Pile Design Example

This document summarizes the design of a pilecap to support a crane beam column with 2 piles based on ACI 318-11 code. Input parameters such as loads, member sizes, and material strengths are provided. Calculations are shown to check the adequacy of the pilecap reinforcement according to the strip and tension model and deep beam model. It is concluded that the provided pilecap reinforcement is adequate according to both design models and the column one-way shear is also adequate.

Uploaded by

Restie Teano
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
246 views

Pile Design Example

This document summarizes the design of a pilecap to support a crane beam column with 2 piles based on ACI 318-11 code. Input parameters such as loads, member sizes, and material strengths are provided. Calculations are shown to check the adequacy of the pilecap reinforcement according to the strip and tension model and deep beam model. It is concluded that the provided pilecap reinforcement is adequate according to both design models and the column one-way shear is also adequate.

Uploaded by

Restie Teano
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 70

Anchor Bolt Design per ACI 318-11

CivilBay Crane Beam Design


www.civilbay.com

2-Pile Pilecap Design Example

Anchor Bolt Design per ACI 318-11


CivilBay Crane Beam Design
www.civilbay.com
Project : Anchor Bolt Design ACI 318-11 Crane Beam Design Eng : Test
Anchor Bolt Design ACI 318-11
Crane Beam Design Jon No : www.civilbay.com Chk : Test
www.civilbay.com
Doc No : www.civilbay.com Date : 2013-03-06
Calculation Sheet Subject : Pilecap Design Examples Rev : 0

1 of 4
DESCRIPTION
2 piles pilecap design based on Code Abbreviation
A23.3-04 Design of Concrete Structures A23.3-04

INPUT
Factored column load Pcf = 1500 [kN] Ver reinft.
Column width bc = 330 [mm] As1 bar size = 25 500
Column length hc = 500 [mm] As1 bar No = 7
Pilecap width bf = 1000 [mm] As1 prov = 3500
Pilecap length hf = 1750 [mm] Equivalent to 25 @ 133
Pilecap thickness tf = 620 [mm]
Hor reinft.
Pile diameter dp = 250 [mm] As2 bar size = 20 300
Pile spacing sp = 750 [mm] As2 bar No = 7
Pile edge distance ed = 500 [mm] As2 prov = 2100
Equivalent to 20 @ 258
Concrete strength f'c = 30 [MPa]
Rebar yield strength fy = 400 [MPa]

Concrete resistance factor  c = 0.65


Rebar resistance factor  s = 0.85
Low density conc factor  = 1.0

Backfill soil weight above cap Ws = 0 [kN]


Pilecap self weight W f = bf x hf x tf x 23.5 = 25 [kN]
Project : Anchor Bolt Design ACI 318-11 Crane Beam Design Eng : Test
Anchor Bolt Design ACI 318-11
Crane Beam Design Jon No :www.civilbay.com Chk : Test
www.civilbay.com
Doc No : www.civilbay.com Date : 2013-03-06
Calculation Sheet Subject : Pilecap Design Examples Rev : 0

2 of 4

Factored total pilecap load Pf = Pcf + W s + W f = 1532 [kN]


Pilecap effective depth d = tf - 1.5db -150 = 440 [mm]
Factored pile axial reaction Qpr = Pf / 2 = 766 [kN]
Vertical Direction
Factored moment to column face Mf = Qpr x (0.5sp - 0.5hc) = 96 [kNm]
Factored shear to column face Vf = Qpr = 766 [kN]

CONCLUSION

[Pilecap Reinft by S&T Model Is Adequate]

[Pilecap Reinft by Deep Beam Model Is Adequate]

[Column One Way Shear Is Adequate]


Project : Anchor Bolt Design ACI 318-11 Crane Beam Design Eng : Test
Anchor Bolt Design ACI 318-11
Crane Beam Design Jon No :www.civilbay.com Chk : Test
www.civilbay.com
Doc No : www.civilbay.com Date : 2013-03-06
Calculation Sheet Subject : Pilecap Design Examples Rev : 0

3 of 4
Code Reference
S&T AND BEARING STRESS LIMIT MODEL by Adebar
Column Bearing Stress
Ac = 1.7E+05 [mm 2] A2 = 1.8E+06 [mm 2]

 A2 
 = 0 .33   1  1 . 0 = 0.75
 A c 
 2d 
 = 0 . 33   1  1 . 0 = 0.39
 Ac 

Allowable stress fb =  c ( 0.6 f 'c  6  f 'c ) = 17.9 [MPa]


Column stress fcb = Pcf / (bc x hc) = 9.1 [MPa]
< fb OK
Pile Bearing Stress
Ap = 4.9E+04 [mm 2] A2 = 7.9E+05 [mm 2]

 A2 
 = 0 .33   1  1 . 0 = 1.00

 Ap 
d 
 = 0 . 33   1  1 .0 = 0.25

 dp 

Allowable stress fb =  c ( 0.6 f 'c  6  f 'c ) = 17.1 [MPa]


Pile stress fcb = Qpr / ( * dp2 /4) = 15.6 [MPa]
< fb OK
Required Reinft
Vertical reinft.
l = 0.5sp - 0.25hc = 250 [mm]
Fh = l / d x Qpr = 435 [kN]
As1 = Fh / ( s x fy) = 1280 [mm 2]
Asmin = 0.2% x bf x tf = 1240 [mm 2]
As1 = max ( As1, Asmin ) = 1280 [mm 2]
As1 prov = 3500 [mm 2]
> As1 OK

[Pilecap Reinft by S&T Model Is Adequate]


Project : Anchor Bolt Design ACI 318-11 Crane Beam Design Eng : Test
Anchor Bolt Design ACI 318-11
Crane Beam Design Jon No : www.civilbay.com Chk : Test
www.civilbay.com
Doc No : www.civilbay.com Date : 2013-03-06
Calculation Sheet Subject : Pilecap Design Examples Rev : 0

4 of 4
REDUCED LEVER ARM MODEL by Park and Paulay

Vertical Direction
dVf / Mf = 3.52 >1.0 -> pilecap acts as deep beam
dVf / Mf > 2.0 Mf / Vf = 125 [mm]
z = 0.4(d + Mf / Vf ) for dVf / Mf >=1.0 = 150 [mm]
1.2 Mf / Vf for dV f / Mf >=2.0
As1 = Mf / ( s fy z ) = 1877 [mm 2]
Asmin = 0.2% x bf x tf = 1240 [mm 2]
As1 = max ( As1, Asmin ) = 1877 [mm 2]
As1 prov = = 3500 [mm 2]
> As1 OK

[Deep Beam Model Is Applicable]

[Pilecap Reinft by Deep Beam Model Is Adequate]

COLUMN ONE WAY SHEAR


Factored single pile load Qpr = 766 [kN] bc = 330 [mm]
Pile diameter dp = 250 [mm] hc = 500 [mm]
Pile edge distance ed = 500 [mm] bf = 1000 [mm]
Pilecap effective depth d = 440 [mm] hf = 1750 [mm]

Hor Critical Shear Line


Dist from col face to pile edge dc = 250 [mm]
Fraction of pile outside critical line r = 0.00
Factored shear force Vf = r x Qpr = 0 [kN]
bw = bf = 1000 [mm]
When no transverse reinft.  = 230 / (1000 + d) = 0.160 11.3.6.3 Eq (11-9)

Vc =  c    fc b w d
'
= 250 [kN] 11.3.4 Eq (11-6)
> Vf OK

[Column One Way Shear Is Adequate]


Anchor Bolt Design per ACI 318-11
CivilBay Crane Beam Design
www.civilbay.com

3-Pile Pilecap Design Example

Anchor Bolt Design per ACI 318-11


CivilBay Crane Beam Design
www.civilbay.com
Project : Anchor Bolt Design ACI 318-11 Crane Beam Design Eng : Test
Anchor Bolt Design ACI 318-11
Crane Beam Design Jon No : www.civilbay.com Chk : Test
www.civilbay.com
Doc No : www.civilbay.com Date : 2013-03-06
Calculation Sheet Subject : Pilecap Design Examples Rev : 0

1 of 6
DESCRIPTION
3 piles pilecap design based on Code Abbreviation
A23.3-04 Design of Concrete Structures A23.3-04

INPUT
Factored column load Pcf = 4500 [kN] Ver reinft. in 2xed width range
Column width bc = 400 [mm] Asver bar size = 25 500
Column length hc = 400 [mm] Asver bar No = 7
Pilecap width bf = 2450 [mm] Asver prov = 3500
Pilecap length hf = 2309 [mm] Equivalent to 25 @ 233
Pilecap thickness tf = 980 [mm]
Hor reinft. in 2xed width range
Pile diameter dp = 350 [mm] As1 bar size = 25 500
Pile spacing sp = 1050 [mm] As1 bar No = 7
Pile edge distance ed = 700 [mm] As1 prov = 3500
Equivalent to 25 @ 233
Concrete strength f'c = 30 [MPa]
Rebar yield strength fy = 400 [MPa]

Concrete resistance factor  c = 0.65


Rebar resistance factor  s = 0.85
Low density conc factor  = 1.0

Backfill soil weight above cap Ws = 0 [kN]


Pilecap self weight W f = bf x hf x tf x 23.5 = 130 [kN]
Project : Anchor Bolt Design ACI 318-11 Crane Beam Design Eng : Test
Anchor Bolt Design ACI 318-11
Crane Beam Design Jon No :www.civilbay.com Chk : Test
www.civilbay.com
Doc No : www.civilbay.com Date : 2013-03-06
Calculation Sheet Subject : Pilecap Design Examples Rev : 0

2 of 6

Factored total pilecap load Pf = Pcf + W s + W f = 4663 [kN]


Pilecap effective depth d = tf - 1.5db -150 = 800 [mm]
Factored pile axial reaction Qpr = Pf / 3 = 1554 [kN]
Vertical Direction
Factored moment to column face Mf = Qpr x (0.577sp - 0.5hc) = 631 [kNm]
Factored shear to column face Vf = Qpr = 1554 [kN]

CONCLUSION

[Pilecap Reinft by S&T Model Is Adequate]

[Pilecap Reinft by Deep Beam Model Is NOT Adequate]

[Pile One and Two Way Shear Is Adequate]

[Column One Way Shear Is Adequate]


Project : Anchor Bolt Design ACI 318-11 Crane Beam Design Eng : Test
Anchor Bolt Design ACI 318-11
Crane Beam Design Jon No : www.civilbay.com Chk : Test
www.civilbay.com
Doc No : www.civilbay.com Date : 2013-03-06
Calculation Sheet Subject : Pilecap Design Examples Rev : 0

3 of 6
Code Reference
S&T AND BEARING STRESS LIMIT MODEL by Adebar
Column Bearing Stress
Ac = 1.6E+05 [mm 2] A2 = 5.2E+06 [mm 2]

 A2 
 = 0 .33   1  1 . 0 = 1.00
 A c 
 2d 
 = 0 . 33   1  1 . 0 = 1.00
 Ac 

Allowable stress fb =  c ( 0.6 f 'c  6  f 'c ) = 33.1 [MPa]


Column stress fcb = Pcf / (bc x hc) = 28.1 [MPa]
< fb OK
Pile Bearing Stress
Ap = 9.6E+04 [mm 2] A2 = 1.5E+06 [mm 2]

 A2 
 = 0 .33   1  1 . 0 = 1.00

 Ap 
d 
 = 0 . 33   1  1 .0 = 0.43

 dp 

Allowable stress fb =  c ( 0.6 f 'c  6  f 'c ) = 20.9 [MPa]


Pile stress fcb = Qpr / ( * dp2 /4) = 16.2 [MPa]
< fb OK
Required Reinft
Vertical direction
l = 0.577sp - 0.25hc = 506 [mm]
Fh = l / d x Qpr = 984 [kN]
Asver = Fh / ( s x fy) = 2893 [mm 2]
Asmin = 0.2% x 2ed x tf = 2744 [mm 2]
Asver = max ( Asver, Asmin ) = 2893 [mm 2]
Asver prov = 3500 [mm 2]
> Asver OK
Horizontal direction
b1 = 425 [mm] h1 = 203 [mm]
l = sqrt( b12 + h12) = 471 [mm]
Fh = l / d x Qpr = 915 [kN]
FT2 = b1 / l x Fh = 826 [kN]
As1 = FT2 / ( s x fy) = 2429 [mm 2]
Asmin = 0.2% x 2ed x tf = 2744 [mm 2]
As1 = max ( As1, Asmin ) = 2744 [mm 2]
As1 prov = 3500 [mm 2]
> As1 OK

[Pilecap Reinft by S&T Model Is Adequate]


Project : Anchor Bolt Design ACI 318-11 Crane Beam Design Eng : Test
Anchor Bolt Design ACI 318-11
Crane Beam Design Jon No :www.civilbay.com Chk : Test
www.civilbay.com
Doc No : www.civilbay.com Date : 2013-03-06
Calculation Sheet Subject : Pilecap Design Examples Rev : 0

4 of 6
REDUCED LEVER ARM MODEL by Park and Paulay

Vertical Direction
dVf / Mf = 1.97 >1.0 -> pilecap acts as deep beam
dVf / Mf < 2.0 Mf / Vf = 406 [mm]
z = 0.4(d + Mf / Vf ) for dVf / Mf >=1.0 = 482 [mm]
1.2 Mf / Vf for dV f / Mf >=2.0
Asver = Mf / ( s fy z ) = 3849 [mm 2]
Asmin = 0.2% x 2ed x tf = 2744 [mm 2]
Asver = max ( Asver, Asmin ) = 3849 [mm 2]
Asver prov = = 3500 [mm 2]
< Asver NG

[Deep Beam Model Is Applicable]

[Pilecap Reinft by Deep Beam Model Is NOT Adequate]


Project : Anchor Bolt Design ACI 318-11 Crane Beam Design Eng : Test
Anchor Bolt Design ACI 318-11
Crane Beam Design Jon No :www.civilbay.com Chk : Test
www.civilbay.com
Doc No : www.civilbay.com Date : 2013-03-06
Calculation Sheet Subject : Pilecap Design Examples Rev : 0

5 of 6
CORNER PILE ONE WAY SHEAR Code Reference
A23.3-04
Factored pile load Vf = 1554 [kN]
Pile diameter dp = 350 [mm]
Pile edge distance ed = 700 [mm] ec = 525 [mm]
Pilecap effective depth d = 800 [mm] d/2 = 400 [mm]
Dist from pile edge to col corner dc = 166 [mm] dc + 50 = 216 [mm]
< d/2
Critical shear line intersect column, one way shear needs NOT to be checked
sqrt(f'c ) = min ( sqrt(fc') , 8 ) = 5.477 [MPa] 11.3.4
min( d, 1.414 ec ) = 742 [mm] bw = 2058 [mm]
When no transverse reinft.  = 230 / (1000 + d) = 0.128 11.3.6.3 Eq (11-9)

Vc =  c    fc b w d
'
= 749 [kN] 11.3.4 Eq (11-6)
< Vf OK

CORNER PILE TWO WAY SHEAR

Factored pile load Vf = 1554 [kN]


Pile diameter dp = 350 [mm]
Pile edge distance ed = 700 [mm] ec = 525 [mm]
Pilecap effective depth d = 800 [mm] d/2 = 400 [mm]
Dist from pile edge to col corner dc = 166 [mm] dc + 50 = 216 [mm]
< d/2
Critical shear line intersect column, one way shear needs NOT to be checked
 = 0.0
Critical perimeter length bo =  (dp + d) (270-2)/360 = 2168 [mm]

 2 
vc1 =  1   0 .19   c f 'c
 c 
= 2.029 [MPa] 13.3.4.1 (13-5)

 c = width / length = 1 for pile

 s d 
vc2 =   0 .19  λ  c f 'c = 3.304 [MPa] 13.3.4.1 (13-6)
 bo 

 s = 2 for corner pile

vc3 = 0 38   c f 'c = 1.353 [MPa] 13.3.4.1 (13-7)


vc = min( vc1 , vc2 , vc3 ) = 1.353 [MPa]
Vc = vc bo d = 2346 [kN]
> Vf OK

[Pile One and Two Way Shear Is Adequate]


Project : Anchor Bolt Design ACI 318-11 Crane Beam Design Eng : Test
Anchor Bolt Design ACI 318-11
Crane Beam Design Jon No : www.civilbay.com Chk : Test
www.civilbay.com
Doc No : www.civilbay.com Date : 2013-03-06
Calculation Sheet Subject : Pilecap Design Examples Rev : 0

6 of 6
COLUMN ONE WAY SHEAR
Factored single pile load Qpr = 1554 [kN] bc = 400 [mm]
Pile diameter dp = 350 [mm] hc = 400 [mm]
Pile edge distance ed = 700 [mm] bf = 2450 [mm]
Pilecap effective depth d = 800 [mm] hf = 2309 [mm]

Hor Critical Shear Line


Dist from col face to pile edge dc = 278 [mm]
Fraction of pile outside critical line r = 0.00
Factored shear force Vf = r x 2 x Qpr = 0 [kN]
bw = bf = 2450 [mm]
When no transverse reinft.  = 230 / (1000 + d) = 0.128 11.3.6.3 Eq (11-9)

Vc =  c    fc b w d
'
= 892 [kN] 11.3.4 Eq (11-6)
> Vf OK

[Column One Way Shear Is Adequate]


Anchor Bolt Design per ACI 318-11
CivilBay Crane Beam Design
www.civilbay.com

4-Pile Pilecap Design Example

Anchor Bolt Design per ACI 318-11


CivilBay Crane Beam Design
www.civilbay.com
Project : Anchor Bolt Design ACI 318-11 Crane Beam Design Eng : Test
Anchor Bolt Design ACI 318-11
Crane Beam Design Jon No : www.civilbay.com Chk : Test
www.civilbay.com
Doc No : www.civilbay.com Date : 2013-03-06
Calculation Sheet Subject : Pilecap Design Examples Rev : 0

1 of 7
DESCRIPTION
4 piles pilecap design based on Code Abbreviation
A23.3-04 Design of Concrete Structures A23.3-04

INPUT
Factored column load Pcf = 2000 [kN] Vertical reinft.
Column width bc = 800 [mm] As1 bar size = 25 500
Column length hc = 400 [mm] As1 bar No = 7
Pilecap width bf = 1400 [mm] As1 prov = 3500
Pilecap length hf = 1400 [mm] Equivalent to 25 @ 92
Pilecap thickness tf = 540 [mm]
Horizontal reinft.
Pile diameter dp = 200 [mm] As2 bar size = 25 500
Pile spacing sp = 600 [mm] As2 bar No = 7
Pile edge distance ed = 400 [mm] As2 prov = 3500
Equivalent to 25 @ 92
Concrete strength f'c = 30 [MPa]
Rebar yield strength fy = 400 [MPa]

Concrete resistance factor  c = 0.65


Rebar resistance factor  s = 0.85
Low density conc factor  = 1.0

Backfill soil weight above cap Ws = 0 [kN]


Pilecap self weight W f = bf x hf x tf x 23.5 = 25 [kN]
Project : Anchor Bolt Design ACI 318-11 Crane Beam Design Eng : Test
Anchor Bolt Design ACI 318-11
Crane Beam Design Jon No :www.civilbay.com Chk : Test
www.civilbay.com
Doc No : www.civilbay.com Date : 2013-03-06
Calculation Sheet Subject : Pilecap Design Examples Rev : 0

2 of 7

Factored total pilecap load Pf = Pcf + W s + W f = 2031 [kN]


Pilecap effective depth d = tf - 1.5db -150 = 360 [mm]
Factored pile axial reaction Qpr = Pf / 4 = 508 [kN]
Vertical Direction
Factored moment to column face Mf = 2 x Qpr x 0.5(Sp - hc) = 102 [kNm]
Factored shear to column face Vf = 2 x Qpr = 1016 [kN]
Horizontal Direction
Factored moment to column face Mf = 2 x Qpr x 0.5(Sp - bc) = -102 [kNm]
Factored shear to column face Vf = 2 x Qpr = 1016 [kN]

CONCLUSION

[Pilecap Reinft by S&T Model Is Adequate]

[Pilecap Reinft by Deep Beam Model Is Adequate]

[Pile One and Two Way Shear Is Adequate]

[Column One and Two Way Shear Is Adequate]


Project : Anchor Bolt Design ACI 318-11 Crane Beam Design Eng : Test
Anchor Bolt Design ACI 318-11
Crane Beam Design Jon No :www.civilbay.com Chk : Test
www.civilbay.com
Doc No : www.civilbay.com Date : 2013-03-06
Calculation Sheet Subject : Pilecap Design Examples Rev : 0

3 of 7
Code Reference
S&T AND BEARING STRESS LIMIT MODEL by Adebar
Column Bearing Stress
Ac = 3.2E+05 [mm 2] A2 = 2.0E+06 [mm 2]

 A2 
 = 0 .33   1  1 . 0 = 0.49
 A c 
 2d 
 = 0 . 33   1  1 . 0 = 0.09
 Ac 

Allowable stress fb =  c ( 0.6 f 'c  6  f 'c ) = 12.7 [MPa]


Column stress fcb = Pcf / (bc x hc) = 6.3 [MPa]
< fb OK
Pile Bearing Stress
Ap = 3.1E+04 [mm 2] A2 = 5.0E+05 [mm 2]

 A2 
 = 0 .33   1  1 . 0 = 1.00

 Ap 
d 
 = 0 . 33   1  1 .0 = 0.27

 dp 

Allowable stress fb =  c ( 0.6 f 'c  6  f 'c ) = 17.4 [MPa]


Pile stress fcb = Qpr / ( * dp2 /4) = 16.2 [MPa]
< fb OK
Required Reinft
b1 = 100 [mm] h1 = 200 [mm]
l = sqrt( b12 + h12) = 224 [mm]
Fh = l / d x Qpr = 315 [kN]
Vertical direction
FT1 = h1 / l x Fh = 282 [kN]
As1 = FT1 / ( s x fy) = 830 [mm 2]
Asmin = 0.2% x bf x tf / 2 = 756 [mm 2]
As1 = max ( As1, Asmin ) = 830 [mm 2]
As1 prov = 3500 [mm 2]
> As1 OK
Horizontal direction
FT2 = b1 / l x Fh = 141 [kN]
As2 = FT2 / ( s x fy) = 415 [mm 2]
Asmin = 0.2% x hf x tf / 2 = 756 [mm 2]
As2 = max ( As1, Asmin ) = 756 [mm 2]
As2 prov = 3500 [mm 2]
> As2 OK

[Pilecap Reinft by S&T Model Is Adequate]


Project : Anchor Bolt Design ACI 318-11 Crane Beam Design Eng : Test
Anchor Bolt Design ACI 318-11
Crane Beam Design Jon No : www.civilbay.com Chk : Test
www.civilbay.com
Doc No : www.civilbay.com Date : 2013-03-06
Calculation Sheet Subject : Pilecap Design Examples Rev : 0

4 of 7
REDUCED LEVER ARM MODEL by Park and Paulay

Vertical Direction
dVf / Mf = 3.60 >1.0 -> pilecap acts as deep beam
dVf / Mf > 2.0 Mf / Vf = 100 [mm]
z = 0.4(d + Mf / Vf ) for dVf / Mf >=1.0 = 120 [mm]
1.2 Mf / Vf for dV f / Mf >=2.0
Asver = Mf / ( s fy z ) = 2489 [mm 2]
Asmin = 0.2% x bf x tf = 1512 [mm 2]
Asver = max ( Asver, Asmin ) = 2489 [mm 2]
As prov = 2 x As1 prov = 7000 [mm 2]
> Asver OK
Horizontal Direction
dVf / Mf = -3.60 <1.0 -> pilecap does NOT act as deep beam
dVf / Mf < 2.0 Mf / Vf = -100 [mm]
z = 0.4(d + Mf / Vf ) for dVf / Mf >=1.0 = 104 [mm]
1.2 Mf / Vf for dV f / Mf >=2.0
Ashor = Mf / ( s fy z ) = -2872 [mm 2]
Asmin = 0.2% x hf x tf = 1512 [mm 2]
Ashor = max ( Ashor, Asmin ) = 1512 [mm 2]
As prov = 2 x As2 prov = 7000 [mm 2]
> Ashor OK

[Deep Beam Model Is NOT Applicable. The Result Is Abandoned]

[Pilecap Reinft by Deep Beam Model Is Adequate]


Project : Anchor Bolt Design ACI 318-11 Crane Beam Design Eng : Test
Anchor Bolt Design ACI 318-11
Crane Beam Design Jon No :www.civilbay.com Chk : Test
www.civilbay.com
Doc No : www.civilbay.com Date : 2013-03-06
Calculation Sheet Subject : Pilecap Design Examples Rev : 0

5 of 7
CORNER PILE ONE WAY SHEAR Code Reference
A23.3-04
Factored pile load Vf = 508 [kN]
Pile diameter dp = 200 [mm]
Pile edge distance ed = 400 [mm] ec = 300 [mm]
Pilecap effective depth d = 360 [mm] d/2 = 180 [mm]
Dist from pile edge to col corner dc = 41 [mm] dc + 50 = 91 [mm]
< d/2
Critical shear line intersect column, one way shear needs NOT to be checked
sqrt(f'c ) = min ( sqrt(fc') , 8 ) = 5.477 [MPa] 11.3.4
min( d, 1.414 ec ) = 360 [mm] bw = 1563 [mm]
When no transverse reinft.  = 230 / (1000 + d) = 0.169 11.3.6.3 Eq (11-9)

Vc =  c    fc b w d
'
= 339 [kN] 11.3.4 Eq (11-6)
< Vf OK

CORNER PILE TWO WAY SHEAR

Factored pile load Vf = 508 [kN]


Pile diameter dp = 200 [mm]
Pile edge distance ed = 400 [mm] ec = 300 [mm]
Pilecap effective depth d = 360 [mm] d/2 = 180 [mm]
Dist from pile edge to col corner dc = 41 [mm] dc + 50 = 91 [mm]
< d/2
Critical shear line intersect column, one way shear needs NOT to be checked
 = 0.0
Critical perimeter length bo =  (dp + d) (270-2)/360 = 1319 [mm]

 2 
vc1 =  1   0 .19   c f 'c
 c 
= 2.029 [MPa] 13.3.4.1 (13-5)

 c = width / length = 1 for pile

 s d 
vc2 =   0 .19  λ  c f 'c = 2.619 [MPa] 13.3.4.1 (13-6)
 bo 

 s = 2 for corner pile

vc3 = 0 38   c f 'c = 1.353 [MPa] 13.3.4.1 (13-7)


vc = min( vc1 , vc2 , vc3 ) = 1.353 [MPa]
Vc = vc bo d = 643 [kN]
> Vf OK

[Pile One and Two Way Shear Is Adequate]


Project : Anchor Bolt Design ACI 318-11 Crane Beam Design Eng : Test
Anchor Bolt Design ACI 318-11
Crane Beam Design Jon No : www.civilbay.com Chk : Test
www.civilbay.com
Doc No : www.civilbay.com Date : 2013-03-06
Calculation Sheet Subject : Pilecap Design Examples Rev : 0

6 of 7
COLUMN ONE WAY SHEAR
Factored single pile load Qpr = 508 [kN] bc = 800 [mm]
Pile diameter dp = 200 [mm] hc = 400 [mm]
Pile edge distance ed = 400 [mm] bf = 1400 [mm]
Pilecap effective depth d = 360 [mm] hf = 1400 [mm]
Ver Critical Shear Line
Dist from col face to pile edge dc = 0 [mm]
Fraction of pile outside critical line r = 0.00
Factored shear force Vf = r x 2 x Qpr = 0 [kN]
bw = hf = 1400 [mm]
When no transverse reinft.  = 230 / (1000 + d) = 0.169 11.3.6.3 Eq (11-9)

Vc =  c    fc b w d
'
= 303 [kN] 11.3.4 Eq (11-6)
> Vf OK
Hor Critical Shear Line
Dist from col face to pile edge dc = 200 [mm]
Fraction of pile outside critical line r = 0.00
Factored shear force Vf = r x 2 x Qpr = 0 [kN]
bw = bf = 1400 [mm]
When no transverse reinft.  = 230 / (1000 + d) = 0.169 11.3.6.3 Eq (11-9)

Vc =  c    fc b w d
'
= 303 [kN] 11.3.4 Eq (11-6)
> Vf OK
Project : Anchor Bolt Design ACI 318-11 Crane Beam Design Eng : Test
Anchor Bolt Design ACI 318-11
Crane Beam Design Jon No : www.civilbay.com Chk : Test
www.civilbay.com
Doc No : www.civilbay.com Date : 2013-03-06
Calculation Sheet Subject : Pilecap Design Examples Rev : 0

7 of 7
COLUMN TWO WAY SHEAR
A23.3-04
Factored single pile load Qpr = 508 [kN] bc = 800 [mm]
Pile diameter dp = 200 [mm] hc = 400 [mm]
Pile edge distance ed = 400 [mm] bf = 1400 [mm]
Pilecap effective depth d = 360 [mm] hf = 1400 [mm]

Ver Critical Shear Line


Dist from col face to pile edge dc = 0 [mm]
Fraction of pile outside critical line r1 = 0.00

Hor Critical Shear Line


Dist from col face to pile edge dc = 200 [mm]
Fraction of pile outside critical line r2 = 0.10

Factored shear force Vf = 203 [kN]


Critical perimeter length bo = 2x(bc + d + hc + d) = 3840 [mm]

 2 
vc1 =  1   0 .19   c f 'c
 c 
= 1.353 [MPa] 13.3.4.1 (13-5)

 c = col length / col width = 2.0

 s d 
vc2 =   0 .19  λ  c f 'c = 2.012 [MPa] 13.3.4.1 (13-6)
 bo 

s = 4 for interior column

vc3 = 0 38   c f 'c = 1.353 [MPa] 13.3.4.1 (13-7)

vc = min( vc1 , vc2 , vc3 ) = 1.353 [MPa]


Vr = vc bo d = 1870 [kN]
> Vf OK

[Column One and Two Way Shear Is Adequate]


Project : Anchor Bolt Design ACI 318-11 Crane Beam Design Eng : Test
Anchor Bolt Design ACI 318-11
Crane Beam Design Jon No : www.civilbay.com Chk : Test
www.civilbay.com
Doc No : www.civilbay.com Date : 2013-03-06
Calculation Sheet Subject : Pilecap Design Examples Rev : 0

1 of 7
PILECAP DESIGN
4 piles pilecap design based on Code Abbreviation
A23.3-04 Design of Concrete Structures A23.3-04

INPUT
Factored column load Pcf = 700 [kN] Vertical reinft.
Column width bc = 900 [mm] As1 bar size = 20 300
Column length hc = 900 [mm] As1 bar No = 6
Pilecap width bf = 2200 [mm] As1 prov = 1650
Pilecap length hf = 3200 [mm] Equivalent to 20 @ 200
Pilecap thickness tf = 900 [mm]
Horizontal reinft.
Pile diameter dp = 324 [mm] As2 bar size = 20 300
Pile spacing sp1 = 2200 [mm] As2 bar No = 8
Pile spacing sp2 = 1200 [mm] As2 prov = 2400
Pile edge distance ed = 500 [mm] Equivalent to 20 @ 200

Concrete strength f'c = 30 [MPa]


Rebar yield strength fy = 400 [MPa]

Concrete resistance factor  c = 0.65


Rebar resistance factor  s = 0.85
Low density conc factor  = 1.0

Backfill soil weight above cap Ws = 0 [kN]


Pilecap self weight W f = bf x hf x tf x 23.5 = 149 [kN] 001
Project : Anchor Bolt Design ACI 318-11 Crane Beam Design Eng : Test
Anchor Bolt Design ACI 318-11
Crane Beam Design Jon No : www.civilbay.com Chk : Test
www.civilbay.com
Doc No : www.civilbay.com Date : 2013-03-06
Calculation Sheet Subject : Pilecap Design Examples Rev : 0

2 of 7

Factored total pilecap load Pf = Pcf + W s + W f = 886 [kN]


Pilecap effective depth d = tf - 1.5db -150 = 720 [mm]
Factored pile axial reaction Qpr = Pf / 4 = 222 [kN]
Vertical Direction
Factored moment to column face Mf = 2 x Qpr x 0.5(Sp1 - hc) = 288 [kNm]
Factored shear to column face Vf = 2 x Qpr = 443 [kN]
Horizontal Direction
Factored moment to column face Mf = 2 x Qpr x 0.5(Sp2 - bc) = 66 [kNm]
Factored shear to column face Vf = 2 x Qpr = 443 [kN]

CONCLUSION

[Pilecap Reinft by S&T Model Is NOT Adequate]

[Pilecap Reinft by Deep Beam Model Is NOT Adequate]

[Pile One and Two Way Shear Is Adequate]

[Column One and Two Way Shear Is Adequate]

002
Project : Anchor Bolt Design ACI 318-11 Crane Beam Design Eng : Test
Anchor Bolt Design ACI 318-11
Crane Beam Design Jon No : www.civilbay.com Chk : Test
www.civilbay.com
Doc No : www.civilbay.com Date : 2013-03-06
Calculation Sheet Subject : Pilecap Design Examples Rev : 0

3 of 7
Code Reference
S&T AND BEARING STRESS LIMIT MODEL by Adebar
Column Bearing Stress
Ac = 8.1E+05 [mm 2] A2 = 7.0E+06 [mm 2]

 A2 
 = 0 .33   1  1 . 0 = 0.65
 A c 
 2d 
 = 0 . 33   1  1 . 0 = 0.20
 Ac 

Allowable stress fb =  c ( 0.6 f 'c  6  f 'c ) = 14.5 [MPa]


Column stress fcb = Pcf / (bc x hc) = 0.9 [MPa]
< fb OK
Pile Bearing Stress
Ap = 8.2E+04 [mm 2] A2 = 7.9E+05 [mm 2]

 A2 
 = 0 .33   1  1 . 0 = 0.70

 Ap 
d 
 = 0 . 33   1  1 .0 = 0.41

 dp 

Allowable stress fb =  c ( 0.6 f 'c  6  f 'c ) = 17.8 [MPa]


Pile stress fcb = Qpr / ( * dp2 /4) = 2.7 [MPa]
< fb OK
Required Reinft
b1 = 375 [mm] h1 = 875 [mm]
l = sqrt( b12 + h12) = 952 [mm]
Fh = l / d x Qpr = 293 [kN]
Vertical direction
FT1 = h1 / l x Fh = 269 [kN]
As1 = FT1 / ( s x fy) = 792 [mm 2]
Asmin = 0.2% x bf x tf / 2 = 1980 [mm 2]
As1 = max ( As1, Asmin ) = 1980 [mm 2]
As1 prov = 1650 [mm 2]
< As1 NG
Horizontal direction
FT2 = b1 / l x Fh = 115 [kN]
As2 = FT2 / ( s x fy) = 339 [mm 2]
Asmin = 0.2% x hf x tf / 2 = 2880 [mm 2]
As2 = max ( As1, Asmin ) = 2880 [mm 2]
As2 prov = 2400 [mm 2]
< As2 NG

[Pilecap Reinft by S&T Model Is NOT Adequate]


003
Project : Anchor Bolt Design ACI 318-11 Crane Beam Design Eng : Test
Anchor Bolt Design ACI 318-11
Crane Beam Design Jon No : www.civilbay.com Chk : Test
www.civilbay.com
Doc No : www.civilbay.com Date : 2013-03-06
Calculation Sheet Subject : Pilecap Design Examples Rev : 0

4 of 7
REDUCED LEVER ARM MODEL by Park and Paulay

Vertical Direction
dVf / Mf = 1.11 >1.0 -> pilecap acts as deep beam
dVf / Mf < 2.0 Mf / Vf = 650 [mm]
z = 0.4(d + Mf / Vf ) for dVf / Mf >=1.0 = 548 [mm]
1.2 Mf / Vf for dV f / Mf >=2.0
Asver = Mf / ( s fy z ) = 1546 [mm 2]
Asmin = 0.2% x bf x tf = 3960 [mm 2]
Asver = max ( Asver, Asmin ) = 3960 [mm 2]
As prov = 2 x As1 prov = 3300 [mm 2]
< Asver NG
Horizontal Direction
dVf / Mf = 4.80 >1.0 -> pilecap acts as deep beam
dVf / Mf > 2.0 Mf / Vf = 150 [mm]
z = 0.4(d + Mf / Vf ) for dVf / Mf >=1.0 = 180 [mm]
1.2 Mf / Vf for dV f / Mf >=2.0
Ashor = Mf / ( s fy z ) = 1086 [mm 2]
Asmin = 0.2% x hf x tf = 5760 [mm 2]
Ashor = max ( Ashor, Asmin ) = 5760 [mm 2]
As prov = 2 x As2 prov = 4800 [mm 2]
< Ashor NG

[Deep Beam Model Is Applicable]

[Pilecap Reinft by Deep Beam Model Is NOT Adequate]

004
Project : Anchor Bolt Design ACI 318-11 Crane Beam Design Eng : Test
Anchor Bolt Design ACI 318-11
Crane Beam Design Jon No :www.civilbay.com Chk : Test
www.civilbay.com
Doc No : www.civilbay.com Date : 2013-03-06
Calculation Sheet Subject : Pilecap Design Examples Rev : 0

5 of 7
CORNER PILE ONE WAY SHEAR Code Reference
A23.3-04
Factored pile load Vf = 222 [kN]
Pile diameter dp = 324 [mm]
Pile edge distance ed = 500 [mm] ec = 338 [mm]
Pilecap effective depth d = 720 [mm] d/2 = 360 [mm]
Dist from pile edge to col corner dc = 505 [mm] dc + 50 = 555 [mm]
> d/2
Critical shear line doesn't intersect column, one way shear shall be checked
sqrt(f'c ) = min ( sqrt(fc') , 8 ) = 5.477 [MPa] 11.3.4
min( d, 1.414 ec ) = 478 [mm] bw = 2458 [mm]
When no transverse reinft.  = 230 / (1000 + d) = 0.134 11.3.6.3 Eq (11-9)

Vc =  c    fc b w d
'
= 843 [kN] 11.3.4 Eq (11-6)
> Vf OK

CORNER PILE TWO WAY SHEAR

Factored pile load Vf = 222 [kN]


Pile diameter dp = 324 [mm]
Pile edge distance ed = 500 [mm] ec = 338 [mm]
Pilecap effective depth d = 720 [mm] d/2 = 360 [mm]
Dist from pile edge to col corner dc = 505 [mm] dc + 50 = 555 [mm]
> d/2
Critical shear line doesn't intersect column, one way shear shall be checked
 = 16.7
Critical perimeter length bo =  (dp + d) (270-2)/360 = 2156 [mm]

 2 
vc1 =  1   0 .19   c f 'c
 c 
= 2.029 [MPa] 13.3.4.1 (13-5)

 c = width / length = 1 for pile

 s d 
vc2 =   0 .19  λ  c f 'c = 3.055 [MPa] 13.3.4.1 (13-6)
 bo 

 s = 2 for corner pile

vc3 = 0 38   c f 'c = 1.353 [MPa] 13.3.4.1 (13-7)


vc = min( vc1 , vc2 , vc3 ) = 1.353 [MPa]
Vc = vc bo d = 2100 [kN]
> Vf OK

[Pile One and Two Way Shear Is Adequate]


005
Project : Anchor Bolt Design ACI 318-11 Crane Beam Design Eng : Test
Anchor Bolt Design ACI 318-11
Crane Beam Design Jon No : www.civilbay.com Chk : Test
www.civilbay.com
Doc No : www.civilbay.com Date : 2013-03-06
Calculation Sheet Subject : Pilecap Design Examples Rev : 0

6 of 7
COLUMN ONE WAY SHEAR
Factored single pile load Qpr = 222 [kN] bc = 900 [mm]
Pile diameter dp = 324 [mm] hc = 900 [mm]
Pile edge distance ed = 500 [mm] bf = 2200 [mm]
Pilecap effective depth d = 720 [mm] hf = 3200 [mm]
Ver Critical Shear Line
Dist from col face to pile edge dc = 312 [mm]
Fraction of pile outside critical line r = 0.00
Factored shear force Vf = r x 2 x Qpr = 0 [kN]
bw = hf = 3200 [mm]
When no transverse reinft.  = 230 / (1000 + d) = 0.134 11.3.6.3 Eq (11-9)

Vc =  c    fc b w d
'
= 1097 [kN] 11.3.4 Eq (11-6)
> Vf OK
Hor Critical Shear Line
Dist from col face to pile edge dc = 812 [mm]
Fraction of pile outside critical line r = 0.28
Factored shear force Vf = r x 2 x Qpr = 126 [kN]
bw = bf = 2200 [mm]
When no transverse reinft.  = 230 / (1000 + d) = 0.134 11.3.6.3 Eq (11-9)

Vc =  c    fc b w d
'
= 754 [kN] 11.3.4 Eq (11-6)
> Vf OK

006
Project : Anchor Bolt Design ACI 318-11 Crane Beam Design Eng : Test
Anchor Bolt Design ACI 318-11
Crane Beam Design Jon No : www.civilbay.com Chk : Test
www.civilbay.com
Doc No : www.civilbay.com Date : 2013-03-06
Calculation Sheet Subject : Pilecap Design Examples Rev : 0

7 of 7
COLUMN TWO WAY SHEAR
A23.3-04
Factored single pile load Qpr = 222 [kN] bc = 900 [mm]
Pile diameter dp = 324 [mm] hc = 900 [mm]
Pile edge distance ed = 500 [mm] bf = 2200 [mm]
Pilecap effective depth d = 720 [mm] hf = 3200 [mm]

Ver Critical Shear Line


Dist from col face to pile edge dc = 312 [mm]
Fraction of pile outside critical line r1 = 0.00

Hor Critical Shear Line


Dist from col face to pile edge dc = 812 [mm]
Fraction of pile outside critical line r2 = 1.00

Factored shear force Vf = 886 [kN]


Critical perimeter length bo = 2x(bc + d + hc + d) = 6480 [mm]

 2 
vc1 =  1   0 .19   c f 'c
 c 
= 2.029 [MPa] 13.3.4.1 (13-5)

 c = col length / col width = 1.0

 s d 
vc2 =   0 .19  λ  c f 'c = 2.259 [MPa] 13.3.4.1 (13-6)
 bo 

s = 4 for interior column

vc3 = 0 38   c f 'c = 1.353 [MPa] 13.3.4.1 (13-7)

vc = min( vc1 , vc2 , vc3 ) = 1.353 [MPa]


Vr = vc bo d = 6312 [kN]
> Vf OK

[Column One and Two Way Shear Is Adequate]

007
Anchor Bolt Design per ACI 318-11
CivilBay Crane Beam Design
www.civilbay.com

5-Pile Pilecap Design Example

Anchor Bolt Design per ACI 318-11


CivilBay Crane Beam Design
www.civilbay.com
Project : Anchor Bolt Design ACI 318-11 Crane Beam Design Eng : Test
Anchor Bolt Design ACI 318-11
Crane Beam Design Jon No : www.civilbay.com Chk : Test
www.civilbay.com
Doc No : www.civilbay.com Date : 2013-03-06
Calculation Sheet Subject : Pilecap Design Examples Rev : 0

1 of 7
DESCRIPTION
5 piles pilecap design based on Code Abbreviation
A23.3-04 Design of Concrete Structures A23.3-04

INPUT
Factored column load Pcf = 2500 [kN] Vertical reinft.
Column width bc = 880 [mm] As1 bar size = 25 500
Column length hc = 440 [mm] As1 bar No = 7
Pilecap width bf = 2061 [mm] As1 prov = 3500
Pilecap length hf = 2061 [mm] Equivalent to 25 @ 143
Pilecap thickness tf = 600 [mm]
Horizontal reinft.
Pile diameter dp = 250 [mm] As2 bar size = 25 500
Pile spacing sp = 1061 [mm] As2 bar No = 7
Pile edge distance ed = 500 [mm] As2 prov = 3500
Equivalent to 25 @ 143
Concrete strength f'c = 30 [MPa]
Rebar yield strength fy = 400 [MPa]

Concrete resistance factor  c = 0.65


Rebar resistance factor  s = 0.85
Low density conc factor  = 1.0

Backfill soil weight above cap Ws = 0 [kN]


Pilecap self weight W f = bf x hf x tf x 23.5 = 60 [kN]
Project : Anchor Bolt Design ACI 318-11 Crane Beam Design Eng : Test
Anchor Bolt Design ACI 318-11
Crane Beam Design Jon No :www.civilbay.com Chk : Test
www.civilbay.com
Doc No : www.civilbay.com Date : 2013-03-06
Calculation Sheet Subject : Pilecap Design Examples Rev : 0

2 of 7

Factored total pilecap load Pf = Pcf + W s + W f = 2575 [kN]


Pilecap effective depth d = tf - 1.5db -150 = 420 [mm]
Factored pile axial reaction Qpr = Pf / 5 = 515 [kN]
Vertical Direction
Factored moment to column face Mf = 2 x Qpr x 0.5(Sp - hc) = 320 [kNm]
Factored shear to column face Vf = 2 x Qpr = 1030 [kN]
Horizontal Direction
Factored moment to column face Mf = 2 x Qpr x 0.5(Sp - bc) = 93 [kNm]
Factored shear to column face Vf = 2 x Qpr = 1030 [kN]

CONCLUSION

[Pilecap Reinft by S&T Model Is Adequate]

[Pilecap Reinft by Deep Beam Model Is Adequate]

[Pile One and Two Way Shear Is NOT Adequate]

[Column One and Two Way Shear Is Adequate]


Project : Anchor Bolt Design ACI 318-11 Crane Beam Design Eng : Test
Anchor Bolt Design ACI 318-11
Crane Beam Design Jon No :www.civilbay.com Chk : Test
www.civilbay.com
Doc No : www.civilbay.com Date : 2013-03-06
Calculation Sheet Subject : Pilecap Design Examples Rev : 0

3 of 7
Code Reference
S&T AND BEARING STRESS LIMIT MODEL by Adebar
Column Bearing Stress
Ac = 3.9E+05 [mm 2] A2 = 4.2E+06 [mm 2]

 A2 
 = 0 .33   1  1 . 0 = 0.77
 A c 
 2d 
 = 0 . 33   1  1 . 0 = 0.12
 Ac 

Allowable stress fb =  c ( 0.6 f 'c  6  f 'c ) = 13.6 [MPa]


Column stress fcb = Pcf / (bc x hc) = 6.5 [MPa]
< fb OK
Pile Bearing Stress
Ap = 4.9E+04 [mm 2] A2 = 7.9E+05 [mm 2]

 A2 
 = 0 .33   1  1 . 0 = 1.00

 Ap 
d 
 = 0 . 33   1  1 .0 = 0.23

 dp 

Allowable stress fb =  c ( 0.6 f 'c  6  f 'c ) = 16.5 [MPa]


Pile stress fcb = Qpr / ( * dp2 /4) = 10.5 [MPa]
< fb OK
Required Reinft
b1 = 311 [mm] h1 = 421 [mm]
l = sqrt( b12 + h12) = 523 [mm]
Fh = l / d x Qpr = 641 [kN]
Vertical direction
FT1 = h1 / l x Fh = 516 [kN]
As1 = FT1 / ( s x fy) = 1516 [mm 2]
Asmin = 0.2% x bf x tf / 2 = 1237 [mm 2]
As1 = max ( As1, Asmin ) = 1516 [mm 2]
As1 prov = 3500 [mm 2]
> As1 OK
Horizontal direction
FT2 = b1 / l x Fh = 381 [kN]
As2 = FT2 / ( s x fy) = 1120 [mm 2]
Asmin = 0.2% x hf x tf / 2 = 1237 [mm 2]
As2 = max ( As1, Asmin ) = 1237 [mm 2]
As2 prov = 3500 [mm 2]
> As2 OK

[Pilecap Reinft by S&T Model Is Adequate]


Project : Anchor Bolt Design ACI 318-11 Crane Beam Design Eng : Test
Anchor Bolt Design ACI 318-11
Crane Beam Design Jon No : www.civilbay.com Chk : Test
www.civilbay.com
Doc No : www.civilbay.com Date : 2013-03-06
Calculation Sheet Subject : Pilecap Design Examples Rev : 0

4 of 7
REDUCED LEVER ARM MODEL by Park and Paulay

Vertical Direction
dVf / Mf = 1.35 >1.0 -> pilecap acts as deep beam
dVf / Mf < 2.0 Mf / Vf = 311 [mm]
z = 0.4(d + Mf / Vf ) for dVf / Mf >=1.0 = 292 [mm]
1.2 Mf / Vf for dV f / Mf >=2.0
Asver = Mf / ( s fy z ) = 3219 [mm 2]
Asmin = 0.2% x bf x tf = 2473 [mm 2]
Asver = max ( Asver, Asmin ) = 3219 [mm 2]
As prov = 2 x As1 prov = 7000 [mm 2]
> Asver OK
Horizontal Direction
dVf / Mf = 4.64 >1.0 -> pilecap acts as deep beam
dVf / Mf > 2.0 Mf / Vf = 91 [mm]
z = 0.4(d + Mf / Vf ) for dVf / Mf >=1.0 = 109 [mm]
1.2 Mf / Vf for dV f / Mf >=2.0
Ashor = Mf / ( s fy z ) = 2524 [mm 2]
Asmin = 0.2% x hf x tf = 2473 [mm 2]
Ashor = max ( Ashor, Asmin ) = 2524 [mm 2]
As prov = 2 x As2 prov = 7000 [mm 2]
> Ashor OK

[Deep Beam Model Is Applicable]

[Pilecap Reinft by Deep Beam Model Is Adequate]


Project : Anchor Bolt Design ACI 318-11 Crane Beam Design Eng : Test
Anchor Bolt Design ACI 318-11
Crane Beam Design Jon No :www.civilbay.com Chk : Test
www.civilbay.com
Doc No : www.civilbay.com Date : 2013-03-06
Calculation Sheet Subject : Pilecap Design Examples Rev : 0

5 of 7
CORNER PILE ONE WAY SHEAR Code Reference
A23.3-04
Factored pile load Vf = 515 [kN]
Pile diameter dp = 250 [mm]
Pile edge distance ed = 500 [mm] ec = 375 [mm]
Pilecap effective depth d = 420 [mm] d/2 = 210 [mm]
Dist from pile edge to col corner dc = 198 [mm] dc + 50 = 248 [mm]
> d/2
Critical shear line doesn't intersect column, one way shear shall be checked
sqrt(f'c ) = min ( sqrt(fc') , 8 ) = 5.477 [MPa] 11.3.4
min( d, 1.414 ec ) = 420 [mm] bw = 1864 [mm]
When no transverse reinft.  = 230 / (1000 + d) = 0.162 11.3.6.3 Eq (11-9)

Vc =  c    fc b w d
'
= 451 [kN] 11.3.4 Eq (11-6)
< Vf NG

CORNER PILE TWO WAY SHEAR

Factored pile load Vf = 515 [kN]


Pile diameter dp = 250 [mm]
Pile edge distance ed = 500 [mm] ec = 375 [mm]
Pilecap effective depth d = 420 [mm] d/2 = 210 [mm]
Dist from pile edge to col corner dc = 198 [mm] dc + 50 = 248 [mm]
> d/2
Critical shear line doesn't intersect column, one way shear shall be checked
 = 0.0
Critical perimeter length bo =  (dp + d) (270-2)/360 = 1579 [mm]

 2 
vc1 =  1   0 .19   c f 'c
 c 
= 2.029 [MPa] 13.3.4.1 (13-5)

 c = width / length = 1 for pile

 s d 
vc2 =   0 .19  λ  c f 'c = 2.571 [MPa] 13.3.4.1 (13-6)
 bo 

 s = 2 for corner pile

vc3 = 0 38   c f 'c = 1.353 [MPa] 13.3.4.1 (13-7)


vc = min( vc1 , vc2 , vc3 ) = 1.353 [MPa]
Vc = vc bo d = 897 [kN]
> Vf OK

[Pile One and Two Way Shear Is NOT Adequate]


Project : Anchor Bolt Design ACI 318-11 Crane Beam Design Eng : Test
Anchor Bolt Design ACI 318-11
Crane Beam Design Jon No : www.civilbay.com Chk : Test
www.civilbay.com
Doc No : www.civilbay.com Date : 2013-03-06
Calculation Sheet Subject : Pilecap Design Examples Rev : 0

6 of 7
COLUMN ONE WAY SHEAR
Factored single pile load Qpr = 515 [kN] bc = 880 [mm]
Pile diameter dp = 250 [mm] hc = 440 [mm]
Pile edge distance ed = 500 [mm] bf = 2061 [mm]
Pilecap effective depth d = 420 [mm] hf = 2061 [mm]
Ver Critical Shear Line
Dist from col face to pile edge dc = 216 [mm]
Fraction of pile outside critical line r = 0.00
Factored shear force Vf = r x 2 x Qpr = 0 [kN]
bw = hf = 2061 [mm]
When no transverse reinft.  = 230 / (1000 + d) = 0.162 11.3.6.3 Eq (11-9)

Vc =  c    fc b w d
'
= 499 [kN] 11.3.4 Eq (11-6)
> Vf OK
Hor Critical Shear Line
Dist from col face to pile edge dc = 436 [mm]
Fraction of pile outside critical line r = 0.06
Factored shear force Vf = r x 2 x Qpr = 64 [kN]
bw = bf = 2061 [mm]
When no transverse reinft.  = 230 / (1000 + d) = 0.162 11.3.6.3 Eq (11-9)

Vc =  c    fc b w d
'
= 499 [kN] 11.3.4 Eq (11-6)
> Vf OK
Project : Anchor Bolt Design ACI 318-11 Crane Beam Design Eng : Test
Anchor Bolt Design ACI 318-11
Crane Beam Design Jon No : www.civilbay.com Chk : Test
www.civilbay.com
Doc No : www.civilbay.com Date : 2013-03-06
Calculation Sheet Subject : Pilecap Design Examples Rev : 0

7 of 7
COLUMN TWO WAY SHEAR
A23.3-04
Factored single pile load Qpr = 515 [kN] bc = 880 [mm]
Pile diameter dp = 250 [mm] hc = 440 [mm]
Pile edge distance ed = 500 [mm] bf = 2061 [mm]
Pilecap effective depth d = 420 [mm] hf = 2061 [mm]

Ver Critical Shear Line


Dist from col face to pile edge dc = 216 [mm]
Fraction of pile outside critical line r1 = 0.02

Hor Critical Shear Line


Dist from col face to pile edge dc = 436 [mm]
Fraction of pile outside critical line r2 = 0.90

Factored shear force Vf = 1862 [kN]


Critical perimeter length bo = 2x(bc + d + hc + d) = 4320 [mm]

 2 
vc1 =  1   0 .19   c f 'c
 c 
= 1.353 [MPa] 13.3.4.1 (13-5)

 c = col length / col width = 2.0

 s d 
vc2 =   0 .19  λ  c f 'c = 2.061 [MPa] 13.3.4.1 (13-6)
 bo 

s = 4 for interior column

vc3 = 0 38   c f 'c = 1.353 [MPa] 13.3.4.1 (13-7)

vc = min( vc1 , vc2 , vc3 ) = 1.353 [MPa]


Vr = vc bo d = 2455 [kN]
> Vf OK

[Column One and Two Way Shear Is Adequate]


Anchor Bolt Design per ACI 318-11
CivilBay Crane Beam Design
www.civilbay.com

6-Pile Pilecap Design Example

Anchor Bolt Design per ACI 318-11


CivilBay Crane Beam Design
www.civilbay.com
Project : Anchor Bolt Design ACI 318-11 Crane Beam Design Eng : Test
Anchor Bolt Design ACI 318-11
Crane Beam Design Jon No : www.civilbay.com Chk : Test
www.civilbay.com
Doc No : www.civilbay.com Date : 2013-03-06
Calculation Sheet Subject : Pilecap Design Examples Rev : 0

1 of 8
DESCRIPTION
6 piles pilecap design based on Code Abbreviation
A23.3-04 Design of Concrete Structures A23.3-04

INPUT
Factored column load Pcf = 7500 [kN] Vertical reinft.
Column width bc = 610 [mm] As1 bar size = 25 500
Column length hc = 410 [mm] As1 bar No = 6
Pilecap width bf = 2100 [mm] As1 prov = 3000
Pilecap length hf = 3000 [mm] Equivalent to 25 @ 173
Pilecap thickness tf = 1180 [mm]
Horizontal reinft.
Pile diameter dp = 300 [mm] As2 bar size = 25 500
Pile spacing sp = 900 [mm] As2 bar No = 6
Pile edge distance ed = 600 [mm] As2 prov = 2750
Equivalent to 25 @ 181
Concrete strength f'c = 30 [MPa]
Rebar yield strength fy = 400 [MPa]

Concrete resistance factor  c = 0.65


Rebar resistance factor  s = 0.85
Low density conc factor  = 1.0

Backfill soil weight above cap W s = 10 [kN]


Pilecap self weight W f = bf x hf x tf x 23.5 = 175 [kN]
Project : Anchor Bolt Design ACI 318-11 Crane Beam Design Eng : Test
Anchor Bolt Design ACI 318-11
Crane Beam Design Jon No : www.civilbay.com Chk : Test
www.civilbay.com
Doc No : www.civilbay.com Date : 2013-03-06
Calculation Sheet Subject : Pilecap Design Examples Rev : 0

2 of 8

Factored total pilecap load Pf = Pcf + W s + W f = 7731 [kN]


Pilecap effective depth d = tf - 1.5db -150 = 1000 [mm]
Factored pile axial reaction Qpr = Pf / 6 = 1288 [kN]
Vertical Direction
Factored moment to column face Mf = 2 x Qpr x (Sp - 0.5hc) = 1791 [kNm]
Factored shear to column face Vf = 2 x Qpr = 2577 [kN]
Horizontal Direction
Factored moment to column face Mf = 3 x Qpr x (Sp - 0.5bc) = 560 [kNm]
Factored shear to column face Vf = 3 x Qpr = 3865 [kN]

CONCLUSION

[Pilecap Reinft by S&T Model Is NOT Adequate]

[Pilecap Reinft by Deep Beam Model Is NOT Adequate]

[Pile One and Two Way Shear Is NOT Adequate]

[Column One and Two Way Shear Is Adequate]


Project : Anchor Bolt Design ACI 318-11 Crane Beam Design Eng : Test
Anchor Bolt Design ACI 318-11
Crane Beam Design Jon No : www.civilbay.com Chk : Test
www.civilbay.com
Doc No : www.civilbay.com Date : 2013-03-06
Calculation Sheet Subject : Pilecap Design Examples Rev : 0

3 of 8
Code Reference
S&T AND BEARING STRESS LIMIT MODEL by Adebar
Column Bearing Stress
Ac = 2.5E+05 [mm 2] A2 = 6.3E+06 [mm 2]

 A2 
 = 0 .33   1  1 . 0 = 1.00
 A c 
 2d 
 = 0 . 33   1  1 . 0 = 1.00
 Ac 

Allowable stress fb =  c ( 0.6 f 'c  6  f 'c ) = 33.1 [MPa]


Column stress fcb = Pcf / (bc x hc) = 30.0 [MPa]
< fb OK
Pile Bearing Stress
Ap = 7.1E+04 [mm 2] A2 = 1.1E+06 [mm 2]

 A2 
 = 0 .33   1  1 . 0 = 1.00

 Ap 
d 
 = 0 . 33   1  1 .0 = 0.78

 dp 

Allowable stress fb =  c ( 0.6 f 'c  6  f 'c ) = 28.3 [MPa]


Pile stress fcb = Qpr / ( * dp2 /4) = 18.2 [MPa]
< fb OK
Required Reinft
b1 = 298 [mm] h1 = 798 [mm]
l = sqrt( b12 + h12) = 851 [mm]
Fh = l / d x Qpr = 1097 [kN]
Vertical direction
FT1 = h1 / l x Fh = 1028 [kN]
As1 = FT1 / ( s x fy) = 3022 [mm 2]
Asmin = 0.2% x bf x tf / 2 = 2478 [mm 2]
As1 = max ( As1, Asmin ) = 3022 [mm 2]
As1 prov = 3000 [mm 2]
< As1 NG
Horizontal direction
FT2 = b1 / l x Fh = 383 [kN]
As2 = FT2 / ( s x fy) = 1127 [mm 2]
Asmin = 0.2% x hf x tf / 3 = 2360 [mm 2]
As2 = max ( As1, Asmin ) = 2360 [mm 2]
As2 prov = 2750 [mm 2]
> As2 OK

[Pilecap Reinft by S&T Model Is NOT Adequate]


Project : Anchor Bolt Design ACI 318-11 Crane Beam Design Eng : Test
Anchor Bolt Design ACI 318-11
Crane Beam Design Jon No : www.civilbay.com Chk : Test
www.civilbay.com
Doc No : www.civilbay.com Date : 2013-03-06
Calculation Sheet Subject : Pilecap Design Examples Rev : 0

4 of 8
REDUCED LEVER ARM MODEL by Park and Paulay

Vertical Direction
dVf / Mf = 1.44 >1.0 -> pilecap acts as deep beam
dVf / Mf < 2.0 Mf / Vf = 695 [mm]
z = 0.4(d + Mf / Vf ) for dVf / Mf >=1.0 = 678 [mm]
1.2 Mf / Vf for dV f / Mf >=2.0
Asver = Mf / ( s fy z ) = 7769 [mm 2]
Asmin = 0.2% x bf x tf = 4956 [mm 2]
Asver = max ( Asver, Asmin ) = 7769 [mm 2]
As prov = 2 x As1 prov = 6000 [mm 2]
< Asver NG
Horizontal Direction
dVf / Mf = 6.90 >1.0 -> pilecap acts as deep beam
dVf / Mf > 2.0 Mf / Vf = 145 [mm]
z = 0.4(d + Mf / Vf ) for dVf / Mf >=1.0 = 174 [mm]
1.2 Mf / Vf for dV f / Mf >=2.0
Ashor = Mf / ( s fy z ) = 9474 [mm 2]
Asmin = 0.2% x hf x tf = 7080 [mm 2]
Ashor = max ( Ashor, Asmin ) = 9474 [mm 2]
As prov = 3 x As2 prov = 8250 [mm 2]
< Ashor NG

[Deep Beam Model Is Applicable]

[Pilecap Reinft by Deep Beam Model Is NOT Adequate]


Project : Anchor Bolt Design ACI 318-11 Crane Beam Design Eng : Test
Anchor Bolt Design ACI 318-11
Crane Beam Design Jon No :www.civilbay.com Chk : Test
www.civilbay.com
Doc No : www.civilbay.com Date : 2013-03-06
Calculation Sheet Subject : Pilecap Design Examples Rev : 0

5 of 8
CORNER PILE ONE WAY SHEAR Code Reference
A23.3-04
Factored pile load Vf = 1288 [kN]
Pile diameter dp = 300 [mm]
Pile edge distance ed = 600 [mm] ec = 450 [mm]
Pilecap effective depth d = 1000 [mm] d/2 = 500 [mm]
Dist from pile edge to col corner dc = 560 [mm] dc + 50 = 610 [mm]
> d/2
Critical shear line doesn't intersect column, one way shear shall be checked
sqrt(f'c ) = min ( sqrt(fc') , 8 ) = 5.477 [MPa] 11.3.4
min( d, 1.414 ec ) = 636 [mm] bw = 2997 [mm]
When no transverse reinft.  = 230 / (1000 + d) = 0.115 11.3.6.3 Eq (11-9)

Vc =  c    fc b w d
'
= 1227 [kN] 11.3.4 Eq (11-6)
< Vf NG

CORNER PILE TWO WAY SHEAR

Factored pile load Vf = 1288 [kN]


Pile diameter dp = 300 [mm]
Pile edge distance ed = 600 [mm] ec = 450 [mm]
Pilecap effective depth d = 1000 [mm] d/2 = 500 [mm]
Dist from pile edge to col corner dc = 560 [mm] dc + 50 = 610 [mm]
> d/2
Critical shear line doesn't intersect column, one way shear shall be checked
 = 22.6
Critical perimeter length bo =  (dp + d) (270-2)/360 = 2550 [mm]

 2 
vc1 =  1   0 .19   c f 'c
 c 
= 2.029 [MPa] 13.3.4.1 (13-5)

 c = width / length = 1 for pile

 s d 
vc2 =   0 .19  λ  c f 'c = 3.469 [MPa] 13.3.4.1 (13-6)
 bo 

 s = 2 for corner pile

vc3 = 0 38   c f 'c = 1.353 [MPa] 13.3.4.1 (13-7)


vc = min( vc1 , vc2 , vc3 ) = 1.353 [MPa]
Vc = vc bo d = 3450 [kN]
> Vf OK
Project : Anchor Bolt Design ACI 318-11 Crane Beam Design Eng : Test
Anchor Bolt Design ACI 318-11
Crane Beam Design Jon No : www.civilbay.com Chk : Test
www.civilbay.com
Doc No : www.civilbay.com Date : 2013-03-06
Calculation Sheet Subject : Pilecap Design Examples Rev : 0

6 of 8
EDGE PILE TWO WAY SHEAR

Factored pile load Vf = 1288 [kN]


Pile diameter dp = 300 [mm]
Pile edge distance ed = 600 [mm] ec = 450 [mm]
Pilecap effective depth d = 1000 [mm] d/2 = 500 [mm]
Dist from pile edge to col corner dc = -5 [mm] dc + 50 = 45 [mm]
< d/2
Critical shear line intersect column, one way shear needs NOT to be checked
 = 22.6
Critical perimeter length bo =  (dp + d) (360-2)/360 = 3571 [mm]
A23.3-04
 2 
vc1 =  1   0 .19   c f 'c
 c 
= 2.029 [MPa] 13.3.4.1 (13-5)

 c = width / length = 1 for pile

 s d 
vc2 =   0 .19  λ  c f 'c = 3.667 [MPa] 13.3.4.1 (13-6)
 bo 

 s = 3 for edge pile

vc3 = 0 38   c f 'c = 1.353 [MPa] 13.3.4.1 (13-7)

vc = min( vc1 , vc2 , vc3 ) = 1.353 [MPa]


Vr = vc bo d = 4831 [kN]
> Vf OK

[Pile One and Two Way Shear Is NOT Adequate]


Project : Anchor Bolt Design ACI 318-11 Crane Beam Design Eng : Test
Anchor Bolt Design ACI 318-11
Crane Beam Design Jon No : www.civilbay.com Chk : Test
www.civilbay.com
Doc No : www.civilbay.com Date : 2013-03-06
Calculation Sheet Subject : Pilecap Design Examples Rev : 0

7 of 8
COLUMN ONE WAY SHEAR
Factored single pile load Qpr = 1288 [kN] bc = 610 [mm]
Pile diameter dp = 300 [mm] hc = 410 [mm]
Pile edge distance ed = 600 [mm] bf = 2100 [mm]
Pilecap effective depth d = 1000 [mm] hf = 3000 [mm]
Ver Critical Shear Line
Dist from col face to pile edge dc = 295 [mm]
Fraction of pile outside critical line r = 0.00
Factored shear force Vf = r x 3 x Qpr = 0 [kN]
bw = hf = 3000 [mm]
When no transverse reinft.  = 230 / (1000 + d) = 0.115 11.3.6.3 Eq (11-9)

Vc =  c    fc b w d
'
= 1228 [kN] 11.3.4 Eq (11-6)
> Vf OK
Hor Critical Shear Line
Dist from col face to pile edge dc = 845 [mm]
Fraction of pile outside critical line r = 0.00
Factored shear force Vf = r x 2 x Qpr = 0 [kN]
bw = bf = 2100 [mm]
When no transverse reinft.  = 230 / (1000 + d) = 0.115 11.3.6.3 Eq (11-9)

Vc =  c    fc b w d
'
= 860 [kN] 11.3.4 Eq (11-6)
> Vf OK
Project : Anchor Bolt Design ACI 318-11 Crane Beam Design Eng : Test
Anchor Bolt Design ACI 318-11
Crane Beam Design Jon No : www.civilbay.com Chk : Test
www.civilbay.com
Doc No : www.civilbay.com Date : 2013-03-06
Calculation Sheet Subject : Pilecap Design Examples Rev : 0

8 of 8
COLUMN TWO WAY SHEAR
A23.3-04
Factored single pile load Qpr = 1288 [kN] bc = 610 [mm]
Pile diameter dp = 300 [mm] hc = 410 [mm]
Pile edge distance ed = 600 [mm] bf = 2100 [mm]
Pilecap effective depth d = 1000 [mm] hf = 3000 [mm]

Ver Critical Shear Line


Dist from col face to pile edge dc = 295 [mm]
Fraction of pile outside critical line r1 = 0.00

Hor Critical Shear Line


Dist from col face to pile edge dc = 845 [mm]
Fraction of pile outside critical line r2 = 1.00

Factored shear force Vf = 5154 [kN]


Critical perimeter length bo = 2x(bc + d + hc + d) = 6040 [mm]

 2 
vc1 =  1   0 .19   c f 'c
 c 
= 1.586 [MPa] 13.3.4.1 (13-5)

 c = col length / col width = 1.49

 s d 
vc2 =   0 .19  λ  c f 'c = 3.034 [MPa] 13.3.4.1 (13-6)
 bo 

s = 4 for interior column

vc3 = 0 38   c f 'c = 1.353 [MPa] 13.3.4.1 (13-7)

vc = min( vc1 , vc2 , vc3 ) = 1.353 [MPa]


Vr = vc bo d = 8171 [kN]
> Vf OK

[Column One and Two Way Shear Is Adequate]


Anchor Bolt Design per ACI 318-11
CivilBay Crane Beam Design
www.civilbay.com

7-Pile Pilecap Design Example

Anchor Bolt Design per ACI 318-11


CivilBay Crane Beam Design
www.civilbay.com
Project : Anchor Bolt Design ACI 318-11 Crane Beam Design Eng : Test
Anchor Bolt Design ACI 318-11
Crane Beam Design Jon No : www.civilbay.com Chk : Test
www.civilbay.com
Doc No : www.civilbay.com Date : 2013-03-06
Calculation Sheet Subject : Pilecap Design Examples Rev : 0

1 of 7
DESCRIPTION
7 piles pilecap design based on Code Abbreviation
A23.3-04 Design of Concrete Structures A23.3-04

INPUT
Factored column load Pcf = 8750 [kN] Ver reinft. in 2xed width range
Column width bc = 740 [mm] As1 bar size = 20 300
Column length hc = 740 [mm] As1 bar No = 12
Pilecap width bf = 3000 [mm] As1 prov = 3450
Pilecap length hf = 2759 [mm] Equivalent to 20 @ 114
Pilecap thickness tf = 960 [mm]
Hor reinft. in 2xed width range
Pile diameter dp = 300 [mm] As2 bar size = 20 300
Pile spacing sp = 900 [mm] As2 bar No = 12
Pile edge distance ed = 600 [mm] As2 prov = 3450
Equivalent to 20 @ 114
Concrete strength f'c = 30 [MPa]
Rebar yield strength fy = 400 [MPa]

Concrete resistance factor  c = 0.65


Rebar resistance factor  s = 0.85
Low density conc factor  = 1.0

Backfill soil weight above cap Ws = 0 [kN]


Pilecap self weight W f = bf x hf x tf x 23.5 = 187 [kN]
Project : Anchor Bolt Design ACI 318-11 Crane Beam Design Eng : Test
Anchor Bolt Design ACI 318-11
Crane Beam Design Jon No : www.civilbay.com Chk : Test
www.civilbay.com
Doc No : www.civilbay.com Date : 2013-03-06
Calculation Sheet Subject : Pilecap Design Examples Rev : 0

2 of 7

Factored total pilecap load Pf = Pcf + W s + W f = 8983 [kN]


Pilecap effective depth d = tf - 1.5db -150 = 780 [mm]
Factored pile axial reaction Qpr = Pf / 7 = 1283 [kN]
Vertical Direction
Factored moment to column face Mf = 2 x Qpr x (0.866Sp - 0.5hc) = 1051 [kNm]
Factored shear to column face Vf = 2 x Qpr = 2567 [kN]
Horizontal Direction
Factored moment to column face Mf = 2Qpr 0.5(Sp-bc)+Qpr(Sp-0.5bc) = 886 [kNm]
Factored shear to column face Vf = 3 x Qpr = 3850 [kN]

CONCLUSION

[Pilecap Reinft by S&T Model Is NOT Adequate]

[Pilecap Reinft by Deep Beam Model Is NOT Adequate]

[Edge Pile Two Way Shear Is Adequate]

[Column One and Two Way Shear Is Adequate]


Project : Anchor Bolt Design ACI 318-11 Crane Beam Design Eng : Test
Anchor Bolt Design ACI 318-11
Crane Beam Design Jon No : www.civilbay.com Chk : Test
www.civilbay.com
Doc No : www.civilbay.com Date : 2013-03-06
Calculation Sheet Subject : Pilecap Design Examples Rev : 0

3 of 7
Code Reference
S&T AND BEARING STRESS LIMIT MODEL by Adebar
Column Bearing Stress
Ac = 5.5E+05 [mm 2] A2 = 8.3E+06 [mm 2]

 A2 
 = 0 .33   1  1 . 0 = 0.96
 A c 
 2d 
 = 0 . 33   1  1 . 0 = 0.37
 Ac 

Allowable stress fb =  c ( 0.6 f 'c  6  f 'c ) = 19.3 [MPa]


Column stress fcb = Pcf / (bc x hc) = 16.0 [MPa]
< fb OK
Pile Bearing Stress
Ap = 7.1E+04 [mm 2] A2 = 1.1E+06 [mm 2]

 A2 
 = 0 .33   1  1 . 0 = 1.00

 Ap 
d 
 = 0 . 33   1  1 .0 = 0.53

 dp 

Allowable stress fb =  c ( 0.6 f 'c  6  f 'c ) = 23.1 [MPa]


Pile stress fcb = Qpr / ( * dp2 /4) = 18.2 [MPa]
< fb OK
Required Reinft
b1 = 715 [mm]
Fh = b1 / d x Qpr = 1176 [kN]
As1 = Fh / ( s x fy) = 3460 [mm 2]
Asmin = 0.2% x bf x tf / 2 = 2880 [mm 2]
As1 = max ( As1, Asmin ) = 3460 [mm 2]
As1 prov = 3450 [mm 2]
< As1 NG

[Pilecap Reinft by S&T Model Is NOT Adequate]


Project : Anchor Bolt Design ACI 318-11 Crane Beam Design Eng : Test
Anchor Bolt Design ACI 318-11
Crane Beam Design Jon No : www.civilbay.com Chk : Test
www.civilbay.com
Doc No : www.civilbay.com Date : 2013-03-06
Calculation Sheet Subject : Pilecap Design Examples Rev : 0

4 of 7
REDUCED LEVER ARM MODEL by Park and Paulay

Vertical Direction
dVf / Mf = 1.91 >1.0 -> pilecap acts as deep beam
dVf / Mf < 2.0 Mf / Vf = 409 [mm]
z = 0.4(d + Mf / Vf ) for dVf / Mf >=1.0 = 476 [mm]
1.2 Mf / Vf for dV f / Mf >=2.0
Asver = Mf / ( s fy z ) = 6496 [mm 2]
Asmin = 0.2% x bf x tf = 5760 [mm 2]
Asver = max ( Asver, Asmin ) = 6496 [mm 2]
As prov = = 7350 [mm 2]
> Asver OK
Horizontal Direction
dVf / Mf = 3.39 >1.0 -> pilecap acts as deep beam
dVf / Mf > 2.0 Mf / Vf = 230 [mm]
z = 0.4(d + Mf / Vf ) for dVf / Mf >=1.0 = 276 [mm]
1.2 Mf / Vf for dV f / Mf >=2.0
Ashor = Mf / ( s fy z ) = 9436 [mm 2]
Asmin = 0.2% x hf x tf = 5297 [mm 2]
Ashor = max ( Ashor, Asmin ) = 9436 [mm 2]
As prov = = 6717 [mm 2]
< Ashor NG

[Deep Beam Model Is Applicable]

[Pilecap Reinft by Deep Beam Model Is NOT Adequate]


Project : Anchor Bolt Design ACI 318-11 Crane Beam Design Eng : Test
Anchor Bolt Design ACI 318-11
Crane Beam Design Jon No :www.civilbay.com Chk : Test
www.civilbay.com
Doc No : www.civilbay.com Date : 2013-03-06
Calculation Sheet Subject : Pilecap Design Examples Rev : 0

5 of 7
EDGE PILE TWO WAY SHEAR Code Reference
A23.3-04
Factored pile load Vf = 1283 [kN]
Pile diameter dp = 300 [mm]
Pile edge distance ed = 600 [mm] ec = 450 [mm]
Pilecap effective depth d = 780 [mm] d/2 = 390 [mm]
Dist from pile edge to col corner dc = 380 [mm] dc + 50 = 430 [mm]
> d/2
Critical shear line doesn't intersect column, one way shear shall be checked
 = 0.0
Critical perimeter length bo =  (dp + d) (360-2)/360 = 3393 [mm]

 2 
vc1 =  1   0 .19   c f 'c
 c 
= 2.029 [MPa] 13.3.4.1 (13-5)

 c = width / length = 1 for pile

 s d 
vc2 =   0 .19  λ  c f 'c = 3.132 [MPa] 13.3.4.1 (13-6)
 bo 

 s = 3 for edge pile

vc3 = 0 38   c f 'c = 1.353 [MPa] 13.3.4.1 (13-7)

vc = min( vc1 , vc2 , vc3 ) = 1.353 [MPa]


Vr = vc bo d = 3580 [kN]
> Vf OK

[Edge Pile Two Way Shear Is Adequate]


Project : Anchor Bolt Design ACI 318-11 Crane Beam Design Eng : Test
Anchor Bolt Design ACI 318-11
Crane Beam Design Jon No : www.civilbay.com Chk : Test
www.civilbay.com
Doc No : www.civilbay.com Date : 2013-03-06
Calculation Sheet Subject : Pilecap Design Examples Rev : 0

6 of 7
COLUMN ONE WAY SHEAR
Factored single pile load Qpr = 1283 [kN] bc = 740 [mm]
Pile diameter dp = 300 [mm] hc = 740 [mm]
Pile edge distance ed = 600 [mm] bf = 3000 [mm]
Pilecap effective depth d = 780 [mm] hf = 2759 [mm]
Ver Critical Shear Line
Dist from col face to pile edge dc1 = 230 [mm] dc2 = 680 [mm]
Fraction of pile outside critical line r1 = 0.00 r2 = 0.00
Factored shear force Vf = (2r1 + r2) Qpr = 0 [kN]
bw = hf = 2759 [mm]
When no transverse reinft.  = 230 / (1000 + d) = 0.129 11.3.6.3 Eq (11-9)

Vc =  c    fc b w d
'
= 990 [kN] 11.3.4 Eq (11-6)
> Vf OK
Hor Critical Shear Line
Dist from col face to pile edge dc = 559 [mm]
Fraction of pile outside critical line r = 0.00
Factored shear force Vf = r x 2 x Qpr = 0 [kN]
bw = bf = 3000 [mm]
When no transverse reinft.  = 230 / (1000 + d) = 0.129 11.3.6.3 Eq (11-9)

Vc =  c    fc b w d
'
= 1076 [kN] 11.3.4 Eq (11-6)
> Vf OK
Project : Anchor Bolt Design ACI 318-11 Crane Beam Design Eng : Test
Anchor Bolt Design ACI 318-11
Crane Beam Design Jon No : www.civilbay.com Chk : Test
www.civilbay.com
Doc No : www.civilbay.com Date : 2013-03-06
Calculation Sheet Subject : Pilecap Design Examples Rev : 0

7 of 7
COLUMN TWO WAY SHEAR
A23.3-04
Factored single pile load Qpr = 1283 [kN] bc = 740 [mm]
Pile diameter dp = 300 [mm] hc = 740 [mm]
Pile edge distance ed = 600 [mm] bf = 3000 [mm]
Pilecap effective depth d = 780 [mm] hf = 2759 [mm]

Ver Critical Shear Line


Dist from col face to pile edge dc = 230 [mm] dc = 680 [mm]
Fraction of pile outside critical line r1 = 0.00 r2 = 0.97

Hor Critical Shear Line


Dist from col face to pile edge dc = 559 [mm]
Fraction of pile outside critical line r3 = 0.56

Factored shear force Vf = 5380 [kN]


Critical perimeter length bo = 2x(bc + d + hc + d) = 6080 [mm]

 2 
vc1 =  1   0 .19   c f 'c
 c 
= 2.029 [MPa] 13.3.4.1 (13-5)

 c = col length / col width = 1.0

 s d 
vc2 =   0 .19  λ  c f 'c = 2.503 [MPa] 13.3.4.1 (13-6)
 bo 

s = 4 for interior column

vc3 = 0 38   c f 'c = 1.353 [MPa] 13.3.4.1 (13-7)

vc = min( vc1 , vc2 , vc3 ) = 1.353 [MPa]


Vr = vc bo d = 6416 [kN]
> Vf OK

[Column One and Two Way Shear Is Adequate]


Anchor Bolt Design per ACI 318-11
CivilBay Crane Beam Design
www.civilbay.com

8-Pile Pilecap Design Example

Anchor Bolt Design per ACI 318-11


CivilBay Crane Beam Design
www.civilbay.com
Project : Anchor Bolt Design ACI 318-11 Crane Beam Design Eng : Test
Anchor Bolt Design ACI 318-11
Crane Beam Design Jon No : www.civilbay.com Chk : Test
www.civilbay.com
Doc No : www.civilbay.com Date : 2013-03-06
Calculation Sheet Subject : Pilecap Design Examples Rev : 0

1 of 8
DESCRIPTION
8 piles pilecap design based on Code Abbreviation
A23.3-04 Design of Concrete Structures A23.3-04

INPUT
Factored column load Pcf = 8000 [kN] Ver. reinft.
Column width bc = 930 [mm] As1 bar size = 20 300
Column length hc = 620 [mm] As1 bar No = 7
Pilecap width bf = 2500 [mm] As1 prov = 2100
Pilecap length hf = 2299 [mm] Equivalent to 20 @ 167
Pilecap thickness tf = 900 [mm]
Hor. reinft.
Pile diameter dp = 250 [mm] As2 bar size = 20 300
Pile spacing sp = 750 [mm] As2 bar No = 8
Pile edge distance ed = 500 [mm] As2 prov = 2400
Equivalent to 20 @ 143
Concrete strength f'c = 30 [MPa]
Rebar yield strength fy = 400 [MPa]

Concrete resistance factor  c = 0.65


Rebar resistance factor  s = 0.85
Low density conc factor  = 1.0

Backfill soil weight above cap Ws = 0 [kN]


Pilecap self weight W f = bf x hf x tf x 23.5 = 122 [kN]
Project : Anchor Bolt Design ACI 318-11 Crane Beam Design Eng : Test
Anchor Bolt Design ACI 318-11
Crane Beam Design Jon No :www.civilbay.com Chk : Test
www.civilbay.com
Doc No : www.civilbay.com Date : 2013-03-06
Calculation Sheet Subject : Pilecap Design Examples Rev : 0

2 of 8

Factored total pilecap load Pf = Pcf + W s + W f = 8152 [kN]


Pilecap effective depth d = tf - 1.5db -150 = 720 [mm]
Factored pile axial reaction Qpr = Pf / 8 = 1019 [kN]
Vertical Direction
Factored moment to column face Mf = 3 x Qpr x (0.866Sp - 0.5hc) = 1038 [kNm]
Factored shear to column face Vf = 3 x Qpr = 3057 [kN]
Horizontal Direction
Factored moment to column face Mf = 2Qpr (Sp-0.5bc)+Qpr0.5(Sp-bc) = 489 [kNm]
Factored shear to column face Vf = 3 x Qpr = 3057 [kN]

CONCLUSION

[Pilecap Reinft by S&T Model Is Adequate]

[Pilecap Reinft by Deep Beam Model Is NOT Adequate]

[Pile One and Two Way Shear Is NOT Adequate]

[Column One and Two Way Shear Is Adequate]


Project : Anchor Bolt Design ACI 318-11 Crane Beam Design Eng : Test
Anchor Bolt Design ACI 318-11
Crane Beam Design Jon No :www.civilbay.com Chk : Test
www.civilbay.com
Doc No : www.civilbay.com Date : 2013-03-06
Calculation Sheet Subject : Pilecap Design Examples Rev : 0

3 of 8
Code Reference
S&T AND BEARING STRESS LIMIT MODEL by Adebar
Column Bearing Stress
Ac = 5.8E+05 [mm 2] A2 = 5.7E+06 [mm 2]

 A2 
 = 0 .33   1  1 . 0 = 0.72
 A c 
 2d 
 = 0 . 33   1  1 . 0 = 0.30
 Ac 

Allowable stress fb =  c ( 0.6 f 'c  6  f 'c ) = 16.3 [MPa]


Column stress fcb = Pcf / (bc x hc) = 13.9 [MPa]
< fb OK
Pile Bearing Stress
Ap = 4.9E+04 [mm 2] A2 = 7.9E+05 [mm 2]

 A2 
 = 0 .33   1  1 . 0 = 1.00

 Ap 
d 
 = 0 . 33   1  1 .0 = 0.63

 dp 

Allowable stress fb =  c ( 0.6 f 'c  6  f 'c ) = 25.1 [MPa]


Pile stress fcb = Qpr / ( * dp2 /4) = 20.8 [MPa]
< fb OK
Required Reinft
b1 = 518 [mm] h1 = 495 [mm]
l = sqrt( b12 + h12) = 716 [mm]
Fh = l / d x Qpr = 1013 [kN]
Ver. Reinft.
FT1 = h1 / l x Fh = 700 [kN]
As1 = FT1 / ( s x fy) = 2058 [mm 2]
Asmin = 0.2% x bf x tf / 3 = 1500 [mm 2]
As1 = max ( As1, Asmin ) = 2058 [mm 2]
As1 prov = 2100 [mm 2]
> As1 OK
Hor. Reinft.
FT2 = b1 / l x Fh = 732 [kN]
As2 = FT2 / ( s x fy) = 2154 [mm 2]
Asmin = 0.2% x hf x tf / 2.4 = 1724 [mm 2]
As2 = max ( As1, Asmin ) = 2154 [mm 2]
As2 prov = 2400 [mm 2]
> As2 OK

[Pilecap Reinft by S&T Model Is Adequate]


Project : Anchor Bolt Design ACI 318-11 Crane Beam Design Eng : Test
Anchor Bolt Design ACI 318-11
Crane Beam Design Jon No : www.civilbay.com Chk : Test
www.civilbay.com
Doc No : www.civilbay.com Date : 2013-03-06
Calculation Sheet Subject : Pilecap Design Examples Rev : 0

4 of 8
REDUCED LEVER ARM MODEL by Park and Paulay

Vertical Direction
dVf / Mf = 2.12 >1.0 -> pilecap acts as deep beam
dVf / Mf > 2.0 Mf / Vf = 340 [mm]
z = 0.4(d + Mf / Vf ) for dVf / Mf >=1.0 = 407 [mm]
1.2 Mf / Vf for dV f / Mf >=2.0
Asver = Mf / ( s fy z ) = 7493 [mm 2]
Asmin = 0.2% x bf x tf = 4500 [mm 2]
Asver = max ( Asver, Asmin ) = 7493 [mm 2]
As prov = = 4140 [mm 2]
< Asver NG
Horizontal Direction
dVf / Mf = 4.50 >1.0 -> pilecap acts as deep beam
dVf / Mf > 2.0 Mf / Vf = 160 [mm]
z = 0.4(d + Mf / Vf ) for dVf / Mf >=1.0 = 192 [mm]
1.2 Mf / Vf for dV f / Mf >=2.0
Ashor = Mf / ( s fy z ) = 7493 [mm 2]
Asmin = 0.2% x hf x tf = 4138 [mm 2]
Ashor = max ( Ashor, Asmin ) = 7493 [mm 2]
As prov = = 4408 [mm 2]
< Ashor NG

[Deep Beam Model Is Applicable]

[Pilecap Reinft by Deep Beam Model Is NOT Adequate]


Project : Anchor Bolt Design ACI 318-11 Crane Beam Design Eng : Test
Anchor Bolt Design ACI 318-11
Crane Beam Design Jon No :www.civilbay.com Chk : Test
www.civilbay.com
Doc No : www.civilbay.com Date : 2013-03-06
Calculation Sheet Subject : Pilecap Design Examples Rev : 0

5 of 8
CORNER PILE ONE WAY SHEAR Code Reference
A23.3-04
Factored pile load Vf = 1019 [kN]
Pile diameter dp = 250 [mm]
Pile edge distance ed = 500 [mm] ec = 375 [mm]
Pilecap effective depth d = 720 [mm] d/2 = 360 [mm]
Dist from pile edge to col corner dc = 318 [mm] dc + 50 = 368 [mm]
> d/2
Critical shear line doesn't intersect column, one way shear shall be checked
sqrt(f'c ) = min ( sqrt(fc') , 8 ) = 5.477 [MPa] 11.3.4
min( d, 1.414 ec ) = 530 [mm] bw = 2384 [mm]
When no transverse reinft.  = 230 / (1000 + d) = 0.134 11.3.6.3 Eq (11-9)

Vc =  c    fc b w d
'
= 817 [kN] 11.3.4 Eq (11-6)
< Vf NG

CORNER PILE TWO WAY SHEAR

Factored pile load Vf = 1019 [kN]


Pile diameter dp = 250 [mm]
Pile edge distance ed = 500 [mm] ec = 375 [mm]
Pilecap effective depth d = 720 [mm] d/2 = 360 [mm]
Dist from pile edge to col corner dc = 318 [mm] dc + 50 = 368 [mm]
> d/2
Critical shear line doesn't intersect column, one way shear shall be checked
 = 0.0
Critical perimeter length bo =  (dp + d) (270-2)/360 = 2286 [mm]

 2 
vc1 =  1   0 .19   c f 'c
 c 
= 2.029 [MPa] 13.3.4.1 (13-5)

 c = width / length = 1 for pile

 s d 
vc2 =   0 .19  λ  c f 'c = 2.920 [MPa] 13.3.4.1 (13-6)
 bo 

 s = 2 for corner pile

vc3 = 0 38   c f 'c = 1.353 [MPa] 13.3.4.1 (13-7)


vc = min( vc1 , vc2 , vc3 ) = 1.353 [MPa]
Vc = vc bo d = 2226 [kN]
> Vf OK
Project : Anchor Bolt Design ACI 318-11 Crane Beam Design Eng : Test
Anchor Bolt Design ACI 318-11
Crane Beam Design Jon No : www.civilbay.com Chk : Test
www.civilbay.com
Doc No : www.civilbay.com Date : 2013-03-06
Calculation Sheet Subject : Pilecap Design Examples Rev : 0

6 of 8
EDGE PILE TWO WAY SHEAR

Factored pile load Vf = 1019 [kN]


Pile diameter dp = 250 [mm]
Pile edge distance ed = 500 [mm] ec = 375 [mm]
Pilecap effective depth d = 720 [mm] d/2 = 360 [mm]
Dist from pile edge to col corner dc = 215 [mm] dc + 50 = 265 [mm]
< d/2
Critical shear line intersect column, one way shear needs NOT to be checked
 = 0.0
Critical perimeter length bo =  (dp + d) (360-2)/360 = 3047 [mm]
A23.3-04
 2 
vc1 =  1   0 .19   c f 'c
 c 
= 2.029 [MPa] 13.3.4.1 (13-5)

 c = width / length = 1 for pile

 s d 
vc2 =   0 .19  λ  c f 'c = 3.200 [MPa] 13.3.4.1 (13-6)
 bo 

 s = 3 for edge pile

vc3 = 0 38   c f 'c = 1.353 [MPa] 13.3.4.1 (13-7)

vc = min( vc1 , vc2 , vc3 ) = 1.353 [MPa]


Vr = vc bo d = 2968 [kN]
> Vf OK

[Pile One and Two Way Shear Is NOT Adequate]


Project : Anchor Bolt Design ACI 318-11 Crane Beam Design Eng : Test
Anchor Bolt Design ACI 318-11
Crane Beam Design Jon No : www.civilbay.com Chk : Test
www.civilbay.com
Doc No : www.civilbay.com Date : 2013-03-06
Calculation Sheet Subject : Pilecap Design Examples Rev : 0

7 of 8
COLUMN ONE WAY SHEAR
Factored single pile load Qpr = 1019 [kN] bc = 930 [mm]
Pile diameter dp = 250 [mm] hc = 620 [mm]
Pile edge distance ed = 500 [mm] bf = 2500 [mm]
Pilecap effective depth d = 720 [mm] hf = 2299 [mm]
Ver Critical Shear Line
Dist from col face to pile edge dc1 = 410 [mm] dc2 = 35 [mm]
Fraction of pile outside critical line r1 = 0.00 r2 = 0.00
Factored shear force Vf = (2r1+r2) x Qpr = 0 [kN]
bw = hf = 2299 [mm]
When no transverse reinft.  = 230 / (1000 + d) = 0.134 11.3.6.3 Eq (11-9)

Vc =  c    fc b w d
'
= 788 [kN] 11.3.4 Eq (11-6)
> Vf OK
Hor Critical Shear Line
Dist from col face to pile edge dc = 465 [mm]
Fraction of pile outside critical line r = 0.00
Factored shear force Vf = r x 3Qpr = 0 [kN]
bw = bf = 2500 [mm]
When no transverse reinft.  = 230 / (1000 + d) = 0.134 11.3.6.3 Eq (11-9)

Vc =  c    fc b w d
'
= 857 [kN] 11.3.4 Eq (11-6)
> Vf OK
Project : Anchor Bolt Design ACI 318-11 Crane Beam Design Eng : Test
Anchor Bolt Design ACI 318-11
Crane Beam Design Jon No : www.civilbay.com Chk : Test
www.civilbay.com
Doc No : www.civilbay.com Date : 2013-03-06
Calculation Sheet Subject : Pilecap Design Examples Rev : 0

8 of 8
COLUMN TWO WAY SHEAR
A23.3-04
Factored single pile load Qpr = 1019 [kN] bc = 930 [mm]
Pile diameter dp = 250 [mm] hc = 620 [mm]
Pile edge distance ed = 500 [mm] bf = 2500 [mm]
Pilecap effective depth d = 720 [mm] hf = 2299 [mm]

Ver Critical Shear Line


Dist from col face to pile edge dc = 410 [mm]
Fraction of pile outside critical line r1 = 0.20

Hor Critical Shear Line


Dist from col face to pile edge dc = 465 [mm]
Fraction of pile outside critical line r2 = 0.42

Factored shear force Vf = 3030 [kN]


Critical perimeter length bo = 2x(bc + d + hc + d) = 5980 [mm]

 2 
vc1 =  1   0 .19   c f 'c
 c 
= 1.578 [MPa] 13.3.4.1 (13-5)

 c = col length / col width = 1.50

 s d 
vc2 =   0 .19  λ  c f 'c = 2.391 [MPa] 13.3.4.1 (13-6)
 bo 

s = 4 for interior column

vc3 = 0 38   c f 'c = 1.353 [MPa] 13.3.4.1 (13-7)

vc = min( vc1 , vc2 , vc3 ) = 1.353 [MPa]


Vr = vc bo d = 5825 [kN]
> Vf OK

[Column One and Two Way Shear Is Adequate]


Anchor Bolt Design per ACI 318-11
CivilBay Crane Beam Design
www.civilbay.com

9-Pile Pilecap Design Example

Anchor Bolt Design per ACI 318-11


CivilBay Crane Beam Design
www.civilbay.com
Project : Anchor Bolt Design ACI 318-11 Crane Beam Design Eng : Test
Anchor Bolt Design ACI 318-11
Crane Beam Design Jon No : www.civilbay.com Chk : Test
www.civilbay.com
Doc No : www.civilbay.com Date : 2013-03-06
Calculation Sheet Subject : Pilecap Design Examples Rev : 0

1 of 8
DESCRIPTION
9 piles pilecap design based on Code Abbreviation
A23.3-04 Design of Concrete Structures A23.3-04

INPUT
Factored column load Pcf = 9000 [kN] Ver. reinft.
Column width bc = 750 [mm] As1 bar size = 20 300
Column length hc = 750 [mm] As1 bar No = 8
Pilecap width bf = 2500 [mm] As1 prov = 2400
Pilecap length hf = 2500 [mm] Equivalent to 20 @ 143
Pilecap thickness tf = 1060 [mm]
Hor. reinft.
Pile diameter dp = 250 [mm] As2 bar size = 20 300
Pile spacing sp = 750 [mm] As2 bar No = 8
Pile edge distance ed = 500 [mm] As2 prov = 2400
Equivalent to 20 @ 143
Concrete strength f'c = 30 [MPa]
Rebar yield strength fy = 400 [MPa]

Concrete resistance factor  c = 0.65


Rebar resistance factor  s = 0.85
Low density conc factor  = 1.0

Backfill soil weight above cap Ws = 0 [kN]


Pilecap self weight W f = bf x hf x tf x 23.5 = 156 [kN]
Project : Anchor Bolt Design ACI 318-11 Crane Beam Design Eng : Test
Anchor Bolt Design ACI 318-11
Crane Beam Design Jon No :www.civilbay.com Chk : Test
www.civilbay.com
Doc No : www.civilbay.com Date : 2013-03-06
Calculation Sheet Subject : Pilecap Design Examples Rev : 0

2 of 8

Factored total pilecap load Pf = Pcf + W s + W f = 9195 [kN]


Pilecap effective depth d = tf - 1.5db -150 = 880 [mm]
Factored pile axial reaction Qpr = Pf / 9 = 1022 [kN]
Vertical Direction
Factored moment to column face Mf = 3Qpr x (Sp - 0.5hc) = 1149 [kNm]
Factored shear to column face Vf = 3 x Qpr = 3065 [kN]
Horizontal Direction
Factored moment to column face Mf = 3Qpr x (Sp - 0.5bc) = 1149 [kNm]
Factored shear to column face Vf = 3 x Qpr = 3065 [kN]

CONCLUSION

[Pilecap Reinft by S&T Model Is Adequate]

[Pilecap Reinft by Deep Beam Model Is NOT Adequate]

[Pile One and Two Way Shear Is NOT Adequate]

[Column One and Two Way Shear Is Adequate]


Project : Anchor Bolt Design ACI 318-11 Crane Beam Design Eng : Test
Anchor Bolt Design ACI 318-11
Crane Beam Design Jon No :www.civilbay.com Chk : Test
www.civilbay.com
Doc No : www.civilbay.com Date : 2013-03-06
Calculation Sheet Subject : Pilecap Design Examples Rev : 0

3 of 8
Code Reference
S&T AND BEARING STRESS LIMIT MODEL by Adebar
Column Bearing Stress
Ac = 5.6E+05 [mm 2] A2 = 6.3E+06 [mm 2]

 A2 
 = 0 .33   1  1 . 0 = 0.78
 A c 
 2d 
 = 0 . 33   1  1 . 0 = 0.45
 Ac 

Allowable stress fb =  c ( 0.6 f 'c  6  f 'c ) = 19.2 [MPa]


Column stress fcb = Pcf / (bc x hc) = 16.0 [MPa]
< fb OK
Pile Bearing Stress
Ap = 4.9E+04 [mm 2] A2 = 7.9E+05 [mm 2]

 A2 
 = 0 .33   1  1 . 0 = 1.00

 Ap 
d 
 = 0 . 33   1  1 .0 = 0.84

 dp 

Allowable stress fb =  c ( 0.6 f 'c  6  f 'c ) = 29.6 [MPa]


Pile stress fcb = Qpr / ( * dp2 /4) = 20.8 [MPa]
< fb OK
Required Reinft
b1 = 563 [mm] h1 = 563 [mm]
l = sqrt( b12 + h12) = 795 [mm]
Fh = l / d x Qpr = 924 [kN]
Ver. Reinft.
FT1 = h1 / l x Fh = 653 [kN]
As1 = FT1 / ( s x fy) = 1921 [mm 2]
Asmin = 0.2% x bf x tf / 3 = 1767 [mm 2]
As1 = max ( As1, Asmin ) = 1921 [mm 2]
As1 prov = 2400 [mm 2]
> As1 OK
Hor. Reinft.
FT2 = b1 / l x Fh = 653 [kN]
As2 = FT2 / ( s x fy) = 1921 [mm 2]
Asmin = 0.2% x hf x tf / 3 = 1767 [mm 2]
As2 = max ( As1, Asmin ) = 1921 [mm 2]
As2 prov = 2400 [mm 2]
> As2 OK

[Pilecap Reinft by S&T Model Is Adequate]


Project : Anchor Bolt Design ACI 318-11 Crane Beam Design Eng : Test
Anchor Bolt Design ACI 318-11
Crane Beam Design Jon No : www.civilbay.com Chk : Test
www.civilbay.com
Doc No : www.civilbay.com Date : 2013-03-06
Calculation Sheet Subject : Pilecap Design Examples Rev : 0

4 of 8
REDUCED LEVER ARM MODEL by Park and Paulay

Vertical Direction
dVf / Mf = 2.35 >1.0 -> pilecap acts as deep beam
dVf / Mf > 2.0 Mf / Vf = 375 [mm]
z = 0.4(d + Mf / Vf ) for dVf / Mf >=1.0 = 450 [mm]
1.2 Mf / Vf for dV f / Mf >=2.0
Asver = Mf / ( s fy z ) = 7512 [mm 2]
Asmin = 0.2% x bf x tf = 5300 [mm 2]
Asver = max ( Asver, Asmin ) = 7512 [mm 2]
As prov = = 4830 [mm 2]
< Asver NG
Horizontal Direction
dVf / Mf = 2.35 >1.0 -> pilecap acts as deep beam
dVf / Mf > 2.0 Mf / Vf = 375 [mm]
z = 0.4(d + Mf / Vf ) for dVf / Mf >=1.0 = 450 [mm]
1.2 Mf / Vf for dV f / Mf >=2.0
Ashor = Mf / ( s fy z ) = 7512 [mm 2]
Asmin = 0.2% x hf x tf = 5300 [mm 2]
Ashor = max ( Ashor, Asmin ) = 7512 [mm 2]
As prov = = 4830 [mm 2]
< Ashor NG

[Deep Beam Model Is Applicable]

[Pilecap Reinft by Deep Beam Model Is NOT Adequate]


Project : Anchor Bolt Design ACI 318-11 Crane Beam Design Eng : Test
Anchor Bolt Design ACI 318-11
Crane Beam Design Jon No :www.civilbay.com Chk : Test
www.civilbay.com
Doc No : www.civilbay.com Date : 2013-03-06
Calculation Sheet Subject : Pilecap Design Examples Rev : 0

5 of 8
CORNER PILE ONE WAY SHEAR Code Reference
A23.3-04
Factored pile load Vf = 1022 [kN]
Pile diameter dp = 250 [mm]
Pile edge distance ed = 500 [mm] ec = 375 [mm]
Pilecap effective depth d = 880 [mm] d/2 = 440 [mm]
Dist from pile edge to col corner dc = 405 [mm] dc + 50 = 455 [mm]
> d/2
Critical shear line doesn't intersect column, one way shear shall be checked
sqrt(f'c ) = min ( sqrt(fc') , 8 ) = 5.477 [MPa] 11.3.4
min( d, 1.414 ec ) = 530 [mm] bw = 2544 [mm]
When no transverse reinft.  = 230 / (1000 + d) = 0.122 11.3.6.3 Eq (11-9)

Vc =  c    fc b w d
'
= 975 [kN] 11.3.4 Eq (11-6)
< Vf NG

CORNER PILE TWO WAY SHEAR

Factored pile load Vf = 1022 [kN]


Pile diameter dp = 250 [mm]
Pile edge distance ed = 500 [mm] ec = 375 [mm]
Pilecap effective depth d = 880 [mm] d/2 = 440 [mm]
Dist from pile edge to col corner dc = 405 [mm] dc + 50 = 455 [mm]
> d/2
Critical shear line doesn't intersect column, one way shear shall be checked
 = 27.8
Critical perimeter length bo =  (dp + d) (270-2)/360 = 2115 [mm]

 2 
vc1 =  1   0 .19   c f 'c
 c 
= 2.029 [MPa] 13.3.4.1 (13-5)

 c = width / length = 1 for pile

 s d 
vc2 =   0 .19  λ  c f 'c = 3.639 [MPa] 13.3.4.1 (13-6)
 bo 

 s = 2 for corner pile

vc3 = 0 38   c f 'c = 1.353 [MPa] 13.3.4.1 (13-7)


vc = min( vc1 , vc2 , vc3 ) = 1.353 [MPa]
Vc = vc bo d = 2518 [kN]
> Vf OK
Project : Anchor Bolt Design ACI 318-11 Crane Beam Design Eng : Test
Anchor Bolt Design ACI 318-11
Crane Beam Design Jon No : www.civilbay.com Chk : Test
www.civilbay.com
Doc No : www.civilbay.com Date : 2013-03-06
Calculation Sheet Subject : Pilecap Design Examples Rev : 0

6 of 8
EDGE PILE TWO WAY SHEAR

Factored pile load Vf = 1022 [kN]


Pile diameter dp = 250 [mm]
Pile edge distance ed = 500 [mm] ec = 375 [mm]
Pilecap effective depth d = 880 [mm] d/2 = 440 [mm]
Dist from pile edge to col corner dc = 250 [mm] dc + 50 = 300 [mm]
< d/2
Critical shear line intersect column, one way shear needs NOT to be checked
 = 27.8
Critical perimeter length bo =  (dp + d) (360-2)/360 = 3003 [mm]
A23.3-04
 2 
vc1 =  1   0 .19   c f 'c
 c 
= 2.029 [MPa] 13.3.4.1 (13-5)

 c = width / length = 1 for pile

 s d 
vc2 =   0 .19  λ  c f 'c = 3.807 [MPa] 13.3.4.1 (13-6)
 bo 

 s = 3 for edge pile

vc3 = 0 38   c f 'c = 1.353 [MPa] 13.3.4.1 (13-7)

vc = min( vc1 , vc2 , vc3 ) = 1.353 [MPa]


Vr = vc bo d = 3575 [kN]
> Vf OK

[Pile One and Two Way Shear Is NOT Adequate]


Project : Anchor Bolt Design ACI 318-11 Crane Beam Design Eng : Test
Anchor Bolt Design ACI 318-11
Crane Beam Design Jon No : www.civilbay.com Chk : Test
www.civilbay.com
Doc No : www.civilbay.com Date : 2013-03-06
Calculation Sheet Subject : Pilecap Design Examples Rev : 0

7 of 8
COLUMN ONE WAY SHEAR
Factored single pile load Qpr = 1022 [kN] bc = 750 [mm]
Pile diameter dp = 250 [mm] hc = 750 [mm]
Pile edge distance ed = 500 [mm] bf = 2500 [mm]
Pilecap effective depth d = 880 [mm] hf = 2500 [mm]
Ver Critical Shear Line
Dist from col face to pile edge dc1 = 500 [mm]
Fraction of pile outside critical line r1 = 0.00
Factored shear force Vf = r1 x 3Qpr = 0 [kN]
bw = hf = 2500 [mm]
When no transverse reinft.  = 230 / (1000 + d) = 0.122 11.3.6.3 Eq (11-9)

Vc =  c    fc b w d
'
= 958 [kN] 11.3.4 Eq (11-6)
> Vf OK
Hor Critical Shear Line
Dist from col face to pile edge dc = 500 [mm]
Fraction of pile outside critical line r = 0.00
Factored shear force Vf = r x 3Qpr = 0 [kN]
bw = bf = 2500 [mm]
When no transverse reinft.  = 230 / (1000 + d) = 0.122 11.3.6.3 Eq (11-9)

Vc =  c    fc b w d
'
= 958 [kN] 11.3.4 Eq (11-6)
> Vf OK
Project : Anchor Bolt Design ACI 318-11 Crane Beam Design Eng : Test
Anchor Bolt Design ACI 318-11
Crane Beam Design Jon No : www.civilbay.com Chk : Test
www.civilbay.com
Doc No : www.civilbay.com Date : 2013-03-06
Calculation Sheet Subject : Pilecap Design Examples Rev : 0

8 of 8
COLUMN TWO WAY SHEAR
A23.3-04
Factored single pile load Qpr = 1022 [kN] bc = 750 [mm]
Pile diameter dp = 250 [mm] hc = 750 [mm]
Pile edge distance ed = 500 [mm] bf = 2500 [mm]
Pilecap effective depth d = 880 [mm] hf = 2500 [mm]

Ver Critical Shear Line


Dist from col face to pile edge dc = 500 [mm]
Fraction of pile outside critical line r1 = 0.24

Hor Critical Shear Line


Dist from col face to pile edge dc = 500 [mm]
Fraction of pile outside critical line r2 = 0.24

Factored shear force Vf = 2707 [kN]


Critical perimeter length bo = 2x(bc + d + hc + d) = 6520 [mm]

 2 
vc1 =  1   0 .19   c f 'c
 c 
= 2.029 [MPa] 13.3.4.1 (13-5)

 c = col length / col width = 1.00

 s d 
vc2 =   0 .19  λ  c f 'c = 2.599 [MPa] 13.3.4.1 (13-6)
 bo 

s = 4 for interior column

vc3 = 0 38   c f 'c = 1.353 [MPa] 13.3.4.1 (13-7)

vc = min( vc1 , vc2 , vc3 ) = 1.353 [MPa]


Vr = vc bo d = 7762 [kN]
> Vf OK

[Column One and Two Way Shear Is Adequate]