The scope of work includes: 1. Reviewing the contract specifications and proposing lining and drainage systems to meet requirements. 2. Providing shop drawings, method statements, and calculations for the proposed systems. 3. Supplying and installing geotextiles, geo composites, and HDPE liners as specified. 4. Considering two options for the liner material: supplied by the subcontractor or supplied free by the main contractor.

Uploaded by

mamahsen
Copyright
© © All Rights Reserved
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
100% found this document useful (2 votes)
788 views

Scope of Works & BOQ

The scope of work includes: 1. Reviewing the contract specifications and proposing lining and drainage systems to meet requirements. 2. Providing shop drawings, method statements, and calculations for the proposed systems. 3. Supplying and installing geotextiles, geo composites, and HDPE liners as specified. 4. Considering two options for the liner material: supplied by the subcontractor or supplied free by the main contractor.

Uploaded by

mamahsen
Copyright
© © All Rights Reserved
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 3

Scope of Works:

1- Adjustment of bedding layer as required (laying and levelling is done by others).


2- Review of Contract specification and propose lining system/s achieving required design life
and free defect period warrantee, Program including expected duration, number of crew
personnel, working hours, and productivity.
3- Review of Contract specification and propose Drainage and leakage detection system
achieving required design life and free defect period warrantee.
4- Supply and installation of Geotextile (if required) as per proposed system by geomembrane
manufacturer.
5- Provide Shop drawings, method statement, and technical calculation.
6- Supply and installation of Geo composite (if required) as per proposed system by
geomembrane manufacturer.
7- Supply and installation for leakage detection and drainage system as indicated on design
drawings. (Please provide Level 1 Program of works including expected duration, number of
crew personnel, working hours, and productivity).
8- For liner, you are required to consider two options
A. liner Material is free issued by main contractor.
- Material shifting from Main contractor store to different working areas is done by
Subcontractor using his own equipment and manpower.
- Subcontractor to advise the quantity required for the works including overlapping,
wastage, samples etc
B. liner is supplied by Subcontractor
- Material receipt and offloading is done by Subcontractor equipment/manpower
- Material shifting from Main contractor store to different working areas is done by
Subcontractor using his own equipment and manpower.
(Please provide Level 1 Program of works including expected duration, number of crew personnel,
working hours, and productivity)
9- Supply and installation of HDPE liner on Spillway.
 The subcontractor shall allow for the following:
- Own arrangement for accommodation, Camp, transport, Flight.
- All testing of material as highlighted in contract specification.
- Sufficient time for safety induction approximately for 1 day for all staff and labour.
- Ay consumables accessories required for installation, fixing, welding, testing , etc.
- Provide proper PPE and small tools.
- Provide experienced qualified supervision and surveyors.
- Any items other than the bellow (provided by main contractor) required to complete the
works
 The Main contractor shall provide the following:
- Provide power connection, the subcontractor to advice requirement.
Des Quantity Unit Rate Total
Mob 1 Item
Demob 1 Item
Project management &
1 Item
Supervision of works etc
Insurances, bank
1 Item
guarantees
Engineering works (items
1 Item
2, 3,5,8)
Upper reservoir Supply
and installation of 327,000 M2
Geotextile (If applicable)
Upper reservoir Supply M2
and installation of Geo
327,000
composite (or any
secondary alternative)
Upper reservoir M2
Membrane Installation 327,000
option A
Upper reservoir M2
Membrane Installation 327,000
option B
Lower reservoir Supply M2
and installation of 305,000
Geotextile (If applicable)
Lower reservoir Supply M2
and installation of Geo
composite (or any 305,000
secondary alternative))
Lower reservoir M2
Membrane Installation 305,000
option A

Lower reservoir M2
Membrane Installation 305,000
option B
Supply and installation of M2
HDPH liner on upper 9500
reservoir spill way
Supply and installation of M2
Geotextile on upper 9500
reservoir spill way
Supply and installation of M2
HDPH liner on Lower 12,000
reservoir spill way
Supply and installation of
Geotextile on Lower 12,000 M2
reservoir spill way