Title: Boiler No.:-PH0351 Page No. 1 of 22 Project: M/s Jacobs Netherlands BV A/c Schoonebeek Oil Field Redevelopment Project
Title: Boiler No.:-PH0351 Page No. 1 of 22 Project: M/s Jacobs Netherlands BV A/c Schoonebeek Oil Field Redevelopment Project
Project: M/s Jacobs Netherlands BV A/c Schoonebeek Oil Field Redevelopment Project
Boiler No.:- PH0351 Specification No. PF5-HR-CS-35356
Page No. 1 of 22
SR NO.
1 SRT project name Schoonebeek OilField Redevelopment
8 Issue date
! !"
# $ $ $ % "
" '( $
& $
! )
Title: ASME CODE CALCULATIONS FOR 1X365 TPH BOILER
Project: M/s Jacobs Netherlands BV A/c Schoonebeek Oil Field Redevelopment Project
Boiler No.:- PH0351 Specification No. PF5-HR-CS-35356
Page No. 2 of 22
CONTENTS
Sr.No. Description Page No.
Front Page 1
Contents 2
Revision control sheet 3
1 General 4
2 Design data 5
3 Material and allowable stresses 6
4 Ligament efficiency calculation for Deaerator bank headers 7
5 Ligament efficiency calculation for LP Downcomer 8
6 Header thickness requirement calculations 9
7 Hole compensation calculations for headers 10
8 Tube stub thickness requirement calculation 11
9 Hole compensation calculations for boiler bank headers 12-17
10 Endcover thickness requirement calculation 18
11 Boiler bank tube thickness calculations 19
12 Nozzle attachment weld size calculations 20
13 Nozzle weld strength calculations 20
14 Membrane stresses during hydro. Test 21-22
15 PWHT & RT reqmt. 22
Title: ASME CODE CALCULATIONS FOR 1X365 TPH BOILER
Project: M/s Jacobs Netherlands BV A/c Schoonebeek Oil Field Redevelopment Project
Boiler No.:- PH0351 Specification No. PF5-HR-CS-35356
Page No. 3 of 22
Design Pressure P ] (M.A.W.P. + max.Hydrostatic Head in the boiler acting on any of the PG-22.1
boiler component (except LP Drum since it is at the topmost elevation).
In design calculations P as per above formula will be used in various formulae as given in
code to calculate required thicknesses of pressure part components. Calculated thicknesses
then will be compared with actual component thk. for suitability check.
Max Hydrostatic Head = 0.214 MPa(g) [for 24400 mm of WC]
Design Metal Temp. for RH side Deaerator 392 DEG.F 200 DEG.C
All material used in Pressure Part are as per ASME Section II, A material specifications and are PG-5 to
selected as per PG-5 to PG-9 of ASME Secton I PG-9
Allowable Stresses taken from ASME Sec.II D at Design Metal Temperatures [DMT] specified in
the table as shown below.
E= [p - d ] / p
p
E = [ 90 - 38.6 ] / 90
E = 0.571
Hence d = 154.080 MM
E= [p - d ] / p
p
E = [ 450 - 154.08 ] / 450
E = 0.658
p'
Circumferential Ligament Efficiency =
E = [ p' - d ] / p'
Where,
P = Header Design Pressure
S = Allowable Stress
E = Ligament Efficiency
Deaerator
1 2 0.964 219.1 117.903 0.571 3.559 15.978
Bank Headers
LP Downcomer
3 2 0.964 60.3 117.903 1.000 2.246 7.648
Drain Stub
Minimum Unpierced Header Thickness tmin (by substituting E=1.0 in above formula):
1/3
d = 8.08 [ D t ( 1 - K ) ] FIG.PG-32
Where,
K = ( P D ) / ( 1.82 x S x t ) PG-32.1.2
S = Allowable Stress
Hence by substitution
D t P S K d
Sr. No. Item
(MM) (MM) MPa(g) MPa(g) (MM)
Since maximum hole size on Deaerator Bank Headers [ which is 154.08 MM] for Riser Stubs PG
and I/C Pipe Stubs is Greater than above calculated diameter 'd', 32.1.3.2
Compensation calculation is required
Since maximum hole size on LP Downcomer [ which is 154.08 MM] for I/C Pipe Stubs
is Greater than above calculated diameter 'd',
Compensation calculation is required
Title: ASME CODE CALCULATIONS FOR 1X365 TPH BOILER
Project: M/s Jacobs Netherlands BV A/c Schoonebeek Oil Field Redevelopment Project
Boiler No.:- PH0351 Specification No. PF5-HR-CS-35356
Page No. 11 of 22
Equipment Data:
C = 0 MM PG-27.4
Note 4
Pipe Thickness Requirement Calculation :
Hence by substitution,
t = 0.686 MM
The above calculated thickness is less than minimum provided [ 6.221 mm] thickness.
Hence thickness provided is adequate.
Title: ASME CODE CALCULATIONS FOR 1X365 TPH BOILER
Project: M/s Jacobs Netherlands BV A/c Schoonebeek Oil Field Redevelopment Project
Boiler No.:- PH0351 Specification No. PF5-HR-CS-35356
Page No. 12 of 22
Total cross section area in a given plane for which compensation is required:
A = d x tr x F PG-33.2.1
Area requirement :
Where
d= 154.1 MM
tr = 0.893 MM
F= 1 PG-33.2
tn= 6.221 MM
A = 154.08 x 0.893 x 1
A= 137.560 SQ. MM
Title: ASME CODE CALCULATIONS FOR 1X365 TPH BOILER
Project: M/s Jacobs Netherlands BV A/c Schoonebeek Oil Field Redevelopment Project
Boiler No.:- PH0351 Specification No. PF5-HR-CS-35356
Page No. 13 of 22
Where
Thickness of Header [t] = 15.978 MM
F = 1 Fig.PG-33
Hence by substitution
A1 = d x [ t- Ftr ] = 2324.253 SQ. MM
Area available [A2] from Nozzle on Hole d1 is smaller of the following PG-36.4.1
A2 = 2x [ tn - trn ] x[ 2.5xtxfr1] Here instead of '2.5t' actual nozzle out side =1290.85 MM>2.5t
and Hence 2.5t MM is used in calculation.
A2 = 2x[ tn - trn ] [ 2.5xtn + te]xfr1 Here instead of '2.5tn' actual nozzle out side =1290.85 MM>2.5tn
and Hence 2.5tn MM is used in calculation.
A3 = 0
Title: ASME CODE CALCULATIONS FOR 1X365 TPH BOILER
Project: M/s Jacobs Netherlands BV A/c Schoonebeek Oil Field Redevelopment Project
Boiler No.:- PH0351 Specification No. PF5-HR-CS-35356
Page No. 14 of 22
Where
Allowable stress in Nozzle mat.[Sn] = 117.903 MPa(g)
Hence by substitution
A2 = 2x [ tn - trn ] x[ 2.5xtxfr1] = 282.439 SQ. MM
A2 = 109.975 SQ. MM
A3 = 0 = 0.000 SQ. MM
Total cross section area in a given plane for which compensation is required:
A = d x tr x F PG-33.2.1
Area requirement :
Where
d= 154.1 MM
tr = 1.320 MM
F= 1 PG-33.2
tn= 6.221 MM
A = 154.08 x 1.32 x 1
A= 203.358 SQ. MM
Title: ASME CODE CALCULATIONS FOR 1X365 TPH BOILER
Project: M/s Jacobs Netherlands BV A/c Schoonebeek Oil Field Redevelopment Project
Boiler No.:- PH0351 Specification No. PF5-HR-CS-35356
Page No. 16 of 22
Where
Thickness of Header [t] = 22.225 MM
F = 1 Fig.PG-33
Hence by substitution
A1 = d x [ t- Ftr ] = 3221.070 SQ. MM
Area available [A2] from Nozzle on Hole d1 is smaller of the following PG-36.4.1
A2 = 2x [ tn - trn ] x[ 2.5xtxfr1] Here instead of '2.5t' actual nozzle out side =1290.85 MM>2.5t
and Hence 2.5t MM is used in calculation.
A2 = 2x[ tn - trn ] [ 2.5xtn + te]xfr1 Here instead of '2.5tn' actual nozzle out side =1290.85 MM>2.5tn
and Hence 2.5tn MM is used in calculation.
A3 = 0
Title: ASME CODE CALCULATIONS FOR 1X365 TPH BOILER
Project: M/s Jacobs Netherlands BV A/c Schoonebeek Oil Field Redevelopment Project
Boiler No.:- PH0351 Specification No. PF5-HR-CS-35356
Page No. 17 of 22
Where
Allowable stress in Nozzle mat.[Sn] = 117.903 MPa(g)
Hence by substitution
A2 = 2x [ tn - trn ] x[ 2.5xtxfr1] = 392.878 SQ. MM
A2 = 109.975 SQ. MM
t = d CP / S
Where,
d = Diameter or short span ( = O.D. - 2 * min. hdr. thk.)
C = Max. of ' 0.33m ' and ' 0.20 ' ts = Actual Provided Hdr. Thickness
m = tr / ts P = Design Pressure
Hence by substitution,
Since the required thickness of End Cover as calculated above is less than
provided thickness, the thickness of End Cover is adequate.
Title: ASME CODE CALCULATIONS FOR 1X365 TPH BOILER
Project: M/s Jacobs Netherlands BV A/c Schoonebeek Oil Field Redevelopment Project
Boiler No.:- PH0351 Specification No. PF5-HR-CS-35356
Page No. 19 of 22
Equipment Data:
e = 0 MM PG-27.4
Note 4
Tube Thickness Requirement Calculation :
t = ( P D / [ 2 S + P ] ) + 0.005 D + e PG-27.2.1
Hence by substitution,
t = 0.346 MM
The above calculated thickness is less than minimum provided [ 2.7 MM] thickness.
Hence thickness provided is adequate.
ANNEXURE - 1
25
20
% Thinning
15
10
0
0 1 2 3 4 5
R/D Ratio
Title: ASME CODE CALCULATIONS FOR 1X365 TPH BOILER
Project: M/s Jacobs Netherlands BV A/c Schoonebeek Oil Field Redevelopment Project
Boiler No.:- PH0351 Specification No. PF5-HR-CS-35356
Page No. 21 of 22
Solving we get
S=[PD/{2(t-C)E}] + [(yP)/E]
e= 0 MM PG-27.4
Note 4
Required Tube Thickness
t = ( P D / [ 2 S + P ] ) + 0.005 D + e PG-27.2.1
Solving we get
S = [ P D / 2 ( t - 0.005 D ) ] - ( P / 2 )
PWHT for Tubes Not required as per Table PW-39, Note 1-a
50 DN Weld sizes
PW-16.1(z) HB1 22.225 8.740 8.740 6.000 ----- ----- ----- 9.000 6.300 ---- ---- ----
Conn. are adequate.
HT /
38.1 od Weld sizes
- 15.978 2.700 2.700 1.890 ----- ----- ----- 6.700 4.690 ---- ---- ----
Tubes are adequate.
HT1
Weld strength calculations are not required for weld configurations shown in figure PW-16.1, sketches (a) & (z) as per clause PW-15.1.6
Title: ASME CODE CALCULATIONS FOR 1X365 TPH BOILER
Project: M/s Jacobs Netherlands BV A/c Schoonebeek Oil Field Redevelopment Project
Boiler No.:- PH0351 Specification No. PF5-HR-CS-35356
Page No. of
Rev.No. 0
Prepared By
Checked By
Approved By
Date