Supplier Quality Manual: Honda Company Principle
Supplier Quality Manual: Honda Company Principle
AEP - ELP - HCM - HDM - HMA - HPE - HSC - HTM - IPS - MAP - MMP
This on-line manual is the only official version of the Honda Supplier Quality Manual. Your access is
your implied permission to download and print a working copy for your business. It is your
responsibility to use the most current version posted on this web site.
This manual contains Honda's requirements for the supplier's quality system and provides
a foundation for assuring the quality of parts, materials and services purchased by Honda.
We ask that the appropriate managers within your organization review the manual.
If you have any questions please contact your Honda quality representative.
Your commitment and support in providing Honda with high quality parts, materials and
services is greatly appreciated.
Sincerely,
Mike Spires
Associate Chief Engineer
New Model and Quality Systems
North American Technical Group
Purchasing
Cover Page
Letter from Honda Management
Table of Contents
Best Practices
Best Practices – A Message to Supplier Top Management
Best Practices - SAP Team
Best Practices - PFMEA Team
Best Practices - PQCT Team
General Information
FGE (Factory Guest Engineer)
Portal and Parts Quality Tracking System (PQTS) Overview
QAV (Quality Assurance Visit)
Quality Control Regulations
Supplier Quality Performance Rating
New Model
Bar Code Standard
CRF (Countermeasure Request Form)
Data
E-Requirements
E-Timing
Inspection Fixture Design Guideline
Limit Sample
Master Sample Development
MPR (Minimum Process Requirements)
New Model Receiving Inspection
NMR (New Model Review) Process
Part Approval
Part Maturation Expectations
Part Quality Standard
PFMEA (Process Failure Mode and Effect Analysis)
PIS (Process Inspection Standards)
PPA (Potential Problem Analysis)
PQCT (Process Quality Control Table)
PV (Part Validation) Testing
SAP (Specified Action Plan)
Styling Parts Guideline
TPR (Technical Part Review)
Traceability and Lot Control
Mass Production
5P (5 Principles for Problem Solving)
Controlled Containment
Electronic Sort Label
Identification Control
Index System
IPP (Initial Production Parts) System
Ordering IPP Related Forms and Labels
Nonconforming Product
Regular Lot Control Tag
Training
Electronic Sort Label
Reference
Supplier Part Schedule (SPS) Procedure
Tooling Release Process
Appendix
Definitions
Honda Addresses
Standards Information