.
cooling water pipe line holded by
cs no 0 0 inspection due under ground piping
excvation.
cooling water pipe line holded by
cs no 0 0 inspection due under ground piping
excvation.

cs no 0 0 job dropped

cooling water pipe line holded by


cs no 0 0 inspection due under ground piping
excvation.
cooling water pipe line holded by
cs no 0 0 inspection due under ground piping
excvation.

partial replacement already done


cs no 0 0 remaining to be done
cs yes 2 2 1 3

cs yes 3 2 1 3

cs yes 1 16 3 19

cs yes 1 0 only pad welding

cs no 0 2 2

cs yes 14 0 2 2

cs yes 16 2 2 4

anticipated replacement after


cs no 0 0 gauging by inspection

cs no 0 0 anticipated replacement

anticipated replacement after


cs no 0 0 gauging by inspection

cs no 4 0 only pad welding

cs no 2 0 only pad welding

INSULATION TO BE REMOVED THEN


CS no 0 2 2 LEAK PIPE TO BE REPLACED

INSULATION TO BE REMOVED THEN


CS no 0 2 2 LEAK PIPE TO BE REPLACED