1. The Nyankenke Sector targets for FY 2019/2020 include increasing access to electricity, water, and improved settlements. 2. Key targets are connecting households and productive areas to electricity grids and off-grid solutions, expanding rural water supply systems, resettling households in scattered settlements, and constructing infrastructure like feeder roads, health centers, and the Nyankenke Sector office. 3. Progress and achievements will be measured using indicators such as the number of connections, construction completion rates, and populations served.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
42 views5 pages

One Stop Center S'sectors Targets (2019-20)

1. The Nyankenke Sector targets for FY 2019/2020 include increasing access to electricity, water, and improved settlements. 2. Key targets are connecting households and productive areas to electricity grids and off-grid solutions, expanding rural water supply systems, resettling households in scattered settlements, and constructing infrastructure like feeder roads, health centers, and the Nyankenke Sector office. 3. Progress and achievements will be measured using indicators such as the number of connections, construction completion rates, and populations served.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 5

Nyankenke Sector targets for FY 2019/2020

Land,Infrastructure,Habitat and community settlement officer


S/N
Outcome Output Indicators Role of Sector

1 Increased Produtive Productive use areas connected to Number of Productive Monitoring the connectivity
users/Household access to electricity use areas connected to of Productive use, Provide
electricity increased electricity monitoring report and
connectivity report.

2 Increased Produtive Households connected to electricity Number of new Identification of beneficiaries


users/Household access to households connected (eligible HHs in Ubudehe
electricity increased to off-grid connection cat1), Mobilisation, providing
the identification report and
monthly mobilization reports,
provide monthly connected
HHs reports

3 Increased Produtive Households connected to electricity Number of new Identification of beneficiaries,


users/Household access to households connected Mobilisation, providing the
electricity increased to on-grid connection identification report and 12
monthly mobilization reports,
provide 12 monthly
connected HHs reports to
electricity
4 Increased Produtive Productive use areas connected to Rate of electrification Monitoring the construction
users/Household access to electricity to Nyankenek sector works of electric line for
electricity increased office and ECD Miyove electrification of Nyankenke
sector office and ECD
Miyove, provide monthly
progressive monitoring
reports
5 Increased Produtive Productive use areas connected to Rate of electrification Monitoring the construction
users/Household access to electricity of Kigogo, Rwagihura, works of electric line for
electricity increased Rusasa and Rutete electrification of Kigogo,
cells in Nyankenke Rwagihura, Rusasa and
sector Rutete cells, provide monthly
progressive monitoring
reports
6 Increased Produtive Street lighting expanded to all Rate of maintenance to Identification of damaged
users/Household access to national and district roads public lighting public lights, monitoring the
electricity increased replacement of damaged
lights, monthly reporting of
maintenance works

7 Improved and Sustained urban Households connected water Number of household Identification of beneficiaries,
and rural households access infrastructure increased connected to clean Mobilisation, providing the
to safe drinking water water identification report and 12
monthly mobilization reports,
provide 12 monthly
connected HHs reports to
clean water
8 Improved and Sustained urban Rural water supply system Rate (%) of Monitoring the construction
and rural households access constructed construction works of works of Museke water
to safe drinking water Museke WSS and system at rate of 100% of
people accessing to construction works, provide
clean water monthly progressive
monitoring reports.
9 Increased access to improved Households living in scattered Number of households 1. monitoring 2. monthly
settlement settlements resettled living in Scattered report 3. site identification
settlements resettled

10 Feeder Roads maintenance (RMF) maintenance of road 1.provide monitoring report,


constructed at 100% and montly report

11 Improved governance, service Nyankenke sector office constructed Rate of construction 1.provide monitoring report,
delivery and accountability in works of Nyankenke and montly report
Local Government Sector office
Prepared by:BIZIMENYERA Theoneste
NYANKENKE

Nyankenke sector office,


Kigogo HC and GS Kigogo

40

150

100% of construction works


100% of construction works

100% of maintenance
works

100% of construction works


and 6,564 people accessing
to clean water

80

maintenance of 11.3 Km
Yaramba-Mashyiga-Miyove
road constructed at 100%

Rate(100% ) of
construction works of
Nyankenke Sector office