Daily Site Diary & Progress Report - DUHAIL: Monday 9-Feb-15

This daily site diary summarizes construction progress on the Development of ISF Camp at Duhail project. On the reported day, work included excavation of 125 cubic meters for storm sewers, installation of 35 square meters of formwork, placement of 16.15 tons of steel reinforcement, and pouring of 65 cubic meters of concrete. The weather was sunny with temperatures between 17-27°C. Various equipment like excavators, concrete mixers, and trucks were used. No issues or delays were reported.

Uploaded by

reynold
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
403 views1 page

Daily Site Diary & Progress Report - DUHAIL: Monday 9-Feb-15

This daily site diary summarizes construction progress on the Development of ISF Camp at Duhail project. On the reported day, work included excavation of 125 cubic meters for storm sewers, installation of 35 square meters of formwork, placement of 16.15 tons of steel reinforcement, and pouring of 65 cubic meters of concrete. The weather was sunny with temperatures between 17-27°C. Various equipment like excavators, concrete mixers, and trucks were used. No issues or delays were reported.

Uploaded by

reynold
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

Employer Project Manager/ Contractor Sub Contractor Project Name: Development of ISF Camp at Duhail

Consultant Preliminary Phase Works

Contract No: CPC-02

Date: 09-Feb-15 Report No - xx

Daily Site Diary & Progress Report - DUHAIL

ON SITE STAFF & LABOUR RECORD DAY Monday DATE 9-Feb-15 ON SITE PLANT & EQUIPMENT RECORD
STAFF WORK FORCE No CATEGORY No. Hrs No. CATEGORY No. Hrs
No. TRADE No. Hrs No. TRADE No. Hrs WEATHER: Sunny Cloudy Rainy Windy Dusty 1 1 TON PICKUP 21
1 Project Manager 1 Carpenter 2 3 TON PICK UP 22
2 Site Engineer 2 Steel Fixer 3 AIR COMPRESSOR 23
3 General Foreman 3 Mason TEMPERATURE:Minimum: 17°C Maximum: 27°C 4 BACKHOE LOADER 24
4 4 5 CUT/BEND MACHINE 25
5 5 DELIVERY OF MATERIALS 6 BULDOZER 26
6 6 No. MATERIAL Qty. Unit 7 CONCRETE MIXER 27
7 7 1 Form work 8 EXCAVATOR - BCKT 28
8 8 2 Steel Rein. 9 EXCAVATOR - DRUM CUT 29
9 9 3 Concrete 10 EXCAVATOR - HM 30
10 10 4 Block 11 FORKLIFT 31
11 11 5 12 32
12 12 6 13 33
13 13 7 14 34
14 14 8 15 35
15 15 9 16 36
16 16 10 17 37
17 17 11 18 38
18 18 12 19 39
19 19 13 20 40
STAFF - TOTAL WORK FORCE - TOTAL 16 Total TOTAL

VISITORS ON SITE DESCRIPTION OF WORKS DONE NON-WORKING PLANT/EQUIPMENT


No. NAME ORGANIZATION No. MAJOR WORKS Unit of Measure Qty. No. CATEGORY Broken Idle

1 1 Excavation for SS No. XXX m3 125 1


2 2 Shutter m2 35 2
3 3 Fixing of Steel ton 16.15 3
4 4 Casting of concrete m3 65 4
5 5 Screed 5
6 6
REMARKS 7 7
1 8 8
2 9 9
3 10 10
4 11
5 12
6 13
7 14
8 15
9 SUBMISSION: AGREED:
10 Construction Manager Signature: Sr. Construction Manager Signature: