0% found this document useful (0 votes)
60 views

Assignment 1-Gantt Chart Only

The document outlines a project plan for the production of vinyl chloride monomer. It includes the project name, team members assigned to the project, and timelines for the plant design phase from October 6, 2019 to April 9, 2019. A Gantt chart is also included showing the project schedule broken down into weekly tasks and milestones over a 15 week period from August 10 to November 15.

Uploaded by

EvangelinePang
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
60 views

Assignment 1-Gantt Chart Only

The document outlines a project plan for the production of vinyl chloride monomer. It includes the project name, team members assigned to the project, and timelines for the plant design phase from October 6, 2019 to April 9, 2019. A Gantt chart is also included showing the project schedule broken down into weekly tasks and milestones over a 15 week period from August 10 to November 15.

Uploaded by

EvangelinePang
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

Project Name Production of Vinyl Chloride Monomer Legend :

Team / Group No. Team A / Group 2 Task bar


1. Kayshni A/P Lingeswaran (K) Progression bar
2. Lum Xu Wen (L) Project Milestones
Group members 3. Nalliisha A/P Rajesvara Rao (N) Dependency*
4. Pang Yi Wen (Y) Subset of activities for main task
5. Pern Zhui Er (Z)
Plant Design I Start Date 10/6/2019 * The arrows used to indicate dependency are multicoloured for better illustration.
Plant Design I End Date 4/9/2019

W3 W4 W5 W6 W7 W8 W9 W10 W11 W12 W13 W14 W15


Number of

10-Aug

11-Aug

12-Aug

13-Aug

14-Aug

15-Aug

16-Aug

17-Aug

18-Aug

19-Aug

20-Aug

21-Aug

22-Aug

23-Aug

24-Aug

25-Aug

26-Aug

27-Aug

28-Aug

29-Aug

30-Aug

31-Aug
10-Jun

11-Jun

12-Jun

13-Jun

14-Jun

15-Jun

16-Jun

17-Jun

18-Jun

19-Jun

20-Jun

21-Jun

22-Jun

23-Jun

24-Jun

25-Jun

26-Jun

27-Jun

28-Jun

29-Jun

30-Jun

1-Aug

2-Aug

3-Aug

4-Aug

5-Aug

6-Aug

7-Aug

8-Aug

9-Aug
10-Jul

11-Jul

12-Jul

13-Jul

14-Jul

15-Jul

16-Jul

17-Jul

18-Jul

19-Jul

20-Jul

21-Jul

22-Jul

23-Jul

24-Jul

25-Jul

26-Jul

27-Jul

28-Jul

29-Jul

30-Jul

31-Jul

1-Sep

2-Sep

3-Sep

4-Sep

5-Sep

6-Sep
1-Jul

2-Jul

3-Jul

4-Jul

5-Jul

6-Jul

7-Jul

8-Jul

9-Jul
Task Name Duration Start Finish Persons-In-
Charge
Assignment 2: Feasibility Study on Process Plant 15 days 10/6/2019 24/6/2019
Research on the background and production of Vinyl Chloride Monomer 2 days 10/6/2019 11/6/2019 5 All
(VCM)
Market and business analysis 2 days 12/6/2019 13/6/2019 2 K, L

Estimation of annual plant capacity 1 day 14/6/2019 14/6/2019 2 N, Y

Identification of objectives of the project 1 day 14/6/2019 14/6/2019 1 Z


Study of potential reaction pathways for preliminary process synthesis of 2 days 15/6/2019 16/6/2019 5 All
VCM
Analysis of gross profit of each potential reaction pathway 2 days 15/6/2019 16/6/2019 5 All
Comparison of the characteristics of the reaction pathways and determination 17/6/2019 18/6/2019 5
2 days All
of the most feasible reaction pathway
Analysis of the chemical properties and associated hazards from the SDS data 2 days 19/6/2019 20/6/2019 3 K, L, N
of the identified chemicals
Suggestion of safety measures for each identified hazards 1 day 20/6/2019 20/6/2019 2 Y, Z

Comparison of the various aspects of potential plant locations and selection 3 days 21/6/2019 23/6/2019 5 All
of the most suitable plant location
Compilation of completed tasks 1 day 23/6/2019 23/6/2019 1 K

Submission of Assignment 2 1 day 24/6/2019 24/6/2019 1 K

Assignment 3: Preliminary Process Synthesis and Heuristics 35 days 24/6/2019 29/7/2019

Assembly of necessary data for preliminary database creation 3 days 24/6/2019 26/6/2019 5 All

Findings on the raw materials and products specifications 2 days 27/6/2019 28/6/2019 5 All

Assembling the process operations for reactor 11 days 29/6/2019 9/7/2019 5 All
Elimination of differences of molecular types between raw materials and 3 days 29/6/2019 1/7/2019 5 All
product streams
Comparison of different types of reactor and selection of the most 4 days 2/7/2019 5/7/2019 5 All
appropriate reactor for each reaction system
Identification of appropriate material of construction for each reaction system 2 days 6/7/2019 7/7/2019 5 All

Creation of flowsheet for reaction systems 2 days 8/7/2019 9/7/2019 5 All

Assembling the process operations for separation equipment 8 days 10/7/2019 17/7/2019 3 L, N, Y
Elimination of differences in composition between effluent streams and 3 days 10/7/2019 12/7/2019 3 L, N, Y
desired products
Identification of suitable separation operations and their respective 3 days 13/7/2019 15/7/2019 3 L, N, Y
placements
Selection of suitable material of construction for each separation equipment 1 day 16/7/2019 16/7/2019 3 L, N, Y

Insertion of the selected separation system into the created flowsheet 1 day 17/7/2019 17/7/2019 3 L, N, Y
Application of heuristics to determine the suitability of pumps, 8 days 18/7/2019 25/7/2019 2 Z, K
compressors, heat exchangers, and other equipment
Elimination of differences in temperature, pressure and phase between feed 3 days 18/7/2019 20/7/2019 2 Z, K
and product streams of the reaction and separation systems
Determination of other suitable equipment to be used and their respective 3 days 21/7/2019 23/7/2019 2 Z, K
placements
Selection of appropriate material of construction for each equipment 1 day 24/7/2019 24/7/2019 2 Z, K

Insertion of selected equipment into the created flowsheet 1 day 25/7/2019 25/7/2019 2 Z, K

Preparation of the entire block flow diagram (BFD) 4 days 26/7/2019 27/7/2019 4 N, Y, Z, K

Construction of BFD for the overall process 1 day 26/7/2019 26/7/2019 2 N, Y

Identification and label of five core systems 1 day 27/7/2019 27/7/2019 2 Z, K

Compilation of completed tasks 1 day 28/7/2019 28/7/2019 1 L

Submission of Assignment 3 1 day 29/7/2019 29/7/2019 1 L

Assignment 4: HYSYS Simulation 23 days 22/7/2019 13/8/2019

Study on the property packages for HYSYS simulation 2 days 22/7/2019 23/7/2019 5 All
Selection of the most appropriate property package for HYSYS simulation of 1 day 24/7/2019 24/7/2019 5 All -
VCM production
Construction of individual core system(s) 2 days 25/7/2019 26/7/2019 5 All

Compilation of all core systems 1 day 27/7/2019 27/7/2019 5 All

HYSYS simulation of VCM production and optimization of system 13 days 28/7/2019 9/8/2019 5 All

Estimation of pipe sizes of selected large flow rate streams 1 day 10/8/2019 10/8/2019 5 All

Revision and correction of BFD (if any) 1 day 11/8/2019 11/8/2019 5 All

Compilation of completed tasks 1 day 12/8/2019 12/8/2019 1 N

Submission of Assignment 4 1 day 13/8/2019 13/8/2019 1 N

Assignment 5: Manual Calculation on Material and Energy Balances 16 days 29/7/2019 13/8/2019

Introduction on the function of selected core systems 1 day 29/7/2019 29/7/2019 5 All

Manual calculation on material and energy balances for the core systems 9 days 30/7/2019 7/8/2019 5 All

Comparison between the results of simulation and manual calculation 4 days 8/8/2019 11/8/2019 5 All

Compilation of completed tasks 1 day 12/8/2019 12/8/2019 1 Y

Submission of Assignment 5 1 day 13/8/2019 13/8/2019 1 Y

Assignment 6: Process Flow Diagram (PFD) 15 days 7/8/2019 21/8/2019

Revision and correction of HYSYS simulation (if any) 6 days 7/8/2019 12/8/2019 5 All

Construction of completed PFD 3 days 13/8/2019 15/8/2019 2 K, L

Construction of stream tables 4 days 16/8/2019 19/8/2019 3 N, Y, Z

Compilation of completed tasks 1 day 20/8/2019 20/8/2019 1 Z

Submission of Assignment 6 1 day 21/8/2019 21/8/2019 1 Z

Oral Presentation 7 days 17/8/2019 23/8/2019

Preparation of slides 2 days 17/8/2019 18/8/2019 5 All

Rehearsal 4 days 19/8/2019 22/8/2019 5 All

Presentation 1 day 23/8/2019 23/8/2019 5 All

Assignment 5 Correction 13 days 23/8/2019 4/9/2019

Revision and correction of Assignment 5 (if any) 12 days 23/8/2019 3/9/2019 5 All

Submission of corrected Assignment 5 1 day 4/9/2019 4/9/2019 1 Z