Fuel Handling System
Fuel Handling System
Part 1 General
Part 2 Products
Part 3 Execution
3.1 PREPARATION
A. Ream pipe and tube ends. Remove burrs. Bevel plain end ferrous pipe
B. Remove scale and dirt, on inside and outside, before assembly
C. Prepare piping connections to equipment with flanges or unions.
3.2 INSTALLATION
A. Install to manufacturer's written instructions.
B. Provide non-conducting dielectric connections wherever jointing dissimilar metals.
C. Route piping in orderly manner and maintain gradient.
D. Install piping to conserve building space and not interfere with use of space.
E. Group piping whenever practical at common elevations.
F. Install piping to allow for expansion and contraction without stressing pipe, joints, or connected
equipment.
G. Provide clearance for installation of insulation and access to valves and fittings.
H. Provide access where valves and fittings are not exposed.
I. Where pipe support members are welded to structural building framing, scrape, brush clean, weld, and
apply one coat of zinc rich primer.
J. Prepare pipe, fittings, supports, and accessories not prefinished, ready for finish painting.
K. Identify piping systems including underground piping.
L. Install valves with stems upright or horizontal, not inverted.
M. Protect piping systems from entry of foreign materials by temporary covers, completing sections of the
work, and isolating parts of completed system.
END OF SECTION