Assignment 1-Gantt Chart Only
Assignment 1-Gantt Chart Only
10-Aug
11-Aug
12-Aug
13-Aug
14-Aug
15-Aug
16-Aug
17-Aug
18-Aug
19-Aug
20-Aug
21-Aug
22-Aug
23-Aug
24-Aug
25-Aug
26-Aug
27-Aug
28-Aug
29-Aug
30-Aug
31-Aug
10-Jun
11-Jun
12-Jun
13-Jun
14-Jun
15-Jun
16-Jun
17-Jun
18-Jun
19-Jun
20-Jun
21-Jun
22-Jun
23-Jun
24-Jun
25-Jun
26-Jun
27-Jun
28-Jun
29-Jun
30-Jun
1-Aug
2-Aug
3-Aug
4-Aug
5-Aug
6-Aug
7-Aug
8-Aug
9-Aug
10-Jul
11-Jul
12-Jul
13-Jul
14-Jul
15-Jul
16-Jul
17-Jul
18-Jul
19-Jul
20-Jul
21-Jul
22-Jul
23-Jul
24-Jul
25-Jul
26-Jul
27-Jul
28-Jul
29-Jul
30-Jul
31-Jul
1-Sep
2-Sep
3-Sep
4-Sep
5-Sep
6-Sep
1-Jul
2-Jul
3-Jul
4-Jul
5-Jul
6-Jul
7-Jul
8-Jul
9-Jul
Task Name Duration Start Finish Persons-In-
Charge
Assignment 2: Feasibility Study on Process Plant 15 days 10/6/2019 24/6/2019
Research on the background and production of Vinyl Chloride Monomer 2 days 10/6/2019 11/6/2019 5 All
(VCM)
Market and business analysis 2 days 12/6/2019 13/6/2019 2 K, L
Comparison of the various aspects of potential plant locations and selection 3 days 21/6/2019 23/6/2019 5 All
of the most suitable plant location
Compilation of completed tasks 1 day 23/6/2019 23/6/2019 1 K
Assembly of necessary data for preliminary database creation 3 days 24/6/2019 26/6/2019 5 All
Findings on the raw materials and products specifications 2 days 27/6/2019 28/6/2019 5 All
Assembling the process operations for reactor 11 days 29/6/2019 9/7/2019 5 All
Elimination of differences of molecular types between raw materials and 3 days 29/6/2019 1/7/2019 5 All
product streams
Comparison of different types of reactor and selection of the most 4 days 2/7/2019 5/7/2019 5 All
appropriate reactor for each reaction system
Identification of appropriate material of construction for each reaction system 2 days 6/7/2019 7/7/2019 5 All
Assembling the process operations for separation equipment 8 days 10/7/2019 17/7/2019 3 L, N, Y
Elimination of differences in composition between effluent streams and 3 days 10/7/2019 12/7/2019 3 L, N, Y
desired products
Identification of suitable separation operations and their respective 3 days 13/7/2019 15/7/2019 3 L, N, Y
placements
Selection of suitable material of construction for each separation equipment 1 day 16/7/2019 16/7/2019 3 L, N, Y
Insertion of the selected separation system into the created flowsheet 1 day 17/7/2019 17/7/2019 3 L, N, Y
Application of heuristics to determine the suitability of pumps, 8 days 18/7/2019 25/7/2019 2 Z, K
compressors, heat exchangers, and other equipment
Elimination of differences in temperature, pressure and phase between feed 3 days 18/7/2019 20/7/2019 2 Z, K
and product streams of the reaction and separation systems
Determination of other suitable equipment to be used and their respective 3 days 21/7/2019 23/7/2019 2 Z, K
placements
Selection of appropriate material of construction for each equipment 1 day 24/7/2019 24/7/2019 2 Z, K
Insertion of selected equipment into the created flowsheet 1 day 25/7/2019 25/7/2019 2 Z, K
Preparation of the entire block flow diagram (BFD) 4 days 26/7/2019 27/7/2019 4 N, Y, Z, K
Study on the property packages for HYSYS simulation 2 days 22/7/2019 23/7/2019 5 All
Selection of the most appropriate property package for HYSYS simulation of 1 day 24/7/2019 24/7/2019 5 All -
VCM production
Construction of individual core system(s) 2 days 25/7/2019 26/7/2019 5 All
HYSYS simulation of VCM production and optimization of system 13 days 28/7/2019 9/8/2019 5 All
Estimation of pipe sizes of selected large flow rate streams 1 day 10/8/2019 10/8/2019 5 All
Revision and correction of BFD (if any) 1 day 11/8/2019 11/8/2019 5 All
Assignment 5: Manual Calculation on Material and Energy Balances 16 days 29/7/2019 13/8/2019
Introduction on the function of selected core systems 1 day 29/7/2019 29/7/2019 5 All
Manual calculation on material and energy balances for the core systems 9 days 30/7/2019 7/8/2019 5 All
Comparison between the results of simulation and manual calculation 4 days 8/8/2019 11/8/2019 5 All
Revision and correction of HYSYS simulation (if any) 6 days 7/8/2019 12/8/2019 5 All
Revision and correction of Assignment 5 (if any) 12 days 23/8/2019 3/9/2019 5 All