Pre-Commissioning Check List

This document is a checklist for commissioning a water treatment system. It includes sections to record raw water analysis parameters, check pre-treatment equipment like filters and softeners, check instruments and utilities, and confirm availability of chemicals. The checklist contains over 50 individual checklist items to verify equipment is installed correctly and meets specifications before commissioning the full system.

Uploaded by

jpmaurya77
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
491 views

Pre-Commissioning Check List

This document is a checklist for commissioning a water treatment system. It includes sections to record raw water analysis parameters, check pre-treatment equipment like filters and softeners, check instruments and utilities, and confirm availability of chemicals. The checklist contains over 50 individual checklist items to verify equipment is installed correctly and meets specifications before commissioning the full system.

Uploaded by

jpmaurya77
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 15

CHECKLIST BEFORE COMM

ANNEXURE -1
NAME OF CLIENT:-
SO No:-
CURRENT RAW WATER ANALYSIS INFORMATION
Parameters
1 SOURCE OF RAW WATER
2 pH
3 TURBIDITY
4 SUSPENDED SOLIDS
5 COLOUR
6 ODOUR
7 TDS
8 CHLORIDE
9 SULPHATE
10 NITRATE
11 FLOURIDE
12 M ALKALINITY
13 P ALKALINITY
14 CALCIUM
15 MAGNESIUM
16 SODIUM
17 SILICA
18 TOC

19 ANY OTHERS PLEASE SPECIFY BELOW


21 BACTERIA

22 TOTAL BACTERIAL COUNT/ TOTAL


VIABLE COUNT
23 COLIFORM BACTERIA
24 E COLI
25 PSEUDOMONAS/PATHOGENS
26 SPORES

28
ANY OTHERS PLEASE SPECIFY BELOW
PRE-TREATMENT START UP CHECK LIST

1 RAW WATER STORAGE TANK

2 FILTER FEED PUMP

3 MULTIGRADE FILTER
4 SOFTENER

5 CHLORINATION SYSTEM

6 DECHLORINATION SYSTEM (SMBS)

7 pH DOSING SYSTEM

8 ANTISCALANT DOSING SYSTEM


8 ANTISCALANT DOSING SYSTEM

9 U F SYSTEM

10 RO-EDI SYSTEM
10 RO-EDI SYSTEM

11 ALL INSTRUMENTS

12 UTILITIES

13 ELECTRICAL

14 DRAIN

15 CHEMICAL REQUIREMENTS
CHECKLIST BEFORE COMMISSIONING
ANNEXURE -1

WATER ANALYSIS INFORMATION YES NO


Result

NTU

ppm

ppm

ppm as CI/ppm as CaCO3

ppm as SO4 or SO3/ ppm as CaCO3

ppm as NO3/ppm asCaCO3

ppm as F

ppm asHCO3/ppm as CaCO3

ppm asHCO3/ppm as CaCO3


ppm as Ca/ppm as CaCO3

ppm as Mg/ppm as CaCO3

ppm as Na/ppm as CaCO3

PPB
PRESENT/ ABSENT

MENT START UP CHECK LIST YES NO

LEVEL SENSOR INSTALLED IN THE TANK

CABLE LAID UPTO OUR CONTROL PANEL

INSTALLED FIRMLY ON THE BASE

ELECTRICALLY CONNECTED
PRESSURE GAUGE AT THE DISCHARGE OF
PUMP

INLET PIPING CONNECTED

OUTLET PIPING CONNECTED

DRAIN LINE CONNECTED


AUTO-MULTIPORT ELECTRICAL SIGNAL
GIVEN

INLET PIPING SUPPORTING DONE

OUTLET PIPING SUPPORTING DONE


SAND FILLED IN THE VESSEL (MINIMUM
HEIGHT 1000MM)

PRESSURE GAUGE AT THE INLET OF FILTER


PRESSURE GAUGE AT THE OUTLET OF
FILTER

INLET PIPING CONNECTED


OUTLET PIPING CONNECTED

DRAIN LINE CONNECTED


AUTO-MULTIPORT ELECTRICAL SIGNAL
GIVEN

INLET PIPING SUPPORTING DONE

OUTLET PIPING SUPPORTING DONE

RESIN FILLED IN THE VESSEL


PRESSURE GAUGE AT THE INLET OF
SOFTENER
PRESSURE GAUGE AT THE OUTLET OF
SOFTENER

DOSING TANK INSTALLED

DOSING PUMP INSTALLED


ELECTRICAL CONNECTION GIVEN TO THE
DOSING PUMP

ALL NRV's ARE OK

LEVEL SWITCH PROVIDED IN TANK

DOSING TANK INSTALLED

DOSING PUMP INSTALLED


ELECTRICAL CONNECTION GIVEN TO THE
DOSING PUMP

ALL NRV's ARE OK

LEVEL SWITCH PROVIDED IN TANK

DOSING TANK INSTALLED

DOSING PUMP INSTALLED


ELECTRICAL CONNECTION GIVEN TO THE
DOSING PUMP

ALL NRV's ARE OK


LEVEL SWITCH PROVIDED IN TANK

DOSING TANK INSTALLED


DOSING PUMP INSTALLED

ELECTRICAL CONNECTION GIVEN TO THE


DOSING PUMP

ALL NRV's ARE OK

LEVEL SWITCH PROVIDED IN TANK

INLET PIPING OF UF CONNECTED

PROPER SUPPORTING PROVIDED FOR INLET


PIPING

OUTLET PIPING OF UF CONNECTED

PROPER SUPPORTING PROVIDED FOR


OUTLET PIPING

BACK WASH PUMP INSTALLED

ELECTRICAL CONNECTION PROVIDED FOR


THE BACK WASH PUMP

FAST FLUSH PUMP INSTALLED

ELECTRICAL CONNECTION PROVIDED FOR


THE FAST FLUSH PUMP
INLET AND OUTLET PIPING DONE FOR
BACKWASH PUMP
INLET AND OUTLET PIPING DONE FOR FAST
FLUSH PUMP

DRAIN LINE CONNECTED

INLET PIPING OF RO CONNECTED

PROPER SUPPORTING PROVIDED FOR INLET


PIPING

OUTLET PIPING OF RO CONNECTED

PROPER SUPPORTING PROVIDED FOR


OUTLET PIPING

HIGH PRESSUIRE PUMP INSTALLED

ELECTRICAL CONNECTION PROVIDED FOR


THE HIGH PRESSURE PUMP

DRAIN LINE CONNECTED


ALL ACCESSORIES RO MEMBRANES/ O
RINGS, SPANNERS OR ANY OTHER
REQUIREMENT AVAILABLE FOR LOADING
OF MEMBRANES

ALL INSTRUMENTS ARE PHYSICALLY OKAY (


NO DAMAGE)/ Calibrated
ALL INSTRUMENTS ARE TERMINALLY
CONNECTED

COMPRESSED AIR - @6 KG/CM2

PLANT STEAM

ALL CABLING FROM FIELD TO PANEL


COMPLETED

3 PHASE POWER SUPPLY

COMMON DRAIN LINE IN THE SERVICE


AREA PROVIDED FROM THE CLIENT'S SCOPE

AVAILABILITY-
DESCRIPTION QTY
YES/NO
SODIUM HYPOCHLORITE AVAILABILITY

SMBS AVAILABILITY

ANTISCALANT AVAILABILITY

SODIUM HYDROXIDE AVAILABILITY

NaCL

Nitric Acid
G