0% found this document useful (0 votes)
62 views

1 2 3 4 5 6 7 B C D E F: Building Design 1 1 2

1. The document contains elevation drawings for the front and right sides of a building with measurements and labels for architectural features. 2. Key features include a parapet wall, roof beam, three floors, decorative brickwork, and steel railings. 3. Materials used are noted as tempered glass, concrete hollow blocks, plaster, painted finish, and metal fire escape stairs.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
62 views

1 2 3 4 5 6 7 B C D E F: Building Design 1 1 2

1. The document contains elevation drawings for the front and right sides of a building with measurements and labels for architectural features. 2. Key features include a parapet wall, roof beam, three floors, decorative brickwork, and steel railings. 3. Materials used are noted as tempered glass, concrete hollow blocks, plaster, painted finish, and metal fire escape stairs.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

1 2 3 4 5 6 7 F E D C B A

0.67M
2.73M 2.87M 5.23M 5.33M 5.33M 5.33M 4.17M 4.27M 3.97M 4.27M1.33M

TOP OF PARAPET WALL TOP OF PARAPET WALL


2.50M 0.67M

TOP OF ROOF BEAM TOP OF ROOF BEAM

2.50M
TEMPERED GLASS
THIRD FLOOR LINE THIRD FLOOR LINE
2.30M

2.30M
4" CHB WALL PLASTERED
SECOND FLOOR LINE FINISH PAINTED SECOND FLOOR LINE
0.13M

0.13M
2.60M

2.60M
DECORATIVE MASONRY
BRICKS

F.F.L. STEEL RAILINGS F.F.L.


N.G.L. N.G.L.

BD F R O N T E L E V A T I O N BD R I G H T E L E V A T I O N
1 4 SCALE 1:150MTS 2 4 SCALE 1:150MTS

7 6 5 4 3 2 1 A B C D E F

0.67M
5.33M 5.33M 5.33M 5.23M 2.87M 2.73M 1.33M 4.27M 3.97M 4.27M 4.17M

TOP OF PARAPET WALL TOP OF PARAPET WALL


2.50M 0.67M

TOP OF ROOF BEAM TOP OF ROOF BEAM

2.50M
METAL FIRE
ESCAPE STAIRS
THIRD FLOOR LINE THIRD FLOOR LINE
2.30M

2.30M
4" CHB WALL PLASTERED
SECOND FLOOR LINE FINISH PAINTED SECOND FLOOR LINE
0.13M

0.13M
2.60M

2.60M
F.F.L.
N.G.L.
F.F.L.
N.G.L.

BD R E A R E L E V A T I O N BD LE F T E L E V A T I O N
3 4 SCALE 1:150MTS 4 4 SCALE 1:150MTS

SUBJECT: PROJECT TITLE & LOCATION: PREPARED AND SUBMITTED BY: SUBMITTED TO: SHEET CONTENTS: SHEET NO.

CAMARINES NORTE STATE COLLEGE FRONT ELEVATION


PROPOSED THREE (3) STOREY RIGHT ELEVATION A
COLLEGE OF ENGINEERING BUILDING DESIGN 1 CONDOMINIUM LEFT ELEVATION

DAET, CAMARINES NORTE


BRGY. MANGCAMAGONG, BASUD, CAMARINES NORTE
ENCINAS, JESSA MAE J.
BACHELOR OF SCIENCE IN CIVIL ENGINEERING 4A
ENGR. RAMON A. ORBITA
INSTRUCTOR / PROFESSOR
REAR ELEVATION
1 2

You might also like