0% found this document useful (0 votes)
19 views1 page

Breakdown/Repair Report: Midway Maritime Foundation

The document is a breakdown/repair report for a maritime property. It lists findings such as issues found with the property and recommendations for repairs. It also documents the subsequent actions taken to repair the property, including who repaired and received the property. The inspected signs off on the initial report and it is then reported to another party and later repaired by a technician and received by someone else.

Uploaded by

Joey De la Cruz
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
19 views1 page

Breakdown/Repair Report: Midway Maritime Foundation

The document is a breakdown/repair report for a maritime property. It lists findings such as issues found with the property and recommendations for repairs. It also documents the subsequent actions taken to repair the property, including who repaired and received the property. The inspected signs off on the initial report and it is then reported to another party and later repaired by a technician and received by someone else.

Uploaded by

Joey De la Cruz
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 1

MADM#15 MIDWAY MARITIME FOUNDATION

Issue#1/Rev. 0/06.21.14
Page 1 of 1 Cabanatuan City

BREAKDOWN/REPAIR REPORT
Property ID Number : _________________________________
Property Name : _________________________________
Location : _________________________________

FINDINGS: RECOMMENDATION:
_____________________________________________ _____________________________________________
_____________________________________________ _____________________________________________
_____________________________________________ _____________________________________________
_____________________________________________ _____________________________________________

Inspected by: __________________ Date: _______ Reported to: __________________ Date: _______

SUBSEQUENT ACTION TAKEN: REMARKS:


_____________________________________________ _____________________________________________
_____________________________________________ _____________________________________________
_____________________________________________ _____________________________________________
_____________________________________________ _____________________________________________

Repaired by: __________________ Date: _______ Received by: __________________ Date: _______

You might also like