Additional Works: Item Description Qty Unit Unit Cost

The document lists 16 additional works items with descriptions and costs for a construction project. It includes items like aquarium framing, concrete saddles, dropped walls, column rectification, various painting and tiling works, and an overall grand total of $78,850 for all additional works.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
24 views

Additional Works: Item Description Qty Unit Unit Cost

The document lists 16 additional works items with descriptions and costs for a construction project. It includes items like aquarium framing, concrete saddles, dropped walls, column rectification, various painting and tiling works, and an overall grand total of $78,850 for all additional works.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 4

ITEM DESCRIPTION QTY UNIT Unit Cost

1 ADDITIONAL WORKS

1.01 Aquarium Framing 1.00 lot 4,000.00

1.02 Concrete Sadle for Water Tank & Cabinet 1.00 lot 3,500.00

1.03 Dropped Wall @ Garage 1.00 lot 6,000.00

1.04 Column Rectification (Plumbness) 1.00 lot 2,500.00

1.05 Painting Works @ Kitchen 1.00 lot 6,000.00

Leveling, Compaction & Arrangement of Concrete


1.06 1.00 lot 8,000.00
Blocks from Lanai to Kitchen

1.07 Patio Gutter & Downspout 1.00 lot 1,500.00

1.08 Main Door Ceiling Canopy 1.00 lot 1,500.00

1.09 Catwalk Railings for Aircondensing Unit 1.00 lot 5,000.00

1.1 Electrical Works @ Garage 1.00 lot 3,000.00

1.11 Preparation for Epoxy Injection 26.50 sqm. 150.00

Chipping & Restoration with Zocalo of Sliding Door


1.12 1.00 lot 4,000.00
Opening @ Balcony

1.13 Concreting of Balcony 26.50 sqm. 250.00

1.14 Tile Works @ Balcony 26.50 sqm. 500.00


1.15 Painting Works @ Balcony 1.00 lot 4,000.00

1.16 Purchase of Materials and Professional Fee 1.00 lot 6,000.00

GRAND TOTAL
AMOUNT

4,000.00

3,500.00

6,000.00

2,500.00

6,000.00

8,000.00

1,500.00

1,500.00

5,000.00

3,000.00

3,975.00

4,000.00

6,625.00

13,250.00
4,000.00

6,000.00

78,850.00