ITS SouthTerminal GBB No 03 2014
ITS SouthTerminal GBB No 03 2014
In relation to the above-mentioned project, please find attached the Powerpoint Presentation
presented during the Pre-qualification Conference held on 03 September, 2014.
As discussed during the Pre-qualification Conference the Prospective Bidders are hereby
infonned that the last day for submission of written queries relative to the Project Information
Memorandum (PIM) and the Instructions to Prospective Bidders (ITPB) is on 12 September
2014.
Southwest ITS
Terminal
South ITS
The DOTC invites bidders to submit Bids to Terminal
finance, design, construct, operate and
maintain the South ITS Project.
2
CONCEPT OF ITS TERMINAL
PROVINCE
‘X’
PROVINCE City
Provincial ITS
‘Y’ Buses TERMINAL
Transport
Modes
METRO MANILA
PROVINCE
‘Z’
PROVINCE
‘X’
PROVINCE City
Provincial ITS
‘Y’ Buses TERMINAL
Transport
Modes
METRO MANILA
PROVINCE
‘Z’
4
INTERNATIONAL PRACTICES – AN EXAMPLE
Kuala Lumpur Bus Terminal, Malaysia
5
KUALA LUMPUR BUS TERMINAL, MALAYSIA
Key Features:
More than 40 bus companies operate from same terminal
6
KUALA LUMPUR BUS TERMINAL, MALAYSIA
Key Features:
State-of-the-art facilities for Passenger and Bus Operators
Key Features:
All the bus schedules are displayed on the website
8
KUALA LUMPUR BUS TERMINAL, MALAYSIA
Key Features:
All the bus schedules are displayed on the website
9
PROJECT STRUCTURE
10
SCOPE & STRUCTURE OF THE PROJECT
Project Description
The Project to be effected by the Concessionaire consists of:
a) the design, engineering and construction of the ITS Terminal within 18 months
from the start of construction;
b) from its completion until the end of the concession period, the O&M of the ITS
Terminal in accordance with specified performance standards;
c) the collection of terminal fee from users of the ITS Terminal on behalf of DOTC
and remitting the same to DOTC;
d) the financing of the above activities;
e) the designing, financing, engineering and construction of Commercial Assets,
carrying out of the Commercial Business (at the Concessionaire's option) and
collection of any revenues generated from the same; and
f) turn-over of the ITS Terminal in good condition to the DOTC at the end of the
Concession Period.
all in accordance with the Concession Agreement.
11
SCOPE & STRUCTURE OF THE PROJECT
Project Description
The accompanying work to be effected by the DOTC or for which the DOTC is
responsible consists of:
a) the provision or acquisition of the Project site;
b) the design, engineering and construction of the Access Road leading to the
Project site, on or before the Completion Date; and
c) the financing of the above activities.
all in accordance with the Concession Agreement.
12
PROJECT SITE – FTI (SOUTH ITS)
Maximum
Allowable Top
Elevation 67 Meters
(above mean
sea level)
13
SCOPE & STRUCTURE OF THE PROJECT
14
*The DOTC, however, does not guarantee that the project proponent will be granted such incentives.
SCOPE & STRUCTURE OF THE PROJECT
o The amount of AGP will depend on the Financial Proposal of the Winning
Bidder
Concessionaire
Revenue
• In addition, the Concessionaire shall be entitled to construct commercial
assets or to carry out commercial businesses on the Project site and to collect
& retain the revenues from these commercial business undertakings for so
long as such construction and businesses do not interfere with the Project.
o Such commercial assets shall not include any residential property. For this
purpose, the development of hotels and service apartments/hotel
apartments shall not be deemed to constitute residential property.
15
INSTRUCTIONS TO PROSPECTIVE
BIDDERS
Two Stage Bid Process
16
Qualification Requirements
17
LEGAL QUALIFICATION REQUIREMENTS
OR
18
LEGAL QUALIFICATION REQUIREMENTS
*“Public Transport Operator” means a partnership, corporation, sole proprietorship or any other
juridical entity that engaged in the operation of public land transportation utilities and services,
except rail transport, toll roads, and land transport terminals, in the Philippines, including any Affiliate,
Shareholder or Affiliate of Shareholder of such entity, whether or not it is a holder of a certificate of
public convenience or permit authorizing the operation of public land transportation utilities and
19services in the Philippines, including any Affiliate of such entity.
TECHNICAL QUALIFICATION REQUIREMENTS
DEVELOPMENT EXPERIENCE
• Must have completed development of 1 or more Eligible Projects within last 10 years
with:
a cumulative cost of Php 3 Bn;
and
a cumulative capacity of 750 parking bays
• “Eligible Project” means a project for development of any of the following: a bus
terminal, commercial complex, shopping mall, airport terminal, parking complex,
freight terminal; provided that a project must have
a minimum development cost of at least PhP 600 Mn
and
a capacity of at least 75 parking bays for land surface transport vehicles with
four (4) or more wheels, excluding rail.
• “development” of a project means when the relevant entity has either paid for or
received payment for the design and construction of that project.
20
TECHNICAL QUALIFICATION REQUIREMENTS
DEVELOPMENT EXPERIENCE
21
TECHNICAL QUALIFICATION REQUIREMENTS
O&M EXPERIENCE
22
TECHNICAL QUALIFICATION REQUIREMENTS
O&M EXPERIENCE
• supervision/implementation activities
24
FINANCIAL CAPABILITY QUALIFICATION
REQUIREMENTS
27
OUTLINE OF THE BIDDING PROCESS
28
THANK YOU
29