0% found this document useful (0 votes)
110 views

Sample

This document provides a bill of materials for the interior fit out construction of the NEDA - PPP office space located at Eton Centris Cyberpod. It includes 3 paragraphs: 1) Instructions for completing the bill including providing itemized materials, noting included or excluded costs, and submitting in print and digital formats. 2) A table layout for the bill of materials organized by item number, item/activity description, quantity, unit of measure, unit cost in peso, total cost, and sub-total. 3) The beginning of the itemized bill including items for preliminaries like permits and bonds, site preparation like temporary facilities and utilities, and internal walls including masonry, insulation
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
110 views

Sample

This document provides a bill of materials for the interior fit out construction of the NEDA - PPP office space located at Eton Centris Cyberpod. It includes 3 paragraphs: 1) Instructions for completing the bill including providing itemized materials, noting included or excluded costs, and submitting in print and digital formats. 2) A table layout for the bill of materials organized by item number, item/activity description, quantity, unit of measure, unit cost in peso, total cost, and sub-total. 3) The beginning of the itemized bill including items for preliminaries like permits and bonds, site preparation like temporary facilities and utilities, and internal walls including masonry, insulation
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 16

Section VIII.

Bill of Quantities/Schedule of Rates for Fit Out Work


Name of Tenderer:

Instructions :

i) Please itemize required item in the following space provided under each sub header. The first few rows are provided as an example.

ii) "0.00" price should be noted with "included" or "not provided", otherwise it will be interpreted as included.
iii) To submit samples mounted on sample boards for materials for approval
iv) Please state clearly all exclusions with details
Submission in excel format is required in addition to the signed print copy. In case of discrepancy, the signed print copy will supersede the electronic
v)
copy.

PROJECT : NEDA - PPP INTERIOR FIT OUT CONSTRUCTION


LOCATION : ETON CENTRIS CYBERPOD, 8TH FLOOR, EDSA CORNER QUEZON AVENUE
OWNER : PPP - NEDA
SUBJECT : BILL OF MATERIALS

Unit of Unit Cost/Rate


ITEM NO. ITEM / ACTIVITY DESCRIPTION Qty. Total Cost Sub-Total
Measure in Peso

1 PRELIMINARIES
1.1 Permits 1.00 Lot
1.1.1 BARANGAY CLEARANCE
1.1.2 BLDG ADMIN CLEARANCE
1.1.3 Building Permit
1.1.4 Occupancy Permit
1.2 Others;I ie Meralco Deposit,Water Deposit, Tel Lines deposit. 1.00 Lot
1.3 Bonds / Insurances
1.3.1 CARI - Contractor's All Risk Insurance & Third Party Liability 1.00 Lot
and Workman's Compensation Insurance. Refer to the
Requirement in the standard contract
1.3.2 Professional Liability indemnity insurance
1.3.3 Performance Bond
1.3.4 Guarranty Bond
1.4 Expenses Charged By Bldg Admin : 1.00 Lot
1.4.1 Security Posting Fee
1.4.2 Telco Bond
1.4.3 Fit Out Fee
1.4.4 Electric Security Deposit
1.4.5 Water Consumption Charge
1.5 As Built Drawings 1.00 Lot
2 SITE PREPARATION :
1/16
Unit of Unit Cost/Rate
ITEM NO. ITEM / ACTIVITY DESCRIPTION Qty. Total Cost Sub-Total
Measure in Peso

2.1 Mobilization 1.00 Lot


2.2 Temporary Facilities
2.2.1 Temporary BOARD -UP ON METAL FRAME 1.00 Lot
2.2.1.1 Gypsum board - 10mm thick 1.00 Lot
2.2.1.2 METAL STUDS / FRAMING ASSEMBLY 1.00 Lot
2.2.1.3 MISCELANNEOUS 1.00 Lot
2.2.2 Temporary storage, Barracks, Office, toilet facilities 1.00 Lot
2.3 Protection of Existing Finish i.e. ceiling, windows, Elev Lobby, etc 1.00 Lot
2.4 Clearing of Site / Demolition of Existing Stuctures 1.00 Lot
2.5 Staking / layout 1.00 Lot
2.6 Hauling of debris & waste during construction 1.00 Lot
2.7 Utilities Consumption During Construction ( 4 months)
2.3.1 Electricity 4.00 months
2.3.2 Water 4.00 months
2.3.3 Telephone / Communication ( Landline / celphone) 4.00 months
2.8 Demobilization 1.00 Lot
2.9 Professional Cleaning Prior to Turn Over 1.00 Lot
3 SCAFFOLDINGS/ Machines / Equipments/ Tools
3.1 Assorted Cocolumber, Plywoods, H-Frame, Nails, ,etc 1.00 Lot
3.2 PPE - Personal Protective Equipments 1.00 Lot
3.3 Other Tools & Equipments 1.00 Lot
4 INTERNAL WALLS -
4.1 MASONRY WORKS - NEW Toilet Walls Refer to Technical Specifications for more details
4.1.1 4" thick Concrete Hollow Blocks 1,150.00 Pcs
4.1.2 Portland Cement 150.00 Bags
4.1.3 Washed Sand 9.00 Cu.mts
4.1.4 10mm diam steel bars, 6.00 Mts. Long 93.00 Pcs
4.1.5 G.I. Wires # 16 0.50 Rolls
4.1.6 Plaster Bond, Sahara, Etc. 1.00 Lot
4.1.7 Labor 1.00 Lot
4.2 Insulated Walls - WALL IN BETWEEN PRESS ROOM & 3431 AND THE ADJACENT ROOM
4.2.1 2" Fiberglass wool insulatio 48 kg 1.2 x 2.4 15.00 pcs
4.2.2 1/2" thck Hardiflex 20.00 pcs
4.2.3 wall studs 103.00 sq. mts
4.2.4 Labor 1.00 Lot
4.3 MOVABLE WALLS Refer to details of Movable Walls (A3 size plan)
4.3.1 Wall in between Main Conference Room & Conf Rm 2 1.00 Lot
4.3.2 Wall in between Press Room & Conference Room 2 1.00 Lot
4.3.3 Wall in between Library / Conference Room 1.00 Lot
4.3.4 Labor 1.00 Lot
4.4 DRY WALL PARTITION WITH & WITHOUT GLASS Refer to Architectural plan
2/16
Unit of Unit Cost/Rate
ITEM NO. ITEM / ACTIVITY DESCRIPTION Qty. Total Cost Sub-Total
Measure in Peso

4.4.1 Metal ( G.I) Wall Framing Assembly 1,570.00 sq.mts


4.4.2 6 mm thick Ficem Board 830.00 pcs
4.4.3 Decorative Panellings 12 mm thick Laminated MDF 320.00 pcs
4.4.4 Aluminum U chanel 6 mm wide 270.00 pcs
4.4.5 Labor 1.00 Lot
4.4.6 Window Coverings - Blinds, Rollers etc 1.00 Lot
4.5 FIX GLASS AND VIEWING GLASS ON WALLS

PLEASE SEE DOOR SCHEDULE Architectural plan A-6

5 CARPENTRY WORKS
5.1 Ceiling Works ACOUSTIC BOARDS TO BE SUPPLIED BY ETON CENTRIS

5.1.1 Accoustic Ceilings Refer to Reflected Ceiling Plan for more details
5.1.1.1 Accoustic Board - 60cm x 60 cm (Installation Only) 1.00 Lot
5.1.2 Gypsum Ceiling Refer to Reflected Ceiling Plan and Technical Specifications for more details
5.1.2.1 Metal Framing ( Metal Furrings, Accessories) 278.00 sq.mts
5.1.2.2 Gypsum Board 139.00 sq.mts
5.1.2.3 Gypsum Screw 1.00 Lot
5.1.2.4 Gypsum Tape 5.00 roll
5.1.2.5 Gypsum Putty 15.00 gal
5.1.2.6 6mm Thick Laminated MDF Panelling 43.00 PCS
5.1.2.7 Labor 1.00 Lot
5.2 Cabinetry Works / Other Carpentry Works
5.2.1 Cabinets Refer to Architectural Plans for the location of cabinets
5.2.1.1 Information Desk Counter 1.00 Lot
5.2.1.2 Info Desk Back Draft Panel 1.00 Lot
5.2.1.3 Bulletin Board (Reception Area) 1.00 Lot
5.2.1.4 Console Cabinet / Table (Data Center) 1.00 Lot
5.2.1.5 Supply Room Cabinets 1.00 Lot
5.2.1.6 Storage Room Cabinets 1.00 Lot
5.2.1.7 Records room shelves 1.00 Lot
5.2.1.8 Wellness center cabinet 1.00 Lot
5.2.1.9 Library / Meeting room Cabinets 1.00 Lot
5.2.1.10 Labor 1.00 Lot
6 DOORS and Door jambs
6.1 Jambs REFER to SCHEDULE Refer to Architectural Plan A - 6 and Technical Specifications Division 8
6.1.1 D-1 10mm Thick Clear Glass on 2"x6" Phil Mahogany Varnish 1.00 SET
6.1.2 D-2 10mm Thick Clear Glass on 2"x6" Phil Mahogany Varnish 2.00 SET
6.1.3 D-3 10mm Thick Clear Glass on 2"x6" Phil Mahogany Varnish 1.00 SET
6.1.4 D-4 10mm Thick Clear Glass on 2"x6" alum frame champagne finish 1.00 SET
3/16
Unit of Unit Cost/Rate
ITEM NO. ITEM / ACTIVITY DESCRIPTION Qty. Total Cost Sub-Total
Measure in Peso

6.1.5 D-5 10mm Thick Clear Glass on 2"x6" alum frame champagne finish 23.00 SET
6.1.6 D-6 10mm Thick Clear Glass on 2"x6" alum frame champagne finish 24.00 SET
6.1.7 D-7 Louvered door paint finish 9.00 SET
6.1.8 D-8 Flush door laminated finish, alder shade 2.00 SET
6.1.9 D-9 Flush door laminated finish, alder shade 5.00 SET
6.1.10 D - 10 Flush door laminated finish, alder shade with louver 3.00 SET
6.1.11 D - 11 Flush door laminated finish, alder shade with louver 4.00 SET
6.1.12 D - 12 Flush door laminated finish, alder shade 2.00 SET
6.1.13 Labor 1.00 LOT
6.2 DOORS Refer to Architectural Plan A - 6 and Technical Specifications Division 8
6.2.1 D-1 10mm Thick Clear Glass on 2"x6" Phil Mahogany Varnish 1.00 SET
6.2.2 D-2 10mm Thick Clear Glass on 2"x6" Phil Mahogany Varnish 2.00 SET
6.2.3 D-3 10mm Thick Clear Glass on 2"x6" Phil Mahogany Varnish 1.00 SET
6.2.4 D-4 10mm Thick Clear Glass on 2"x6" alum frame champagne finish 1.00 SET
6.2.5 D-5 10mm Thick Clear Glass on 2"x6" alum frame champagne finish 23.00 SET
6.2.6 D-6 10mm Thick Clear Glass on 2"x6" alum frame champagne finish 20.00 SET
6.2.7 D-7 Louvered door paint finish 4.00 SET
6.2.8 D-8 Flush door laminated finish, alder shade 2.00 SET
6.2.9 D-9 Flush door laminated finish, alder shade 5.00 SET
6.2.10 D - 10 Flush door laminated finish, alder shade with louver 3.00 SET
6.2.11 D - 11 Flush door laminated finish, alder shade with louver 4.00 SET
6.2.12 D - 12 Flush door laminated finish, alder shade 2.00 SET
6.2.13 D - 13 FIX PANEL 2.00 SET
6.2.14 Labor 1.00 LOT
6.3 Windows Refer to Architectural Plan A - 6 and Technical Specifications Division 8
6.3.1 W- 1 FIX GLASS FOR CASHIER / DISPATCHING 1.00 SET
6.3.2 W- 2 VIEWING FIX GLASS PANEL 1.00 SET
6.3.3 W- 3 VIEWING FIX GLASS PANEL 1.00 SET
6.3.4 W- 4 VIEWING FIX GLASS PANEL 1.00 SET
6.3.5 W- 5 FOLDING GLASS DOOR SEE DETAILS 1.00 SET
6.3.6 W- 6 VIEWING FIX GLASS PANEL 11.00 SET
6.3.7 W- 7 VIEWING FIX GLASS PANEL 1.00 SET
6.3.8 W- 8 VIEWING FIX GLASS PANEL 1.00 SET
6.3.9 W- 9 VIEWING FIX GLASS PANEL 1.00 SET
6.3.10 W- 10 VIEWING FIX GLASS PANEL 6.00 SET
6.3.11 W- 11 VIEWING FIX GLASS PANEL 2.00 SET
6.3.12 W- 12 VIEWING FIX GLASS PANEL 3.00 SET
6.3.13 W- 13 VIEWING FIX GLASS PANEL 14.00 SET
6.3.14 W- 14 VIEWING FIX GLASS PANEL 4.00 SET
6.3.15 W- 15 VIEWING FIX GLASS PANEL 3.00 SET
6.3.16 W- 16 VIEWING FIX GLASS PANEL 3.00 SET
4/16
Unit of Unit Cost/Rate
ITEM NO. ITEM / ACTIVITY DESCRIPTION Qty. Total Cost Sub-Total
Measure in Peso

6.3.17 W- 17 VIEWING FIX GLASS PANEL 1.00 SET


6.3.18 W- 18 VIEWING FIX GLASS PANEL 18.00 SET
6.3.19 Labor 1.00 LOT
6.4 Procuring Entity Supplied Doors Refer to Technical Specifications Division 8 page 9
6.4.1 D-6 Procuring Entity Supplied Glass Doors 33"L x 82"H - Labor only 4.00 SET
6.4.2 D-7 Procuring Entity Supplied Glass Doors 33"L x 82"H - Labor only 5.00 SET
7 DOOR HINGES and LOCKSETS
7.1 Door Hinges; Loosepin 4 1 / 2" X 3 1/2 " Refer to Technical Specifications Division 8 page 10
7.1.1 D-1 10mm Thick Clear Glass on 2"x6" Phil Mahogany Varnish 2.00 SET
7.1.2 D-2 10mm Thick Clear Glass on 2"x6" Phil Mahogany Varnish 4.00 SET
7.1.3 D-3 10mm Thick Clear Glass on 2"x6" Phil Mahogany Varnish 4.00 SET
7.1.4 D-4 10mm Thick Clear Glass on 2"x6" alum frame champagne finish 4.00 SET
7.1.5 D-5 10mm Thick Clear Glass on 2"x6" alum frame champagne finish 23.00 SET
7.1.6 D-6 10mm Thick Clear Glass on 2"x6" alum frame champagne finish 24.00 SET
7.1.7 D-7 Louvered door paint finish 18.00 SET
7.1.8 D-8 Flush door laminated finish, alder shade 4.00 SET
7.1.9 D-9 Flush door laminated finish, alder shade 10.00 SET
7.1.10 D - 10 Flush door laminated finish, alder shade with louver 6.00 SET
7.1.11 D - 11 Flush door laminated finish, alder shade with louver 8.00 SET
7.1.12 D - 12 Flush door laminated finish, alder shade 6.00 SET
7.1.13 Labor 1.00 LOT
7.2 LOCKSETS Refer to Technical Specifications Division 8 page 10
7.2.1 D-1 10mm Thick Clear Glass on 2"x6" Phil Mahogany Varnish 1.00 SET
7.2.2 D-2 10mm Thick Clear Glass on 2"x6" Phil Mahogany Varnish 3.00 SET
7.2.3 D-3 10mm Thick Clear Glass on 2"x6" Phil Mahogany Varnish 2.00 SET
7.2.4 D-4 10mm Thick Clear Glass on 2"x6" alum frame champagne finish 2.00 SET
7.2.5 D-5 10mm Thick Clear Glass on 2"x6" alum frame champagne finish 23.00 SET
7.2.6 D-6 10mm Thick Clear Glass on 2"x6" alum frame champagne finish 24.00 SET
7.2.7 D-7 Louvered door paint finish 9.00 SET
7.2.8 D-8 Flush door laminated finish, alder shade 2.00 SET
7.2.9 D-9 Flush door laminated finish, alder shade 5.00 SET
7.2.10 D - 10 Flush door laminated finish, alder shade with louver 3.00 SET
7.2.11 D - 11 Flush door laminated finish, alder shade with louver 4.00 SET
7.2.12 D - 12 Flush door laminated finish, alder shade 2.00 SET
7.2.13 Labor 1.00 LOT
8 WORK STATIONS / SPECIALTY WORKS Refer to Technical Specifications Division 16 pages 61 - 62 for more details
8.1 FURNITURE FOR 2 DED's AND 6 SERVICE DIRECTORS
8.1.1 Executive Table 8.00 pcs.
8.1.2 Executive Chair 8.00 pcs.
8.1.3 Visitor's Chair 16.00 pcs.
8.2 CHAIRS FOR ED, DG AND ASST. DIRECTORS
5/16
Unit of Unit Cost/Rate
ITEM NO. ITEM / ACTIVITY DESCRIPTION Qty. Total Cost Sub-Total
Measure in Peso

8.2.1 Executive Chair 7.00 pcs.


8.2.2 Visitor's Chair 14.00 pcs.
8.3 FURNITURE FOR 19 DIVISION CHIEFS See detailed plan
8.3.1 Workstation Table 19.00 pcs.
8.3.2 Executive Chair 19.00 pcs.
8.3.3 Mobile Pedestal 19.00 pcs.
8.3.4 Meeting Table 19.00 pcs.
8.3.5 Visitor's Chair 38.00 pcs.
8.4 CHAIRS FOR REGULAR STAFF
8.4.1 Staff Chair 60.00 pcs.
8.5 MAIN CONFERENCE ROOM
8.5.1 Conference Tables Modular 1.00 lot
8.5.2 Mesh chair with arms and gas lift 40.00 pcs.
8.6 CONFERENCE ROOM 4
8.6.1 Conference Tables Modular 1.00 lot
8.6.2 Mesh chair with arms and gas lift 12.00 pcs.
8.7 WORKSTATION FOR 102 STAFF See detailed plan
8.7.1 Workstation Table 102.00 sets
8.8 Monoblock Tables and Chairs for Pantry
8.8.1 Monoblock Chairs 44.00 pcs
8.8.2 Monoblock tables 11.00 pcs
8.9 Cashier's Vault 1.00 set
8.10 Labor Cost for the Workstation 1.00 Lot
9 Finishing works
9.1 FLOORING Refer to Achitectural Plan for details of Floor Finishes
9.1.1 LOBBY / LOUNGE SYNTHETIC GRANITE TILES 38.00 sq. mts
9.1.2 HALLWAYS 2MM THICK VINYL ROLL TYPE 160.00 sq.m.
9.1.3 OFFICES 2MM THICK VINYL ROLL TYPE 1,085.00 sq.m.
9.1.4 CONFERENCE RMS TILE CARPET 180.00 sq.mts
9.1.5 STORAGE / SUPPLY ROOMS/ STORAGE - 300 X 300 X 3MM HOMOGENOUS VINYL TILES 95.00 sq.mts
VINYL COVE BASE 150 mm high vinyl straight profile. On Areas With Synthetic Floor
9.1.6 1.00 LOT
Tile, Carpet Tile , Vinyl Tile Finish
9.1.7 LABOR 1.00 LOT
9.2 Toilet Tiles Refer to Achitectural Plan for details of Floor Finishes
9.2.1 Floor Tiles 18.00 sq.m.
9.2.2 Wall Tiles 48.00 sq.m.
9.2.3 Labor 1.00 Lot
10 PAINTING WORKS
10.1 Interior Paint Refer to Achitectural Plan for details of Floor Finishes
10.1.1 Walls 2,630.00 sq. mts
10.1.2 Ceilings 320.00 sq. mts

6/16
Unit of Unit Cost/Rate
ITEM NO. ITEM / ACTIVITY DESCRIPTION Qty. Total Cost Sub-Total
Measure in Peso

10.1.3 Others DOORS, JAMBS ETC 1.00 Lot


10.1.4 Labor 1.00 Lot
11 Plumbing Works
11.1 Water Line Refer to Technical Specifications, ETON Centris Fit-Out Guidelines and Plumbing Plans for more details.
11.1.1 25mm x 4mtrs. PILSATHERM PIPE 15.00 pcs
11.1.2 20mm x 4mtrs. PILSATHERM PIPE 23.00 pcs
11.1.3 25mm ELBOW 90º 12.00 pcs
11.1.4 20mm ELBOW 90º 25.00 pcs
11.1.5 25mm TEE 7.00 pcs
11.1.6 20mm TEE 6.00 pcs
11.1.7 25x20x25mm TEE (Reduced) 5.00 pcs
11.1.8 20mm ELBOW ADAPTOR (Female) 7.00 pcs
11.1.9 20mm TEE ADAPTOR (Female) 6.00 pcs
11.1.10 20mm MALE ADAPTOR (Male) 18.00 pcs
11.1.11 25mm SOCKET 7.00 pcs
11.1.12 20mm SOCKET 11.00 pcs
11.1.13 25x20mm SOCKET (Reduced) 7.00 pcs
11.1.14 20mm END CAP 7.00 pcs
11.1.15 20mm GATE VALVE 10.00 pcs
11.1.16 Water Meter 3.00 sets
11.1.17 Hangers And Supports 1.00 Lot
11.1.18 Labor 1.00 Lot
11.2 SEWERLINE: Refer to Technical Specifications and Plumbing Plans for more details
11.2.1 NELTEX PVC PIPE 100mm x 3mtrs. 25.00 pcs
11.2.2 NELTEX PVC PIPE 75mm x 3mtrs. 5.00 pcs
11.2.3 NELTEX PVC PIPE 50mm x 3mtrs. 8.00 pcs
11.2.4 WYE 100x100mm 10.00 pcs
11.2.5 WYE 100 x 50mm 16.00 pcs
11.2.6 ELBOW 90º 100mm 12.00 pcs
11.2.7 ELBOW 90º 75mm 2.00 pcs
11.2.8 ELBOW 90º 50mm 12.00 pcs
11.2.9 ELBOW 45º 100mm 9.00 pcs
11.2.10 ELBOW 45º 75mm 8.00 pcs
11.2.11 TEE 50mm 8.00 pcs
11.2.12 P-TRAP 50mm 9.00 pcs
11.2.13 CLEAN-OUT 100mm 8.00 pcs
11.2.14 PVC SOLVENT CEMENT 400cc 6.00 cans
11.2.15 Hangers And Supports 1.00 Lot
11.2.16 Labor 1.00 Lot
11.3 VENT LINE Refer to Plumbing Plans for more details
11.3.1 NELTEX PVC PIPE 50mm x 3mtrs. 24.00 pcs
7/16
Unit of Unit Cost/Rate
ITEM NO. ITEM / ACTIVITY DESCRIPTION Qty. Total Cost Sub-Total
Measure in Peso

XI.3.2 ELBOW 90º 50mm 15.00 pcs


XI.3.3 TEE 50mm 13.00 pcs
XI.3.4 TEE (Reduced) 100x50x100mm 5.00 pcs
XI.3.5 PVC SOLVENT CEMENT 400cc 8.00 cans
XI.3.6 Hangers And Supports 1.00 Lot
XI.3.7 Labor 1.00 Lot
11.4 AIRCON DRAINAGE LINE Refer to Detailed Plans, ETON Centris Fit-Out Guidelines and Technical Specifications for more details
11.4.1 Procuring Entity Supplied Airconditioning Units
11.4.1 Pipes and Fittings 1.00 Lot
11.4.2 PVC SOLVENT CEMENT 400cc 1.00 Lot
11.4.3 Hangers And Supports 1.00 Lot
11.4.4 Insulation 1.00 Lot
11.4.5 Labor 1.00 Lot
12.4.2 ETON Centris VRF Airconditioning Units
11.4.1 Pipes and Fittings 1.00 Lot
11.4.2 PVC SOLVENT CEMENT 400cc 1.00 Lot
11.4.3 Supports 1.00 Lot
11.4.4 Insulation 1.00 Lot
11.4.5 Labor 1.00 Lot
11.5 Fixtures - all toilet fixtures Refer to Detailed Plans, Technical Specifications and ETON Centris Fit-Out Guidelines for more details
11.5.1 Toilet Bowl ( Water Closet) 4.00 set
11.5.2 Lavatory 5.00 set
11.5.3 Lavatory Faucet 5.00 set
11.5.4 Shower Set 2.00 set
11.5.5 Floor Drain 100x100mm 9.00 set
11.5.6 Curtain Rod 2.00 set
11.5.7 Tissue Paper Holder 5.00 set
11.5.8 Towel Ring 5.00 set
11.5.9 Mirror 4.00 set
11.5.10 Urinal 3.00 set
11.5.11 Accessories 1.00 Lot
11.5.12 Labor 1.00 Lot
11.6 Employees Lounge/Pantry Refer to Detailed Plans, Technical Specifications and ETON Centris Fit-Out Guidelines for more details
11.6.1 Grease Trap 1.00 set
11.6.2 Faucet 1.00 set
11.6.3 Pantry sink with top and bottom cabinets 1.00 lot
11.6.4 Pipes and Fittings 1.00 Lot
11.6.5 Labor 1.00 Lot
12 Electrical / Mechanical Works
12.1 Electrical Works
12.1.1 Conduits and fittings Refer to Electrical Plans and Technical Specifications for more details
8/16
Unit of Unit Cost/Rate
ITEM NO. ITEM / ACTIVITY DESCRIPTION Qty. Total Cost Sub-Total
Measure in Peso

12.1.1.1 Pipes and Fittings 1.00 Lot


12.1.1.2 EMT 1" diam. Entrance Cap 2.00 Pcs.
12.1.1.3 G.I. 2" X 4" Utility Box, Deep Type 250.00 Pcs.
12.1.1.4 G.I. 4" X 4" Junction Box w/ Cover 75.00 Pcs.
12.1.1.5 G.I. 4" /16 Pullbox w/ Cover 45.00 Pcs.
12.1.1.6 G.I. 60 cc Solvent Cement 15.00 cans
12.1.1.7 Big Rubber Tape 50.00 Pcs.
12.1.1.8 G.I. Wire, Gauge 16 2.00 Pcs.
12.1.1.9 Big Electrical Tape 100.00 Pcs.
12.1.1.10 Accessories 1.00 Lot
12.1.1.11 Hangers And Supports 1.00 Lot
12.1.1.12 Labor 1.00 Lot
12.1.2 Wires and Cables Refer to Electrical Plans and Technical Specifications for more details
12.1.2.1 3.5 mm² THHN 1.00 Lot
12.1.2.2 5.5 mm² THHN 1.00 Lot
12.1.2.3 8.0 mm² THHN 1.00 Lot
12.1.2.4 22.0 mm² THHN 1.00 Lot
12.1.2.5 30.0 mm² THHN 33.00 mtrs.
12.1.2.6 50.0 mm² THHN 30.00 mtrs.
12.1.2.7 125.0 mm² THHN 65.00 mtrs.
12.1.2.8 200.0 mm² THHN 104.00 mtrs.
12.1.2.9 Telephone Cable 15.00 rolls
12.1.2.10 Labor 1.00 Lot
12.1.3 WIRING DEVICES Refer to Electrical Plans and Technical Specifications for more details
12.1.3.1 C.O. Two Gang UNIVERSAL OUTLET 1.00 Lot
12.1.3.2 C.O. Water Proof UNIVERSAL OUTLET 6.00 Sets
12.1.3.3 Switch Three Gang 34.00 Sets
12.1.3.4 Switch Two Gang 50.00 Sets
12.1.3.5 Switch One Gang 29.00 Sets
12.1.3.6 Switch Three Way ( One Gang) 10.00 Sets
12.1.3.7 Lights 20 Watts Flourescent with Acrylic Cover 118.00 Sets
12.1.3.8 Lighting for Conference Room and Consultants' Room 1.00 Lot
12.1.3.9 Pinlights, 6" diam.,White Rim, Chrome Interior 150.00 Pcs.
12.1.3.10 Floor Convenience Outlets 10.00 Pcs.
12.1.3.11 Special Power Outlets 12.00 Pcs.
12.1.3.12 Accessories 1.00 Lot
12.1.3.13 LABOR 1.00 Lot
12.1.4 Flourescent Lamp Re-use Existing T5 Flourescent Lamp and Fixtures Supplied by ETON (Refer to As-built plan and Electrical Plan)
12.1.4.1 Flourescent Lamp Relocation 1.00 Lot
12.1.4.2 Accessories 1.00 Lot
12.1.5 Others Refer to Electrical Plans and Technical Specifications for more details
9/16
Unit of Unit Cost/Rate
ITEM NO. ITEM / ACTIVITY DESCRIPTION Qty. Total Cost Sub-Total
Measure in Peso

12.1.5.1 PANEL BOARDS 1.00 Lot


12.1.5.2 Other Heavy / Big Wires & Cables 1.00 Lot
12.1.5.3 Labor 1.00 Lot
12.2 Sprinkler System Refer to Fire Protection Plans, As-built Plans and Technical Specifications for more details
12.2.1 32mm diam B.I. Pipe Schedule 40 / ASTM A53 1.00 Lot
12.2.2 25mm diam B.I. Pipe Schedule 40 / ASTM A53 1.00 Lot
12.2.3 GI Fittings 1.00 Lot
12.2.4 Sprinkler Head relocation Pendent 212 76.00 pcs
12.2.5 new Pendent 212 60.00 pcs
12.2.6 Hangers And Supports 1.00 Lot
12.2.7 Testing & Commisioning 1.00 Lot
12.2.8 Fire Hose Cabinet 3.00 set
12.2.9 Accessories 1.00 Lot
12.2.10 Labor 1.00 Lot
12.3 Smoke detector system Refer to Electrical Plans, As-built Plans and Technical Specifications for more details
12.3.1 Smoke Detectors relocation 28.00 set
12.3.2 new 1.00 Lot
12.3.3 Wires & Cables 1.00 Lot
12.3.4 Pipes and Fittings 1.00 Lot
12.3.5 Panel 1.00 set
12.3.6 Labor 1.00 Lot
12.4 AIRCONDITIONING WORKS Refer to Mechanical Plans, Attachment A, As-built plans and Technical Specifications for more details
12.4.1 Procuring Entity Supplied Airconditioning Units (9 units)
12.4.1 Pipes & fittings - copper 1.00 Lot
12.4.2 Insulation 1.00 Lot
12.4.3 Hangers and Supports 1.00 Lot
12.4.4 Relocation Cost (Dismantling and Transport) 1.00 Lot
12.4.5 Wires and Cables 1.00 Lot
12.4.6 Accessories 1.00 Lot
12.4.7 Labor 1.00 Lot
12.4.2 ETON Centris VRF Airconditioning Units
12.4.2.1 Aircon Duct 1.00 Lot
12.4.2.2 Air Diffusers 1.00 Lot
12.4.2.3 Insulation 1.00 Lot
12.4.2.4 Hangers and Supports 1.00 Lot
12.4.2.5 Aircon Units Relocation Ceiling Casette 1.00 Lot
12.4.2.6 Accessories 1.00 Lot
12.4.2.7 Labor 1.00 Lot
12.5 EXHAUST SYSTEM Refer to Mechanical Plans for details
12.5.1 Exhaust fan 1.00 Lot
12.5.2 Hangers and Supports 1.00 Lot
10/16
Unit of Unit Cost/Rate
ITEM NO. ITEM / ACTIVITY DESCRIPTION Qty. Total Cost Sub-Total
Measure in Peso

12.5.3 Accessories 1.00 Lot


12.5.4 Labor 1.00 Lot
12.6 RETURN AIR INLET Refer to Mechanical Plans for details
12.6.1 Return Air Duct 1.00 Lot
12.6.2 Air Diffuser 1.00 Lot
12.6.3 Supports 1.00 Lot
12.6.4 Accessories 1.00 Lot
12.6.5 Labor 1.00 Lot
(Data Room, PBX Room, Monitoring Room, Partition, Cabinets, Raised Flooring, Lights and Fixture, Cabling system, Communication system,
13 I.T. STRUCTURE
Devices, Riser, extension cabinet, Electrical)

STRUCTURED CABLING SYSTEM (SCS) FOR DATA AND VOICE CONNECTIVITY(Both Horizontal and Vertical Layout)-Refer to Section VI Technical Specification, Division 17
1 200 Data Nodes distributed to PPPC office areas
Cat 6 cable
I/O
24 port Patch Panel for 200 nodes
24 port Patch Panel for 7 Data Cabinets
Face plate
Cover
Piping, Connectors, elbows, tie wrap, Fittings
Patch cable for 200 nodes (work area)
1.00 lot
Patch cable for 200 nodes (equipment)
RJ-45 connector
Ladder racks

At least 100 pieces of Hook and Loop cable Tie wrap for
cabinets
Drop down insulation
RjJ5 connector
Labeling Materials
Other materials Needed and Accessories
2 200 Voice Nodes distributed to PPPC office areas
Cat 6 cable
I/O
24 port Patch Panel for 200 nodes
24 port Patch Panel for 7 Data Cabinets
Face plate
Cover
Piping, Connectors, elbows, tie wrap, fittings
Patch cable for 200 nodes (work area)
Patch cable for 200 nodes (equipment) 1.00 lot
RJ-45 connector
11/16
Unit of Unit Cost/Rate
ITEM NO. ITEM / ACTIVITY DESCRIPTION 1.00
Qty. lot Total Cost Sub-Total
Measure in Peso

Ladder racks
At least 100 pieces of Hook and Loop cable Tie wrap for
cabinets
Drop down insulation
RjJ5 connector
110 Block for analog and digital termination
Labeling Materials
Other materials Needed and Accessories
Communication Riser(Vertical and Horizontal)
3 25 pair Vertical Riser(from MDF to Data Center) for data
Panel Board at MDF and TTC
25 pair 110 Block at the MDF and Server Room
Cable Run Horizontal
Cable Run Uplink
Piping, Connectors, elbows, tie wrap 1.00 lot

50 pair 110 Block (Server Room)


Cable Run Horizontal
Labeling materials
Other materials Needed and Accessories
4 25 pair Vertical Riser(from MDF to PBX Room) for voice
Panel Board at MDF and TTC
25 pair 110 Block at the MDF and PBX Room
Cable Run Horizontal
Cable Run Uplink
Piping, Connectors, elbows, tie wrap 1.00 lot

50 pair 110 Block (PBX Room)


Cable Run Horizontal
Labeling materials
Other materials Needed and Accessories
5 8 pair fiber optics Vertical Riser(from MDF to 1 Data Center)
Panel Board at MDF and TTC
8 pair Fiber Run at the MDF and Server Room
Fiber Cable Run Horizontal
Fiber Cable Run Uplink
Piping, Connectors, elbows, tie wrap
1.00 Lot
Fiber box and terminating block
Fabricated Fiber cable (12 pcs ) compatible to equipment
connection
Cable Run Horizontal
12/16
1.00 Lot

Unit of Unit Cost/Rate


ITEM NO. ITEM / ACTIVITY DESCRIPTION Qty. Total Cost Sub-Total
Measure in Peso

Labeling materials
Other materials Needed and Accessories
6 DIRECT LINE CABLING SYSTEM

Provision for direct lines cabling to be installed in the following


locations.
· Two (2) lines for the Executive Director with extension to
the secretary

· Two (2) lines for the two (2) Deputy Executive Directors
with extension to the secretary 1 Lot

· Two (2) lines for the Admin Director with extension to


the secretary
· One (1) line each for six (5) Service Directors with
extension to the secretary
Voice backbone and horizontal cabling shall be 4-wire
Telephone Cord or Telephone wire gauge.
Devices and Racks
7 Wireless Devices(WIFI)
Labeling materials
5.00 units
Other materials Needed and Accessories
Power cables
8 Open Bay Rack(For PABX Mounted)
42U Telecommunication Cabinet
Rail width 19" opening
with vertical and horizontal cable managers mounted
with rack anchor kit and mounting screws 1.00 lot
1 power strip 8co's, 3 prong 30 amperes
Bolts and Nuts
Hook and Loop Tie Wrap
Other materials Needed and Accessories
9 Communication Cabinet
Open Bay Rack(For PABX Mounted)
42U Communication Cabinet
Rail width 19" opening
framing & paneling Ga#16
1 power strip 8co's, 3 prong 30 amperes
with front, side and back panels
w/ 2 units vertical wire manager 1.00 lot
w/ vertical wire management
w/ 60 pcs. Cage nuts & rack screws
3 pcs. Fixed tray D= 30
Bolts and Nuts
13/16
1.00 lot

Unit of Unit Cost/Rate


ITEM NO. ITEM / ACTIVITY DESCRIPTION Qty. Total Cost Sub-Total
Measure in Peso

Hook and Loop Tie Wrap


Other materials Needed and Accessories
10 Wall Mount Data Cabinet
One (1) 9U Mountable rack rails
w/ 16 pcs. Cage nuts & rack screws 1.00 lot
1w/ one(1) Horizontal management Tray
1 power strip 6co's, 3 prong 30 amperes
11 Digital Phones
Handset
Cables 1.00 lot
Baterries
Stand
12 Analog Phones
Handset
Cables 1.00 lot
Baterries
Stand
13 Packaged technical implementation training and support services 1.00 Lot
14 Packaged Training and Orientation 1.00 lot
15 Package Testing 1.00 lot
16 Labor Cost 1.00 lot
SUPPLY AND CONSTRUCTION OF A DATA CENTER ROOM - Refer to Section VI Technical Specification, Division 18
Raised flooring for the Server Room, Communications (IPPBX) and
1 Technical Working/Monitoring Rooms, seismic 49.00 sq.mts

Floor Component 1.00 lot


Floor Ties and Static 1.00 lot
Stringers 1.00 lot
Pedestals 1.00 lot
Seismic bracing 1.00 lot
Ramps 1.00 lot
Panel Lifting - Refere to Section VI Tech Specs , Division 18,
item 18.1.2 2.00 units

Pathways (Runner grid) for electrical supply with space provisions for
2 data/voice cabling
1.00 lot
Cabl
Electrical runner
Electrical system for Data Center, Technical Working/Monitoring work
3 area , and Communications (PABX) room
circuit panel board 1.00 lot
Cricuit breaker for UPS
Distribution Panel
14/16
Unit of Unit Cost/Rate
ITEM NO. ITEM / ACTIVITY DESCRIPTION Qty. Total Cost Sub-Total
Measure in Peso

Wall partition and doors installation for Data Center, Communications


4 (PABX) and Technical Working/Monitoring Rooms, ramp
1.00 lot
Wall Partition
Doors
5 Furniture and Fixtures for Technical Working/Monitoring Area 1.00 lot
Environmental Control : Ventilation ducting and exhaust system, cooling
6 system, fire suppression system, Humidification system, pre-action wet
system 1.00 lot
Exhaust fan
Dehumidifier Equipment/sensor in 3 rooms of data center
8 Early Warning Smoke Detection System 1.00 lot
9 Relocation of Facilities 1.00 lot
10 Finishing, Painting and Sealing 1.00 lot
11 Fire protection system for PBX and Working Area
FM200 1.00 lot
Discharge Tube ,Valve Outlet Adapter
Valve outlet adapter includes PBX room , working area
room and under flooring of the whole data center
12 Package Technical Implementation and services 1.00 lot
13 Labor and services 1.00 lot
Conference System
Delegate Microphone 20.00 set
Chairman Microphone 1.00 set
Control Unit for Conference System 1.00 Lot
2 - Wireless Microphones w/ receiver 1.00 set
Mic Stand 1.00 set
Speakers for Conference System 1.00 Lot
Lapel Microphone 2.00 sets
Amplifier/mixer 1.00 Lot
Lectern with built-in amplifier 1.00 unit
Cables and Accessories 1.00 Lot
Labor 1.00 Lot
Package Technical Implementation, Training and services 1.00 Lot
Projector
Multimedia Controller Switcher 1.00 Lot
Projectors 2.00 units
Projector Ceiling Mount 2.00 sets
Motorized Screen 2.00 units
Package Technical Implementation, Training and services 1.00 lot
Labor 1.00 Lot
Other Devices

15/16
Unit of Unit Cost/Rate
ITEM NO. ITEM / ACTIVITY DESCRIPTION Qty. Total Cost Sub-Total
Measure in Peso

110 Block 1.00 Lot


EXTENSION OF DATA CABINET 1.00 Lot
Pipes and Fittings (CONDUITS) 1.00 Lot
Labor 1.00 Lot
14 Demobilization / Final cleaning of Works 1.00 Lot

GRAND TOTAL -