AmBright Labor Cost

This document contains price lists for various construction materials and works for a project located in Batangas, Philippines. It includes pricing for ceiling works, concrete works, electrical works, elevators, embankments, fire protection systems, glazing and curtain walls, cement mixtures for concrete classes, hardscape works, and heavy equipment rental rates. The prices provided are for materials, labor, and execution of tasks needed for completion of the described project works.

Uploaded by

Andrea Magtuto
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
1K views

AmBright Labor Cost

This document contains price lists for various construction materials and works for a project located in Batangas, Philippines. It includes pricing for ceiling works, concrete works, electrical works, elevators, embankments, fire protection systems, glazing and curtain walls, cement mixtures for concrete classes, hardscape works, and heavy equipment rental rates. The prices provided are for materials, labor, and execution of tasks needed for completion of the described project works.

Uploaded by

Andrea Magtuto
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 53

Project

San Juan Imelda Batangas


Location
Subject MATERIAL PRICE LIST

Description
Ceiling works price list in the Philippines

Ceiling Works

4′ x 8′ x 4.50mm Fiber Cement (ceiling board)

4′ x 8′ x 9mm Gypsum Board (ceiling board)


4′ x 8′ x 9mm Gypsum Board (ceiling board, Moisture
Resistant)
Ficem Screw 20mm
Ceiling Vent:
1″x1″x10′ s4s Tanguile or its equivalent
1″x3″x8′ s4s Tanguile or its equivalent
Insect Sreen
0.8mm thk. -12mm x 38mm x 5.00m Double Furring
0.8mm thk. -12mm x 38mm x 5.00m Single Furring
0.2mm thk-20mm x 20mm x 2.44m Wall Angle
Rod suspension hanger w/adjustment spring
Pre-formed wire clip
Toks Srew

List of Construction Prices for Concreting Works Philippines


Concreting Works
Concrete
Soil Poisoning – Termicide
Gravel
Wash Sand
Portland Cement, 40kg
Pozzolan Cement, 40kg
Steel Bars
 10mm Diameter Deformed Bars
 12mm Diameter Deformed Bars
 16mm Diameter Deformed Bars
 20mm Diameter Deformed Bars
 #16 G.I. Tie Wire
Formworks
 2 x 3 x 10′ Coco lumber
 2 x 4 x 10 Coco lumber
 1/2″ x 4′ x 8′ Plywood
 6mm thk. Lawanit board
 6mm thk. Ordinary Plywood
 1″x2″x8′ Hard wood or its equivalent
 2″x2″x8′ Hard wood or its equivalent
 2″x2″x8’Hardwood or its equivalent
 2″x24″x8′ Hard wood or its equivalent

Deformed Reinforcing Bars Prices per Length


Deformed Reinforcing Bars Prices
Description
 REBAR, Gr 40, 12mm dia x 6m
 REBAR, Gr 40, 12mm dia x 7.5m
 REBAR, Gr 40, 12mm dia x 9m
 REBAR, Gr 40, 12mm dia x 10.5m
 REBAR, Gr 40, 12mm dia x 12m
 REBAR, Gr 60, 16mm dia x 6m
 REBAR, Gr 60, 16mm dia x 7.5m
 REBAR, Gr 60, 16mm dia x 9m
 REBAR, Gr 60, 16mm dia x 10.5m
 REBAR, Gr 60, 16mm x 12m
 REBAR, Gr 60, 20mm dia x 6.0m
 REBAR, Gr 60, 20mm dia x 10.5m
 REBAR, Gr 60, 25mm dia x 6.0m
 REBAR, Gr 60, 25mm x 9.0m
 REBAR, Gr 60, 25mm dia x 10.5m
 REBAR, Gr 60, 25mm dia x 12m

Electrical Pipe Prices per Commercial Length


Description
IMC PIPE 1/2″ (15mm) x 3M w/ COUPLING
IMC PIPE 3/4″ (20mm) x 3M w/ COUPLING
IMC PIPE 1″ (25mm) x 3M w/ COUPLING
IMC PIPE 1-1/4″ (32mm) x 3M w/ COUPLING
IMC PIPE 1-1/2″ (40mm) x 3M w/ COUPLING
IMC PIPE 2″ (50mm) x 3M w/ COUPLING
IMC PIPE 2-1/2″ (65mm) x 3M w/ COUPLING
IMC PIPE 3″ (80mm) x 3M w/ COUPLING
IMC PIPE 3-1/2″ (90mm) x 3M w/ COUPLING
IMC PIPE 4″ (100mm) x 3M w/ COUPLING
FMC ORDINARY 1/2″ (15mm)
FMC LT 4″ (100mm)
FMC LT 30″ (80mm)
FMC LT 2-1/2″ (65mm)
PVC CONDUIT 20MM (1/2″) x 3m
PVC CONDUIT 25MM (3/4″) x 3m
PVC CONDUIT 32MM (1″) x 3m
PVC CONDUIT 40MM (1-1/4″) x 3m
PVC CONDUIT 63MM (2″) x 3m
PVC CONDUIT 110MM (4″) x 3m

List of Construction Prices for Electrical Works Philippines


ELECTRICAL WORKS
Pipe and Fitting
20mmdia UPVC  pipe
20mmdia RSC conduit
20mmdia RSC coupling
20mmdia UPVC coupling
20mmdia  UPVC adoptor
20mm dia. Locknut& bushing
20mm dia. RSC Locknut& bushing
Boxes and Gutter
Junction box depth type,metal gauge 16 w/ cover
Utility box depth type, metal gauge 16 w/cover
4×4 square box depth, metal gauge 16 w/cover
Miscellaneous and Consumables
Electrical tape big
Rubber tape big
Solvent cement 100cc
G.I. Wire No. 12
Concrete nail no.3
CWN no.3
Entrance cap
Terminal Lugs
Red Led Paint
Cable Tie
Secondary Rack
Black Paint
Wires
8.0mm2 THHN
5.5mm2 THHN
3.5mm2 THHN
2.0mm2 THHN
Wiring Devices
1-gang Switch, 10A, 240V
2-gang  switch, 10A, 240V
2-gang  3  way  switch, 10A, 240V
1-gang Convenince Outlet, 10A, 240V
2-gang  Convenience Outlet, 3 prong 10A, 240V
Lighting Fixtures
24  Watts light bulb
1-18watts Compact flourescent lighting fixtures
keyless type,porcelain receptacle
2-36 watts ,220v,Flourescent (box type)
1 x 18, 230V, Compact Flourescent (Keyless Type Porcelain
Receptacle Outlet)
Power Load Center Switch Gear and Panel Board
Main :40AT/50AF,1PCB,240V,18KAIC, BOLT-ON
Branches
2-15AT/50AF,1PCB,240V,10KAIC,,BOLT-ON
3-20AT/50AF,1PCB,240V,10KAIC,,BOLT-ON

Price Guide to Elevator Construction


GENERAL REQUIREMENTS / PRELIMINARIES
Description
A. Mobilization (Temporary Office (including construction/relocation of temporary
Contractor’s Office
Warehouse
B. Cleaning and Disposal of Garbage/Debris
C. Premium for Insurance and Bonds (including Renewal Cost up to Project Comp
Surety Bond (Equivalent to 10% contract amount)
Performance Bond (Equivalent to 10% contract amount)
Guarantee Bond (Equivalent to 10% contract amount)
D. Water and Electric Consumption
E. Demobilization  (Clearing, removal of temporary facilities,
Tools, Debris, Excess Materials, etc.)
F. Other Requirements (Pls. specify)

Permits (Incl. Mayor’s City tax, & Other Misc. Permit charges)

Cost of Local Procurement/ Material (Incl. Drawings/ Plotting,


PME Sign & Seal materials door safety nettings, barricades,
consumable materials, welding rods, wire, etc.
Cable + Conduit (for WTB-Watch Tower Board or Supervisory
Panel
Total
ELEVATOR WORKS, TESTING & COMMISSIONING
Description
Installation of Scaffolding
Hoisting
Template Setting
Marking and Boring of Holes
Bracket Setting
Rail Setting
Sill/Jamb Installation
Floor Indicator/Call buttons
Machine Room Equipment Setting
Machine Room Piping
Hoist-way Piping
Landing Door Assembly
Car Assembly
Travelling Cable Lay-out
CWT Assembly
Lay-out of Ropes
Wiring (Machine Room/Hoist-way)
Initial Test
Slow Speed test (Start up)
Load Test
Drop Test
Buffer Test
Plate Setting/Slow Switch Installation
Rubber Block Setting
High Speed Testing
Standard/Special Feature Test
Others
Total

Embankment Price List Philippines


Embankment (per cubic meter)
Common Borrow
Selected Borrow
Mixed Sand & Gravel
Rock
Aggregate Subbase Course
Aggregate Subbase Course Material
Aggregate Base Course
Crushed Grading A
Uncrushed Grading A
Crushed Grading B
Uncrushed Grading B
Blended Weathered Limestone and Crush Stone
Filler Materials
Crushed Aggregate Base (per cubic meter)
Crushed Grading A
Crushed Grading B
Lime Stabilized Road Mx Base Course (per cubic meter)
Lime Stabilized Mixed Soil Aggregate Base Course Crushed
Grading A
Lime Stabilized Mixed Soil Aggregate Base Course Crushed
Grading B
Lime Stabilized Mixed Soil Aggregate Base Course Uncrushed
Grading A
Lime Stabilized Mixed Soil Aggregate Base Course Uncrushed
Grading B
Aggregate Surface Course (per cubic meter)
Crushed Grading A
Crushed Grading B
Crushed Grading C
Crushed Grading D
Uncrushed Grading A
Uncrushed Grading B
Uncrushed Grading C
Uncrushed Grading D

Fire Protection and Suppression System Prices in the Philippin


Fire Protection System
B.I. Pipe 100mm dia
B.I. Pipe 75mm dia
B.I. Pipe 65mm dia
B.I. Pipe 50mm dia
B.I. Pipe 40mm dia
B.I. Pipe 25mm dia
Fittings (Elbow, Tee, Reducer, etc)
Pendent 12mm dia
Side Wall 12mm dia
Fire Hose Cabinet with Fire Extinguisher
Fire Extinguisher, 10 lbs Capacity, Wall Mounted, HCFC 123

FP-1, Horizontal Split Case Centrifugal Pump with A.C. Motor &
Controller, UL/FM Approved, 350 GPM, 125psi, 40 HP, 230/3/60

FP-1, Horizontal Split Case Centrifugal Pump with A.C. Motor &
Controller, UL/FM Approved, 350 GPM, 100psi, 30 HP, 230/3/60

JP-1 Vertical In-Line Centrifugal Pump with AC Motor &


Controller, UL/FM Approved, 10GPM, 5HP, 130psi, 230, 3/60
m. JP-1 Vertical In-Line Centrifugal Pump with AC Motor &
Controller, UL/FM Approved, 10GPM, 3HP, 100psi, 230, 3/60
Gate Valve (OS & Y), 100mm dia
Y-Strainer
Check Valve
Alarm Check Valve Assembly
Globe Valve
Pressure Reducing Valve
Float Valve
Water Flow Switch
Floor Control Valve
Pressure Gauge
FDC Siamese Twin: Two-Way
Isolation Valve
Water Flow Meter
Drain Off Valve
Roof Manifold
Hangers and Support
Electrical Works for Pumps from Main Breaker
Miscellaneous and Consumables
Testing and Commissioning
Overhead Water Tank 2000 US Gal
Fire Reserve Tank 11000 US gal
Fire Reserve Tank 7000 US gal
Fire Alarm System
Bell, Vibrating Type
Equipment for Fire Alarm Control Panel
Manual Pull Switch

Glazing and Curtain Wall Prices Philippines


Curtain Walls and Glazing Works Prices
Material Description
8mm thk Reflective Tempered Glass Door
12mm thk Frameless Glass Door
12mm thk Reflective Tempered Glass Door
12mm thk Clear Tempered Glass Wall
Light Blue Light Reflective Tempered Glass Curtain Wall
Aluminum Wall Cladding
Aluminum Canopy
Railing with 12mm thk Clear Tempered Glass x 0.8m H

Guide to Cement and Aggregates Factors per Concrete Class Mixture


Class C (2,000 psi)
Cement
Sand
Gravel
Class B (2,500 psi)
Cement
Sand
Gravel
Class A (3,500 psi)
Cement
Sand
Gravel
Class AA (4,000 psi)
Cement
Sand
Gravel

Price Guide to Basic Hardscape Works


Product and Execution Requirements
Description
Product Storage and Handling (Contractor’s Temporary
Warehouse)
Construction Layout and Surveying
Local Business Permit
Cleaning

Description

Dampproofing  and Waterproofing

Cementitious and Reactive Waterproofing

Colorless Floor Hardener

Tiles, Stampcrete and Accessories


Supply, Delivery and Installation of Granite (150mm x 150mm)
Supply, Delivery and Installation of Granite (300mm x 600mm)
Supply, Delivery and Installation of #10 Crushed Granite
(Washout)
Supply, Delivery and Installation of Homogeneous Tiles
(600mm x 600mm)
Supply, Delivery and Installation of Homogeneous Tiles
(300mm x 300mm)
Supply, Delivery and Installation of 150mm Wide Stampcrete
Supply, Delivery and Installation of Stampcrete
Lighting Accessories
Supply, Delivery and Installation of Recessed Steplight (15W
Die Cast Aluminum with Front Panels)

Construction Heavy Equipment and Tools Rates in the Philippines


DESCRIPTION

Earthmoving Equipment
Bulldozer
Payloader
Motorized Road Grader
Compaction Equipment
Plate Compactor
Lifting Equipment
Crawler Crane
Crawler Crane
Crawler Crane
Truck Mounted Crane
Truck Mounted Crane
Truck Mounted Crane
Truck Mounted, Scissor Lift, Terrain
Excavating Equipment
Backhoe
Backhoe w/ Breaker
Backhoe, Wheel Mounted
Portable Breaker
Foundation Equipment
Diesel Hammer
Vibro Hammer
Vibro Hammer w/ Hydraulic Power Pack
Vibro Hammer
Drilling Rig
Concreting Equipment
Concrete Screeder
Concrete Paver
One Bagger Mixer
Transit Mixer
Hauling Equipment
Dump Truck
Cargo/Service Truck
Boom Truck
Cargo/Service Truck
Water Truck/Pump
Air Equipment
Air Compressor
Air Compressor
Air Compressor, Portable
Air Compressor
Diamond Drill
Jackhammer
Pneumatic Drilling Machine
Pumping Equipment
Water Pump, 100 mm suction Ø
Water Pump, 100 mm suction Ø
Pumpcrete
Power Generating Equipment
Generator Set
Generator Set
Shop Equipment
Welding Machine
Welding Machine
Special Support Equipment
Chainsaw
Miscellaneous Equipment
Concrete Vibrator
Bar Cutter
Bar Bender
Others
Drop Hammer w/ accessories

1 Air Compressor w/ 2 Jack Hammer

Cutting Outfit
Pile Integrity Testing (Sonic) & accessories
(includes professional fee of Strcutural Engineer and reports)
Pile Integrity Testing & accessories
(includes professional fee of Strcutural Engineer and reports)
Dynamic Pile Testing
(includes professional fee of Structural Engineer)

Lighting System/Tower Lights

Bentonite Bin

Bentonite Mixer
SPT & Desanding Machine

Tremie Pipe Set

Construction Labor Rates in the Philippines


Construction Labor Rates
Description
 Foreman
 Electrician
 Plumber
 Leadman
 Heavy Equipment Operator
 Highly Skilled Worker
 Light Equipment Operator
 Driver
 Skilled Worker
 Semi-skilled Worker
 Unskilled Worker

Philippine Manpower and Equipment Productivity Ratio


PHILIPPINE PRODUCTIVITY RATIOS

DESCRIPTION

1.STRUCTURAL EXCAVATION
Common excavation
Hand
Machine
Rock excavation
Hauling of spoils
2.STRUCTURAL BACKFILL
By hand
By machine
3.TRENCHING
By hand

By machine
EXCAVATION- MANUAL
Common earth
Loam of sand
Clay or heavy soil
Rock
EXCAVATION- MECHANICAL
Common earth
Rock with jack hammer
BACKFILLING
Common manual
Gravel fill manual
TRENCHING & BACFILLING OF UNDERGROUND PIPING USING EXCAVATION MATLS
FROM:
0 – 2m Depth
2 – 3m Depth
3 – 4m Depth
4 – 5m Depth
Placing binder gravel
Escombro backfilling
Spreading,tamping & grading
Mechanical compaction, plate compaction
MANUAL CLEARING & GRUBBING
Clearing under growth & trees – 12″
Clearing under growth & shrubs
Disposal of soil
Hauling of soil
Gravel fill
EXCAVATION – CRANE & CLAMPSHELL
With 8 men & 2 carpenters
5.ROOFING AND SIDING
Roofing
Metallic
Non-Metallic
Siding
Metallic
Non-Metallic
CONCRETE WORKS
4.CONCRETE WORKS
Grade members
Formworks
Concreting
Rebar
Finishing
Suspended members
Formworks
Concreting
Rebar
Finishing
Embeded metal
Water proofing
Joint filler
PLACING CONCRETE
Slab on Fill
Slip Form
Floor Finish Unhardened
Concrete finished hardened
REBAR WORKS
Ground floor installation
Upper floor installation
Fabrication
Mixing manual
Mixing machine
MORE THAN  1.8 M3 POUR
Chute from truck
Crane & bucket
Wheeling
Finishing
FORMWORKS & CARPENTRY WORKS
FORM WORKS INSTALLATION
Wall on ground
Wall above ground
Beams
Columns
Suspended slab
Suspended slab 0 – 18″
Suspended slab 10 – 36″ up
Elevated & shored slab forming
Forming only
Forming & Shoring
Wood wall & Partition
FORM WORKS FABRICATION
Form works fabrication
STRIPPING OF FORMS
Wall on ground
Wall above 10″
Beams
Columns
Suspended slab
Suspended slab 0 – 18″
Suspended slab 10 – 36″ up
Elevated & shored slab forming – strip of forms
Floor slab at grade – strip of forms
INSTALLATION OF CARPENTRY WORKS
Plywood partition
T & G Flooring and Siding
Ceiling & frame work
Siding frame work
Flooring framing
Wooden post errection
Truss Fabrication
Truss Installation
Girt Installation
Plates Installation
Purlins Installation
Fascia board Installation
1/4″ or 3/4″ thk. plywood
Cutting by manual
Assembly
ARCHITECTURAL SPECIALTIES
DOORS
Wooden
Steel
Aluminum
Cyclone wire
WINDOWS
Glass
Louver
Steel
PARTITIONS
single wall
Wooden wall
Wooden Louver
cyclone Louver
PAINTING ( 3 coats )
Equipment
Pipes
Miscillaneous
STRUCTURAL STEEL WORKS
7. STRUCTURAL STEEL
Fabrication
Light
Heavy
Errection
Light
Heavy
WELDING ( one pass only )
1- Welder and 1- Helper ( 16 total mh )
G.1 STRUCTURAL STEEL
Fabrication
Heavy weight
Light weight
Grating 1 1/4″ x 3/16″
Star threat grating
Errection
Heavy Structural teel
Light Structural steel
Stacks ( Inc. full welding )
Tanks ( Inc. full welding )

FINISHING AND MASONRY WORKS


H. CHB
4” CHB
Laying
Tooling
Plastering
6” CHB
Laying
Tooling
Plastering
8” CHB
Laying
Tooling
Plastering

List of Construction Prices for Painting Works Philippines


Reinforced Concrete Pipe Prices
RCP 1200mm x 1m
RCP 910mm x 1m
RCP 750mm x 1m
RCP 600mm x 1m
RCP 450mm x 1m
RCP 375mm x 1m
RCP 300mm x 1m
Ready Mixed Concrete Prices
Ready Mixed Concrete 3000psi @ 28 Days
Ready Mixed Concrete 3000psi @ 14 Days
Ready Mixed Concrete 3000psi @ 7 Days
Ready Mixed Concrete 3500psi @ 28 Days
Ready Mixed Concrete 3500psi @ 14 Days
Ready Mixed Concrete 3500psi @ 7 Days
Ready Mixed Concrete 4000psi @ 28 Days
Ready Mixed Concrete 4000psi @ 14 Days
Ready Mixed Concrete 5000psi @ 28 Days

List of Construction Prices for Painting Works Philippines


Slope Stabilization Mesh System
Description
3mm Ø High Tensile Wire mesh (3.5x30mm)
10mm Ø Tensile Rope Anchor
4mm Ø High Tensile Wire Clips
10mm Ø Tensile Wire Rope Anchor
Anchor Bolt (32mmØ x 2.5m)
Threading of Bolts w/ nuts
Non-Shrink Grout
Centralizer
Drill Bit
Centrosema Seeds
Enzyme
3D Geonet

List of Construction Prices for Truss Works Philippines


Truss Works
Item Name
6mm thk.x 65mm x 65mm x 6.0 Angle bar(T & B Chord)
6mm thk. x 50mm x 50mm x 6.0 Angle bar(Web Member)
10mm thk. Gusset plate welded to truss
150mm x 65mm x 20mm x 2mm LC-Purlins
255mm x 90mm x 25mm x 5mm thk.  LC- Channel beam
300mmx12mm dia. Plain Bar w/ standard nuts & washers @
both ends: Sagrod
350mmx12mm dia. Plain Bar w/ standard nuts & washers @
both ends: Sagrod
380mmx12mm dia. Plain Bar w/ standard nuts & washers @
both ends: Sagrod
465mmx12mm dia. Plain Bar w/ standard nuts & washers @
both ends: Sagrod
550mmx12mm dia. Plain Bar w/ standard nuts & washers @
both ends: Sagrod
12mm. Thk. Buckle Plate
16mm dia. Plain Bar cross bracing
16 mm dia. Turn buckle
12mm x 250mm x 300mm Base Plate
100 x 100 x 6mm thk. Angular base plate
50 x 50 x 5mm Angular Bar
75 x 75 x 6mm x 130mm Clip Angle to Purlins
Welding Rod (Fuji)
Oxygen(content only)
Acetylene(content only)
Hacksaw Blade
Paint brush # 4
Paint brush # 2
Red Lead Primer
Paint Thiner

Construction Heavy Equipment and Engineering Survey Equipment Price


onstruction Heavy Equipment and Engineering Survey Equipment Price List
4th Quarter of 2018
Description
Amphibious Excavator
Backhoe Payloader
Crack Sealing Applicator, Walk Behind
Cutter Suction Dredge and Support Vessel
Dump Truck, 210 Hp, 5.5 cu.m
Dump Truck, 150 Ps, 3 cu.m
High side Pick-Up with Roof (HSPUR)
Hydraulic Excavator
Kneading Machine
Multi-Purpose Amphibious  Dredge
Multi-Purpose Amphibious  Dredge, 10
Multi-purpose Cutter Suction Dredge
Pavement Marking Remover
Prime Mover, 400 Hp
Road Patcher
Stake Truck, 210 Hp
Vibratory Roller, 15 Hp, 1500 Kgs
Wheel Loader, 110 Hp, 1.7 cu.m
Digital Level
Handheld Global Positioning System (GPS)
Total Station

List of Construction Prices for Sanitary and Plumbing Works Philippines


Plumbing and Sanitary Works
Sanitary Lines
100mm dia. PVC
75mm dia. PVC
50mm dia PVC (vp & wp)
PVC Clean Out w/ plug & sealing ring 100mm
PVC Clean Out w/ plug & sealing ring 150mm
PVC P-Trap w/ plug & sealing ring 50mm
PVC Te (150mm)
PVC Tee (100mm)
PVC WYE (100mm)
PVC WYE REDUCER (100mmX50mm)
PVC WYE REDUCER (100mmX75mm)
PVC ELBOW 90° (100mm)
PVC ELBOW 90° (75mm)
PVC Elbow 90° (50mm)
PVC Elbow 45° (100mm)

PVC Elbow 45° (75mm)

PVC Elbow 45° (50mm)


PVC Coupling (100mm)

Vulca Seal

Cold Water Lines

20mmØ Polypropylene, Type 3, PN20

20mmØ Coupling

20mmØ Tee

20mmØ Elbow

Teflon Tape

Swimming Pool Accessories Price Guide

PLUMBING & EQUIPMENT

 Description

Supply and install valves, pipings, fittings and other items as


necessary

Centrifugal pump/motor 2HP, 230v


Sand Filter 360T2  w/ Multiport Valve

Maindrain Cover

Vacum Fittings

Return Fittings

Vacuum cleaning set

Hydrostatic relief valve

 ELECTRICAL & UNDERWATER LIGHTS

 Description

Underwater Light  12v

Mounting Ring

Deck Box

Transformer 300w / 12-16 v

Conduits 3/4″ diameter


#10 Wire

Panel Board
Magnetic Switch
Push Botton Switches

 OTHER WORKS
 Description
Construction of balancing tank
Construction of filtration room
Supply of water line from sourec to pump room using PVC
pipes
Supply of power from source to pump room. Tapping not
included
Testing & Commissioning
One month maintenance
Unit Unit Price

sheet           425.00

sheet           410.00

sheet           520.00

pc 0.7

pc 65
pc 65
sht 140
pcs 112.56
pcs 102.56
pcs. 36.5
set 65
set 3.03
pcs. 0.7

ines
Liter        325.00
cu.m     1,010.00
cu.m     1,035.00
Bag        260.00
Bag        260.00

pc        156.00
pc        223.00
pc        394.00
pc        645.00
kg          16.00

pc        280.00
pc        280.00
pc        660.00
pc        209.00
pc        330.00
pc          65.00
pc          65.00
pc          65.00
pc          65.00

Unit  Amount (php)


pc 187.13
pc 233.92
pc 280.69
pc 327.47
pc 374.26
pc 334.42
pc 418.02
pc 501.62
pc   585.23
pc 668.83
pc 522.6
pc 914.56
pc 816.55
pc 1,224.82
pc 1,428.97
pc 1,633.10

Unit  Amount (Php)


pc                227.70
pc                294.19
pc                515.53
pc                613.88
pc                777.52
pc                992.70
pc             1,685.50
pc             2,060.26
pc             3,091.29
pc             3,583.05
pc                  21.59
pc             1,841.44
pc             1,095.94
pc                924.46
pc                  58.14
pc                  76.04
pc                108.09
pc                137.92
pc                222.17
pc                673.96

es

pcs          85.00


pcs        216.00
pcs          20.00
pcs             5.00
pcs             7.50
pcs             8.00
pcs          14.30

pcs          25.00


pcs          25.00
pcs          50.00
pcs.          40.00
pcs.          90.00
pcs.        240.00
kls.          70.00
kls.        120.00
kls.          70.00
pcs.          35.00
lot        600.00
pcs.        429.00
pc             1.00
pc        540.00
gal         610.00

m          43.33
m          36.59
m          25.00
m          23.33

set        110.00


set        140.00
set        240.00
set        250.00
set        351.00

set         285.00


set         680.00

set      1,200.00

set         680.00

set   12,500.00

PC 315.70
PC 315.70

Unit Amount (Php)


on/relocation of temporaryfacilities)
lot 51,750.00
lot 51,750.00
lot 17,250.00
al Cost up to Project Completion)
lot 21,968.65
lot 43,937.29
lot 109,814.06
lot 23,000.00

lot 17,250.00

lot 88,895.00

lot       492,200.00

lot         34,500.00

      952,315.00

Unit Amount (Php)


lot         17,503.00
lot         26,254.50
lot         43,757.50
lot         26,254.50
lot         35,006.00
lot         43,757.50
lot         52,509.00
lot           8,751.50
lot         43,757.50
lot         17,503.00
lot         43,757.50
lot         35,006.00
lot         61,260.50
lot         21,878.75
lot         21,878.75
lot         26,254.50
lot         70,012.00
lot         52,509.00
lot         26,254.50
lot         13,127.25
lot         13,127.25
lot           8,751.50
lot         43,757.50
lot         17,503.00
lot         61,260.50
lot         26,254.50
lot         17,503.00
      875,150.00

       384.40
       392.40
       585.11
       602.56

       818.13
       934.89
       839.13
       926.00
       831.63
       837.00
       818.22
       401.00

       921.63
       875.43
)

       693.75

        662.78

       670.00

       641.11

       878.22
       864.33
       884.75
       856.38
       826.13
       817.38
       812.63
       793.25

m Prices in the Philippines

lm          1,889.00
lm             984.00
lm             708.00
lm             425.00
lm             317.00
lm             192.00
l.s.        15,000.00
pc             503.00
pc             518.00
set        24,000.00
set          6,825.00

assy   1,116,923.00

assy      887,692.31

assy      300,000.00

assy      180,000.00

unit        31,680.00


unit        36,118.45
unit        17,500.00
unit        63,360.00
unit          9,114.00
unit      104,099.33
unit        77,396.68
unit          6,468.00
unit          8,303.00
unit             971.13
unit          6,500.00
unit        18,000.00
unit        58,084.99
unit        19,557.51
unit        16,199.14
l.s.        25,000.00
l.s.        15,000.00
l.s.          5,000.00
l.s.      167,000.00
unit      167,000.00
unit      162,962.00
unit      103,703.70

set          1,300.00


set        13,890.00
set          1,250.00

ices Philippines

Unit Price
sq.m. 33,600.00
sq.m. 33,000.00
sq.m. 37,000.00
sq.m. 6,700.00
sq.m. 7,400.00
sq.m.        4,200.00
sq.m.        4,400.00
l.m.        1,008.50

ncrete Class Mixture

5.634 Bags
0.4794 cu.m.
0.898 cu.m.

7.399 Bags
0.486 cu.m.
0.8856 cu.m.

8.799 Bags
0.5724 cu.m.
0.856 cu.m.
11.729 Bags
0.475 cu.m.
0.8344 cu.m.

Unit  Amount (Php) 

lot           20,000.00

lot           20,000.00


lot           20,000.00
lot           20,000.00
Labor
Unit Material (Php)
(Php)
SQ.M.
      
SQ.M.                690.00
200.00

         
               135.00
56.25

SQ.M.
SQ.M.             3,450.00 1,800.00
SQ.M.             4,300.00 1,800.00

SQ.M.             3,290.00       


350.00
      
SQ.M.             1,515.00
350.00
      
SQ.M.             1,525.00
350.00
      
SQ.M.             1,950.00
300.00
      
            1,950.00
300.00
pc
   
            6,900.00
3,800.00

in the Philippines
 HOURLY
RATE (PHP)

          
3,379.00
          
1,733.00
          
2,173.00

             
123.00

          
1,522.00
          
1,902.00
          
2,151.00
          
1,631.00
          
1,861.00
          
2,606.00
          
1,386.00

          
1,537.00
          
1,998.10
             
922.00
             
129.38

          
1,286.00
          
2,123.00
          
4,118.00
          
3,069.00
          
3,932.00

             
545.00
          
6,765.00
             
172.00
          
1,318.00

          
1,420.00
             
783.00
          
1,017.90
          
1,212.00
          
2,450.00

             
965.00
             
502.00
             
450.00
             
205.00
             
201.25
             
150.00
             
170.00

             
266.25
             
123.38
          
2,076.00

             
872.87
          
2,147.27

             
391.00
             
371.00

               
75.36

               
91.25
             
219.75
             
351.50

          
5,000.00
          
1,265.00
               
45.45

  65,000.00

37,000.00

103,000.00
             
543.50
             
280.00
             
173.00
             
559.00
             
320.00

Unit  Rate
hourly 70.76
hourly 64.89
hourly 64.89
hourly 64.89
hourly 59.02
hourly 59.02
hourly 55.21
hourly 51.33
hourly 51.33
hourly 47.46
hourly 39.59

ent Productivity Ratio

MANHOUR/U
UNIT
NIT

6 MH/M3
0.5 MH/M3
8 MH/M3
1 MH/M3

5 MH/M3
2 MH/M3

6 MH/M3

0.5 MH/M3

8 MH/M3
1.31 MH/M3
1.64 MH/M3
2.63 MH/M3

6.67 MH/M3
16.67 MH/M3

0.82 MH/M3
5 MH/M3
USING EXCAVATION MATLS MANUAL

1.25 MH/LM
1.67 MH/LM
2.5 MH/LM
3.33 MH/LM
0.11 MH/M3
0.21 MH/M3
0.48 MH/M2
0.06 MH/M3

0.05 MH/M2
0.03 MH/M2
1.69 MH/M3
1 MH/M3
2.07 MH/M3

1.07 MH/M3

0.97 MH/m2
1.51 MH/m2

1.29 MH/m2
1.51 MH/m2

2.54 MH/M2
8.54 MH/M3
0.07 MH/kg
0.4 MH/M2

3.28 MH/M2
16.7 MH/M3
0.08 MH/kg
0.8 MH/M2
0.27 MH/kg
1.82 MH/M2
0.3 MH/lLm

5 MH/M3
25 MH/M3
1 MH/M3
1.43 MH/M3

0.07 MH/M3
0.08 MH/M3
0.1 MH/M3
16 MH/M3
1.8 MH/M3

7 MH/M3
14 MH/M3
27 MH/M3
2.8 MH/M3

2 MH/M2
2.35 MH/M2
3.08 MH/M2
2.35 MH/M2

1.67 MH/M2
3.33 MH/M2

8.6 MH/M2
11 MH/M2
0.5 MH/M2

1 MH/M2

0.25 MH/M2
1.29 MH/M2
1.03 MH/M2
0.85 MH/M2

0.83 MH/M2
1.08 MH/M2
3.5 MH/M2
2.8 MH/M2

1 MH/PC
0.14 MH/B.F.
0.36 MH/B.F.
0.27 MH/B.F.
0.97 MH/B.F.
0.43 MH/B.F.
0.35 MH/B.F.
0.8 MH/B.F.
0.21 MH/B.F.
0.13 MH/B.F.
0.27 MH/B.F.
0.46 MH/B.F.

1 MH/PC
0.42 MH/M2

2.37 MH/M2
7.64 MH/M2
8.07 MH/M2
7.64 MH/M2

3.23 MH/M2
4.63 MH/M2
32.29 MH/M2

2.48 MH/M2
3.44 MH/M2
3.44 MH/M2
5.38 MH/M2

0.24 MH/f2
0.3 MH/f2
0.24 MH/f2

110-130 MH/MT
60-90 MH/MT

70-100 MH/MT
40-60 MH/MT

40-50 Lf/day

50-90 MH/MT
100-125 MH/MT
3.0 – 3.5 MH/SF
4.0 – 5.0 MH/SF

30 – 60 MH/MT
60- 90 MH/MT
250 – 300 MH/MT
200 – 275 MH/MT

8.0 – 10 m2/day
11 – 14 m2/day
8.0 – 10 m2/day

7.0 – 9.0 m2/day


11 – 14 m2/day
8.0 – 10 m2/day

6.0 – 8.0 m2/day


11 – 14 m2/day
8.0 – 10 m2/day

ilippines
pc     4,116.00
pc     2,860.00
pc     1,607.00
pc     1,250.00
pc        803.00
pc        714.00
pc        625.00

cu.m     4,503.00


cu.m     4,766.00
cu.m     4,911.00
cu.m     4,754.00
cu.m     4,948.00
cu.m     5,244.00
cu.m     5,151.00
cu.m     5,347.00
cu.m     5,707.00

ilippines

Unit Price (Php)


sq.m 6,992.00
ln.m 1,012.00
pc 138
pc 4,600.00
pc 966
pc 1,288.00
bags 552
pc 230
pc 18,400.00
kgs. 294.4
ltrs. 13.8
sq.m 598

pines

Unit Price
pc 2,248.70
pc 1,704.66
sq.m. 4,245.52
pcs.   1,089.00
pcs. 4,057.57

pcs. 74.12

pcs. 76.74

pcs. 78.31

pcs. 82.76

pcs. 87.22

sq.m. 5,100.44
pc. 419.1
pc. 137.5
sq.m. 5,100.44
pc. 1,880.00
pc. 1,392.12
pc.   2,611.40
box   2,330.00
tank   1,575.00
tank   2,000.00
pc. 65
pc. 65
pc. 35
gal. 429.45
gal. 551.25

Survey Equipment Price List – 4Q of


Equipment Price List

Unit  Price
Unit         15,800,000.00
Unit            4,800,000.00
Unit               390,000.00
Unit       300,000,000.00
Unit            3,450,000.00
Unit            2,700,000.00
Unit               920,000.00
Unit            5,900,000.00
Unit               960,000.00
Unit         37,500,000.00
Unit         41,500,000.00
Unit         54,700,000.00
Unit            1,180,000.00
Unit            4,750,000.00
Unit            4,300,000.00
Unit            3,100,000.00
Unit            1,400,000.00
Unit            2,500,000.00
Unit               110,000.00
Unit                 44,000.00
Unit               460,000.00

mbing Works Philippines

Unit  Price
pc 753.5
pc 485
pc 330
pc 95
pc 114
pc 66
pc 95
pc 95
pc 95
pc 85
pc 95
pc 95
pc 85
pc 66
pc 95
 Total
pc 85  Materials  Labor  Other
(Php)
              
pc 66 103,700.0 31,110. 37,746. 172,55
0 00 80 6.80
              
     
pc 95 3,050.0 12,468. 56,998.
41,480.00
0 40 40

              
     
pc 440 3,050.0 21,350. 97,600.
73,200.00
0 00 00

       
                        
Unit  Price 2,810.8
1,830.00 366.00 614.88
8

             
                  
pc. 250 1,830.0 6,558.7
732.00 717.36
0 2

       
                           
pc. 95 4,528.6
732.00 152.50 247.66
4

                


     
pc. 95 1,830.0 5,636.4 51,532.
18,300.00
0 0 80

       
                        
pc. 95 2,654.7
1,708.00 366.00 580.72
2

   
roll 27.5 395,24
0.96

 Total
 Materials  Labor  Other
(Php)
              
     
1,464.0 5,192.3 189,89
17,080.00
0 2 0.56

     
                        
Unit Qty 22,736.
1,708.00 512.40 621.71
90

     
                        
 Lot 1.00 10,306.
1,098.00 244.00 375.76
56

          
                
 Item 1.00 1,195.6 21,862.
3,660.00 610.00
0 40
                
     
 Item 1.00 5,490.0 6,661.2 30,451.
18,300.00
0 0 20

            
     
 Item 1.00 10,980. 13,322. 60,902.
36,600.00
00 40 40

                


     
 Item 2.00 1,830.0 5,636.4 25,766.
18,300.00
0 0 40

            
                
 Item 4.00 1,263.9 5,777.9
3,904.00 610.00
2 2

       
                           
 Item 2.00 3,872.7
610.00 146.40 211.79
7

   
 Item 1.00 371,56
7.10

 Total
 Materials  Labor  Other
(Php)
              
Unit Qty 140,300.0 42,090. 51,069. 233,45
0 00 20 9.20

              


 Item 8.00 140,300.0 42,090. 51,069. 233,45
0 00 20 9.20

                


     
 Item 8.00 6,588.0 7,993.4 36,541.
21,960.00
0 4 44

     
     
 Item 6.00 – – 30,500.
30,500.00
00

                


     
 Item 4.00 5,490.0 6,661.2 30,451.
18,300.00
0 0 20

                


     
 lot 1.00 6,100.0 5,124.0 23,424.
12,200.00
0 0 00
   
 lot 1.00 587,83
5.04
 Item 1.00
 Item 1.00
 Item 4.00

Unit Qty
 Item 1.00
 Item 1.00

 item 1.00

 item 1.00

 item 1.00
 item 1.00
Date:
Project Name:
Project Location:
Subject: LABOR UNIT PRICE ANALYSIS

Daily Labor-Hours Cost per Cost per Unit


Ref. No. Type of Work Crew Output per Output Unit LaborHour Output
1 Crew A 21.666667 10.3385 kg ₱ 65.77 ₱ 679.95
2 Crew B 4.1666667 96.0000 sqm ₱ 283.50 ₱ 27,216.00

Prepared by:
___________
Date:
Project Name:
Project Location:
Subject: LABOR CREW SUMMARY

Cost per Labor-Hour Cost per Labor-Hour Labor-Hours


Crew No.
(Bare) (Incl. O&P) (Daily total) Description
Crew A ₱ 65.77 ₱ - 224.00 Earthworks
Crew B ₱ 283.50 ₱ - 400.00 Rebar Installation
Crew C Formworks
Crew D Concrete Works
Crew E Masonry Works
Crew F Carpentry
Crew G Tile Works/
Crew H Floor Finishing
Crew I Ceiling Finishing
Crew J Wall Finishing
Crew K Painting Works
Crew L Door & Windows Installation

Prepared by:
___________
Date:
Project Name:
Project Location:
Subject: LABOR CREW BREAKDOWN

Crew No. Bare Cost Incl. Subs & O & P Cost per Labor-Hour

Incl. Subs &


Crew A Hr Daily Hr Daily Bare Costs O&P
2 Foreman ₱ 70.76 ₱ 1,132.16 ₱ 65.77 ₱ -
6 Steelmen ₱ 75.00 ₱ 3,600.00
20 Laborer ₱ 62.50 ₱ 10,000.00

224 L.H., Daily Total ₱ 14,732.16 ₱ - ₱ 65.77 ₱ -


Incl. Subs &
Crew B Hr Daily Hr Daily Bare Costs O&P
2 Foreman ₱ 87.50 ₱ 1,400.00 ₱ 66.50 ₱ -
8 leadman ₱ 81.25 ₱ 5,200.00 ₱ 63.00
10 housekeeping ₱ 62.50 ₱ 5,000.00 ₱ 50.00
30 carpenter ₱ 62.50 ₱ 15,000.00 ₱ 104.00

₱ - ₱ -
400 L.H., Daily Total ₱ 26,600.00 ₱ 283.50 ₱ -
Incl. Subs &
Crew C Hr Daily Hr Daily Bare Costs O&P
1 Labor Foreman ₱ 30.75 ₱ 246.00 ₱ 47.90 ₱ 383.20 ₱ 32.39 ₱ 49.70
2 Laborers ₱ 28.75 ₱ 460.00 ₱ 44.75 ₱ 716.00
1 Equip. Oper. (Crane) ₱ 39.80 ₱ 318.40 ₱ 60.00 ₱ 480.00
1 Equip. Oper. Oiler ₱ 33.90 ₱ 271.20 ₱ 51.10 ₱ 408.80
1 Crawler Crane, 100Ton ₱ 1,717.00 ₱ 1,888.70
3 Conc. Bucket, 8CY ₱ 518.00 ₱ 570.24 ₱ 55.88 ₱ 61.47
40 L.H., Daily Total ₱ 3,530.60 ₱ 4,446.94 ₱ 88.27 ₱ 111.17
Incl. Subs &
Crew D Hr Daily Hr Daily Bare Costs O&P
3 Mason ₱ 38.05 ₱ 913.20 ₱ 47.56 ₱ 1,141.50 ₱ 34.29 ₱ 42.86
2 Mason Helper ₱ 28.65 ₱ 458.40 ₱ 35.81 ₱ 573.00
Date:
Project Name:
Project Location:
Subject: LABOR CREW BREAKDOWN

Crew No. Bare Cost Incl. Subs & O & P Cost per Labor-Hour
40 L.H., Daily Total ₱ 1,371.60 ₱ 1,714.50 ₱ 34.29 ₱ 42.86
Incl. Subs &
Crew E Hr Daily Hr Daily Bare Costs O&P
1 Foreman ₱ 75.00 ₱ 600.00 ₱ 93.75 ₱ 750.00 ₱ 57.35 ₱ 71.69
8 Steelmen ₱ 62.50 ₱ 4,000.00 ₱ 78.13 ₱ 5,000.00
8 Steelmen Helpers ₱ 50.00 ₱ 3,200.00 ₱ 62.50 ₱ 4,000.00

136 L.H., Daily Total ₱ 7,800.00 ₱ 9,750.00 ₱ 57.35 ₱ 71.69


Incl. Subs &
Crew F Hr Daily Hr Daily Bare Costs O&P
1 Foreman ₱ 75.00 ₱ 600.00 ₱ 93.75 ₱ 750.00 ₱ 57.35 ₱ 71.69
8 Steelmen ₱ 62.50 ₱ 4,000.00 ₱ 78.13 ₱ 5,000.00
8 Steelmen Helpers ₱ 50.00 ₱ 3,200.00 ₱ 62.50 ₱ 4,000.00

136 L.H., Daily Total ₱ 7,800.00 ₱ 9,750.00 ₱ 57.35 ₱ 71.69


Incl. Subs &
Crew G Hr Daily Hr Daily Bare Costs O&P
1 Foreman ₱ 75.00 ₱ 600.00 ₱ 93.75 ₱ 750.00 ₱ 57.35 ₱ 71.69
8 Steelmen ₱ 62.50 ₱ 4,000.00 ₱ 78.13 ₱ 5,000.00
8 Steelmen Helpers ₱ 50.00 ₱ 3,200.00 ₱ 62.50 ₱ 4,000.00

136 L.H., Daily Total ₱ 7,800.00 ₱ 9,750.00 ₱ 57.35 ₱ 71.69


Incl. Subs &
Crew H Hr Daily Hr Daily Bare Costs O&P
1 Foreman ₱ 75.00 ₱ 600.00 ₱ 93.75 ₱ 750.00 ₱ 57.35 ₱ 71.69
8 Steelmen ₱ 62.50 ₱ 4,000.00 ₱ 78.13 ₱ 5,000.00
8 Steelmen Helpers ₱ 50.00 ₱ 3,200.00 ₱ 62.50 ₱ 4,000.00
Date:
Project Name:
Project Location:
Subject: LABOR CREW BREAKDOWN

Crew No. Bare Cost Incl. Subs & O & P Cost per Labor-Hour

136 L.H., Daily Total ₱ 7,800.00 ₱ 9,750.00 ₱ 57.35 ₱ 71.69


Incl. Subs &
Crew I Hr Daily Hr Daily Bare Costs O&P
1 Foreman ₱ 75.00 ₱ 600.00 ₱ 93.75 ₱ 750.00 ₱ 57.35 ₱ 71.69
8 Steelmen ₱ 62.50 ₱ 4,000.00 ₱ 78.13 ₱ 5,000.00
8 Steelmen Helpers ₱ 50.00 ₱ 3,200.00 ₱ 62.50 ₱ 4,000.00

136 L.H., Daily Total ₱ 7,800.00 ₱ 9,750.00 ₱ 57.35 ₱ 71.69


Incl. Subs &
Crew J Hr Daily Hr Daily Bare Costs O&P
1 Foreman ₱ 75.00 ₱ 600.00 ₱ 93.75 ₱ 750.00 ₱ 57.35 ₱ 71.69
8 Steelmen ₱ 62.50 ₱ 4,000.00 ₱ 78.13 ₱ 5,000.00
8 Steelmen Helpers ₱ 50.00 ₱ 3,200.00 ₱ 62.50 ₱ 4,000.00

136 L.H., Daily Total ₱ 7,800.00 ₱ 9,750.00 ₱ 57.35 ₱ 71.69


Incl. Subs &
Crew K Hr Daily Hr Daily Bare Costs O&P
1 Foreman ₱ 75.00 ₱ 600.00 ₱ 93.75 ₱ 750.00 ₱ 57.35 ₱ 71.69
8 Steelmen ₱ 62.50 ₱ 4,000.00 ₱ 78.13 ₱ 5,000.00
8 Steelmen Helpers ₱ 50.00 ₱ 3,200.00 ₱ 62.50 ₱ 4,000.00

136 L.H., Daily Total ₱ 7,800.00 ₱ 9,750.00 ₱ 57.35 ₱ 71.69


Incl. Subs &
Crew L Hr Daily Hr Daily Bare Costs O&P
1 Foreman ₱ 75.00 ₱ 600.00 ₱ 93.75 ₱ 750.00 ₱ 57.35 ₱ 71.69
8 Steelmen ₱ 62.50 ₱ 4,000.00 ₱ 78.13 ₱ 5,000.00
8 Steelmen Helpers ₱ 50.00 ₱ 3,200.00 ₱ 62.50 ₱ 4,000.00
Date:
Project Name:
Project Location:
Subject: LABOR CREW BREAKDOWN

Crew No. Bare Cost Incl. Subs & O & P Cost per Labor-Hour

136 L.H., Daily Total ₱ 7,800.00 ₱ 9,750.00 ₱ 57.35 ₱ 71.69


Construction Heavy Equipment and Tools Rates in the Philippines
DESCRIPTION HOURLY RATE (PHP)
Earthmoving Equipment
Bulldozer 3,379.00
Payloader 1,733.00
Motorized Road Grader 2,173.00
Compaction Equipment
Plate Compactor 123.00
Lifting Equipment
Crawler Crane 1,522.00
Crawler Crane 1,902.00
Crawler Crane 2,151.00
Truck Mounted Crane 1,631.00
Truck Mounted Crane 1,861.00
Truck Mounted Crane 2,606.00
Truck Mounted, Scissor Lift, Terrain 1,386.00
Excavating Equipment
Backhoe 1,537.00
Backhoe w/ Breaker 1,998.10
Backhoe, Wheel Mounted 922.00
Portable Breaker 129.38
Foundation Equipment
Diesel Hammer 1,286.00
Vibro Hammer 2,123.00
Vibro Hammer w/ Hydraulic Power Pack 4,118.00
Vibro Hammer 3,069.00
Drilling Rig 3,932.00
Concreting Equipment
Concrete Screeder 545.00
Concrete Paver 6,765.00
One Bagger Mixer 172.00
Transit Mixer 1,318.00
Hauling Equipment
Dump Truck 1,420.00
Cargo/Service Truck 783.00
Boom Truck 1,017.90
Cargo/Service Truck 1,212.00
Water Truck/Pump 2,450.00
Air Equipment
Air Compressor 965.00
Air Compressor 502.00
Air Compressor, Portable 450.00
Air Compressor 205.00
Diamond Drill 201.25
Jackhammer 150.00
Pneumatic Drilling Machine 170.00
Pumping Equipment
Water Pump, 100 mm suction Ø 266.25
Water Pump, 100 mm suction Ø 123.38
Pumpcrete 2,076.00
Power Generating Equipment
Generator Set 872.87
Generator Set 2,147.27
Shop Equipment
Welding Machine 391.00
Welding Machine 371.00
Special Support Equipment
Chainsaw 75.36
Miscellaneous Equipment
Concrete Vibrator 91.25
Bar Cutter 219.75
Bar Bender 351.50
Others
Drop Hammer w/ accessories 5,000.00
1 Air Compressor w/ 2 Jack Hammer 1,265.00
Cutting Outfit 45.45
Pile Integrity Testing (Sonic) & accessories 65,000.00
(includes professional fee of Strcutural Engineer and reports)
Pile Integrity Testing & accessories 37000
(includes professional fee of Strcutural Engineer and reports)
Dynamic Pile Testing 103000
(includes professional fee of Structural Engineer)
Lighting System/Tower Lights 543.50
Bentonite Bin 280.00
Bentonite Mixer 173.00
SPT & Desanding Machine 559.00
Tremie Pipe Set 320.00