M-12C-003 Padding Plate Fuel Gas Cold Vent Stack

This document records the results of an inspection of padding for a cold vent stack for a 450MW combined cycle power plant extension project. It lists the project name, subcontractor performing the inspection, inspection item, applicable drawings, and date. Measurement points around the vent stack are shown on a diagram. The design and actual dimensions are recorded for each point, with any deviations noted. The inspection found deviations of 1mm at two points but was otherwise accepted with no remarks.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
137 views

M-12C-003 Padding Plate Fuel Gas Cold Vent Stack

This document records the results of an inspection of padding for a cold vent stack for a 450MW combined cycle power plant extension project. It lists the project name, subcontractor performing the inspection, inspection item, applicable drawings, and date. Measurement points around the vent stack are shown on a diagram. The design and actual dimensions are recorded for each point, with any deviations noted. The inspection found deviations of 1mm at two points but was otherwise accepted with no remarks.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 4

GRATI CCPP (PEAKER) EXTENSION PROJECT 450MW

PADDING INSPECTION RECORD

PROJECT : GRATI CCPP (PEAKER) EXTENTION 450 MW CCPP PROJECT


Sub-Con Name PT INDO TEHNIK INDUSTRI Report No. M-12C-003

Inspection Item PADDING COLD VENT STACK Area / Unit FUEL GAS / COLD VENT STACK

Drawing No. GR-MP02112-C30-0000 , GR-MPO2112-M30-0724 Date 18-Aug-17

Padding Plate Sketch


Tolerance :
270°

5 N
1
(+)

0° 90° W
(-)

S
4 2
(-)

180°

Unit : mm
ELEVATION
Check Point
Design Actual Deviation Remark

1 6154 6154 0

2 6154 6153 -1

3 6154 6154 0

4 6154 6154 0

5 6154 6153 -1

Result : ACCEPTED REJECTED

Comment :
Sub-Contractor Consortium Owner
Name
Signature
Date
EXTENTION 450 MW CCPP PROJECT
M-12C-003

FUEL GAS / COLD VENT STACK

18-Aug-17

±3 mm