0% found this document useful (0 votes)
80 views5 pages

Proyek Anantara Ubud - Bali: Check

This document provides details on the concrete structure works for the Anantara Ubud - Bali project including a schedule of columns for the ground floor foundation. It lists 9 columns with specifications like height, size, rebar ratios. It provides rebar quantities and weights. In total it outlines plans for constructing 6 columns with a combined concrete volume of 6.01 cubic meters and rebar weight of 1,288.86 kg. A second section outlines 3 larger columns with a total concrete volume of 6.62 cubic meters and rebar weight of 1,331.60 kg.

Uploaded by

Isna Muthoharoh
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
80 views5 pages

Proyek Anantara Ubud - Bali: Check

This document provides details on the concrete structure works for the Anantara Ubud - Bali project including a schedule of columns for the ground floor foundation. It lists 9 columns with specifications like height, size, rebar ratios. It provides rebar quantities and weights. In total it outlines plans for constructing 6 columns with a combined concrete volume of 6.01 cubic meters and rebar weight of 1,288.86 kg. A second section outlines 3 larger columns with a total concrete volume of 6.62 cubic meters and rebar weight of 1,331.60 kg.

Uploaded by

Isna Muthoharoh
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 5

PROYEK ANANTARA UBUD - BALI

AREA : LANTAI PONDASI


SCHEDULE OF : CONCRETE STRUCTURE WORKS
CONC & REINF. IN : COLUMNS VILLA
f'c = 25 Mpa
CHECK
Type Height Size Coloum Thickness Length Area Re-bar Remark Main
Concrete
No. Grid Line SLAB TYPE BEAM TYPE Height Bruto Wide High Slab Netto Formwork Ratio
Sengkang Ties Tul. Utama Total QTY DIA. Overlap WEIGHT
Column S/DS Beam m m m m m m3 m2 (kg/m3)
Level PC -Ground

1 2 / A K2 S0 G4 0.40 1.20 0.50 0.40 - 1.20 0.24 2.16 13.24 7.64 55.90 76.79 319.95 14 16 1.330 55.90
2 2 / B K6 S11 G4 0.40 4.20 0.50 0.40 0.12 4.08 0.82 7.34 47.45 25.99 122.19 195.63 239.74 14 16 1.330 122.19
3 2 / C K2 S11 G4 0.40 4.20 0.50 0.40 0.12 4.08 0.82 7.34 47.45 25.99 122.19 195.63 239.74 14 16 1.330 122.19
4 3 / A K3 S11 G4 0.40 4.20 0.40 0.40 0.12 4.08 0.65 6.53 42.15 23.90 69.82 135.87 208.13 8 16 1.330 69.82
5 3 / B K7 S11 G4 0.40 4.20 0.40 0.40 0.12 4.08 0.65 6.53 42.15 23.90 69.82 135.87 208.13 8 16 1.330 69.82
6 3 / C K8 S11 G4 0.40 4.20 0.40 0.40 0.12 4.08 0.65 6.53 42.15 23.90 69.82 135.87 208.13 8 16 1.330 69.82

7 3" / A K4 S11 G4 0.40 4.67 0.40 0.40 0.12 4.55 0.73 7.28 47.05 28.11 62.57 137.74 189.28 8 16 0.288 62.57
8 3" / B K4 S11 G4 0.40 4.67 0.40 0.40 0.12 4.55 0.73 7.28 47.05 28.11 62.57 137.74 189.28 8 16 0.288 62.57
9 3" / C K4 S11 G4 0.40 4.67 0.40 0.40 0.12 4.55 0.73 7.28 47.05 28.11 62.57 137.74 189.28 8 16 0.288 62.57

6.01 58.26 1,288.86


Sengkang Ties REKAP PER DIA
JUMLAH ZONE QTY JUMLAH ZONE Length 10 13 16 19 22 25 29 32
DIA. JML Length WEIGHT JML DIA. WEIGHT
A B C D H V A B C D H V 0.6165 1.0419 1.5782 2.2256 2.9839 3.8531 5.1848 6.3130

10 4 2 4 2 12 1.79 13.24 1 1 4 2 2 2 10 10 0.670 0.570 7.64 20.89 - 55.90 - - - - -


10 4 10 19 10 43 1.79 47.45 1 1 4 10 10 10 34 10 0.670 0.570 25.99 73.44 - 122.19 - - - - -
10 4 10 19 10 43 1.79 47.45 1 1 4 10 10 10 34 10 0.670 0.570 25.99 73.44 - 122.19 - - - - -
10 4 10 19 10 43 1.59 42.15 1 1 4 10 10 10 34 10 0.570 0.570 23.90 66.05 - 69.82 - - - - -
10 4 10 19 10 43 1.59 42.15 1 1 4 10 10 10 34 10 0.570 0.570 23.90 66.05 - 69.82 - - - - -
10 4 10 19 10 43 1.59 42.15 1 1 4 10 10 10 34 10 0.570 0.570 23.90 66.05 - 69.82 - - - - -

10 4 11 22 11 48 1.59 47.05 1 1 4 11 11 11 40 10 0.570 0.570 28.11 75.16 - 62.57 - - - - -


10 4 11 22 11 48 1.59 47.05 1 1 4 11 11 11 40 10 0.570 0.570 28.11 75.16 - 62.57 - - - - -
10 4 11 22 11 48 1.59 47.05 1 1 4 11 11 11 40 10 0.570 0.570 28.11 75.16 - 62.57 - - - - -

591.40 - 697.46 - - - - -
PROYEK ANANTARA UBUD - BALI

AREA : LANTAI PONDASI


SCHEDULE OF : CONCRETE STRUCTURE WORKS
CONC & REINF. IN : COLUMNS VILLA
f'c = 25 Mpa
CHECK
Type Height Size Coloum Thickness Length Area Re-bar Remark Main
Concrete
No. Grid Line SLAB TYPE BEAM TYPE Height Bruto Wide High Slab Netto Formwork Ratio
Sengkang Ties Tul. Utama Total QTY DIA. Overlap WEIGHT
Column S/DS Beam m m m m m m3 m2 (kg/m3)
Level PC - Ground

1 1 / A K1 S11 G2 0.40 9.32 0.60 0.40 0.12 9.20 2.21 18.40 116.55 60.31 267.01 443.87 201.03 16 16 1.254 267.01
2 1 / B K5 S11 G2 0.40 9.32 0.60 0.40 0.12 9.20 2.21 18.40 116.55 60.31 267.01 443.87 201.03 16 16 1.254 267.01
3 1 / C K1 S11 G2 0.40 9.32 0.60 0.40 0.12 9.20 2.21 18.40 116.55 60.31 267.01 443.87 201.03 16 16 1.254 267.01

6.62 55.20 1,331.60


Sengkang Ties REKAP PER DIA
JUMLAH ZONE QTY JUMLAH ZONE Length 10 13 16 19 22 25 29 32
DIA. JML Length WEIGHT JML DIA. WEIGHT
A B C D H V A B C D H V 0.6165 1.0419 1.5782 2.2256 2.9839 3.8531 5.1848 6.3130

10 4 23 45 23 95 1.99 116.55 1 1 4 23 23 23 73 10 0.770 0.570 60.31 176.86 - 267.01 - - - - -


10 4 23 45 23 95 1.99 116.55 1 1 4 23 23 23 73 10 0.770 0.570 60.31 176.86 - 267.01 - - - - -
10 4 23 45 23 95 1.99 116.55 1 1 4 23 23 23 73 10 0.770 0.570 60.31 176.86 - 267.01 - - - - -

530.57 - 801.04 - - - - -
KEBUTUHAN DRAINASE PROCESS BUILDING
PROYEK PABRIK FABRIKASI BAJA MAJALENGKA

Panjang Description
Panjang
Drainase Penutup
No Type Drainase Drainase UDICTH Spesifikasi Keterangan
Precast Beton
(m) (m) (bh) bh

1 Cover Uditch standard small


Drainase 50 x 60 1283.500 1.200 1,070 BEP,Standard Dry cast K350 2,140 Heavy Duty CU 500 HD

2 Cover Uditch standard small


Drainase 50 x 70 196.000 1.200 164 BEP,Standard Dry cast K350 328 Heavy Duty CU 500 HD

3 Cover Uditch standard small


Drainase 60 x 80 361.000 1.200 304 BEP,Standard Dry cast K350 608 heavy duty CU 600 HD