100% found this document useful (2 votes)
2K views

Feeder Protection Test Report Format

The commissioning test report summarizes the testing of the outgoing feeder relay for MRPL – ONGC in Katipalla. The relay is a Siemens Motor Protection Relay with settings for phase overcurrent, earth fault, negative phase sequence, and thermal overload protection. Tests were conducted to verify the relay measurements and operation of the protection functions within calculated specifications. The relay performed as expected during testing.

Uploaded by

Hari haran
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
100% found this document useful (2 votes)
2K views

Feeder Protection Test Report Format

The commissioning test report summarizes the testing of the outgoing feeder relay for MRPL – ONGC in Katipalla. The relay is a Siemens Motor Protection Relay with settings for phase overcurrent, earth fault, negative phase sequence, and thermal overload protection. Tests were conducted to verify the relay measurements and operation of the protection functions within calculated specifications. The relay performed as expected during testing.

Uploaded by

Hari haran
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

COMMISSIONING TEST REPORT FOR OUTGOING FEEDER RELAY

SIT E:
MRPL – ONGC , Customer: Mangalore Refinery
Katipalla and petrochemicals Ltd., CONTRA CTOR:

Location: Subtation-03 Feeder No: 06F1 Work order No. 4500011598

Feeder Name: O/G to Desalter/Dosing Pump Date 07.07.2019

1. RELAY DETAILS:
Make : Siemens Designation : Motor Protection Relay
MLFB code : 7SJ6612-5EB90-1HF0/BB P. Set. Version : V4.31.01
Nominal Current : 5A Auxiliary Volt. : 110 VDC
Sr No : GF1812502668 Rated Freq. : 50 HZ

2. RELAY POWER SYSTEM DATA:


CT Rated primary current : 800 A
CT Rated secondary current : 5A

3. RELAY SETTINGS :
PHASE O/C PHASE E/F
Ip : 5A Iep : 2A
TMS : 0.2 sec TMS : 0.2 sec
IEC Curve : VERY INVERSE IEC Curve : VERY INVERSE

NEGATIVE PHASE SEQUENCE THERMAL OVERLOAD


I2> : 0.75 A K-Factor 0.90
Time 1 min
Ti2> : 7 Sec
Constant
I2>> : 1A T-Alarm 90%
Ti2>> : 5 Sec

STARTUP SUPERVISION
IS> : 6A
Tis> : 3 Sec

Tested By : Resonance Power Witnessed By : Mangalore Refinery


Systems (P) Ltd, Chennai. and petrochemicals Ltd.,

NAME HARIHARAN J
DESIGNATION PROTECTION ENGINEER
SIGNATURE

3DJHRI
COMMISSIONING TEST REPORT FOR OUTGOING FEEDER RELAY

SIT E:
MRPL – ONGC , Customer: Mangalore Refinery
Katipalla and petrochemicals Ltd., CONTRA CTOR:

Location: Subtation-03 Feeder No: 06F1 Work order No. 4500011598

Feeder Name: O/G to Desalter/Dosing Pump Date 07.07.2019

4. MEASUREMENTS

CT Ratio : 800/5 A

Current measurement Primary Current


Phase Current injection Remarks
from clamp meter(A) Displayed on Relay (A)
RYB 25% 195 200
RYB 50% 396 400 OK
RYB 100% 796 800

5. IDMT O/C (51)

IP– 5 A , TMS – 0.2 Sec , IEC Curve – VI


Operating Time Operating Time
Ip Pickup Remarks
Phase @ 2 x Ip in Sec @ 5 x Ip in Sec
(A)
Measured Calculated Measured Calculated
OK
L1-L2-L3 5 2.677 2.700 0.667 0.675

6. IDMT E/F (51N)

IP – 2 A , TMS – 0.2 Sec , IEC Curve – VI


Operating Time Operating Time
Ip Pickup Remarks
Phase @ 2 x Ip in Sec @ 5 x Ip in Sec
(A)
Measured Calculated Measured Calculated
OK
L-E 5 2.695 2.700 0.668 0.675

7. NEGATIVE SEQUENCE (46)

I2> 0.75 A , TI2> 7 Sec

Operating time Calculated Time Remarks


Phase Ip Pickup Phase Angle
(sec) (Sec)
(A)
L1 0.75 0°
OK
L2 0.75 120° 7.034 7.00
L3 0.75 240°

Tested By : Resonance Power Witnessed By : Mangalore Refinery


Systems (P) Ltd, Chennai. and petrochemicals Ltd.,

NAME HARIHARAN J
DESIGNATION PROTECTION ENGINEER
SIGNATURE

3DJHRI