Project Title: Replacement of 4.16 KV Switchgears & LV Switchboards @Swc-1 Marafeq Jubail

This document provides a progress update for the replacement of 4.16 kV switchgears and LV switchboards at the SWC-1 Marafeq Jubail project. It lists 9 demolition drawings, 2 new drawings, and 9 revised drawings that are part of the engineering deliverables for the project. For each drawing, it shows the planned and earned progress to date for both engineering and CAD work. The project manager for this work is Naeyer Siddiqui.

Uploaded by

farhanyazdani
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
179 views3 pages

Project Title: Replacement of 4.16 KV Switchgears & LV Switchboards @Swc-1 Marafeq Jubail

This document provides a progress update for the replacement of 4.16 kV switchgears and LV switchboards at the SWC-1 Marafeq Jubail project. It lists 9 demolition drawings, 2 new drawings, and 9 revised drawings that are part of the engineering deliverables for the project. For each drawing, it shows the planned and earned progress to date for both engineering and CAD work. The project manager for this work is Naeyer Siddiqui.

Uploaded by

farhanyazdani
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 3

PROJECT MANAGER: NAIYER SIDDIQUI

PROJECT TITLE : REPLACEMENT OF 4.16 kV SWITCHGEARS & LV SWITCHBOARDS @SWC-1 MARAFEQ JUBAIL
DRAWING CONTROL SHEET
DAR AL RIYADH CONSULTANTS DATE :

(1295KF) Previous Present This Week


BUDGETED MAN-HOURS EARNED MAN-HOURS
PROGRESS CREDIT CHAIN MILESTONE (PCCM) FOR ENGINEERING DELIVERABLES Percentage as on Percentage as on DISCIPLINE
Level
ACTIVITY 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 XXXX XXXX Percentage ENG CAD TOTAL ENG CAD TOTAL

Sl. No DRAWING NUMBER INDEX SIZE SHT No. REV. No. REMARKS

DEMOLISH DRAWING DWRG


1 072 – 315 – 20AN – AE – 430 Elec. Equipment building ,Plan ,Section, Elevation E E 1 3A X X X 10.0% 15.0% 5.0% ELEC 5.00 5.00 10.00 0.75 0.75 1.50
2 072 – 315 – 20AN – AE – 431 Elec. Equipment building ,External wall ,Roof Details E E 1 2A X X X X 10.0% 20.0% 10.0% ELEC 10.00 10.00 20.00 2.00 2.00 4.00
3 072 – 315 – 20AN – AE – 435 Elec. Equipment building ,Ceiling Plan E E 1 1A X X X X X X 15.0% 30.0% 15.0% ELEC 10.00 20.00 30.00 3.00 6.00 9.00
4 072 – 315 – 20AN – ED – 523 Main S/S Lighting and Small power E E 1 1A X X 5.0% 10.0% 5.0% ELEC 0.00 0.00 0.00 0.00
NEW DRAWING
1 7000006744-JSWC-EE-XXX CABLE SCHEDULE -480/277V E E 1 A X X 10.0% 10.0% ELEC 0.00 0.00 0.00 0.00
2 7000006744-JSWC-EE-XXX CABLE SCHEDULE -110V-DC E E 1 A X X 10.0% 10.0% ELEC 0.00 0.00 0.00 0.00
REVISED DRAWING
1 072-410-20SB-EE-011 SWC 1/SWC 2 115kV Interconnection, One Line Diagram E E 1 1A X X 10.0% 10.0% ELEC 0.00 0.00 0.00 0.00
2 072-410-20SB-EE-015 SWC 1/SWC 2 115kV Interconnection Layout E E 1 1A X X 10.0% 10.0% ELEC 0.00 0.00 0.00 0.00
3 072-310-22EL-EE-300 MAIN ONE Line Diagram E E 1 7A X X 10.0% 10.0% ELEC 0.00 0.00 0.00 0.00
4 072-310-22EL-EE-328 Single Line Diagram for Main Station Switchboard 4.16kV 250 MVA E E 1 A X X 10.0% 10.0% ELEC 0.00 0.00 0.00 0.00
5 072-310-22EL-EE-339 General Arrangement of 4.16kV Switchboard L-H Section E E 1 A X X 10.0% 10.0% ELEC 0.00 0.00 0.00 0.00
6 072-310-22EL-EE-340 General Arrangement of 4.16kV Switchboard R-H Section E E 1 A X X 10.0% 10.0% ELEC 0.00 0.00 0.00 0.00
7 072-310-22EL-EE-341 Rear View & Foundation Details of 4.16kV Sw/BRD L.H. Section E E 1 A X X 10.0% 10.0% ELEC 0.00 0.00 0.00 0.00
8 072-310-22EL-EE-342 Rear View & Foundation Details of 4.16kV Switchboard (R.H. Section) E E 1 A X X 10.0% 10.0% ELEC 0.00 0.00 0.00 0.00
9 072-310-22EL-EE-489 Interconnecting Multi-core Diagram for 4.16kV Main Station Swbd. E E 1 1A X X 10.0% 10.0% ELEC 0.00 0.00 0.00 0.00
10 072-315-20AN-EB-118 Diagram of Partial Differential Protection Scheme E E 1 1A X X 10.0% 10.0% ELEC 0.00 0.00 0.00 0.00
11 072-315-20AN-EB-119 Diagram of Typical Standby Generator Protection and Metering E E 1 1A X X 10.0% 10.0% ELEC 0.00 0.00 0.00 0.00
12 072-315-20AN-EB-120 Diagram of Typical Seawater Pump Motor Feeder Protection and Metering E E 1 1A X X 10.0% 10.0% ELEC 0.00 0.00 0.00 0.00
13 072-315-20AN-EB-121 Diagram of No. 1A & 4A Main Sub-Station 480/277V Switchboard Feeder Protection and Metering. E E 1 6A X X 10.0% 10.0% ELEC 0.00 0.00 0.00 0.00
14 072-315-20AN-EE-136 Electrical Power System – Single Line Diagram, SWC-1 E E 1 2A X X 10.0% 10.0% ELEC 0.00 0.00 0.00 0.00
15 072-315-20AN-EE-219 Diagram for Lighting & Small Power Sht. 3 E E 1 2A X X 10.0% 10.0% ELEC 0.00 0.00 0.00 0.00
16 072-315-20AN-EE-593 Seawater Pump House Security Lighting Single Line Diagram E E 1 5A X X 10.0% 10.0% ELEC 0.00 0.00 0.00 0.00
17 072-315-20AN-ED-301 one line diagram 480V E E 1 1A X X 10.0% 10.0% ELEC 0.00 0.00 0.00 0.00
18 072 – 315 – 20AN – ED – 523 Lighting Drawing – EEB - 1 E E 1 1A X X 10.0% 10.0% ELEC 0.00 0.00 0.00 0.00
19 072 – 315 – 20AN – EB – 116 Diagram of Protection & metering - incoming transformer E E 1 1A X X 10.0% 10.0% ELEC 0.00 0.00 0.00 0.00
20 072 – 315 – 20AN – EB – 117 Protection & metering - 4.16KV Bus section E E 1 1A X X 10.0% 10.0% ELEC 0.00 0.00 0.00 0.00
21 072 – 315 – 20AN – EB – 123 Protection & metering -Feeders to Pump house & Store E E 1 1A X X 10.0% 10.0% ELEC 0.00 0.00 0.00 0.00
22 072 – 315 – 20AN – EB – 124 Protection & metering -Feeders to Chlorination Plant House E E 1 1A X X 10.0% 10.0% ELEC 0.00 0.00 0.00 0.00
23 072 – 315 – 20AN – EB – 160 Protection & metering - incoming transformer E E 1 3A X X 10.0% 10.0% ELEC 0.00 0.00 0.00 0.00
24 072 – 315 – 20AN – AE – 430 Elec. Equipment building ,Plan ,Section, Elevation E E 1 3A X X 10.0% 10.0% ELEC 0.00 0.00 0.00 0.00
25 072 – 315 – 20AN – AE – 431 Elec. Equipment building ,External wall ,Roof Details E E 1 2A X X 10.0% 10.0% ELEC 0.00 0.00 0.00 0.00
26 072 – 315 – 20AN – AE – 435 Elec. Equipment building ,Ceiling Plan E E 1 1A X X 10.0% 10.0% ELEC 0.00 0.00 0.00 0.00
27 072 – 315 – 20AN – ED – 523 Main S/S Lighting and Small power E E 1 1A X X 10.0% 10.0% ELEC 0.00 0.00 0.00 0.00
28 072 – 310 – 22EL – ED – 381 G.A. Main S/S Switch Board – 1A E E 1 2A X X 10.0% 10.0% ELEC 0.00 0.00 0.00 0.00
29 072 – 310 – 22EL – ED – 403 CKT Diagram.Switch Board – 1A Module A&B E E 1 1A X X 10.0% 10.0% ELEC 0.00 0.00 0.00 0.00
30 072 – 310 – 22EL – ED – 404 CKT Diagram.Switch Board – 1A Module C&D E E 1 2A X X 10.0% 10.0% ELEC 0.00 0.00 0.00 0.00
31 072 – 310 – 22EL – ED – 405 CKT Diagram.Switch Board – 1A Module E E E 1 2A X X 10.0% 10.0% ELEC 0.00 0.00 0.00 0.00
32 072 – 310 – 22EL – ED – 382 G.A. Main S/S Switch Board – 4A E E 1 2A X X 10.0% 10.0% ELEC 0.00 0.00 0.00 0.00
33 072 – 310 – 22EL – ED – 406 CKT Diagram.Switch Board – 4A Module A&B E E 1 1A X X 10.0% 10.0% ELEC 0.00 0.00 0.00 0.00
34 072 – 310 – 22EL – ED – 407 CKT Diagram.Switch Board – 4A Module C&D E E 1 2A X X 10.0% 10.0% ELEC 0.00 0.00 0.00 0.00
35 072 – 310 – 22EL – ED – 408 CKT Diagram.Switch Board – 4A Module E E E 1 1A X X 10.0% 10.0% ELEC 0.00 0.00 0.00 0.00
36 072 – 310 – 22EL – EC – 470 G.A.OF 110V Battery \ Charger E E 1 A X X 10.0% 10.0% ELEC 0.00 0.00 0.00 0.00
37 072 – 310 – 22EL – EC – 473 CKT Diagram.of 110V distribution Panel E E 1 A X X 10.0% 10.0% ELEC 0.00 0.00 0.00 0.00
38 072 – 310 – 22EL – ED – 471 CKT Diagram.of 110V Battery \ Charger E E 1 A X X 10.0% 10.0% ELEC 0.00 0.00 0.00 0.00
ELECTRICAL DOCUMENTS DOC
1 7000006744-JSWC-EA-XXX AC AUX.LOAD CAPACITY VERIFICATION E A 1 A X X X X X X X X 40.0% 40.0% ELEC 0.00 0.00 0.00 0.00
2 7000006744-JSWC-EA-XXX DC AUX.LOAD CAPACITY VERIFICATION E A 1 A X X X X X X X X 40.0% 40.0% ELEC 0.00 0.00 0.00 0.00
3 7000006744-JSWC-EA-XXX LVAC DISTRIBUTION BOARD VERIFICATION E A 1 A X X X X X X X X 40.0% 40.0% ELEC 0.00 0.00 0.00 0.00
4 7000006744-JSWC-EA-XXX LVDC DISTRIBUTION BOARD VERIFICATION E A 1 A X X X X X X X X 40.0% 40.0% ELEC 0.00 0.00 0.00 0.00
5 7000006744-JSWC-EA-XXX LIGHTING SYSTEM DESIGN -SWC\EEB-1 ROOMS E A 1 A X X X X X X X X 40.0% 40.0% ELEC 0.00 0.00 0.00 0.00
6 7000006744-JSWC-EA-XXX PROTECTION COORDINATION STUDY E A 1 A X X X X X X X X 40.0% 40.0% ELEC 0.00 0.00 0.00 0.00
TOTAL 25.00 35.00 60.00 5.75 8.75 14.50

436304166.xlsx 1 of 3
PROJECT: SRU FOR YERP SRU FOR YERP
PROJECT NO. : 5334K 5334K
WEEK ENDING 30-Dec-99 30-Dec-99
PROJECT STATISTICS REPORT
BUDGET PROGRESS PROGRESS PROGRESS % MHRS THIS REMAI- MH W/ NO
PRODUCTIVITY
DISCIPLINE ENGG ENGG DIFF CADD CADD DIFF TOTAL EARNED VALUE LAST WEEK THIS WEEK TODATE MNHRS VARIANCE PREV WEEK TODATE NING PROG

ARCHITECTURAL 0 0 0 0 0 0 #DIV/0! #VALUE! 0.0 0.0 0.00 #DIV/0!

CIVIL 1,549 0 -1549 1056 0 -1056 0 0 80.02% #VALUE! #DIV/0! #VALUE! 2,375.0 2,375.0 (2,375.0) -2375.00 0.0

COMM 1,084 0 -1084 686 0 -686 0 0 23.32% #VALUE! #DIV/0! #VALUE! 350.0 350.0 (350.0) -350.00 0.0

ELECTRICAL 2,016 0 -2016 859 0 -859 0 0 88.99% #VALUE! #DIV/0! #VALUE! 2,761.5 2,761.5 (2,761.5) -2761.50 0.0

MECHANICAL 582 0 -582 349 0 -349 0 0 54.30% #VALUE! #DIV/0! #VALUE! 1,222.0 1,222.0 (1,222.0) -1222.00 0.0

INSTRUMENT 7,492 0 -7492 4336 0 -4336 0 0 69.36% #VALUE! #DIV/0! #VALUE! 8,604.5 8,604.5 (8,604.5) -8604.50 0.0

PIPING 22,103 0 -22103 17462 0 -17462 0 0 76.98% #VALUE! #DIV/0! #VALUE! 35,964.0 35,964.0 (35,964.0) -35964.00 0.0

STATIC 4,815 0 -4815 450 0 -450 0 0 63.23% #VALUE! #DIV/0! #VALUE! 3,224.0 3,224.0 (3,224.0) -3224.00 0.0

STRUCTURAL 6,703 0 -6703 6063 0 -6063 0 0 81.72% #VALUE! #DIV/0! #VALUE! 11,098.0 11,098.0 (11,098.0) -11098.00 0.0

QS / MATL. 300 0 -300 0 0 0 0 55.00% #VALUE! #DIV/0! #VALUE! 161.0 161.0 (161.0) -161.00 0.0

PM 9,400 0 -9400 0 0 0 0 74.00% -74.00% 0.00% #DIV/0! #DIV/0! 6,485.5 6,485.5 (6,485.5) -6485.50 0.0

TOTAL 56,044 0 -56044 31261 0 -31261 0 0 74.57% #DIV/0! #DIV/0! #DIV/0! #DIV/0! 72,245.5 0.0 72,245.5 (72,245.5) (72,245.5) 0.00

file:///conversion/tmp/scratch/436304166.xlsx
DAR AL RIYADH - IK EPC
PROJECT PROGRESS SUMMARY REPORT

PROJECT: SRU FOR YERP


PROJECT NO. : 5334K
WEEK PERIOD 24-Dec-99 - 30-Dec-99
PROJECT STATISTICS REPORT (Input)
PROGRESS PROGRESS ORIG

DISCIPLINE THIS WEEK TODATE EQ A SZ

CIVIL #VALUE! CIVIL

COMM #VALUE! COMM

ELECTRICAL #VALUE! ELECTRICAL

MECHANICAL #VALUE! MECHANICAL

INSTRUMENT #VALUE! INSTRUMENT

PIPING #VALUE! PIPING

STATIC #VALUE! STATIC

STRUCTURAL #VALUE! STRUCTURAL

QS / MATL. #VALUE! QS / MATL.

PM -74.00% 0.00% PM
CONTINGENCY CONTINGENCY

TOTAL PROGRESS #DIV/0! #DIV/0! ###