AmBright Labor Cost
AmBright Labor Cost
Description
Ceiling works price list in the Philippines
Ceiling Works
Permits (Incl. Mayor’s City tax, & Other Misc. Permit charges)
FP-1, Horizontal Split Case Centrifugal Pump with A.C. Motor &
Controller, UL/FM Approved, 350 GPM, 125psi, 40 HP, 230/3/60
FP-1, Horizontal Split Case Centrifugal Pump with A.C. Motor &
Controller, UL/FM Approved, 350 GPM, 100psi, 30 HP, 230/3/60
Description
Earthmoving Equipment
Bulldozer
Payloader
Motorized Road Grader
Compaction Equipment
Plate Compactor
Lifting Equipment
Crawler Crane
Crawler Crane
Crawler Crane
Truck Mounted Crane
Truck Mounted Crane
Truck Mounted Crane
Truck Mounted, Scissor Lift, Terrain
Excavating Equipment
Backhoe
Backhoe w/ Breaker
Backhoe, Wheel Mounted
Portable Breaker
Foundation Equipment
Diesel Hammer
Vibro Hammer
Vibro Hammer w/ Hydraulic Power Pack
Vibro Hammer
Drilling Rig
Concreting Equipment
Concrete Screeder
Concrete Paver
One Bagger Mixer
Transit Mixer
Hauling Equipment
Dump Truck
Cargo/Service Truck
Boom Truck
Cargo/Service Truck
Water Truck/Pump
Air Equipment
Air Compressor
Air Compressor
Air Compressor, Portable
Air Compressor
Diamond Drill
Jackhammer
Pneumatic Drilling Machine
Pumping Equipment
Water Pump, 100 mm suction Ø
Water Pump, 100 mm suction Ø
Pumpcrete
Power Generating Equipment
Generator Set
Generator Set
Shop Equipment
Welding Machine
Welding Machine
Special Support Equipment
Chainsaw
Miscellaneous Equipment
Concrete Vibrator
Bar Cutter
Bar Bender
Others
Drop Hammer w/ accessories
Cutting Outfit
Pile Integrity Testing (Sonic) & accessories
(includes professional fee of Strcutural Engineer and reports)
Pile Integrity Testing & accessories
(includes professional fee of Strcutural Engineer and reports)
Dynamic Pile Testing
(includes professional fee of Structural Engineer)
Bentonite Bin
Bentonite Mixer
SPT & Desanding Machine
DESCRIPTION
1.STRUCTURAL EXCAVATION
Common excavation
Hand
Machine
Rock excavation
Hauling of spoils
2.STRUCTURAL BACKFILL
By hand
By machine
3.TRENCHING
By hand
By machine
EXCAVATION- MANUAL
Common earth
Loam of sand
Clay or heavy soil
Rock
EXCAVATION- MECHANICAL
Common earth
Rock with jack hammer
BACKFILLING
Common manual
Gravel fill manual
TRENCHING & BACFILLING OF UNDERGROUND PIPING USING EXCAVATION MATLS
FROM:
0 – 2m Depth
2 – 3m Depth
3 – 4m Depth
4 – 5m Depth
Placing binder gravel
Escombro backfilling
Spreading,tamping & grading
Mechanical compaction, plate compaction
MANUAL CLEARING & GRUBBING
Clearing under growth & trees – 12″
Clearing under growth & shrubs
Disposal of soil
Hauling of soil
Gravel fill
EXCAVATION – CRANE & CLAMPSHELL
With 8 men & 2 carpenters
5.ROOFING AND SIDING
Roofing
Metallic
Non-Metallic
Siding
Metallic
Non-Metallic
CONCRETE WORKS
4.CONCRETE WORKS
Grade members
Formworks
Concreting
Rebar
Finishing
Suspended members
Formworks
Concreting
Rebar
Finishing
Embeded metal
Water proofing
Joint filler
PLACING CONCRETE
Slab on Fill
Slip Form
Floor Finish Unhardened
Concrete finished hardened
REBAR WORKS
Ground floor installation
Upper floor installation
Fabrication
Mixing manual
Mixing machine
MORE THAN 1.8 M3 POUR
Chute from truck
Crane & bucket
Wheeling
Finishing
FORMWORKS & CARPENTRY WORKS
FORM WORKS INSTALLATION
Wall on ground
Wall above ground
Beams
Columns
Suspended slab
Suspended slab 0 – 18″
Suspended slab 10 – 36″ up
Elevated & shored slab forming
Forming only
Forming & Shoring
Wood wall & Partition
FORM WORKS FABRICATION
Form works fabrication
STRIPPING OF FORMS
Wall on ground
Wall above 10″
Beams
Columns
Suspended slab
Suspended slab 0 – 18″
Suspended slab 10 – 36″ up
Elevated & shored slab forming – strip of forms
Floor slab at grade – strip of forms
INSTALLATION OF CARPENTRY WORKS
Plywood partition
T & G Flooring and Siding
Ceiling & frame work
Siding frame work
Flooring framing
Wooden post errection
Truss Fabrication
Truss Installation
Girt Installation
Plates Installation
Purlins Installation
Fascia board Installation
1/4″ or 3/4″ thk. plywood
Cutting by manual
Assembly
ARCHITECTURAL SPECIALTIES
DOORS
Wooden
Steel
Aluminum
Cyclone wire
WINDOWS
Glass
Louver
Steel
PARTITIONS
single wall
Wooden wall
Wooden Louver
cyclone Louver
PAINTING ( 3 coats )
Equipment
Pipes
Miscillaneous
STRUCTURAL STEEL WORKS
7. STRUCTURAL STEEL
Fabrication
Light
Heavy
Errection
Light
Heavy
WELDING ( one pass only )
1- Welder and 1- Helper ( 16 total mh )
G.1 STRUCTURAL STEEL
Fabrication
Heavy weight
Light weight
Grating 1 1/4″ x 3/16″
Star threat grating
Errection
Heavy Structural teel
Light Structural steel
Stacks ( Inc. full welding )
Tanks ( Inc. full welding )
Vulca Seal
20mmØ Coupling
20mmØ Tee
20mmØ Elbow
Teflon Tape
Description
Maindrain Cover
Vacum Fittings
Return Fittings
Description
Mounting Ring
Deck Box
Panel Board
Magnetic Switch
Push Botton Switches
OTHER WORKS
Description
Construction of balancing tank
Construction of filtration room
Supply of water line from sourec to pump room using PVC
pipes
Supply of power from source to pump room. Tapping not
included
Testing & Commissioning
One month maintenance
Unit Unit Price
pc 0.7
pc 65
pc 65
sht 140
pcs 112.56
pcs 102.56
pcs. 36.5
set 65
set 3.03
pcs. 0.7
ines
Liter 325.00
cu.m 1,010.00
cu.m 1,035.00
Bag 260.00
Bag 260.00
pc 156.00
pc 223.00
pc 394.00
pc 645.00
kg 16.00
pc 280.00
pc 280.00
pc 660.00
pc 209.00
pc 330.00
pc 65.00
pc 65.00
pc 65.00
pc 65.00
es
m 43.33
m 36.59
m 25.00
m 23.33
set 12,500.00
PC 315.70
PC 315.70
lot 17,250.00
lot 88,895.00
952,315.00
384.40
392.40
585.11
602.56
818.13
934.89
839.13
926.00
831.63
837.00
818.22
401.00
921.63
875.43
)
693.75
662.78
670.00
641.11
878.22
864.33
884.75
856.38
826.13
817.38
812.63
793.25
lm 1,889.00
lm 984.00
lm 708.00
lm 425.00
lm 317.00
lm 192.00
l.s. 15,000.00
pc 503.00
pc 518.00
set 24,000.00
set 6,825.00
assy 1,116,923.00
ices Philippines
Unit Price
sq.m. 33,600.00
sq.m. 33,000.00
sq.m. 37,000.00
sq.m. 6,700.00
sq.m. 7,400.00
sq.m. 4,200.00
sq.m. 4,400.00
l.m. 1,008.50
5.634 Bags
0.4794 cu.m.
0.898 cu.m.
7.399 Bags
0.486 cu.m.
0.8856 cu.m.
8.799 Bags
0.5724 cu.m.
0.856 cu.m.
11.729 Bags
0.475 cu.m.
0.8344 cu.m.
135.00
56.25
SQ.M.
SQ.M. 3,450.00 1,800.00
SQ.M. 4,300.00 1,800.00
in the Philippines
HOURLY
RATE (PHP)
3,379.00
1,733.00
2,173.00
123.00
1,522.00
1,902.00
2,151.00
1,631.00
1,861.00
2,606.00
1,386.00
1,537.00
1,998.10
922.00
129.38
1,286.00
2,123.00
4,118.00
3,069.00
3,932.00
545.00
6,765.00
172.00
1,318.00
1,420.00
783.00
1,017.90
1,212.00
2,450.00
965.00
502.00
450.00
205.00
201.25
150.00
170.00
266.25
123.38
2,076.00
872.87
2,147.27
391.00
371.00
75.36
91.25
219.75
351.50
5,000.00
1,265.00
45.45
65,000.00
37,000.00
103,000.00
543.50
280.00
173.00
559.00
320.00
Unit Rate
hourly 70.76
hourly 64.89
hourly 64.89
hourly 64.89
hourly 59.02
hourly 59.02
hourly 55.21
hourly 51.33
hourly 51.33
hourly 47.46
hourly 39.59
MANHOUR/U
UNIT
NIT
6 MH/M3
0.5 MH/M3
8 MH/M3
1 MH/M3
5 MH/M3
2 MH/M3
6 MH/M3
0.5 MH/M3
8 MH/M3
1.31 MH/M3
1.64 MH/M3
2.63 MH/M3
6.67 MH/M3
16.67 MH/M3
0.82 MH/M3
5 MH/M3
USING EXCAVATION MATLS MANUAL
1.25 MH/LM
1.67 MH/LM
2.5 MH/LM
3.33 MH/LM
0.11 MH/M3
0.21 MH/M3
0.48 MH/M2
0.06 MH/M3
0.05 MH/M2
0.03 MH/M2
1.69 MH/M3
1 MH/M3
2.07 MH/M3
1.07 MH/M3
0.97 MH/m2
1.51 MH/m2
1.29 MH/m2
1.51 MH/m2
2.54 MH/M2
8.54 MH/M3
0.07 MH/kg
0.4 MH/M2
3.28 MH/M2
16.7 MH/M3
0.08 MH/kg
0.8 MH/M2
0.27 MH/kg
1.82 MH/M2
0.3 MH/lLm
5 MH/M3
25 MH/M3
1 MH/M3
1.43 MH/M3
0.07 MH/M3
0.08 MH/M3
0.1 MH/M3
16 MH/M3
1.8 MH/M3
7 MH/M3
14 MH/M3
27 MH/M3
2.8 MH/M3
2 MH/M2
2.35 MH/M2
3.08 MH/M2
2.35 MH/M2
1.67 MH/M2
3.33 MH/M2
8.6 MH/M2
11 MH/M2
0.5 MH/M2
1 MH/M2
0.25 MH/M2
1.29 MH/M2
1.03 MH/M2
0.85 MH/M2
0.83 MH/M2
1.08 MH/M2
3.5 MH/M2
2.8 MH/M2
1 MH/PC
0.14 MH/B.F.
0.36 MH/B.F.
0.27 MH/B.F.
0.97 MH/B.F.
0.43 MH/B.F.
0.35 MH/B.F.
0.8 MH/B.F.
0.21 MH/B.F.
0.13 MH/B.F.
0.27 MH/B.F.
0.46 MH/B.F.
1 MH/PC
0.42 MH/M2
2.37 MH/M2
7.64 MH/M2
8.07 MH/M2
7.64 MH/M2
3.23 MH/M2
4.63 MH/M2
32.29 MH/M2
2.48 MH/M2
3.44 MH/M2
3.44 MH/M2
5.38 MH/M2
0.24 MH/f2
0.3 MH/f2
0.24 MH/f2
110-130 MH/MT
60-90 MH/MT
70-100 MH/MT
40-60 MH/MT
40-50 Lf/day
50-90 MH/MT
100-125 MH/MT
3.0 – 3.5 MH/SF
4.0 – 5.0 MH/SF
30 – 60 MH/MT
60- 90 MH/MT
250 – 300 MH/MT
200 – 275 MH/MT
8.0 – 10 m2/day
11 – 14 m2/day
8.0 – 10 m2/day
ilippines
pc 4,116.00
pc 2,860.00
pc 1,607.00
pc 1,250.00
pc 803.00
pc 714.00
pc 625.00
ilippines
pines
Unit Price
pc 2,248.70
pc 1,704.66
sq.m. 4,245.52
pcs. 1,089.00
pcs. 4,057.57
pcs. 74.12
pcs. 76.74
pcs. 78.31
pcs. 82.76
pcs. 87.22
sq.m. 5,100.44
pc. 419.1
pc. 137.5
sq.m. 5,100.44
pc. 1,880.00
pc. 1,392.12
pc. 2,611.40
box 2,330.00
tank 1,575.00
tank 2,000.00
pc. 65
pc. 65
pc. 35
gal. 429.45
gal. 551.25
Unit Price
Unit 15,800,000.00
Unit 4,800,000.00
Unit 390,000.00
Unit 300,000,000.00
Unit 3,450,000.00
Unit 2,700,000.00
Unit 920,000.00
Unit 5,900,000.00
Unit 960,000.00
Unit 37,500,000.00
Unit 41,500,000.00
Unit 54,700,000.00
Unit 1,180,000.00
Unit 4,750,000.00
Unit 4,300,000.00
Unit 3,100,000.00
Unit 1,400,000.00
Unit 2,500,000.00
Unit 110,000.00
Unit 44,000.00
Unit 460,000.00
Unit Price
pc 753.5
pc 485
pc 330
pc 95
pc 114
pc 66
pc 95
pc 95
pc 95
pc 85
pc 95
pc 95
pc 85
pc 66
pc 95
Total
pc 85 Materials Labor Other
(Php)
pc 66 103,700.0 31,110. 37,746. 172,55
0 00 80 6.80
pc 95 3,050.0 12,468. 56,998.
41,480.00
0 40 40
pc 440 3,050.0 21,350. 97,600.
73,200.00
0 00 00
Unit Price 2,810.8
1,830.00 366.00 614.88
8
pc. 250 1,830.0 6,558.7
732.00 717.36
0 2
pc. 95 4,528.6
732.00 152.50 247.66
4
pc. 95 2,654.7
1,708.00 366.00 580.72
2
roll 27.5 395,24
0.96
Total
Materials Labor Other
(Php)
1,464.0 5,192.3 189,89
17,080.00
0 2 0.56
Unit Qty 22,736.
1,708.00 512.40 621.71
90
Lot 1.00 10,306.
1,098.00 244.00 375.76
56
Item 1.00 1,195.6 21,862.
3,660.00 610.00
0 40
Item 1.00 5,490.0 6,661.2 30,451.
18,300.00
0 0 20
Item 1.00 10,980. 13,322. 60,902.
36,600.00
00 40 40
Item 4.00 1,263.9 5,777.9
3,904.00 610.00
2 2
Item 2.00 3,872.7
610.00 146.40 211.79
7
Item 1.00 371,56
7.10
Total
Materials Labor Other
(Php)
Unit Qty 140,300.0 42,090. 51,069. 233,45
0 00 20 9.20
Item 6.00 – – 30,500.
30,500.00
00
Unit Qty
Item 1.00
Item 1.00
item 1.00
item 1.00
item 1.00
item 1.00
Date:
Project Name:
Project Location:
Subject: LABOR UNIT PRICE ANALYSIS
Prepared by:
___________
Date:
Project Name:
Project Location:
Subject: LABOR CREW SUMMARY
Prepared by:
___________
Date:
Project Name:
Project Location:
Subject: LABOR CREW BREAKDOWN
Crew No. Bare Cost Incl. Subs & O & P Cost per Labor-Hour
₱ - ₱ -
400 L.H., Daily Total ₱ 26,600.00 ₱ 283.50 ₱ -
Incl. Subs &
Crew C Hr Daily Hr Daily Bare Costs O&P
1 Labor Foreman ₱ 30.75 ₱ 246.00 ₱ 47.90 ₱ 383.20 ₱ 32.39 ₱ 49.70
2 Laborers ₱ 28.75 ₱ 460.00 ₱ 44.75 ₱ 716.00
1 Equip. Oper. (Crane) ₱ 39.80 ₱ 318.40 ₱ 60.00 ₱ 480.00
1 Equip. Oper. Oiler ₱ 33.90 ₱ 271.20 ₱ 51.10 ₱ 408.80
1 Crawler Crane, 100Ton ₱ 1,717.00 ₱ 1,888.70
3 Conc. Bucket, 8CY ₱ 518.00 ₱ 570.24 ₱ 55.88 ₱ 61.47
40 L.H., Daily Total ₱ 3,530.60 ₱ 4,446.94 ₱ 88.27 ₱ 111.17
Incl. Subs &
Crew D Hr Daily Hr Daily Bare Costs O&P
3 Mason ₱ 38.05 ₱ 913.20 ₱ 47.56 ₱ 1,141.50 ₱ 34.29 ₱ 42.86
2 Mason Helper ₱ 28.65 ₱ 458.40 ₱ 35.81 ₱ 573.00
Date:
Project Name:
Project Location:
Subject: LABOR CREW BREAKDOWN
Crew No. Bare Cost Incl. Subs & O & P Cost per Labor-Hour
40 L.H., Daily Total ₱ 1,371.60 ₱ 1,714.50 ₱ 34.29 ₱ 42.86
Incl. Subs &
Crew E Hr Daily Hr Daily Bare Costs O&P
1 Foreman ₱ 75.00 ₱ 600.00 ₱ 93.75 ₱ 750.00 ₱ 57.35 ₱ 71.69
8 Steelmen ₱ 62.50 ₱ 4,000.00 ₱ 78.13 ₱ 5,000.00
8 Steelmen Helpers ₱ 50.00 ₱ 3,200.00 ₱ 62.50 ₱ 4,000.00
Crew No. Bare Cost Incl. Subs & O & P Cost per Labor-Hour
Crew No. Bare Cost Incl. Subs & O & P Cost per Labor-Hour