0% found this document useful (0 votes)
182 views1 page

18-09-19-09-G1 (C1-2) Model-Bv PDF

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
182 views1 page

18-09-19-09-G1 (C1-2) Model-Bv PDF

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

LPO1166834 Review is carried out for modification parts only:

1) Revise Summer Load Line to 2.8M Draft


2) Relocate Crane to port after side
3) Change detergent Tank to Slope Tank
4) Extend forecastle deck to Fr30 and update accommodation layout of main deck.
5) Adding Rescue Boat
LPO1166433 The oil content of slope tank shall have a flash point of above 60 deg C.
31621X / 31881F
BUREAU VERITAS Section ....................
VU avec observations
Singapore, 24-Aug-2016
[Electronic document]
The plan approval office
Ref tech comment sheet(SPO/16/03382) DD.24-Aug-2016