The document requests geotechnical reports for various ALH locations that require different foundation options based on soil conditions. It lists 8 ALH locations with their building charges and required foundation types ranging from isolated girders, raft foundations with soil replacement, to pile foundations depending on the expected bearing capacity of the soil. The review section asks for isolated foundation designs from Arun on specified dates to replace some of the originally requested raft or pile foundations.

Uploaded by

Ahmad Masood
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
69 views

Geotech Status

The document requests geotechnical reports for various ALH locations that require different foundation options based on soil conditions. It lists 8 ALH locations with their building charges and required foundation types ranging from isolated girders, raft foundations with soil replacement, to pile foundations depending on the expected bearing capacity of the soil. The review section asks for isolated foundation designs from Arun on specified dates to replace some of the originally requested raft or pile foundations.

Uploaded by

Ahmad Masood
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 6

SN NO. BLDG.

CHG
1 ALH-202 133.680
2 ALH-210 183.660
3 ALH-225 275.040
4 ALH-237 348.740
5 ALH-248 417.700
6 ALH-254 454.917
7 ALH-250 432.905
8 ALH-260 497.720
REQUEST FOR GEOTECHNICAL REPORTS FOR VARIOUS ALH LOCATION

REQUIRED
NEED ISOLATED GIR WITH SOIL REPLACEMENT/S.B.C REQUIRED AT LEAST REACH TO (12T/M2)
NEED ISOLATED GIR
NEED ISOLATED GIR
FIRST PREFERENCE NEED RAFT GIR WITH SOIL REPLACEMENT/(S.B.C REQUIRED AT LEAST REACH TO (12T/M2 TO 13T/M2)/SECOND PREFERENCE PILE GIR UPTO
NEED RAFT GIR WITH SOIL REPLACEMENT/S.B.C REQUIRED AT LEAST REACH TO (12T/M2 TO 13T/M2)
NEED RAFT GIR WITH SOIL REPLACEMENT/S.B.C REQUIRED AT LEAST REACH TO (12T/M2 TO 13T/M2)
FIRST PREFERENCE NEED RAFT GIR WITH SOIL REPLACEMENT/(S.B.C REQUIRED AT LEAST REACH TO (13T/M2 TO 14T/M2)/SECOND PREFERENCE PILE GIR UPTO
OUR ACTUAL CHAINAGE IS 497.720 INSTEAD OF 497.760 SO DO NECESSARY ACTION
REVIEW
SN NO. BLDG.CHG
1 ALH-202 133.680
2 ALH-210 183.660
3 ALH-225 275.040
4 ALH-237 348.740
5 ALH-248 417.700
6 ALH-254 454.917
7 ALH-250 432.905
8 ALH-260 497.720
REQUEST FOR GEOTECHNICAL REPORTS FOR VARIOUS ALH LOCATION

REQUIRED
NEED ISOLATED GIR WITH SOIL REPLACEMENT
NEED ISOLATED GIR
NEED ISOLATED GIR
FIRST PREFERENCE NEED RAFT GIR WITH SOIL REPLACEMENT SECOND PREFERENCE PILE GIR UPTO HARD STRATA
NEED RAFT GIR WITH SOIL REPLACEMENT
NEED RAFT GIR WITH SOIL REPLACEMENT
FIRST PREFERENCE NEED RAFT GIR WITH SOIL REPLACEMENT SECOND PREFERENCE PILE GIR UPTO HARD STRATA
OUR ACTUAL CHAINAGE IS 497.720 INSTEAD OF 497.760 SO DO NECESSARY ACTION
REVIEW
ARUN SEND US OFFICIALLY ISOLATED WITHOUT SOIL REPLACEMENT AT(15-JUNE-2019)
NOT RECEIVE
NOT RECEIVE
ARUN SEND US OFFICIALLY ISOLATED INSTEAD OF RAFT WITH SOIL REPLACEMENT AT(13-JULY-2019)
ARUN SEND US OFFICIALLY ISOLATED INSTEAD OF RAFT WITH SOIL REPLACEMENT AT(15-JUNE-2019)
ARUN SEND US OFFICIALLY ISOLATED INSTEAD OF RAFT WITHOUT SOIL REPLACEMENT AT(29-JUNE-2019)
ARUN SEND US OFFICIALLY ISOLATED INSTEAD OF RAFT WITHOUT SOIL REPLACEMENT AT(13-JULY-2019)
ARUN SEND US OFFICIALLY ISOLATED AT CHAINAGE 497.760 AT(13-JULY-2019)