0% found this document useful (0 votes)
39 views

Item Description Quantity Unit Unit Cost Total Cost I

This document contains a bill of quantities for construction materials and labor costs for various items needed to build a structure. It lists 15 categories of work including earthworks, concreting, masonry, tiling, steelworks, roofing, doors/windows, plumbing, water systems, electrical works, painting, furnishings, landscaping and their associated materials, quantities, unit costs and total costs. The total material and labor cost is calculated at the end.

Uploaded by

Kim
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
39 views

Item Description Quantity Unit Unit Cost Total Cost I

This document contains a bill of quantities for construction materials and labor costs for various items needed to build a structure. It lists 15 categories of work including earthworks, concreting, masonry, tiling, steelworks, roofing, doors/windows, plumbing, water systems, electrical works, painting, furnishings, landscaping and their associated materials, quantities, unit costs and total costs. The total material and labor cost is calculated at the end.

Uploaded by

Kim
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 5

ITEM DESCRIPTION QUANTITY UNIT UNIT COST TOTAL COST

I. Earthworks
Structural Excavation cu.m.
Backfilling and Compaction cu.m.
Gravel Bedding cu.m.
Embankment cu.m.
Material Cost:
Labor Cost (35%):
Sub. Total:
II. Concreting Works
Footing, Column, Beam, Slab, etc.
Cement bags
Sand cu.m.
Gravel cu.m.
Material Cost:
Labor Cost (35%):
Sub. Total:
III. Masonry Works
Wall, Column, Beam, Septic Vault, etc.
6" x 8" x16" CHB pcs
Cement bags
Sand cu.m.
Material Cost:
Labor Cost (35%):
Sub. Total:
IV Tile Works
0.40 x 0.40 Unglazed Tiles pcs.
per
Stone Wall Cladding
meter
Cement bags
Sand cu.m.
White Cement (40kg) bags
Tile Adhesive (25kg) bags
Material Cost:
Labor Cost (35%):
Sub. Total:
VI Steel Works pcs.
10 mm ø steel bars pcs.
16 mm ø steel bars kg.
#16 GI Tie Wires pcs.
16mm x 6m steel square bars (red)
Material Cost:
Labor Cost (35%):
Sub. Total:
VII Roofing Works
Ceiling
25mm x 25 mm x 0.60mm x 2.44 wall angle pcs.
17 mm x 49mm x 17mm x 5m double furring pcs.
Blind Rivets pcs.
4' x 8' Hardiflex pcs.
Airvent
1" x 1" x 10' wooden stat pcs.
per
Mesh Mosquito Screen meter
Trusses
2" x 2" x 1/4" x 6m angle bars pcs.
2" x 3" 1.2mm x 6m c-purlins pcs.
10mm thk Gusset Plate sq. m.
Roof
per
8m rib type roof 0.50mm thickness meter
1o mm ø round bars pcs.
Prepainted Ridge Roll GA 24(0.701) x 2.44m pcs.
Gutter
Prepainted Gutter 24(0.701mm) x 2.44m pcs.
Flat Bars 3.5mm x 1" x 20' pcs.
2.44m x 0.254m x 0.009 m fascia board pcs.
Material Cost:
Labor Cost (35%):
Sub. Total:
VIII Doors and Windows (w/ complete accessories)
Windows 1/4" thick sq.m.
1m x 2.10m wooden door sets
0.90m x 2.10m wooden door sets
0.80m x 2.10m wooden panel sets
0.70m x 2.10m PVC d00r sets
Material Cost:
Labor Cost (35%):
Sub. Total:
X Plumbing Works
3" P-TRAP pcs.
3" ELBOW pcs.
3" PVC PIPE pcs.
3" WYE pcs.
4" TEE pcs.
4" 45ᵒ ELBOW pcs.
4" CLEAN OUT pcs.
4" PVC pcs.
4" WYE pcs.
4" END CAP pcs.
4" ELBOW pcs.
1/2' ELBOW pcs.
1/2' PVC pcs.
Water Closet pcs.
Floor Drain pcs.
Sub. Total:
XI Water System
1/2" ø ELBOW pcs.
1/2 " ø TEE pcs.
1/2" ø PVC pcs.
Teflon Tape pcs.
Heavy Duty Faucets pcs.
Gate Valve set
Solvent bottle
Sub. Total:
XII Electrical Works
5 Watts Industrial Pinlight sets
10 Watts Industrial Pin Light sets
Receptacle (4 x 4) sets
2 Gang Outlet (Flush Type) sets

1 Gang Switch (Flush Type) sets


Service Entrance set
# 12 THW Wire box
# 14 THW Wire boxes
# 8 THW Wire meters
Electrical Type pcs.
Utility Box pcs.
Junction Box pcs.
Panel Board (14 Branches) set
Air Condition Unit unit

Circuit Breakers:
15A sets
20A sets
30 A sets
70 A sets
Material Cost:
Labor Cost (35%):
Sub. Total:
XIII Painting Works
Neutralizer gal.
Primer gal.
Topcoat gal.
Masonry Putty gal.
Metal Primer gal.
Reducer gal.
Paint Brush pcs.
Roller Brush and Pan pcs.
Material Cost:
Labor Cost (50%):
Sub. Total:
XIV Furnishing and Fixtures
Side Table each
Sofa Set set
Dining Set set
Bed Frame each
Wardrobe each
TV Stand each
Coffee Table each
Sink each
Bowl and Toilet Sink Set set
Sub Total:
XV Landscaping
Bermuda Grass sq.m.
Material Cost:
Labor Cost (35%):
Sub. Total:
TOTAL MATERIAL
AND LABOR COST: