This 3 sentence summary provides the key details about the electrical work procedure document: The document outlines safety procedures for electrical repairs being conducted by a contractor for a gas company in Syria, requiring that only authorized electricians perform repairs, a permit to work is obtained, the power is disconnected, lock out/tag out is used, inspections are conducted, proper tools and equipment are used, and work on live equipment only occurs under specified safe conditions. Managers are responsible for communicating the procedure and supervisors for ensuring compliance.

Uploaded by

Wael Hannon
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
37 views3 pages

HSE 306 - Electrical

This 3 sentence summary provides the key details about the electrical work procedure document: The document outlines safety procedures for electrical repairs being conducted by a contractor for a gas company in Syria, requiring that only authorized electricians perform repairs, a permit to work is obtained, the power is disconnected, lock out/tag out is used, inspections are conducted, proper tools and equipment are used, and work on live equipment only occurs under specified safe conditions. Managers are responsible for communicating the procedure and supervisors for ensuring compliance.

Uploaded by

Wael Hannon
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 3

Rev.

Date: Purpose of revision Prepared by Checked by Approved Approved


dd.mm.yy by

CLIENT:

SYRIAN GAS COMPANY

CONTRACTOR:

STROYTRANSGAZ

PROJECT:
South Middle Area Gas Exploitation
Compressor Station Project,
Syria
CONTRACT #: 4/2016 Document type:
Procedure
Document ID code: Revision: Other denotations:

HSE-PC-306
File name: HSE 306 - Electrical

Document name:
Electrical

Page: 1/3
Purpose
The purpose of this work procedure is to define actions to be taken when carrying out electrical repairs in
the Contractor performed operations, locations, sites, facilities or camps.

Scope
This procedure applies to all activities involving electrical works as it is considered highly dangerous to
other performed activities.

Only authorized personnel shall carry out electrical repairs.

Responsibilities
Individual Managers are responsible for ensuring that this procedure is communicated to and
implemented throughout the Contractor organization.

Line Supervisors are responsible for ensuring they and all their work force teams fully understand and
comply with this procedure at all times.

Actions
 The requirement for varying voltage, phases, current and the type of electrical equipment needed
must all be assessed and preplanned.

 A competent electrician shall be the only authorized and responsible person for the maintenance,
alterations, extensions and testing of the installation.

 A Permit To Work should be filled for all kinds of electrical job.

Before commencing work the supply of electricity must be disconnected


 Make sure the work area is as dry and clean as possible. This may entail the laying of dry
wooden planks or pallets on wet ground or cleaning any grease/oil spills.

 The Lock Out/ Tag Out Work Procedure should be applied at all times before any electrical work
is commenced.

 The installation shall be inspected with special emphasis on cable and cords, which are prone to
mechanical damage.

 Where joints in cables are required they shall be properly made with connectors; taped joints are
not permitted.

 All portable tools and temporary lighting must be grounded.

 The correct type and rating of receptacle breaker and fuses must be used.

 Work on live equipment should not be commenced without prior consultation with HSE
Department personnel and the establishment of safe procedures and these following conditions
must exist:
 Exact voltage known

 The General Permit To Work Form is filled

 Protective equipment available


 Second electrician available as stand by watchman

 Workman clearly understands the job requirements

 A readily Fire fighting equipment is available

 A readily First Aid equipment and/or ambulance are available

 Area marked off and warning signs are in position

 Using of non – classifed electrical equipment or opening classified electrical equipments in


process area require a hot work permit.
 Upon completion of the electrical work, ensure that all wires are covered and any Lock Out/ Tag
Out is removed.

 Check that all repairs have been carried out correctly and that the equipment is safe.

 After completing the job, Connect power and check that all voltages are correct.