0% found this document useful (0 votes)
18 views

Annexure D Plan of Action Document: TH TH

This plan of action document outlines the tasks and timeline for a student project over 10 weeks. It includes the names of the 3 project members and supervisor. The tasks are divided by week and include activities like preparing the project title and abstract, conducting a literature survey, collecting and analyzing data, pre-processing the data, using machine learning algorithms, predicting results, and implementing the project. Each weekly task is marked as completed with no reported deviations from the plan.

Uploaded by

Vishnu Vardhan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
18 views

Annexure D Plan of Action Document: TH TH

This plan of action document outlines the tasks and timeline for a student project over 10 weeks. It includes the names of the 3 project members and supervisor. The tasks are divided by week and include activities like preparing the project title and abstract, conducting a literature survey, collecting and analyzing data, pre-processing the data, using machine learning algorithms, predicting results, and implementing the project. Each weekly task is marked as completed with no reported deviations from the plan.

Uploaded by

Vishnu Vardhan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

Annexure D

Plan of Action Document

KLEF Department of Computer science


Plan of Action
Batch No:10
Name of Supervisor:M.S.Mekala(Asst.prof)

ID Number and Name of Project Members:


160030218-T.Chandra Harsha
160030706-Prem chand
160031488-V.Vishnu Vardhan

Week Tasks to be Accomplishment Reason for Student Guide Faculty


Done Deviation Sign Sign Signature
Week-1 Project title, Done No Deviation
5th Aug-11th Aug abstract
preparation.

Week -2 Literature Done No Deviation


12thAug-18thAug Survey

Week-3 Proposed system Done No Deviation


19thAug-25thAug

Week-4 Data collection Done No Deviation


26th Aug-1th Sep

Week-5 Analyse of data


2th Sep-8th Sep
Week-6 Storage of
9 Sep-15th Sep
th
processing of data

Week-7 Pre processing the


16th Sep-22th Sep data

Week-8 Using machine


23 Sep-29th Sep
th
learning algorithms

Week-9 Prediction of the


30th Sep-6th Oct data

Week-10 Implementation of
7th Oct-13th Oct project