Project Title:Prettify!
_______________________________________________________________
Conduct meeting with the Work Plan September School Head; P50.00 MOOE
school staff and 2015 TLE
stakeholders Teachers
Conduct meeting with the school Work Plan January 2016 School Head/PTA P50.00 MOOE
staff and stakeholders Officers
Send Letters to feather Letters February 2016 School Head/PTA P50.00 MOOE
Barangays to set an appointment Officers
with the Barangay Officials
Conduct of the BrigadaEskwela Parade May 2016 School Head,All P1,000.00 MOOE
Advocacy Teachers and
Stakeholders
Project Objective Statement: 100% of learners will participate to every learning activities
_____________________________________________________________________________
Date of
Activity Output Person Responsible Budget Budget Source
Implementation
School
Search for MR.&MS.
Documentation October 2015 Head;Teachers;PTA P17,000.00 Fund-raising
MNHS 2015
Officials
Purchase 8 sets of
November
LED TV with Documentation School Head P105,000.00 Fund-raising
2015
speakers
Problem Statement: 75% of the Grade 10 learners have low Interest in NAT Review
_____________________________________________________________________
Project Objective Statement: 95% of the Grade 10 learners participate actively during NAT Review
_________________________________________________________________________________
Searching/Photocopying NAT Review Materials October 2015 Subject Teachers P500.00/ subject MOOE
Review Materials
Provide meals to the NAT Meals March 2016 TLE Teachers P1500.00 MOOE
Examinee during the NAT
Examination
ANNEX 9 Project Work Plan and Budget Matrix
Date of Person
Activity Output Budget Budget Source
Implementation Responsible
November
Functional and TLE
Conduct HE Sink Repair 2016-March P10,000.00 MOOE
hygienic HE Sink Teachers
2017
ANNEX 9 Project Work Plan and Budget Matrix
Project Objective Statement: To prevent students from going out of the school
______________________________________________________________________
Problem Statement: Some of the students are having fun of staying outside the campus
__________________________________________________________________________
Problem Statement: The school has stage, but is not finished. There is no proper place for the presentation of programs and
school gatherings.
__________________________________________________________________________________________________________
Project Objective Statement: To finish the stage project for the improvement of the school
___________________________________________________________________________
Root Cause:
_______________________________________________________________
LGU
Alumni President LGU-San Francisco
75% of the stage was already done Documentation 2015 School Head P100,000.00
Teachers
Problem Statement: The school has no sound system so whenever there are PTA Meetings and Programs, the school needs to
rent or borrow
____________________________________________________________________________________________________________
Root Cause: The school wants to lessen the cost of expense during programs, so the purchase of sound system did.
_______________________________________________________________________________________________________
The schedule was set for Minutes January 2016 Teachers P200.00 PTA/MOOE
the caroling Attendance Students
Documentation
The caroling was done Documentation January 2016 Teachers P200.00 PTA/MOOE
Students
The new sound system Receipts January 2016 School Head P25,000.00 MOOE/PTA/SSG
was purchased Documentation
ANNEX 9 Project Work Plan and Budget Matrix
Problem Statement: 75% of the Grade 10 learners have low interest in NAT Review
_____________________________________________________________________
Project Objective Statement: 100% of the Grade 10 learners participate actively during NAT Review
___________________________________________________________________________________
Problem Statement: Too much heat from the gate in going to the respective classrooms and during rainy seasons, we tend to get
wet.
_____________________________________________________________________________________________________________
Project Objective Statement: To keep the students and teachers safe and protected against heat and rain.
________________________________________________________________________________________
Root Cause: During sunny day, the students and teachers will suffer from headache due to too much heat. During rainy season,
they also get wet in going to their classroom from the gate.
_____________________________________________________________________________________________________________
Project Title:Fresh Me Up
(Additional Ceiling Fan)
_______________________________
Problem Statement: 80% of the learners did not participate in class activities
________________________________________________________________
Tap LGU and other kind- List of LGU August Teachers P560,000.00 NGO’s
hearted people for person for School Head
sponsor sponsor
Project Objective Statement: To promote and maintain cleanliness of the students and in the school as well.
________________________________________________________________________________________
The teachers will conduct Attendance October 2015 School Head P200.00 PTA/MOOE
meeting. Documentation Teachers
Minutes
Include in the agenda was Attendance
the proposed construction Minutes October 2015 School Head P200.00 PTA/MOOE