Module – 12
Well Completions
Schlumberger Private
Section – 8
Sub Sea Well Heads
Quartz School. Module 12: Well Completions / Section 8: Sub Sea Well Head Installations
1/22
8. Sub Sea Well Head Installations
Contents
y Offshore Operations Evolution
y Why go Subsea?
Schlumberger Private
y Subsea Development Options
y Technical Challenges
y Schlumberger Subsea
y SRC
Quartz School. Module 12: Well Completions / Section 8: Sub Sea Well Head Installations
2/22
8. Sub Sea Well Head Installations
Offshore Operations Evolution
Offshore Deepwater Subsea
Schlumberger Private
Quartz School. Module 12: Well Completions / Section 8: Sub Sea Well Head Installations
3/22
8. Sub Sea Well Head Installations
Deepwater Potential
Schlumberger Private
Production Modeled
Alaska
Deepwater
Billions of bbls
3.6 Peak
Production
Horizontal Impact
Wells
3.0
2.4
Total U.S.
Lower 48 GOM: 20-46 Billion bbls
1.8
Global: 200+ Billion bbls
Quartz School. Module 12: Well Completions / Section 8: Sub Sea Well Head Installations
4/22
8. Sub Sea Well Head Installations
Subsea Market
Schlumberger Private
1600
1400
1200
1000
800
600
400
200
0
1960- 1965- 1970- 1975- 1980- 1985- 1990- 1995- 2000-
1965 1970 1975 1980 1985 1990 1995 2000 2005
Quartz School. Module 12: Well Completions / Section 8: Sub Sea Well Head Installations
5/22
8. Sub Sea Well Head Installations
Subsea Development Options
Schlumberger Private
Quartz School. Module 12: Well Completions / Section 8: Sub Sea Well Head Installations
6/22
8. Sub Sea Well
Deepwater Head Installations
Development Options
Schlumberger Private
Tension Leg Platform
(TLP)
Tanker FPSO
Semi submersible FPS
Spar
Fixed Platform
Subsea Tieback
Quartz School. Module 12: Well Completions / Section 8: Sub Sea Well Head Installations
7/22
8. Sub Sea Well Head Installations
Deepwater Development Options
Schlumberger Private
Platforms
Tanker FPSO
Semisub FPS
SPAR
Subsea Tieback
Water Depth ft
Quartz School. Module 12: Well Completions / Section 8: Sub Sea Well Head Installations
8/22
8. Sub Sea Well Head Installations
Subsea System Overview
y Wells
y Subsea Production trees
y Tiebacks
Schlumberger Private
y Templates
y Manifolds
y Pipelines
y Control Systems
y Umbilical
y Control Pods
y Pumps
y Separators
Quartz School. Module 12: Well Completions / Section 8: Sub Sea Well Head Installations
9/22
8. Sub Sea Well Head Installations
Sub Sea Tree Design Options
Schlumberger Private
Quartz School. Module 12: Well Completions / Section 8: Sub Sea Well Head Installations
10/22
8. Sub Sea Well Head Installations
Conventional Trees
y Tubing Hanger installed in the
Wellhead
y Flow Control valves in line with
tubing
y
Schlumberger Private
Consist of three sub-systems
1. Surface Equipment
y Surface Flow Tree
y Swivel
y Coiled Tubing Lifting Frame
2. Riser System
y Dual bore risers and
monobosre risers
3. Subsea Equipment
y Lower Riser Package
y Emergency Disconnect
Package
Quartz School. Module 12: Well Completions / Section 8: Sub Sea Well Head Installations
11/22
8. Sub Sea Well Head Installations
Horizontal Trees
Schlumberger Private
of the tubing flow path
y Configuration allows for full bore
access to tubing hanger
y Well intervention without
disturbing tree, flow line
connections or umbilical
y Reduce cost and tree size
y Allows for 7” production tubing
y Higher production per tree
Quartz School. Module 12: Well Completions / Section 8: Sub Sea Well Head Installations
12/22
8. Sub Sea Well Head Installations
Tiebacks
y Simple wellhead / pipeline
configurations are often not
practical
y Water depth
Schlumberger Private
y Environment
y Subsea Solution – Tiebacks
y Multiple wellheads
connected to a manifold by
flowlines
y Production connected to
y Floating Production
Systems
y Neighboring Platforms
y Onshore facilities
y Record distance 68 miles
(GOM Mensa field)
Quartz School. Module 12: Well Completions / Section 8: Sub Sea Well Head Installations
13/22
8. Sub Sea Well Head Installations
Templates and Manifolds
Templates Manifolds
y Provide support for manifolds y Interface between the production
and wells pipeline, flow line and the well.
y Can be deployed in 2500 m water y Collect and distribute produced fluids from
Schlumberger Private
depth individual subsea wells
y Inject gas, inject chemicals and control
fluids.
y Distribute the electrical and hydraulic
systems.
Quartz School. Module 12: Well Completions / Section 8: Sub Sea Well Head Installations
14/22
8. Sub Sea Well Head Installations
Control Systems
y Downhole valves, valves on tree, flow
lines and manifolds are controlled
hydraulically from surface
Schlumberger Private
y Topside controls linked to Subsea
Control Modules (SCM) with Umbilical
Quartz School. Module 12: Well Completions / Section 8: Sub Sea Well Head Installations
15/22
8. Sub Sea Well Head Installations
Subsea Challenges
Schlumberger Private
y Well Accessibility
y Weather, Currents
y Technology
y Hydrates, Scales, Corrosion
y Multi-zone production
y Hostile, unconsolidated
y Extended Reach operations
y Risks
y Little previous experience
y Financial Exposure
Quartz School. Module 12: Well Completions / Section 8: Sub Sea Well Head Installations
16/22
8. Sub Sea Well Head Installations
Schlumberger Subsea
Schlumberger Private
y The latest product is now called SenTREE 3.
Schlumberger Private
Well Control and Intervention using
the SenTREE 7 systems
y Light Weight Intervention
Schlumberger Private
provide access, well shut-in and
emergency disconnects
y Primary Subsea Safety System:
y Isolates landing string from
completion
y Rapid Disconnect
y Prevents Discharge
y Allows Reconnection
y Two Systems
y SenTree 3
y SenTREE 7
Quartz School. Module 12: Well Completions / Section 8: Sub Sea Well Head Installations
19/22
8. Sub Sea Well Head Installations
SenTREE 7 primary functions
Applications
y Testing
y Installing Completion
y Well Intervention
Schlumberger Private
It is the primary subsea safety
device and provides fast acting
and reliable means to:
y Shut-in the well with two
barriers
y Prevent discharge of its
contents into the riser
y Disconnect the landing
string from the test string.
y Allows Chemicals to be
pumped into the landing
string.
Quartz School. Module 12: Well Completions / Section 8: Sub Sea Well Head Installations
20/22
8. Sub Sea Well Head Installations
SenTREE 7 Operation
Schlumberger Private
Emergency Disconnect
Ball Valve
Operational Overview
Latch
Flapper Valve
Quartz School. Module 12: Well Completions / Section 8: Sub Sea Well Head Installations
21/22
8. Sub Sea Well Head Installations
Subsea Technology at SRC
y SenTREE 7 System
Engineering
y Subsea Accumulator
Module - SAM
Schlumberger Private
y Subsea Control Module -
SCM
y Subsea Spanner Joint
y Ball, Retainer and Flapper
Valves
y Deep Water Control
System - DWCS
y Building of SenTREE 7 Systems
y Acceptance and System
Integration Tests