100% found this document useful (1 vote)
1K views2 pages

Structural Steel Works Man-Hours

The document contains a bill of materials listing various steel items, their specifications, unit prices, and estimated quantities needed. Items are grouped by weight and include light, medium, heavy, and extra heavy steel, as well as pipes, platforms, beams, gratings, handrails, ladders, and fabrication costs. A total of 14 different items are listed with their respective unit rates and estimated quantities in tons.

Uploaded by

Renny Devassy
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
1K views2 pages

Structural Steel Works Man-Hours

The document contains a bill of materials listing various steel items, their specifications, unit prices, and estimated quantities needed. Items are grouped by weight and include light, medium, heavy, and extra heavy steel, as well as pipes, platforms, beams, gratings, handrails, ladders, and fabrication costs. A total of 14 different items are listed with their respective unit rates and estimated quantities in tons.

Uploaded by

Renny Devassy
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 2

Item Description & Item Unit Price Unit kg/m or Quantity Quantity

Specification kg/m2 (Tons)


Light Steel (0-25Kg/Lm) Te Te 1.00

Medium Steel (25-70 Te Te 1.00


Kg/Lm)
Heavy Steel (70- Te Te 1.00
180Kg/Lm)
Extra Heavy Steel (Above- Te Te 1.00
180 Kg/Lm)
Te Te 1.00
Pipe & E&I Supports
Te Te 1.00
Round Platforms
Te Te 1.00
Trolly Beams
Te Te 1.00
Lifting/Spreader Beams
Te Te 1.00
Shipping Beams
Floor Grating (In-house SM SM 57.75 1 0.06
fabricated)
Straight Handrails and Toe Lm Te 19 1 0.02
Plates
Slope Handrails and Toe Lm Te 23 1 0.02
Plates
Round Handrails and Toe Lm Te 23 1 0.02
Plates
Ladders without Cages Lm Te 22 1 0.02

Ladders with Cages Lm Te 59.65 1 0.06


Fabrication Pre Assembly
Assembly
175 25 75

150 25 60

100 25 50

75 25 50

175 0 100
150 25 75
75 0 75

75 0 0
75 0 0

150 25 75

150 0 75

150 0 75

150 0 75

100 0 75

150 0 75