MDC Labor Rate 2017

The scope of work document outlines the civil, structural, and architectural works for a construction project spanning basement to 40 floors. It includes items like rebar fabrication and installation, formworks, concrete works, block laying, plastering, door and window installation, painting, and more. The standard rates per unit are also provided for items like rebar installation, formwork installation and stripping, concrete pouring, block laying with and without hauling, and more.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
196 views6 pages

MDC Labor Rate 2017

The scope of work document outlines the civil, structural, and architectural works for a construction project spanning basement to 40 floors. It includes items like rebar fabrication and installation, formworks, concrete works, block laying, plastering, door and window installation, painting, and more. The standard rates per unit are also provided for items like rebar installation, formwork installation and stripping, concrete pouring, block laying with and without hauling, and more.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 6

SCOPE OF WORK

A. CIVIL / STRUCTURAL WORKS


1 Rebar Fabrication and Installation
1.1 Mat Foundation / Footing (Including tie wires)
1.2 Columns / Shearwalls (Basement - 10F)
1.3 Columns / Shearwalls (11F - 20F)
1.4 Columns / Shearwalls (21F - 30F)
1.5 Columns / Shearwalls (31F - 40F)
1.6 Beams / Slabs / RC Walls (Basement - 10F)
1.7 Beams / Slabs / RC Walls (11F - 20F)
1.8 Beams / Slabs / RC Walls (21F - 30F)
1.9 Beams / Slabs / RC Walls (31F - 40F)
1.10 Stairs (Basement - 10F)
1.11 Stairs (11F - 20F)
1.12 Stairs (21F - 30F)
1.13 Stairs (31F - 40F)
2 Formworks (Incl. Stripping and Reshoring and Pouring Guard)
2.1 Columns / Shearwalls / RC Walls
2.2 Beams
2.3 Slabs
2.4 Stairs
2.5 Ledges / Cantilevers
3 Translab (Incl. Shoring and Scaffolding)
4 Concreting
4.1 RC Walls
4.2 Columns / Shearwalls
4.3 Beams / Girders
4.4 Slabs (Rough)
4.5 Slabs (Straight to Finish)

B. ARCHITECTURAL
1 Vanjoin Panels
1.1 Vanjoin Panels (Incl. hauling of materials, dowels) Grd Floor
1.2 Vanjoin Panels (Incl. hauling of materials, dowels) 2nd Flr & up; B1 & down
2 Anticrack mortar (provision of mesh, anticrack)
3 Skimcoat (ready to receive paint)
4 Grooving (Incl. application of sealant)
4.1 Grooving including 1st application of sealant
4.2 Final application of sealant
5 Block Laying
5.1 Block Laying (Basement - down) Incl. Hauling of Materials
5.2 Block Laying (GF) Incl. Hauling of Materials
5.3 Block Laying (2F -10F) Incl. Hauling of Materials
5.4 Block Laying (11F -20F) Incl. Hauling of Materials
5.5 Block Laying (21F - 30F) Incl. Hauling of Materials
5.6 Block Laying (31F -40F) Incl. Hauling of Materials
6 Plastering
6.1 Plastering (Basement - GF)
6.2 Plastering (2F - 10F)
6.3 Plastering (11F - 20F)
6.4 Plastering (21F - 30F)
6.5 Plastering (31F - 40F)
7 Stiffener Columns / Lintel Beams
8 Making Good of Corners
9 Tile Setting
600mm x 600mm
500mm x 500mm
300mm x 300mm (T&B)
10 Zocalo
11 Skirting
12 Concrete Topping
20.1 Concrete Topping (Basement - GF)
20.2 Concrete Topping (2F - 10F)
20.3 Concrete Topping (11F - 20F)
20.4 Concrete Topping (21F - 30F)
20.5 Concrete Topping (31F - 40F)
13 Rubbed Concrete (Incl. Chipping works and Making good up to 2cm)
14 Installation of Jambs (Incl. concreting)
15 Installation of Wooden Doors incl. Door Hardware
23.1 Installation of Wooden Doors
23.2 Installation of Wooden Hardware
16 Installation of Steel Doors and Jambs (Bolted)
24.1 Installation of Steel Doors and Jambs
24.2 Installation of Steel Doors Hardware
17 Installation of PVC Doors incl. Door Hardware
25.1 Installation of PVC Doors and Jambs
25.2 Installation of PVC Doors Hardware
18 Installation of Panic Device and Door Closer
19 Precast Installation
20 Interior Painting
28.1 Primer
28.2 1st top coat
28.3 Top Coat
21 Exterior Painting
29.1 Primer
29.2 1st top coat
29.3 Top Coat
22 Painting of door panel & Jambs
30.1 Painting of door panel
30.2 Painting of door jamb
STANDARD PR/MS
UNIT STANDARD PR/MS UNIT RATE (NEW)
UNIT RATE (OLD)
FABRICATION INSTALLATION

kg 3.00 3.00 0.64 2.36


kg 3.50 3.50 0.64 2.86
kg 3.60 3.60 0.64 2.96
kg 3.70 3.70 0.64 3.06
kg 3.80 3.80 0.64 3.16
kg 4.00 4.00 0.64 3.36
kg 4.10 4.10 0.64 3.46
kg 4.20 4.20 0.64 3.56
kg 4.30 4.30 0.64 3.66
kg 4.20 4.20 0.64 3.56
kg 4.30 4.30 0.64 3.66
kg 4.40 4.40 0.64 3.76
kg 4.50 4.50 0.64 3.86
80% / 20% 70% / 30% INSTALLATION STRIPPING
m2 250.00 250.00 175.00 75.00
m2 280.00 280.00 196.00 84.00
m2 260.00 260.00 182.00 78.00
m2 350.00 350.00 245.00 105.00
m2 260.00 260.00 182.00 78.00
m2 150.00 150.00 105.00 45.00

m3 280.00 280.00 196.00 84.00


m3 260.00 260.00 182.00 78.00
m3 180.00 180.00 126.00 54.00
m3 160.00 160.00 112.00 48.00
m2 64.00 64.00 44.80 19.20

INSTALLATION AND INSTALLATION HAULING


HAULING

m2 150.00 150.00 150.00 -


m2 150.00 170.00 150.00 20.00
m2 80.00 80.00 80.00 -
m2 100.00 100.00 80.00 20.00
lm 80.00 100.00 100.00 -
lm 40.00 60.00 60.00 -
lm 40.00 40.00 40.00 -

m2 160.00 180.00 160.00 20.00


m2 160.00 160.00 160.00 -
m2 180.00 180.00 160.00 20.00
m2 200.00 200.00 160.00 40.00
m2 220.00 220.00 160.00 60.00
m2 240.00 240.00 160.00 80.00

m2 160.00 160.00 160.00 -


m2 170.00 170.00 160.00 10.00
m2 180.00 180.00 160.00 20.00
m2 190.00 190.00 160.00 30.00
m2 200.00 200.00 160.00 40.00
lm 200.00 200.00 200.00 -
lm 64.00 64.00 64.00 -

m2 200.00 200.00 200.00 -


m2 200.00 200.00 200.00 -
m2 200.00 250.00 250.00 -
lm 195.00 195.00 195.00 -
lm 64.00 64.00 64.00 -

m2 140.00 140.00 - 140.00


m2 160.00 160.00 20.00 140.00
m2 180.00 180.00 40.00 140.00
m2 200.00 200.00 60.00 140.00
m2 220.00 220.00 80.00 140.00
m2 100.00 100.00 100.00 -
set 550.00 550.00 550.00 -
set 300.00 270.00 270.00 -
set - 250.00 250.00 -
set - 20.00 20.00 -
set 900.00 900.00 900.00 -
set 850.00 850.00 850.00 -
set 50.00 50.00 50.00 -
set 800.00 800.00 800.00 -
set 750.00 750.00 750.00 -
set 50.00 50.00 50.00 -
pc 300.00 300.00 300.00 -
m2 200.00 200.00 200.00 -
80.00 80.00
m2 20.00 25.00 25.00 -
m2 20.00 25.00 25.00 -
m2 20.00 30.00 30.00 -
100.00 100.00
m2 30.00 30.00 -
m2 30.00 30.00 -
m2 40.00 40.00 -
550.00 550.00 -
set 300.00 300.00 -
set 250.00 250.00 -
2018 IR: 7.60%

FABRICATION INSTALLATION

3.23 0.69 2.54


3.77 0.69 3.08
3.87 0.69 3.18
3.98 0.69 3.29
4.09 0.69 3.40
4.30 0.69 3.62
4.41 0.69 3.72
4.52 0.69 3.83
4.63 0.69 3.94
4.52 0.69 3.83
4.63 0.69 3.94
4.73 0.69 4.05
4.84 0.69 4.15

269.00 188.30 80.70


301.28 210.90 90.38
279.76 195.83 83.93
376.60 263.62 112.98
279.76 195.83 83.93
161.40 112.98 48.42

301.28 210.90 90.38


279.76 195.83 83.93
193.68 135.58 58.10
172.16 120.51 51.65
68.86 48.20 20.66

- - -
161.40 161.40 -
182.92 161.40 21.52
86.08 86.08 -
107.60 86.08 21.52
107.60 107.60 -
64.56 64.56 -
43.04 43.04 -

193.68 172.16 21.52


172.16 172.16 -
193.68 172.16 21.52
215.20 172.16 43.04
236.72 172.16 64.56
258.24 172.16 86.08
- - -
172.16 172.16 -
182.92 172.16 10.76
193.68 172.16 21.52
204.44 172.16 32.28
215.20 172.16 43.04
215.20 215.20 -
68.86 68.86 -
- - -
215.20 215.20 -
215.20 215.20 -
269.00 269.00 -
209.82 209.82 -
68.86 68.86 -
- - -
150.64 - 150.64
172.16 21.52 150.64
193.68 43.04 150.64
215.20 64.56 150.64
236.72 86.08 150.64
107.60 107.60 -
591.80 591.80 -
290.52 290.52 -
269.00 269.00 -
21.52 21.52 -
968.40 968.40 -
914.60 914.60 -
53.80 53.80 -
860.80 860.80 -
807.00 807.00 -
53.80 53.80 -
322.80 322.80 -
215.20 215.20 -
86.08 - -
26.90 26.90 -
26.90 26.90 -
32.28 32.28 -
107.60 - -
32.28 32.28 -
32.28 32.28 -
43.04 43.04 -
591.80 591.80 -
322.80 322.80 -
269.00 269.00 -