0% found this document useful (0 votes)
614 views1 page

Construction Progress Measurement System (PMS) Format PDF

Why BCES 'Sab Kuch Check Karo, Fir Sahi Chuno' campaign wants you to try other institute Syllabus. ! #An Internship. ??An internship is a temporary position with an emphasis on on-the-job training rather than merely employment, and it can be paid or unpaid.http://www.internshipbces.com If you want to go into an organization, you might have to take an internship before you are qualified for an actual job !

Uploaded by

AMMAR MAW
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
614 views1 page

Construction Progress Measurement System (PMS) Format PDF

Why BCES 'Sab Kuch Check Karo, Fir Sahi Chuno' campaign wants you to try other institute Syllabus. ! #An Internship. ??An internship is a temporary position with an emphasis on on-the-job training rather than merely employment, and it can be paid or unpaid.http://www.internshipbces.com If you want to go into an organization, you might have to take an internship before you are qualified for an actual job !

Uploaded by

AMMAR MAW
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

1

GC-32: NEW GATHERING CENTRE FOR SEK


CONSTRUCTION PROGRESS MEASUREMENT SYSTEM (PMS)

LEGEND : ON GOING COMPLETED L3 ACTIVITY Status as of : 12-Apr-19

30.54% 2.86% 33.40% 0.00% 0.00% 0.00%

Current Current
Original L3 Plan L3 Plan Percntage in Last Week Weekly Last Week Weekly
L3 / L4 Activity ID Tank No. Activity L3 / L4 Activity Name Manhour Cummulative Actual Start Actual Finish Cummulativ
Duration Start Finish Overall Cum. Plan Plan Cum. Actual Actual
Plan e Actual

32D990A FAB Fire Water Tank ( 032-D-990A ) - Fabrication


TNKFAB32D990A0001 32D990A FAB Plate Shifting from Contractor Yard for Fabrication Works 30 4-Dec-18 8-Jan-19 1200 0.26% 0.26% 0.00% 0.26% 0.00% 0.00% 0.00%
TNKFAB32D990A0010 32D990A FAB Structural Material Shifting from Contractor Yard for Fabrication Works 10 9-Jan-19 20-Jan-19 400 0.09% 0.09% 0.00% 0.09% 0.00% 0.00% 0.00%
TNKFAB32D990A0020 32D990A FAB Shifting of flange, fittings, Brought out items and nozzle pipes for Fab works 10 2-Feb-19 12-Feb-19 400 0.09% 0.09% 0.00% 0.09% 0.00% 0.00% 0.00%
TNKFAB32D990A1000 32D990A FAB Fabrication of Annular Plates 4 8-Dec-18 12-Dec-18 200 0.04% 0.04% 0.00% 0.04% 0.00% 0.00% 0.00%
TNKFAB32D990A1010 32D990A FAB Fabrication of Sump 5 12-Dec-18 18-Dec-18 120 0.03% 0.03% 0.00% 0.03% 0.00% 0.00% 0.00%
TNKFAB32D990A1020 32D990A FAB Surface preperation and Underside Painting of Annular Plates and Sump 7 13-Dec-18 20-Dec-18 90 0.02% 0.02% 0.00% 0.02% 0.00% 0.00% 0.00%
TNKFAB32D990A1030 32D990A FAB Fabrication of Bottom Plates 8 13-Dec-18 22-Dec-18 1100 0.24% 0.24% 0.00% 0.24% 0.00% 0.00% 0.00%
TNKFAB32D990A1040 32D990A FAB Surface preperation and Underside Painting of Bottom Plates 12 23-Dec-18 6-Jan-19 320 0.07% 0.07% 0.00% 0.07% 0.00% 0.00% 0.00%
TNKFAB32D990A1050 32D990A FAB Fabrication of Shell Courses S5 & S6 12 23-Dec-18 6-Jan-19 520 0.11% 0.11% 0.00% 0.11% 0.00% 0.00% 0.00%
TNKFAB32D990A1060 32D990A FAB Fabrication of Wind Girder , Top Landing Platform, Stairway and FPS Brackets 11 6-Jan-19 19-Jan-19 990 0.21% 0.21% 0.00% 0.21% 0.00% 0.00% 0.00%
TNKFAB32D990A1070 32D990A FAB Fabrication of Roof Plates and Roof Structure 23 23-Jan-19 18-Feb-19 1860 0.40% 0.40% 0.00% 0.40% 0.00% 0.00% 0.00%
TNKFAB32D990A1080 32D990A FAB Surface preperation and Painting of Roof Structure 14 2-Feb-19 17-Feb-19 1150 0.25% 0.25% 0.00% 0.25% 0.00% 0.00% 0.00%
TNKFAB32D990A1085 32D990A FAB Fabrication of Shell Courses S4 to S1 20 24-Feb-19 20-Mar-19 1040 0.22% 0.22% 0.00% 0.22% 0.00% 0.00% 0.00%
TNKFAB32D990A1090 32D990A FAB Surface preperation and Painting of Roof Plate and Compression ring Underside 10 11-Feb-19 21-Feb-19 440 0.09% 0.09% 0.00% 0.09% 0.00% 0.00% 0.00%
TNKFAB32D990A1100 32D990A FAB Fabrication of Shell and Roof Appurtances including all Bal Misc Fabrications 26 21-Mar-19 21-Apr-19 1030 0.22% 0.11% 0.05% 0.16% 0.00% 0.00% 0.00%
TNKFAB32D990A1110 32D990A FAB Fabrication of COD 15 22-Apr-19 12-May-19 900 0.19% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
32D990A ERE Firewater Tank ( 032-D-0990 A ) - Erection & Welding, Annular & Bottom Plate

TNKERE32D990A1000-1 32D990A ERE Annular Laying and Fitup 2 2-Jan-19 3-Jan-19 108 0.02% 0.02% 0.00% 0.02% 0.00% 0.00% 0.00%

TNKERE32D990A1000-2 32D990A ERE Annular Welding 4 4-Jan-19 7-Jan-19 135 0.03% 0.03% 0.00% 0.03% 0.00% 0.00% 0.00%

TNKERE32D990A1000-3 32D990A ERE Annular NDT 1 8-Jan-19 9-Jan-19 27 0.01% 0.01% 0.00% 0.01% 0.00% 0.00% 0.00%

TNKERE32D990A1010-1 32D990A ERE Bottom Full Plate Laying and Fitup 3 10-Jan-19 13-Jan-19 216 0.05% 0.05% 0.00% 0.05% 0.00% 0.00% 0.00%

TNKERE32D990A1010-2 32D990A ERE Short Seam and Long Seam Welding 10 11-Jan-19 21-Jan-19 648 0.14% 0.14% 0.00% 0.14% 0.00% 0.00% 0.00%

TNKERE32D990A1010-3 32D990A ERE Sketch Plate Laying and Fitup 3 21-Jan-19 24-Jan-19 216 0.05% 0.05% 0.00% 0.05% 0.00% 0.00% 0.00%

TNKERE32D990A1010-4 32D990A ERE Annular to Sketch Plate Welding 5 24-Jan-19 30-Jan-19 360 0.08% 0.08% 0.00% 0.08% 0.00% 0.00% 0.00%
TNKERE32D990A1020 32D990A ERE Installation of Temperorary Elevators on Tank Annular 2 14-Jan-19 15-Jan-19 60 0.01% 0.01% 0.00% 0.01% 0.00% 0.00% 0.00%
32D990A ERE Firewater Tank ( 032-D-0990 A ) - Erection & Welding, Shell Course-5

TNKERE32D990A1030-1 32D990A ERE Scaffolding Work 3 14-Jan-19 17-Jan-19 100 0.02% 0.02% 0.00% 0.02% 0.00% 0.00% 0.00%

TNKERE32D990A1040-1 32D990A ERE Shell Erection & Fitup 2 20-Jan-19 21-Jan-19 116 0.02% 0.02% 0.00% 0.02% 0.00% 0.00% 0.00%

TNKERE32D990A1040-2 32D990A ERE Shell Vertical Welding 4 22-Jan-19 26-Jan-19 160 0.03% 0.03% 0.00% 0.03% 0.00% 0.00% 0.00%

TNKERE32D990A1040-3 32D990A ERE NDT 1 27-Jan-19 28-Jan-19 14 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
32D990A ERE Firewater Tank ( 032-D-0990 A ) - Erection & Welding, Shell Course-6

TNKERE32D990A1030-2 32D990A ERE Scaffolding Work 2 18-Jan-19 20-Jan-19 100 0.02% 0.02% 0.00% 0.02% 0.00% 0.00% 0.00%

TNKERE32D990A1050-1 32D990A ERE Shell Erection & Fitup 4 28-Jan-19 31-Jan-19 436 0.09% 0.09% 0.00% 0.09% 0.00% 0.00% 0.00%

TNKERE32D990A1050-2 32D990A ERE Shell Vertical Welding 6 1-Feb-19 8-Feb-19 600 0.13% 0.13% 0.00% 0.13% 0.00% 0.00% 0.00%

TNKERE32D990A1050-3 32D990A ERE NDT 1 9-Feb-19 10-Feb-19 54 0.01% 0.01% 0.00% 0.01% 0.00% 0.00% 0.00%
32D990A ERE Firewater Tank ( 032-D-0990 A )- Erection & Welding, Wind Girder & Compression ring

TNKERE32D990A1060-1 32D990A ERE Wind Girder Erection and Fitup 2 10-Feb-19 11-Feb-19 198 0.04% 0.04% 0.00% 0.04% 0.00% 0.00% 0.00%

TNKERE32D990A1060-2 32D990A ERE Wind Girder Welding 3 12-Feb-19 15-Feb-19 396 0.09% 0.09% 0.00% 0.09% 0.00% 0.00% 0.00%

TNKERE32D990A1060-3 32D990A ERE Compression ring Erection and Fitup 2 16-Feb-19 17-Feb-19 198 0.04% 0.04% 0.00% 0.04% 0.00% 0.00% 0.00%

TNKERE32D990A1060-4 32D990A ERE Compression ring Welding 3 18-Feb-19 21-Feb-19 396 0.09% 0.09% 0.00% 0.09% 0.00% 0.00% 0.00%

TNKERE32D990A1060-5 32D990A ERE Compression Ring NDT 1 22-Feb-19 23-Feb-19 132 0.03% 0.03% 0.00% 0.03% 0.00% 0.00% 0.00%
32D990A ERE Firewater Tank ( 032-D-0990 A )- Erection & Welding, Roof & Structures
TNKERE32D990A1070 32D990A ERE Scaffolding inside the tank for erection and welding of Roof 10 11-Feb-19 21-Feb-19 500 0.11% 0.11% 0.00% 0.11% 0.00% 0.00% 0.00%
TNKERE32D990A1080-1 32D990A ERE Erection and Welding of Central Drum and Roof Chairs 2 23-Feb-19 25-Feb-19 160 0.03% 0.03% 0.00% 0.03% 0.00% 0.00% 0.00%
TNKERE32D990A1080-2 32D990A ERE Erection and Fitup of Roof Main Truss 3 26-Feb-19 1-Mar-19 240 0.05% 0.05% 0.00% 0.05% 0.00% 0.00% 0.00%
TNKERE32D990A1080-3 32D990A ERE Welding of Roof Main Truss 5 2-Mar-19 7-Mar-19 320 0.07% 0.07% 0.00% 0.07% 0.00% 0.00% 0.00%
TNKERE32D990A1080-4 32D990A ERE Erection and Fitup of Cross Girders, Secondary rafters , Purlins and Roof assembly4 8-Mar-19 12-Mar-19 320 0.07% 0.07% 0.00% 0.07% 0.00% 0.00% 0.00%
TNKERE32D990A1080-5 32D990A ERE Welding of Cross Girders, Secondary rafters , Purlins and Roof assembly 7 13-Mar-19 20-Mar-19 560 0.12% 0.12% 0.00% 0.12% 0.00% 0.00% 0.00%
TNKERE32D990A1090-1 32D990A ERE Erection and Fitup of Roof Plates 6 21-Mar-19 28-Mar-19 1768 0.38% 0.38% 0.00% 0.38% 0.00% 0.00% 0.00%
TNKERE32D990A1090-2 32D990A ERE Welding of Roof Plates 12 29-Mar-19 11-Apr-19 3282 0.71% 0.40% 0.30% 0.71% 0.00% 0.00% 0.00%
TNKERE32D990A1100 32D990A ERE Erection and Welding Top Handrailing along with Landing Platform and Top Stairway 7 22-Apr-19 29-Apr-19 1400 0.30% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
TNKERE32D990A1110 32D990A ERE Paint touchup after Roof erection and Welding works 11 14-Apr-19 25-Apr-19 410 0.09% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
32D990A ERE Fire Water Tank ( 032-D-0990 A )- Erection & Welding, Shell Course-4
TNKERE32D990A1120 32D990A ERE Installation of hydraulic jacking systems inside the tanks 4 30-Apr-19 4-May-19 900 0.19% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

TNKERE32D990A1130-1 32D990A ERE Shell Erection & Fitup 2 5-May-19 7-May-19 316 0.07% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

TNKERE32D990A1130-2 32D990A ERE Shell Vertical and Horizontal Welding 7 8-May-19 15-May-19 632 0.14% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

TNKERE32D990A1130-3 32D990A ERE NDT 1 16-May-19 17-May-19 105 0.02% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
32D990A ERE Fire Water Tank ( 032-D-0990 A )- Erection & Welding, Shell Course-3

TNKERE32D990A1130-4 32D990A ERE Shell Erection & Fitup 2 18-May-19 20-May-19 316 0.07% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

TNKERE32D990A1130-5 32D990A ERE Shell Vertical and Horizontal Welding 7 21-May-19 30-May-19 632 0.14% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

TNKERE32D990A1130-6 32D990A ERE NDT 1 31-May-19 1-Jun-19 105 0.02% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
32D990A ERE Fire Water Tank ( 032-D-0990 A )- Erection & Welding, Shell Course-2

TNKERE32D990A1130-7 32D990A ERE Shell Erection & Fitup 3 2-Jun-19 6-Jun-19 421 0.09% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

TNKERE32D990A1130-8 32D990A ERE Shell Vertical and Horizontal Welding 8 6-Jun-19 16-Jun-19 842 0.18% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

TNKERE32D990A1130-9 32D990A ERE NDT 1 17-Jun-19 18-Jun-19 141 0.03% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
32D990A ERE Firewater Tank ( 032-D-0990 A ) - Erection & Welding, Shell Course-1 and Appurtances
TNKERE32D990A1140 32D990A ERE Installation and Welding of Spiral Staircase on Tank along with Jacking 30 22-May-19 3-Jul-19 660 0.14% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
TNKERE32D990A1145 32D990A ERE Post Weld Heat Treatment 7 12-May-19 26-May-19 600 0.13% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
TNKERE32D990A1150 32D990A ERE Erection of shell course S1 3 18-Jun-19 22-Jun-19 240 0.05% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
TNKERE32D990A1160 32D990A ERE Erection and Welding of all Tank Internal ,Shell Appurtances and Cleanout Doors 10 18-Jun-19 30-Jun-19 1870 0.40% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
TNKERE32D990A1170 32D990A ERE Erection and Welding of Roof Appurtances including Guage well, Level Radar and9Temp well
23-Jun-19 2-Jul-19 1340 0.29% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
TNKERE32D990A1190 32D990A ERE Welding of Shell Strake S1 8 3-Jul-19 13-Jul-19 1200 0.26% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
TNKERE32D990A1200 32D990A ERE Fitup and Welding of Shell to Bottom Plate Outside and Inside 5 13-Jul-19 18-Jul-19 1920 0.41% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
TNKERE32D990A1210 32D990A ERE Fitup and Welding of Annular to Sketch Plate 4 18-Jul-19 23-Jul-19 400 0.09% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
TNKERE32D990A1220 32D990A ERE Vaccum test of Bottom Plates 3 23-Jul-19 27-Jul-19 180 0.04% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
TNKERE32D990A1230 32D990A ERE Punch points liquidation prior to hydrotest 7 27-Jul-19 4-Aug-19 1800 0.39% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
32D990A HYD Fire Water Tank ( 032-D-990A ) - Hydrotest works
TNKHYD32D990A1000 32D990A HYD Hydrotest 21 4-Aug-19 1-Sep-19 440 0.09% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
TNKHYD32D990A1010 32D990A HYD Tank cleaning 2 1-Sep-19 3-Sep-19 240 0.05% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
TNKHYD32D990A1020 32D990A HYD Calibration 4 3-Sep-19 8-Sep-19 120 0.03% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
32D990A PNT Firewater Tank ( 032-D-0990 A ) - External Painting

TNKPNT32D990A1000-1 32D990A PNT Scaffolding 11 22-Aug-19 2-Sep-19 1650 0.35% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

TNKPNT32D990A1040-2 32D990A PNT Surface preparation and Blasting 14 2-Sep-19 16-Sep-19 399 0.09% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

TNKPNT32D990A1040-3 32D990A PNT Painting - Primer 19 2-Sep-19 21-Sep-19 228 0.05% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

TNKPNT32D990A1040-4 32D990A PNT Painting - 2nd coat 7 22-Sep-19 30-Sep-19 228 0.05% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

TNKPNT32D990A1040-5 32D990A PNT Painting - Final coat 7 1-Oct-19 9-Oct-19 228 0.05% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

TNKPNT32D990A1040-6 32D990A PNT Touch up painting 2 10-Oct-19 12-Oct-19 57 0.01% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
32D990A PNT Firewater Tank ( 032-D-0990 A ) - Internal Painting & Lining

TNKPNT32D990A1000-2 32D990A PNT Scaffolding 11 3-Sep-19 18-Sep-19 1650 0.35% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
TNKPNT32D990A1010 32D990A PNT Internal Painting of Tank Shell 14 18-Sep-19 5-Oct-19 790 0.17% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
TNKPNT32D990A1020 32D990A PNT Removal of Scaffolding Inside the Tank 4 5-Oct-19 9-Oct-19 600 0.13% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
TNKPNT32D990A1030 32D990A PNT Internal Painting of Tank Bottom 13 9-Oct-19 24-Oct-19 1610 0.35% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
32D990A HND Fire Water Tank ( 032-D-990A ) - Final Punch Point and Boxup
TNKHND32D990A1000 32D990A HND Final Punch Points / Checklist Clearance 15 22-Oct-19 9-Nov-19 880 0.19% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
TNKHND32D990A1010 32D990A HND Final Box-up & Handover 5 9-Nov-19 16-Nov-19 300 0.06% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
32D990B FAB Fire Water Tank ( 032-D-990B ) - Fabrication
TNKFAB32D990B0001 32D990B FAB Plate Shifting from Contractor Yard for Fabrication Works 31 12-Dec-18 17-Jan-19 1200 0.26% 0.26% 0.00% 0.26% 0.00% 0.00% 0.00%
TNKFAB32D990B0010 32D990B FAB Structural Material Shifting from Contractor Yard for Fabrication Works 10 19-Jan-19 29-Jan-19 400 0.09% 0.09% 0.00% 0.09% 0.00% 0.00% 0.00%
TNKFAB32D990B0020 32D990B FAB Shifting of flange, fittings, Brought out items and nozzle pipes for Fab works 10 11-Feb-19 21-Feb-19 400 0.09% 0.09% 0.00% 0.09% 0.00% 0.00% 0.00%
TNKFAB32D990B1000 32D990B FAB Fabrication of Annular Plates 4 20-Dec-18 25-Dec-18 200 0.04% 0.04% 0.00% 0.04% 0.00% 0.00% 0.00%
TNKFAB32D990B1010 32D990B FAB Fabrication of Sump 5 25-Dec-18 31-Dec-18 120 0.03% 0.03% 0.00% 0.03% 0.00% 0.00% 0.00%
TNKFAB32D990B1020 32D990B FAB Surface preperation and Underside Painting of Annular Plates and Sump 7 26-Dec-18 3-Jan-19 90 0.02% 0.02% 0.00% 0.02% 0.00% 0.00% 0.00%
TNKFAB32D990B1030 32D990B FAB Fabrication of Bottom Plates 8 26-Dec-18 5-Jan-19 1100 0.24% 0.24% 0.00% 0.24% 0.00% 0.00% 0.00%
TNKFAB32D990B1040 32D990B FAB Surface preperation and Underside Painting of Bottom Plates 12 6-Jan-19 19-Jan-19 320 0.07% 0.07% 0.00% 0.07% 0.00% 0.00% 0.00%
TNKFAB32D990B1050 32D990B FAB Fabrication of Shell Courses S5 & S6 12 6-Jan-19 19-Jan-19 520 0.11% 0.11% 0.00% 0.11% 0.00% 0.00% 0.00%
TNKFAB32D990B1060 32D990B FAB Fabrication of Wind Girder , Top Landing Platform, Stairway and FPS Brackets 12 16-Jan-19 30-Jan-19 990 0.21% 0.21% 0.00% 0.21% 0.00% 0.00% 0.00%
TNKFAB32D990B1070 32D990B FAB Fabrication of Roof Plates and Roof Structure 22 2-Feb-19 28-Feb-19 1860 0.40% 0.40% 0.00% 0.40% 0.00% 0.00% 0.00%
TNKFAB32D990B1080 32D990B FAB Surface preperation and Painting of Roof Structure 14 12-Feb-19 3-Mar-19 1150 0.25% 0.25% 0.00% 0.25% 0.00% 0.00% 0.00%
TNKFAB32D990B1085 32D990B FAB Fabrication of Shell Courses S4 to S1 20 9-Mar-19 1-Apr-19 1040 0.22% 0.22% 0.00% 0.22% 0.00% 0.00% 0.00%
TNKFAB32D990B1090 32D990B FAB Surface preperation and Painting of Roof Plate and Compression ring Underside 11 20-Feb-19 7-Mar-19 440 0.09% 0.09% 0.00% 0.09% 0.00% 0.00% 0.00%
TNKFAB32D990B1100 32D990B FAB Fabrication of Shell and Roof Appurtances including all Bal Misc Fabrications 26 1-Apr-19 2-May-19 1030 0.22% 0.03% 0.05% 0.08% 0.00% 0.00% 0.00%
TNKFAB32D990B1110 32D990B FAB Fabrication of COD 15 2-May-19 30-May-19 900 0.19% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
32D990B ERE Firewater Tank ( 032-D-0990 B ) - Erection & Welding, Annular & Bottom Plate

TNKERE32D990B1000-1 32D990B ERE Annular Laying and Fitup 2 10-Jan-19 11-Jan-19 108 0.02% 0.02% 0.00% 0.02% 0.00% 0.00% 0.00%

TNKERE32D990B1000-2 32D990B ERE Annular Welding 4 12-Jan-19 15-Jan-19 135 0.03% 0.03% 0.00% 0.03% 0.00% 0.00% 0.00%

TNKERE32D990B1000-3 32D990B ERE Annular NDT 1 16-Jan-19 17-Jan-19 27 0.01% 0.01% 0.00% 0.01% 0.00% 0.00% 0.00%