Connection Sheet 1

The document shows details of steel and precast concrete connections for a structural system. Steel columns connect to precast concrete beams and columns using steel plates and node connectors. The connections are located at different elevations, including the beam top, deck slab top, and steel and bottom levels. Labels indicate specific precast and steel components used in the connections.

Uploaded by

vishalgore
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
44 views

Connection Sheet 1

The document shows details of steel and precast concrete connections for a structural system. Steel columns connect to precast concrete beams and columns using steel plates and node connectors. The connections are located at different elevations, including the beam top, deck slab top, and steel and bottom levels. Labels indicate specific precast and steel components used in the connections.

Uploaded by

vishalgore
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

5' STEEL COLUMN 5'

STEEL PLATE NODE CONNECTOR


1DS40

(PRECAST COLUMN BASE CONNECTOR


BEAM
STEEL COLUMN
1DS39)
STEEL PLATE
NODE CONNECTOR
STEEL PLATE T
28.500 28.500 1C20
COLUMN BASE CONNECTOR
04.BEAM TOP 04.BEAM TOP STEEL BRACKET
520

28.200 28.200 1DS41


NODE CONNECTOR 03.DECK SLAB TOP 03.DECK SLAB TOP

450
28.000 28.000 1
450

1
900

02.STEEL TOP LVL 02.STEEL TOP LVL


900
600

600
3D VIEW @ SEC-1-1
27.350
5' 4
27.300 27.300
002.CONNECTOR 003.BOTTOM 002.CONNECTOR
27.350 BOTTOM LEVEL BOTTOM LEVEL

003.BOTTOM
002.CONNECTOR
3 BOTTOM
1 : 25
LEVEL
(PRECAST BEAM
1DS40)
(PRECAST CORBEL)

(PRECAST CORBEL)
No. Description Date
1DS41

2 2

NODE CONNECTOR
1C40 (PRECAST COLUMN)

1C40

1C20 (PRECAST COLUMN) 1DS39

5'

3D VIEW @ SEC-2-2
002.CONNECTOR 6
23.400 23.400
5 BOTTOM
1 : 25
LEVEL Copy 1
01.COLUMN 01.COLUMN
BOTTOM BOTTOM

Section 1 Section 2 Project number 5048


1 1 : 15
2 1 : 15
Date 23/08/2019
Drawn by
S.S.M
Checked by H.S.M

CONNECTIONS
Scale
As indicated