Lower reservoir M2
Membrane Installation 305,000
option B
Supply and installation of M2
HDPH liner on upper 9500
reservoir spill way
Supply and installation of M2
Geotextile on upper 9500
reservoir spill way
Supply and installation of M2
HDPH liner on Lower 12,000
reservoir spill way
Supply and installation of
Geotextile on Lower 12,000 M2
reservoir spill way